Split type grading ring
By designing a split pressure equalizing ring and using a combined structure of a support rod, an arc-shaped fixed cylinder and a locking arc plate, the problem of low installation efficiency of the traditional pressure equalizing ring is solved, achieving quick installation by one person and high stability, and is suitable for suitable for various installation scenarios.
Patent Information
- Application Number
- CN202420106430.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-16
AI Technical Summary
Traditional pressure equalizing rings are difficult to adapt to all installation scenarios and have low assembly efficiency. They usually require two people to install.
A split pressure equalizing ring is designed, including a left ring body and a right ring body. Through the combined structure of a support rod, an arc-shaped fixed cylinder, a locking arc plate and bolts, a single person can be quickly installed, and through the docking column and The in-line fit and bolt locking of the through holes improve stability.
It realizes the quick installation of the pressure equalizing ring when it cannot be installed from the top of the rod body, improves the installation efficiency, and enhances the stability of the ring body through double clamping force and rubber layer to avoid separation.
Smart Images

Figure CN221805199U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of pressure equalizing rings, in particular to a split type pressure equalizing ring. Background Art
[0002] The voltage equalization can evenly distribute the high voltage around the object, ensuring that there is no potential difference between the various parts of the ring, thus achieving the effect of voltage equalization.
[0003] The current pressure-equalizing ring is an integrated structure. In some completed buildings, since there are many objects on the pole, it cannot be guaranteed that the pressure-equalizing ring can be installed on each pole from top to bottom. Therefore, the traditional pressure-equalizing ring cannot adapt to all installation scenarios; at the same time, some assembled pressure-equalizing rings require two people to cooperate at the same time, that is, one person holds the two rings to keep them stable after assembly, and the other person uses bolts to install them, which is time-consuming, labor-intensive and inefficient. Utility Model Content
[0004] The utility model aims to provide a split type pressure equalizing ring which has a novel structure and is convenient and quick to install.
[0005] The purpose of the utility model is achieved as follows: a split pressure equalizing ring, comprising a left ring body and a right ring body; the left ring body and the right ring body are butt-jointed to form a circular ring body, and support rods are provided at the openings of the left ring body and the right ring body; a right arc-shaped fixing cylinder is connected to the top of the support rod located at the right ring body, and a locking arc-shaped plate is hinged on one side of the upper part of the right arc-shaped fixing cylinder; a left arc-shaped fixing cylinder butt-jointed with the right arc-shaped fixing cylinder is connected to the top of the support rod located at the left ring body; fixing plates are provided on both sides of the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder, and fixing holes are evenly opened on the fixing plates.
[0006] Preferably, corresponding through holes are provided on the support rods of the left ring body and the right ring body, and the support rods on the left ring body and the right ring body are fixed by pins passing through the through holes.
[0007] Preferably, a docking post is provided on the ring body at the open end of the left ring body, and a docking hole is provided on the ring body at the open end of the right ring body, and the docking post is inserted into the docking hole for docking cooperation.
[0008] Preferably, the height of the left arc-shaped fixing cylinder is lower than the height of the right arc-shaped fixing cylinder below the locking arc-shaped plate.
[0009] Preferably, the inner walls of the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder are both provided with a rubber layer; and the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder are fixedly connected by bolts.
[0010] Compared with the prior art, the utility model is beneficial in that:
[0011] 1. The split-type pressure-equalizing ring is adopted, so that the ring body can be separated during installation, which is suitable for the rod structure that cannot be installed from the top of the rod body downward; at the same time, the locking structure is optimized so that it can be operated by one person. During installation, the right ring body is installed first, and the right ring body is fixed on the rod body through the locking structure, and then the left ring body is connected with the right ring body, and then bolts are used to fix them to realize a complete ring body assembly and installation. It can be operated by one person, which greatly improves the installation efficiency;
[0012] 2. When the left and right ring bodies are docked, docking columns and docking holes are used for embedded matching. At the same time, secondary locking is performed through bolts and through holes on the support rods to avoid the separation of the left and right ring bodies after installation, greatly improving stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the utility model.
[0014] Figure 2 for Figure 1 A magnified view of the structure in the middle.
[0015] Figure 3 for Figure 1 Enlarged view of the structure at point B in the middle.
[0016] Among them, 1 is a left ring body, 101 is a docking column, 2 is a right ring body, 201 is a docking hole, 3 is a support rod, 4 is a right arc-shaped fixing cylinder, 5 is a locking arc-shaped plate, 6 is a left arc-shaped fixing cylinder, 7 is a fixing plate, 8 is a through hole, and 9 is a pin shaft. DETAILED DESCRIPTION
[0017] The following is a description of the implementation of the present invention by means of specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0018] It should be noted that in the description of the present utility model, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the utility model product is usually placed when in use, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", "third" and the like are only used to distinguish the description, and cannot be understood as indicating or implying relative importance. Terms such as "horizontal", "vertical", and "overhanging" do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0019] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, it can be a mechanical connection, it can be an electrical connection, it can be a direct connection, it can be indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0020] like Figure 1-3 As shown, a split type pressure equalizing ring comprises a left ring body 1 and a right ring body 2; the left ring body 1 and the right ring body 2 are butt-jointed to form a circular ring body, and support rods 3 are provided at the openings of the left ring body 1 and the right ring body 2; a right arc-shaped fixing cylinder 4 is connected to the top of the support rod 3 located at the right ring body 2, and a locking arc-shaped plate 5 is hinged on one side of the upper part of the right arc-shaped fixing cylinder 4; a left arc-shaped fixing cylinder 6 butt-jointed with the right arc-shaped fixing cylinder 4 is connected to the top of the support rod located at the left ring body 1; fixing plates 7 are provided on both sides of the left arc-shaped fixing cylinder 6 and the right arc-shaped fixing cylinder 4, and fixing holes are evenly opened on the fixing plates 7, and the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder are butt-jointed through the fixing holes on the fixing plates.
[0021] like Figure 1 As shown, corresponding through holes 8 are provided on the support rods of the left ring body 1 and the right ring body 2. The support rods on the left ring body 1 and the right ring body 2 are fixed by pins 9 passing through the through holes. The support rods of the two ring bodies are connected by the pins to form a double clamping force with the two fixing tubes on the top, thereby improving the stability of the left and right ring bodies after installation.
[0022] like Figure 3As shown, a docking column 101 is provided on the ring body at the open end of the left ring body 1, and a docking hole 201 is provided on the ring body at the open end of the right ring body 2. The docking column and the docking hole are inserted and docked together. During installation, the docking column is first docked with the docking hole, and then the arc-shaped fixing cylinder and the arc-shaped fixing cylinder are bolted together to ensure the stability of the left and right ring bodies after assembly and avoid displacement.
[0023] like Figure 1 As shown, the height of the left arc-shaped fixing cylinder 6 is lower than the height of the right arc-shaped fixing cylinder 4 below the locking arc-shaped plate 5, ensuring that after the left and right ring bodies are docked, the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder will not touch the locking arc-shaped plate, thereby ensuring subsequent assembly.
[0024] like Figure 1 As shown, the inner walls of the left arc-shaped fixed cylinder 6 and the right arc-shaped fixed cylinder 4 are provided with a rubber layer, and the rubber layer is used to protect the inner wall of the fixed cylinder and the rod body connected with it to prevent damage, and further improve the friction after installation to avoid falling off; the left arc-shaped fixed cylinder and the right arc-shaped fixed cylinder are fixedly connected by bolts, and the two sets of fixed cylinders are connected by through holes on the fixing plate.
[0025] The working principle of the utility model is explained as follows: when the traditional pressure-equalizing ring cannot be inserted into the top of the connecting rod body, the assembled pressure-equalizing ring of this scheme can be used; when in use, first fix the right ring body to the connecting rod through the locking arc plate, that is, the first step is to install the right ring body, at this time the right ring body has been fixed on the rod body, then dock the docking column of the left ring body with the docking hole, and then connect the left arc-shaped fixing cylinder with the right arc-shaped fixing cylinder; finally, use a pin shaft to connect the connecting rod to ensure the overall stability, that is, the installation of the entire ring body is completed; there is no need to disassemble any objects of the rod body, and it can be completed by one person from the side of the rod body, which is convenient and quick.
[0026] The above-described embodiments are merely descriptions of preferred implementations of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by ordinary personnel in the field to the technical solution of the present invention should fall within the protection scope of the present invention, and the technical contents of the present invention for protection have been fully recorded in the claims.
Claims
1. A split type pressure equalizing ring, characterized in that: It includes a left ring body and a right ring body; the left ring body and the right ring body are connected to form a circular ring body, and support rods are provided at the openings of the left ring body and the right ring body; a right arc-shaped fixing cylinder is connected to the top of the support rod located on the right ring body, and a locking arc-shaped plate is hinged on one side of the upper part of the right arc-shaped fixing cylinder; a left arc-shaped fixing cylinder connected to the right arc-shaped fixing cylinder is connected to the top of the support rod located on the left ring body; fixing plates are provided on both sides of the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder, and fixing holes are evenly opened on the fixing plates.
2. A split type pressure equalizing ring according to claim 1, characterized in that: The support rods of the left ring body and the right ring body are provided with corresponding through holes, and the support rods on the left ring body and the right ring body are fixed by pins passing through the through holes.
3. A split type pressure equalizing ring according to claim 1, characterized in that: A docking post is provided on the ring body at the open end of the left ring body, and a docking hole is provided on the ring body at the open end of the right ring body. The docking post is inserted into the docking hole for docking cooperation.
4. A split type pressure equalizing ring according to claim 1, characterized in that: The height of the left arc-shaped fixing cylinder is lower than the height of the right arc-shaped fixing cylinder below the locking arc-shaped plate.
5. A split type pressure equalizing ring according to claim 1, characterized in that: The inner walls of the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder are both provided with a rubber layer; the left arc-shaped fixing cylinder and the right arc-shaped fixing cylinder are fixedly connected by bolts.
