Support-free and platform-free aluminum mold hanging structure for post-pouring area of local laminated slab

Through the aluminum formwork hanging formwork structure without supports and platforms, the winch and steel rope are used to drive the lifting and lowering of the supporting plate, which solves the problem of frequent installation and dismantling of wooden formwork in the existing technology, and realizes the efficient construction and concrete pouring area of ​​the partial laminated plate. Improvement of molding quality.

CN221799142UActive Publication Date: 2024-10-01ZHEJIANG DADONGWU CONSTR TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420277566.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-10-01
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

The existing construction of the post-pouring area of ​​partial laminated panels requires frequent installation and dismantling of wooden formwork, resulting in high costs and extended construction period. In addition, the flatness of the wooden formwork is insufficient, which affects the quality of concrete molding.

Method used

An aluminum formwork hanging formwork structure without supports and platforms is adopted, including a winch, brackets, steel ropes, connecting frames, casings and support plates. The winch drives the steel ropes and support plates up and down to achieve uninterrupted pouring in the post-pouring area and reduce Support plate installation and removal operations.

Benefits of technology

It achieves uninterrupted construction on multiple floors, reduces construction costs, shortens the construction period, and improves the flatness and quality of concrete molding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799142U_ABST
    Figure CN221799142U_ABST
Patent Text Reader

Abstract

The utility model provides a support-free and platform-free aluminum mold hanging structure for a post-pouring area of a local laminated slab, and relates to the technical field of laminated slab construction. Comprising a winch, a support, a steel rope, a connecting frame, a sleeve and a supporting plate. The winch is installed on the support and located above a post-pouring area of the local laminated slab, one end of the steel rope is connected to the winch in a winding mode, the other end of the steel rope is connected with the connecting frame, the connecting frame is connected with the supporting plate, and when the steel rope drives the connecting frame to ascend and descend, the connecting frame drives the supporting plate to ascend and descend. The utility model has the beneficial effects that an operation platform does not need to be built for the wood pattern in the post-pouring area, the support does not need to be mounted and dismounted at one time when the post-pouring area of each floor is poured, a plurality of floors can be continuously constructed, the cost is low, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite slab construction, in particular to an aluminum formwork hanging formwork structure for a post-casting area of ​​a local composite slab without a support or a platform. Background Art

[0002] With the implementation of the national prefabricated policy, the application of prefabricated buildings is becoming more and more extensive. As the most commonly used prefabricated component of prefabricated buildings, the composite board has the highest application ratio. As an innovative product of composite boards, the partial composite board is perfectly matched with steel structure buildings. It is installed at the assembly site by installing the composite board, and then pouring concrete on the composite board to complete the construction.

[0003] Due to the limitations of the formwork and transport vehicles, when the size of the partial composite slab exceeds a certain limit, the composite slab needs to be divided into blocks, and then a post-casting area is reserved for splicing during on-site installation.

[0004] At present, the construction measures for the post-casting area of ​​the local composite slab are mainly to set up supports to fix the wooden formwork. After the concrete pouring is completed, the wooden formwork is removed using an operating platform. The installation and fixation of the formwork as well as the subsequent removal are time-consuming and labor-intensive. The formwork needs to be installed and removed once during the pouring of the post-casting area of ​​each floor, which is costly and prolongs the construction period. Utility Model Content

[0005] The purpose of the utility model is to propose a support-free and platform-free aluminum formwork hanging formwork structure for the post-casting area of ​​a partial composite slab in response to the deficiencies of the above-mentioned prior art. It does not require a support-free and platform-free aluminum formwork hanging formwork structure for the post-casting area of ​​the partial composite slab, and does not require a support installation and removal when pouring the post-casting area of ​​each floor. It can carry out uninterrupted construction on multiple floors, with low cost and shortened construction period.

[0006] The utility model proposes a non-support and non-platform aluminum formwork hanging formwork structure for the post-casting area of ​​a partial composite plate, and the improvement thereof lies in that it comprises a winch, a bracket, a steel rope, a connecting frame, a sleeve and a support plate; the winch is installed on the bracket and the winch is located above the post-casting area of ​​the partial composite plate, one end of the steel rope is wound and connected to the winch, and the other end of the steel rope is connected to the connecting frame, and the connecting frame is connected to the support plate, and when the steel rope drives the connecting frame to rise and fall, the connecting frame drives the support plate to rise and fall.

[0007] The better technical solution of the utility model is as follows: the connecting frame includes a connecting plate, a connecting rod, a nut and a nut; the connecting plate is vertically connected to one end of the connecting rod, the nut is vertically welded to the other end of the connecting rod, the steel rope is passed through the nut, and the steel rope is connected to the connecting rod through the nut; one end of the connecting rod connected to the nut is threaded, and the nut is threadedly connected to the end of the connecting rod; a through hole is provided on the support plate, and the connecting rod is passed through the through hole; both ends of the support plate are bent.

[0008] The better technical solution of the utility model also includes two parallel distributed rectangular steel pipes, both ends of which are supported on the local overlapping plates on both sides of the post-casting area, the support rod is passed through the gap between the two rectangular steel pipes, and the nuts are supported on the two rectangular steel pipes.

[0009] A better technical solution of the utility model: it also includes a sleeve, which is sleeved on the connecting rod and is located between the rectangular steel pipe and the support plate.

[0010] The better technical solution of the utility model is as follows: the bracket includes a plurality of vertical poles and a plurality of horizontal beams, the plurality of vertical poles are symmetrically distributed on the local overlapping plates on both sides of the post-cast strip, the horizontal beams are vertically connected to the vertical poles, and the winch is installed on the horizontal beams.

[0011] A better technical solution of the utility model: the support plate is an aluminum plate.

[0012] A more optimal technical solution of the utility model: it also includes pins and pin pieces, and the aluminum plate includes a plurality of splicing plates, and the splicing plates are connected by the pins and pin pieces.

[0013] A better technical solution of the utility model is as follows: a block-shaped protrusion is provided on the plate surface of the support plate away from the winch, and the bending parts at both ends of the connecting plate abut against the block-shaped protrusion.

[0014] A better technical solution of the utility model: the sleeve is made of PVC.

[0015] The beneficial effects of the utility model are as follows: the utility model reels in the steel rope through the winch, thereby driving the support plate to rise and fall. When it is necessary to pour the post-pouring area of ​​the partial composite plate, the support plate is lowered to the bottom of the post-pouring area through the winch, and the post-pouring area is poured under the support of the support plate. After the poured concrete is solidified, the winch unwinds the steel rope to make the support plate descend to the next floor, and the steel rope and the connecting frame are disassembled on the next floor. The steel rope is unwound with the winch and descends to the bottom of the post-pouring area of ​​the next floor, and the steel rope and the connecting frame are connected together by nuts under the post-pouring area of ​​the next floor. The post-pouring area can be poured uninterruptedly, and there is no need to build an operating platform for the support plate to install and disassemble the support plate. The operation is convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings, which are incorporated into the specification and constitute a part of the specification, illustrate embodiments of the utility model and are used together with the description to explain the principles of the utility model. In these drawings, similar reference numerals are used to represent similar elements. The drawings described below are some embodiments of the utility model, rather than all embodiments. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 The utility model is a structural schematic diagram of an aluminum formwork hanging formwork structure for a post-casting area of ​​a local composite slab without support and platform.

[0018] Figure 2 The utility model is a structural schematic diagram of a connecting frame in an aluminum formwork hanging formwork structure of a post-casting area of ​​a local composite slab without support and platform.

[0019] Figure 3 The utility model is a schematic diagram of the distribution of rectangular steel pipes in the aluminum formwork hanging formwork structure of the post-casting area of ​​a local composite slab without support and platform.

[0020] In the figure: 100, winch; 200, bracket; 300, steel rope; 400, connecting frame; 500, casing; 600, support plate; 700, rectangular steel pipe; 800, nut; 900, nut; 1000, partial composite plate; 201, vertical pole; 202, cross beam; 401, connecting rod; 402, connecting plate; 4021, bending place; 601, block-shaped protrusion; 701, welding iron. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical scheme and advantages of the embodiment of the utility model clearer, the technical scheme in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other arbitrarily without conflict.

[0022] Reference Figures 1 to 3As shown in the figure, the utility model provides a non-support and non-platform partial composite plate post-casting area aluminum formwork hanging formwork structure, including a winch 100, a bracket 200, a steel rope 300, a connecting frame 400, a sleeve 500 and a support plate 600. The bracket 200 includes a plurality of vertical poles 201 and a plurality of horizontal beams 202, wherein the plurality of vertical poles 201 are symmetrically distributed on the partial composite plate 1000 on both sides of the post-casting zone, the horizontal beams 202 are vertically connected to the vertical poles 201, and the winch 100 is installed on the horizontal beams 202. The hoist 100 is installed on the bracket 200 and is located above the post-casting area of ​​the partial composite plate 1000. One end of the steel rope 300 is wound and connected to the hoist 100. The other end of the steel rope 300 is connected to the connecting frame 400. The connecting frame 400 includes a connecting plate 402 and a connecting rod 401. The connecting plate 402 is vertically connected to one end of the connecting rod 401. The other end of the connecting rod 401 is connected to the steel rope 300. The sleeve 500 is sleeved on the connecting rod 401. A through hole is opened on the support plate 600, and the connecting rod 401 is inserted into the through hole.

[0023] In the utility model, the hoist 100 and the steel rope 300 are supported on the upper floor of the area to be poured by the bracket 200. When the area to be poured needs to be poured, the hoist 100 unwinds the steel rope 300 to make the support plate 600 connected with the steel rope 300 rise and fall in the post-pouring area between the floors. The support plate 600 rises to the bottom of the post-pouring area to be poured under the drive of the steel rope 300, and then concrete is poured in the post-pouring area. After the concrete solidifies, since the sleeve 500 is provided on the connecting rod 401, the solidified concrete will not be connected to the connecting rod 401 as a whole. After being wound up, the connecting frame 400 drives the support plate 600 to move to the next floor, and the steel rope 300 is disassembled from the connecting frame 400 on the next floor, and the steel rope 300 is unwound with the winch 100 and descends to the bottom of the post-casting area of ​​the next floor, and the steel rope 300 and the connecting frame 400 are connected together by the nut 800 under the post-casting area of ​​the next floor, and a new round of pouring of the post-casting area is carried out. In this way, the post-casting area of ​​each floor is continuously poured, which is convenient and quick, and reduces the installation and disassembly process caused by setting supports for the support plate 600 at the post-casting area of ​​each floor in the existing method, thereby reducing costs and saving construction time.

[0024] The number of steel ropes 300 and connecting frames 400 can be set to multiple groups. In the present embodiment, two groups are adopted. The two steel ropes 300 are respectively connected to the two connecting frames 400. Holes are opened on both sides of the support plate 600 to pass through the connecting frames 400. The connecting rods 401 of the connecting frames 400 are passed through the holes. The connecting plates 402 support the support plates 600 on the back side of the support plates 600. The more the number of connecting frames 400, the more stable the support for the support plates 600 is, and the better the effect is in the subsequent pouring process.

[0025] The structure provided by the utility model also includes two parallel rectangular steel pipes 700, which are intermittently welded by a welding iron 701. Both ends of the rectangular steel pipe 700 are supported on the local superimposed plates 1000 on both sides of the post-casting area, the connecting rod 401 is inserted into the gap between the two rectangular steel pipes 700, and the nut 800 is supported on the two rectangular steel pipes 700. When the steel rope 300 is reeled and unreeled to move the support plate 600 to the bottom of the post-casting area, the concrete of the post-casting area is subsequently poured. During the pouring process and the process of waiting for the concrete to solidify after pouring, the support plate 600 carries concrete. At this time, the support plate 600 relies on the winch 100 to overcome gravity. In order to avoid damage to the winch 100 due to excessive force and the risk of the support plate 600 falling, a rectangular steel pipe 700 is erected on the local superimposed plate 1000 on both sides of the post-casting area, and the connecting rod 401 is fixed on the rectangular steel pipe 700 through the nut 800 to support the support plate 600. The gravity carried by the support plate 600 is shared by the rectangular steel pipe 700 and the nut 800. At the same time, the two rectangular steel pipes 700 are arranged in parallel to support the nut 800, so that the nut 800 can be supported to slide on the rectangular steel pipe 700, and then the position of the connecting rod 401 is adjusted so that the support plate 600 is aligned with the post-casting area.

[0026] Among them, the sleeve 500 is located between the rectangular steel pipe 700 and the support plate 600. The sleeve 500 is made of PVC. The area between the rectangular steel pipe 700 and the support plate 600 is a concrete pouring area. The sleeve 500 is sleeved on the connecting rod 401 between the rectangular steel pipe 700 and the support plate 600. After the concrete solidifies, the concrete and the sleeve 500 are connected as a whole, and the connecting rod 401 and the steel rope 300 can slide in the sleeve 500, which does not affect the unwinding of the steel rope 300 to drive the connecting frame 400 and the support plate 600 to descend to the next floor.

[0027] The structure provided by the utility model also includes a nut 900, the outer side of which is welded to the threaded end of the connecting rod 401, and the steel rope 300 is inserted into the nut 900. The steel rope 300 is connected to the connecting rod 401 by connecting the steel rope 300 and the nut 900. The steel rope 300 and the connecting frame 400 are connected by the nut 900, which facilitates the installation and disassembly of the steel rope 300 and the connecting frame 400. Therefore, in the structure provided by the utility model, the bracket 200, the hoist 100, the steel rope 300, the connecting frame 400, and the support plate 600 are all detachably installed, which is convenient for the handling and transportation of the entire structure. After use at a construction site, it is convenient to carry it to a subsequent construction site, and it is convenient to store it after disassembly.

[0028] At present, the construction measures for the post-casting area of ​​the local composite slab 1000 are mainly to set up supports to fix the wooden formwork. After the concrete is poured, the wooden formwork is removed using an operating platform. The wooden formwork is not flat enough and has relatively low rigidity, so the concrete molding quality of the post-casting area is poor. Therefore, the support plate 600 in the utility model is an aluminum plate. The aluminum plate is flat and has high rigidity, so the concrete molding quality of the post-casting area is good and beautiful.

[0029] In order to match the sizes of different post-casting areas, the aluminum plate is disassembled and installed, and it also includes pins and pin pieces. The aluminum plate includes multiple splicing plates, which are connected by pins and pin pieces. The sizes of different post-casting areas are adapted by splicing the splicing plates.

[0030] At the same time, in order to ensure the supporting effect of the connecting plate 402 on the aluminum plate, a block-shaped protrusion 601 is provided on the plate surface of the supporting plate 600 away from the hoist 100, and the two ends of the connecting plate 402 are bent, and the bending part 4021 abuts against the protrusion. Through the cooperation of the block-shaped protrusion 601 of the supporting plate 600 and the bending part 4021 of the connecting plate 402, the connecting plate 402 and the aluminum plate are firmly matched and will not slide, thereby avoiding concrete leakage caused by the movement of the aluminum plate during the subsequent construction and pouring process.

[0031] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model is described in detail with reference to the above embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above embodiments, or replace some of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the utility model.

Claims

1. A non-support and non-platform aluminum formwork hanging structure for the post-casting area of ​​a local composite slab, characterized by: The invention comprises a hoist (100), a bracket (200), a steel rope (300), a connecting frame (400), a sleeve (500) and a support plate (600); the hoist (100) is installed on the bracket (200) and the hoist (100) is located above the post-casting area of ​​the local composite plate (1000); one end of the steel rope (300) is wound and connected to the hoist (100); the other end of the steel rope (300) is connected to the connecting frame (400); the connecting frame (400) is connected to the support plate (600); when the steel rope (300) drives the connecting frame (400) to rise and fall, the connecting frame (400) drives the support plate (600) to rise and fall.

2. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 1 is characterized by: The connecting frame (400) comprises a connecting plate (402), a connecting rod (401), a nut (900) and a nut (800); the connecting plate (402) is vertically connected to one end of the connecting rod (401), the nut (900) is vertically welded to the other end of the connecting rod (401), the steel rope (300) is inserted into the nut (900), and the steel rope (300) is connected to the connecting rod (401) through the nut (900); one end of the connecting rod (401) connected to the nut (900) is threaded, and the nut (800) is threadedly connected to the end of the connecting rod (401); a through hole is provided on the support plate (600), and the connecting rod (401) is inserted into the through hole; both ends of the support plate (600) are bent.

3. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 2 is characterized by: It also includes two parallel rectangular steel pipes (700), the two ends of the rectangular steel pipes (700) are supported on the local superimposed plates (1000) on both sides of the post-casting area, the connecting rod (401) is inserted into the gap between the two rectangular steel pipes (700), and the nut (800) is supported on the two rectangular steel pipes (700).

4. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 3 is characterized by: It also includes a sleeve (500), wherein the sleeve (500) is sleeved on the connecting rod (401) and the sleeve (500) is located between the rectangular steel pipe (700) and the support plate (600).

5. The aluminum formwork hanging structure for the post-casting area of ​​a local composite slab without support and platform according to claim 1 is characterized by: The support (200) comprises a plurality of vertical poles (201) and a plurality of horizontal beams (202); the plurality of vertical poles (201) are symmetrically distributed on the local composite plate (1000) on both sides of the post-cast strip; the horizontal beams (202) are vertically connected to the vertical poles (201); and the hoist (100) is installed on the horizontal beams (202).

6. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 1 is characterized by: The support plate (600) is an aluminum plate.

7. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 6 is characterized by: It also includes pins and pin pieces. The aluminum plate includes a plurality of splicing plates, and the splicing plates are connected by the pins and pin pieces.

8. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 2 is characterized by: A block-shaped protrusion (601) is provided on the plate surface of the support plate (600) away from the hoist (100), and the bending parts (4021) at both ends of the connecting plate (402) are in contact with the block-shaped protrusion (601).

9. The aluminum formwork hanging structure for the post-casting area of ​​a partial composite slab without support and platform according to claim 3 is characterized by: The sleeve (500) is made of PVC.

Citation Information

Cited By

  • Support-free and platform-free aluminum mold hanging structure and method for post-pouring area of local laminated slab

    CN118223674A