Ballastless track slab built-in pre-tensile stress steel bar dismounting device

By designing a built-in pre-stressed steel bar disassembly device on the ballastless track slab and using the energy induction channel, energy-absorbing inner cavity and energy-transmitting piston to absorb the impact energy, the safety risk problem of large impact energy during the disassembly of the pre-stressed steel bars is solved. Safe steel bar removal and inspection is achieved.

CN221781881UActive Publication Date: 2024-09-27SHANGHAI UNIV OF ENG SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323318718.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-06
Publication Date
2024-09-27
Estimated Expiration
2033-12-06

AI Technical Summary

Technical Problem

During the disassembly process of the pre-stressed steel bars of the ballastless track slab, the sharp ejection of the steel bars resulted in large impact energy, posing safety risks and affecting the safety of surrounding workers.

Method used

A device for removing pre-stressed steel bars built into the ballastless track slab is designed, which includes a device base, a force-unloading module and a delivery module. The unloading module has an energy induction channel, an energy-absorbing inner cavity, an energy-absorbing plastic body and an energy-transmitting piston inside. , absorbs impact energy through plastic deformation, and further weakens the impact energy through buffer springs and rough surfaces.

Benefits of technology

It effectively weakens the impact energy when the pre-stressed steel bars pop out, reduces the safety risks to surrounding workers, and simply completes the delivery of steel bars and the interception of test sample sections through the delivery module.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221781881U
    Figure CN221781881U
Patent Text Reader

Abstract

The utility model belongs to the field of track construction, and discloses a dismounting device for a built-in pre-tensile stress reinforcing steel bar of a ballastless track slab, which can greatly weaken impact energy generated by the popped pre-tensile stress reinforcing steel bar, so that the safety risk of the pre-tensile stress reinforcing steel bar to surrounding working personnel is avoided, and the dismounting device comprises a device base and a force unloading module arranged on the device base, an energy guide channel, an energy absorption inner cavity, an energy absorption plastic body and an energy transfer piston are arranged in the force unloading module, the energy guide channel is parallel to or coaxial with the pre-tensile stress steel bar, the energy absorption inner cavity is communicated with the energy guide channel, and the energy absorption plastic body is arranged in the energy absorption inner cavity and used for absorbing received impact energy through plastic deformation; the energy transfer piston is provided with an input end and an output end, the input end is located in the energy guide channel, and the output end is located in the energy absorption inner cavity and faces the energy absorption plastic body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of track construction, and in particular relates to a built-in pre-tensioned stress steel bar disassembly device for a ballastless track slab. Background Art

[0002] Ballastless track slabs use concrete or asphalt roadbeds with better stability instead of ballasted roadbeds to transfer dynamic and static loads during driving.

[0003] In order to provide the strength of the ballastless track slab, when manufacturing the ballastless track slab, pre-stressed steel bars are placed at intervals in the length direction of the ballastless track slab. The pre-stressed steel bars extend in the width direction of the ballastless track slab, and the two ends of the pre-stressed steel bars are fixed by nuts on both sides of the ballastless track slab so that the pre-stressed steel bars always maintain a predetermined pre-stress. In the implementation practice of the ballastless track slab, the pre-stressed steel bars need to be removed from the ballastless track slab, and their physical parameters and mechanical properties are tested to ensure the processing quality of batches of pre-stressed steel bars. The pre-stressed steel bars are removed by removing the nuts fixed at one end. The pre-stressed steel bars lose the fixation at one end and shrink rapidly in the direction of the pre-stressed stress, that is, they pop out rapidly and violently from the other end of the ballastless track slab. After the popped-out pre-stressed steel bars are stable and stationary, a test sample section of a predetermined length is cut from the pre-stressed steel bars, and the performance data of the physical parameters and mechanical properties of the pre-stressed steel bars are obtained by testing the test sample section.

[0004] However, this implementation method has a major defect: during the popping-out process of the prestressed steel bars, their impact energy is large, posing a safety risk to personnel working nearby, or their impulse causes part of the ballastless track slab to splash, posing a safety risk to personnel working nearby. Utility Model Content

[0005] In view of the shortcomings of the prior art, the utility model provides a built-in pre-stressed steel bar disassembly device for a ballastless track slab, which can significantly weaken the impact energy generated by the ejected pre-stressed steel bars, thereby eliminating safety risks to personnel working nearby.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] The ballastless track slab is equipped with a pre-stressed steel bar disassembly device, wherein the pre-stressed steel bar is arranged along the width direction of the ballastless track slab, and the two ends of the pre-stressed steel bar are stretched and fixed by nuts. The device is characterized in that it includes: a device base, which is detachably arranged on the ballastless track slab, and the device base has a module setting part, and a force unloading module, which is detachably arranged on the module setting part, wherein the interior of the force unloading module has an energy-drawing channel, an energy-absorbing inner cavity, an energy-absorbing plastic body and an energy-transmitting piston, the energy-drawing channel is open toward the side surface corresponding to the thickness of the ballastless track slab, the energy-drawing channel is parallel or coaxial with the pre-stressed steel bar, the energy-absorbing inner cavity is connected with the energy-drawing channel, the energy-absorbing plastic body is arranged inside the energy-absorbing inner cavity, the energy-absorbing plastic body is used to absorb the received impact energy through plastic deformation, and the energy-transmitting piston has an input end and an output end, the input end is located in the energy-drawing channel, the output end is located in the energy-absorbing inner cavity and the output end faces the energy-absorbing plastic body.

[0008] Preferably, the opening of the energy diverting channel in the energy absorbing inner cavity is used as the entrance portion, and the passing area of ​​the entrance portion is smaller than the passing area of ​​the energy diverting channel. The energy transmitting piston also has an input rod portion, and the input end and the output end are respectively formed at both ends of the input rod portion, the input end cooperates with the energy diverting channel, and the input rod portion cooperates with the entrance portion. The force unloading module also includes a buffer spring, which is sleeved on the input rod portion, and the buffer spring is arranged between the input end and the entrance portion.

[0009] Preferably, the inner wall of the energy guiding channel is a rough surface.

[0010] Preferably, the cross-sectional area of ​​the output end in the extension direction of the energy introduction channel is larger than the cross-sectional area of ​​the input end in the extension direction of the energy introduction channel.

[0011] Preferably, the utility model also includes a delivery module, which is detachably arranged on the module setting part, and the delivery module has a delivery inner cavity and a delivery opposite hole, and the delivery inner cavity is located inside the delivery module, and the delivery opposite hole is a through hole formed on the surface of the delivery module, and the through axis is parallel or coaxial with the pre-stressed steel bar, and the delivery opposite hole is connected with the delivery inner cavity, and the delivery module also includes a delivery synchronous belt, which is located inside the delivery inner cavity, and the transmission direction is the through axis direction of the delivery opposite hole, and the transmission surface of the delivery synchronous belt corresponds to the lower contour of the delivery opposite hole.

[0012] Further, the feeding module further has a tightening through-hole located on the surface of the feeding module, and the orientation of the tightening through-hole is perpendicular to the orientation of the feeding alignment hole. The feeding module further includes a steel bar pressing block and a tightening nut. The steel bar pressing block is located inside the feeding cavity and directly above the conveying surface of the feeding synchronous belt. A tightening screw rod that is in threaded engagement with the tightening through-hole is formed on the side of the steel bar pressing block. The tightening screw rod is movably arranged in the tightening through-hole in a direction perpendicular to the conveying surface of the synchronous belt. The tightening nut is located outside the feeding cavity and is in threaded engagement with the tightening screw rod. The tightening nut fixes the steel bar pressing block inside the feeding cavity by pressing the surface of the feeding module.

[0013] Still further, the number of the adjusting through-holes is at least one pair. Each pair of adjusting through-holes penetrates and is formed on the surface of the feeding module. The number of the tightening screw rods and the tightening nuts is at least one pair and corresponds to the adjusting through-holes.

[0014] Preferably, the device base further has a track fixing part parallel to the module setting part. The device base is in a "C" shape. The track fixing part and the module setting part respectively correspond to two thickness-corresponding side faces of the ballastless track. The unloading module and the feeding module are alternatively arranged between the module setting part and the thickness-corresponding side face of the ballastless track slab. The track fixing part is tightly pressed against the thickness-corresponding side face of the ballastless track slab by passing through and tightening a bolt, so that the device base alternatively presses the unloading module and the feeding module against the thickness-corresponding side face of the ballastless track.

[0015] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0016] 1. Since the ballastless track slab built-in pre-tensioned steel bar disassembly device of the present utility model includes a device base and an unloading module arranged on the device base, the inside of the unloading module has an energy guiding channel, an energy absorbing cavity, an energy absorbing plastic body, and a power transmitting piston. The energy guiding channel is parallel or coaxial with the pre-tensioned steel bar. The energy absorbing cavity is communicated with the energy guiding channel. The energy absorbing plastic body is arranged inside the energy absorbing cavity and is used for absorbing the received impact energy through plastic deformation. The power transmitting piston has an input end and an output end. The input end is located in the energy guiding channel, and the output end is located in the energy absorbing cavity and faces the energy absorbing plastic body. When disassembling the pre-tensioned steel bar from the ballastless track slab, the energy guiding channel is coaxially corresponded to one end of the pre-tensioned steel bar, and then the fixing nut at the other end of the pre-tensioned steel bar is disassembled. Thus, one end of the pre-tensioned steel bar pops out sharply and violently in the energy guiding channel and impacts the input end, causing the power transmitting piston to move. The output end impacts the energy absorbing plastic body, and the energy absorbing plastic body absorbs most of the impact energy through plastic deformation. Therefore, the present utility model can greatly weaken the impact energy generated by the popped pre-tensioned steel bar, so that there is no longer a safety risk to the surrounding workers.

[0017] 2. Because the energy transmission piston of the utility model also has an input rod portion, the input end and the output end are respectively formed at the two ends of the input rod portion, the input end cooperates with the energy guide channel, the input rod portion cooperates with the entrance port portion, and the force unloading module also includes a buffer spring, the buffer spring is sleeved on the input rod portion, and the buffer spring is arranged between the input end and the entrance port portion. Therefore, when the impact energy pushes the energy transmission piston, the utility model further weakens the impact energy through the buffer spring.

[0018] 3. Because the inner wall of the energy introduction channel of the utility model is a rough surface, when the impact energy pushes the energy transmission piston, the utility model generates a large friction resistance to the energy transmission piston through the energy introduction channel, thereby further weakening the impact energy.

[0019] 4. Because the cross-sectional area of ​​the output end of the utility model in the extension direction of the energy guide channel is larger than the cross-sectional area of ​​the input end in the extension direction of the energy guide channel, the utility model can make the contact surface between the energy-absorbing plastic body and the output end larger, thereby making the energy-absorbing plastic body have a better deformation buffering effect.

[0020] 5. Because the utility model also includes a delivery module, the delivery module has a delivery inner cavity and a delivery hole, the delivery hole is a through hole formed on the surface of the delivery module, and the through axis is parallel or coaxial with the pre-stressed steel bar, the delivery module also includes a delivery synchronous belt, and the transmission direction is the through axis direction of the delivery hole, and the transmission surface of the delivery synchronous belt corresponds to the lower contour of the delivery hole, after the impact energy of the pre-stressed steel bar is unloaded by the force unloading module and the pre-stressed steel bar stops stably, the force unloading module is removed and the delivery module is replaced on the module setting part, and the pre-stressed steel bar that partially extends out of the ballastless track plate is delivered along the outer side of the ballastless track plate by the delivery synchronous belt arranged in the delivery module. Therefore, the utility model can also simply deliver the pre-stressed steel bar through the delivery module, so as to intercept the detection sample section for detection.

[0021] 6. Because the delivery module of the utility model also has a tightening through hole, and the direction of the tightening through hole is perpendicular to the direction of the delivery hole, the delivery module also includes a steel bar clamping block and a tightening nut. The steel bar clamping block is located directly above the conveying surface of the delivery synchronous belt, and the side of the steel bar clamping block is formed with a tightening screw that cooperates with the tightening through hole, and the tightening screw is movable in the tightening through hole along a direction perpendicular to the conveying surface of the synchronous belt. The tightening nut is located outside the delivery inner cavity and cooperates with the tightening screw thread, and the tightening nut fixes the steel bar clamping block inside the delivery inner cavity by clamping the surface of the delivery module. Therefore, the utility model adjusts the relative spacing of the steel bar clamping block relative to the conveying belt, so that the pre-stressed steel bars are confined to a predetermined space in the delivery inner cavity for conveyance, thereby making the conveying stability of the pre-stressed steel bars high. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 The utility model is a schematic diagram of the assembly of the ballastless track slab with the built-in prestressed steel bar removal device and the ballastless track slab. Figure 1 ;

[0023] Figure 2 The utility model is a schematic diagram of the assembly of the ballastless track slab with the built-in prestressed steel bar removal device and the ballastless track slab. Figure 2 ;

[0024] Figure 3 A schematic diagram of a device base according to an embodiment of the utility model;

[0025] Figure 4 A cross-sectional view of a force unloading module according to an embodiment of the present utility model;

[0026] Figure 5 A schematic diagram of a delivery module according to an embodiment of the present utility model;

[0027] Figure 6 for Figure 5 A cross-sectional view of

[0028] Figure 7 This is a schematic diagram of the cooperation between the steel bar clamping block and the tightening nut of an embodiment of the utility model (only one side of the cooperation is shown).

[0029] In the figure: B, ballastless track slab, R, pre-stressed steel bar, 100, ballastless track slab built-in pre-stressed steel bar disassembly device, 10, device base, 11, module setting part, 12, track fixing part, 12a, tightening bolt, 20, force unloading module, 20a, energy diversion channel, 20b, energy absorption inner cavity, 21, energy absorption plastic body, 22, energy transmission piston, 221, input end, 222, input rod part, 223, output end, 23, buffer spring, 30, delivery module, 30a, delivery inner cavity, 30b, delivery hole, 30c, tightening through hole, 31, delivery synchronous belt, 32, steel bar clamping block, 32a, steel bar adapting surface, 321, tightening screw, 33, tightening nut. DETAILED DESCRIPTION

[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the following embodiments and the accompanying drawings specifically illustrate the built-in pre-stressed steel bar removal device for ballastless track slabs of the present invention. It should be noted that the description of these implementation methods is used to help understand the present invention, but does not constitute a limitation of the present invention.

[0031] like Figure 1 and Figure 2As shown in the figure, in the pre-tensioned steel bar disassembly device 100 built into the ballastless track slab in this embodiment, the pre-tensioned steel bars R are arranged along the width direction of the ballastless track slab B, and both ends of the pre-tensioned steel bars R are tensioned and fixed inside the ballastless track slab B through nuts (not shown in the attached drawings). Specifically, when detecting the pre-tensioned steel bars R, it is necessary to slightly chisel the structures on the two opposite sides of the ballastless track slab B, that is, the sides corresponding to the thickness, so that the ends of the pre-tensioned steel bars R are exposed.

[0032] The pre-tensioned steel bar disassembly device 100 built into the ballastless track slab includes a device base 10, a force unloading module 20, and a sending module 30.

[0033] As Figure 3 shown, the device base 10 is detachably arranged on the ballastless track slab B.

[0034] The device base 10 has a module setting part 11 and a track fixing part 12. The track fixing part 12 is parallel to the module setting part 11. The device base is in a "C" shape, and the track fixing part 12 and the module setting part 11 respectively correspond to the two sides corresponding to the thickness of the ballastless track slab B. Specifically, the device base 10 straddles the entire width direction of the ballastless track slab B, and there is a predetermined distance between the module setting part 11 and the side surface of the ballastless track slab B.

[0035] The force unloading module 20 and the sending module 30 are both detachably arranged on the module setting part 12. The force unloading module 20 and the sending module 30 are alternatively arranged between the module setting part 12 and the side surface corresponding to the thickness of the ballastless track slab B. The track fixing part 11 is tightly pressed against the side surface corresponding to the thickness of the ballastless track slab B by passing through and tightening bolts 12a, so that the device base 10 alternatively presses the force unloading module 20 and the sending module 30 against the side surface corresponding to the thickness of the ballastless track slab B. Specifically, during the implementation of the pre-tensioned steel bar disassembly device 100 built into the ballastless track slab, one of the force unloading module 20 and the sending module 30 is arranged on the module setting part 12 through thread fitting according to needs. After setting, one side surface of the force unloading module 20 and the sending module 30 faces the side surface corresponding to the thickness of the ballastless track slab B.

[0036] As Figure 4 shown, the inside of the force unloading module 20 has an energy guiding channel 20a, an energy absorbing inner cavity 20b, an energy absorbing plastic body 21, a force transmitting piston 22, and a buffer spring 23.

[0037] The energy diverting channel 20a is open toward the side surface corresponding to the thickness of the ballastless track slab B, the energy diverting channel 20a is parallel or coaxial with the pre-stressed steel bar R, and the inner wall of the energy diverting channel 20a is a rough surface. Specifically, when the device base 10 is set on the ballastless track slab B, the energy diverting channel 20a and the pre-stressed steel bar R are usually not coaxially corresponding. At this time, it is necessary to loosen the tightening bolts 12a of the track fixing part 12 and move the device base 10 so that the energy diverting channel 20a is coaxially corresponding with the pre-stressed steel bar R. In this embodiment, a wear-resistant rubber layer (not shown in the drawings) is applied on the inner wall of the energy diverting channel 20a.

[0038] The energy absorbing inner cavity 20b is connected with the energy guiding channel 20a, and the opening of the energy guiding channel 20a in the energy absorbing inner cavity 20b is used as an entrance portion (not shown in the drawings). The passing area of ​​the entrance portion is smaller than the passing area of ​​the energy guiding channel. Specifically, the energy absorbing inner cavity 20b and the energy guiding channel 20a are both cylindrical, and the cross-sectional inner diameter of the energy absorbing inner cavity 20b is larger than the corresponding cross-sectional inner diameter of the energy guiding channel 20a.

[0039] The energy-absorbing plastic body 21 is disposed inside the energy-absorbing inner cavity 20 b . The energy-absorbing plastic body 21 is used to absorb the received impact energy through plastic deformation. In the present embodiment, the material of the energy-absorbing plastic body 21 is ACF artificial bionic material.

[0040] The energy transmission piston 22 is a movable piston movably disposed in the energy introduction channel 20a and the energy absorption inner cavity 20b, and has an input end 221, an input rod portion 222 and an output end 223 which are arranged in sequence.

[0041] The input end 221 is located in the energy guiding channel 20a, the output end 223 is located in the energy absorbing inner cavity 20b and the output end 223 faces the energy absorbing plastic body 21, and the cross-sectional area of ​​the output end 223 in the extension direction of the energy guiding channel 20a is larger than the cross-sectional area of ​​the input end 221 in the extension direction of the energy guiding channel 20a. Specifically, the input end 221 and the output end 223 both have a disc-shaped flange structure perpendicular to the extension direction of the energy guiding channel 20a, and the force unloading module 20, the delivery module 30 and the module setting part 11 all have corresponding threaded holes (not shown in the drawings), and the force unloading module 20 and the delivery module 30 are assembled on the module setting part 11 by screws.

[0042] The input end 221 cooperates with the energy guiding channel 20a, the input rod 222 cooperates with the entrance portion, the buffer spring 23 is sleeved on the input rod 222, and the buffer spring 23 is arranged between the input end 221 and the entrance portion. Specifically, when the energy transmitting piston 22 moves toward the energy absorbing inner cavity 20b, the input end 221 moves toward the entrance portion, and the output end 223 squeezes the energy absorbing plastic body 21. During this process, the buffer spring 23 has a buffering effect on the movement of the energy transmitting piston 22, and the rough surface of the energy absorbing inner cavity 20b effectively consumes the moving kinetic energy of the energy transmitting piston 22 through the larger friction force with the input end 221.

[0043] like Figures 5 to 7 As shown, the delivery module 30 has a delivery inner cavity 30a, a delivery hole 30b, a tightening through hole 30c, a delivery synchronous belt 31, a steel bar clamping block 32 and a tightening nut 33.

[0044] The delivery inner cavity 20a, the delivery synchronous belt 31 and the steel bar clamping block 32 are all located inside the delivery module 30, the delivery hole 30b and the tightening through hole 30c are both formed on the surface of the delivery module 30, and the tightening nut 33 is located outside the delivery module 30 entity.

[0045] The delivery hole 30b is a through hole and its through axis is parallel or coaxial with the pre-tensioned stress steel bar R, and the delivery hole 30b is connected with the delivery inner cavity 30a. Specifically, when the device base 10 is set on the ballastless track slab B, the through axis of the delivery hole 30b and the pre-tensioned stress steel bar R are usually not coaxially corresponding. At this time, it is necessary to loosen the tightening bolt 12a of the track fixing part 12 and move the device base 10 so that the through axis of the delivery hole 30b is coaxially corresponding with the pre-tensioned stress steel bar R.

[0046] The number of the adjusting through holes 30c is at least one pair, and the orientation of the tightening through holes 30c is perpendicular to the orientation of the delivery holes 30b. Specifically, each pair of tightening through holes 30c is a through-hole, and the through-axis extends along the length direction of the ballastless track slab B, and the long axis of the tightening through holes 30c extends along the thickness direction of the ballastless track slab B. In this embodiment, the number of the adjusting through holes 30c is two pairs.

[0047] The transmission direction of the delivery synchronous belt 31 is the axial direction of the delivery hole 30b, and the transmission surface of the delivery synchronous belt 31 corresponds to the lower contour of the delivery hole 30b. Specifically, the delivery synchronous belt 31 is driven by a driving motor (not shown in the drawings). When the pre-stressed steel bar R passes through the delivery hole 30b and enters the delivery inner cavity 20a, the delivery synchronous belt 31 transmits the pre-stressed steel bar R toward the outside of the ballastless track slab B. In this embodiment, the transmission surface of the synchronous belt 31 has a concave-convex structure for enhancing the transmission friction.

[0048] The steel bar clamping block 32 is located directly above the conveying surface of the delivery synchronous belt 31. A tightening screw 321 is formed on the side of the steel bar clamping block 32 to cooperate with the tightening through hole 30c, and the tightening screw 321 is movably arranged in the tightening through hole 30c in a direction perpendicular to the conveying surface of the delivery synchronous belt 31. In this embodiment, the steel bar clamping block 32 has a steel bar adaptation surface 32a facing the delivery synchronous belt 31 and having an arc surface.

[0049] The tightening nut 33 is threadedly matched with the tightening screw 321, and the tightening nut 33 fixes the steel bar clamping block 32 inside the delivery cavity 30a by pressing the surface of the delivery module 30, and the number of the tightening screw 321 and the tightening nut 33 is at least one pair and corresponds to the adjustment through hole 30c.

[0050] The implementation process of the ballastless track slab built-in prestressed steel bar removal device 100 is described below by way of an embodiment:

[0051] Unloading stage: the device base 10 is matched and set on the ballastless track slab B, the unloading module 20 is threadedly matched with the module setting part 11, and the device base 10 is moved along the length direction of the ballastless track slab B. When the gravity channel 20a corresponds coaxially with the pre-tensioned stress steel bar R, the device base 10 is tightened and fixed on the ballastless track slab B by the tightening bolts 12a, and the nut fixing at the other end of the pre-tensioned stress steel bar R is removed. The end of the pre-tensioned stress steel bar R bounces into the gravity channel 20a, pushing the energy transmission piston 22 to impact the energy absorbing plastic body 21, and then waits for the pre-tensioned stress steel bar R to be completely still.

[0052] Module switching stage: remove the threaded cooperation between the force unloading module 20 and the module setting part 11. Since the prestressed steel bar R extends into the gravity channel 20a at this time, the force unloading module 20 will not be separated from the correspondence with the ballastless track slab B. Move the device base 10 along the length direction of the ballastless track slab B to separate the device base 10 from the force unloading module 20. Remove the force unloading module 20 from the extended section of the prestressed steel bar R. Insert the delivery module 30 into the extended section of the prestressed steel bar R through the delivery hole 30b. Move the device base 10 along the length direction of the ballastless track slab B to overlap the device base 10 and thread the delivery module 30 with the module setting part 11 to fix it.

[0053] Feeding stage: adjust the spacing distance between the steel bar pressing block 32 and the delivery synchronous belt 31 to a predetermined distance by tightening the tightening nut 33, tighten the tightening nut 33 so that the tightening nut 33 is pressed against the surface of the delivery module 30 and remains stationary, so that the steel bar pressing block 32 is fixed inside the delivery inner cavity 30a, start the driving motor, so that the delivery synchronous belt 31 transports the pre-stressed steel bars R toward the outside of the ballastless track slab B for subsequent sampling and testing.

[0054] The above-mentioned implementation modes are preferred cases of the present utility model and are not used to limit the protection scope of the present utility model. Various deformations or modifications that can be made by ordinary technicians in this field without creative work within the scope of the attached claims are still within the protection scope of this patent.

Claims

1. A ballastless track slab has a built-in pre-stressed steel bar disassembly device, wherein the pre-stressed steel bar is arranged along the width direction of the ballastless track slab, and the two ends of the pre-stressed steel bar are stretched and fixed by nuts, characterized in that: include: The device base is detachably arranged on the ballastless track plate, and the device base has a module setting part. A force unloading module is detachably arranged on the module setting portion, Among them, the interior of the force unloading module is provided with an energy diversion channel, an energy absorbing inner cavity, an energy absorbing plastic body and an energy transmitting piston, the energy diversion channel is open toward the side corresponding to the thickness of the ballastless track slab, the energy diversion channel is parallel or coaxial with the prestressed steel bar, the energy absorbing inner cavity is connected with the energy diversion channel, the energy absorbing plastic body is arranged inside the energy absorbing inner cavity, the energy absorbing plastic body is used to absorb the received impact energy through plastic deformation, and the energy transmitting piston has an input end and an output end, the input end is located in the energy diversion channel, the output end is located in the energy absorbing inner cavity and the output end faces the energy absorbing plastic body.

2. The device for removing built-in prestressed steel bars of ballastless track slab according to claim 1 is characterized in that: in, The opening of the energy introduction channel in the energy absorption inner cavity is used as an entrance portion, and the passage area of ​​the entrance portion is smaller than the passage area of ​​the energy introduction channel. The energy transmission piston also has an input rod portion, the input end and the output end are respectively formed at two ends of the input rod portion, the input end cooperates with the energy introduction channel, and the input rod portion cooperates with the inlet portion. The unloading module further comprises a buffer spring, which is sleeved on the input rod portion and arranged between the input end and the inlet portion.

3. The device for removing built-in prestressed steel bars of ballastless track slab according to claim 1 is characterized in that: in, The inner wall of the energy introduction channel is a rough surface.

4. The device for removing built-in prestressed steel bars of ballastless track slab according to claim 1 is characterized in that: in, A cross-sectional area of ​​the output end in the extending direction of the energy introduction channel is larger than a cross-sectional area of ​​the input end in the extending direction of the energy introduction channel.

5. The device for removing built-in prestressed steel bars of ballastless track slab according to claim 1, characterized in that: Also includes: A delivery module is detachably arranged on the module setting portion, The delivery module has a delivery inner cavity and a delivery opposite hole, wherein the delivery inner cavity is located inside the delivery module, the delivery opposite hole is a through hole formed on the surface of the delivery module, and the through axis is parallel or coaxial with the pre-tensioned stress steel bar, and the delivery opposite hole is connected with the delivery inner cavity, The delivery module also includes a delivery synchronous belt, which is located inside the delivery inner cavity, and the transmission direction is the through-axis direction of the delivery pair holes, and the transmission surface of the delivery synchronous belt corresponds to the lower contour of the delivery pair holes.

6. The device for removing built-in prestressed steel bars of ballastless track slab according to claim 5 is characterized in that: in, The delivery module also has a tightening through hole, which is located on the surface of the delivery module, and the direction of the tightening through hole is perpendicular to the direction of the delivery hole. The sending module further includes a steel bar pressing block and an adjusting nut. The steel bar pressing block is located inside the sending inner cavity and directly above the conveying surface of the sending synchronous belt. A tightening screw rod that is in threaded engagement with the adjusting through hole is formed on the side of the steel bar pressing block. Moreover, the tightening screw rod is movably arranged in the adjusting through hole in a direction perpendicular to the conveying surface of the synchronous belt. The adjusting nut is located outside the sending inner cavity and is in threaded engagement with the tightening screw rod. And the adjusting nut fixes the steel bar pressing block inside the sending inner cavity by pressing the surface of the sending module.

7. The device for disassembling the pre-tensioned steel bars embedded in the ballastless track slab according to claim 6, wherein: in, The number of the adjusting through holes is at least one pair. Each pair of the adjusting through holes penetrates and is formed on the surface of the sending module. The number of the tightening screw rods and the adjusting nuts is at least one pair and corresponds to the adjusting through holes.

8. The device for disassembling the pre-tensioned steel bars embedded in the ballastless track slab according to claim 5, wherein: in, The device base further has a track fixing part which is parallel to the module setting part. The device base is in a "C" shape. And the track fixing part and the module setting part respectively correspond to two thickness-corresponding side faces of the ballastless track. The unloading module and the sending module are alternatively arranged between the module setting part and the thickness-corresponding side face of the ballastless track slab. The track fixing part is tightly pressed against the thickness-corresponding side face of the ballastless track slab by passing through and tightening bolts. Thus, the device base alternatively presses the unloading module and the sending module against the thickness-corresponding side face of the ballastless track.