Ton bag suspension device

By designing a ton bag hanging device that includes a support frame, a winch, a pulley and a hook, the problem of the inability to fully open the ton bag is solved, achieving a higher holding capacity and lower labor intensity.

CN221821740UActive Publication Date: 2024-10-11CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420017870.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-10-11
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

The ton bag has no support device under the salt outlet of the desalination equipment, so it cannot be fully opened, resulting in reduced capacity, spilled salt and high labor intensity for workers.

Method used

Design a ton bag suspension device that includes a support frame, a winch, a pulley, a drawstring and a hook. The pulley on the support frame keeps the drawstring tensioned, and the winch is used to operate the hook to fully open the ton bag, reducing the need for manual adjustment.

Benefits of technology

The capacity of the ton bag is increased, salt spillage is reduced, and the labor intensity of workers is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221821740U_ABST
    Figure CN221821740U_ABST
Patent Text Reader

Abstract

The utility model relates to a ton bag suspension device, and relates to the technical field of packaging machinery. The ton bag hanging device comprises a supporting frame, a winch, a pulley, a pull rope and a hook, the winch is arranged on one side of the supporting frame, the pulley is arranged on the top of the supporting frame, the pull rope penetrates through a sliding groove of the pulley, the first end of the pull rope is connected with the winch, and the hook is arranged at the second end of the pull rope. The hook can hook a lifting lug of the ton bag, the pulley arranged on the supporting frame enables the pull rope to be kept in a tensioning state, the pull rope can pull the lifting lug by operating the winch, and therefore the ton bag can be fully opened, the ton bag does not need to be manually and frequently adjusted, the containing amount of the ton bag can be increased, salt scattering is reduced, and the labor intensity of workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of packaging machinery, in particular to a ton bag hanging device. Background Art

[0002] Large amounts of high-salinity wastewater discharged from industrial wastewater and urban sewage will increase the mineralization of river water. Minerals will not only cause eutrophication of water bodies, salinization of land, and reduction of ecological diversity, but also cause serious pollution to soil, surface water, and groundwater. The current mainstream solution is to treat sewage before discharging it, which can not only reduce the pollution of sewage to the environment but also achieve the recovery and full utilization of waste resources.

[0003] After the salt slurry is separated by the desalination equipment, it is packaged in ton bags, which are placed at the salt outlet of the desalination equipment. At present, since there is no support or hanging device for the ton bags at the lower end of the salt outlet, the ton bags cannot be fully opened and can only be placed flat on the ground. The direction of the ton bags is adjusted manually at any time according to the salt output situation, resulting in problems such as reduced capacity of ton bags, spillage of salt products, and high labor intensity for workers. Utility Model Content

[0004] The utility model provides a ton bag hanging device, which can hang ton bags and fully open the ton bags without frequent manual adjustment of the ton bags, thereby increasing the filling capacity of the ton bags, reducing the spillage of salt products, and reducing the labor intensity of workers.

[0005] The utility model provides a ton bag hanging device, comprising:

[0006] Support frame;

[0007] A winch, wherein the winch is arranged on one side of the support frame;

[0008] A pulley, the pulley being arranged on the top of the support frame;

[0009] A pull rope, the pull rope passes through a slide groove of the pulley, and a first end of the pull rope is connected to the winch; and

[0010] A hook is arranged at the second end of the pull rope.

[0011] In one embodiment, the support frame includes columns and beams vertically connected to each other, and the pulleys are provided on both the columns and the beams.

[0012] In one embodiment, the support frame further includes an extension portion, the extension portion is arranged at an end of the beam away from the column, and the extension portion is provided with a through hole for the pull rope to pass through.

[0013] In one embodiment, a limiting member is provided on the pull rope, and the limiting member is located between the extending portion and the hook.

[0014] In one embodiment, the limiting member is spherical, and the diameter of the limiting member is larger than the aperture of the through hole.

[0015] In one embodiment, the ton bag hanging device further comprises a protective cover, wherein the protective cover is arranged on the supporting frame, and the pulley is located inside the protective cover.

[0016] In one embodiment, the winch is a bidirectional self-locking winch.

[0017] In one embodiment, the ton bag hanging device further includes a base, and the support frame is arranged on the base.

[0018] In one embodiment, the support frames are arranged in pairs on the base.

[0019] In one embodiment, the distance between the winch and the base is less than 1 m.

[0020] Compared with the prior art, the utility model has the advantage that the hook can hook the lifting lug of the ton bag, and the pulley arranged on the support frame enables the pull rope to remain in a tensioned state. By operating the winch, the pull rope can pull the lifting lug, thereby fully opening the ton bag. There is no need for frequent manual adjustment of the ton bag, which can increase the capacity of the ton bag, reduce the spillage of salt, and reduce the labor intensity of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings.

[0022] Figure 1 It is a structural schematic diagram of a ton bag hanging device and a salt outlet in an embodiment of the utility model;

[0023] Figure 2 It is a side schematic diagram of a ton bag hanging device in an embodiment of the utility model;

[0024] Figure 3 yes Figure 1 Enlarged view of point A in the middle.

[0025] Reference numerals:

[0026] 1. Support frame; 11. Column; 12. Crossbeam; 13. Extension part; 131. Through hole; 2. Capstan; 3. Pulley; 4. Pull rope; 5. Hook; 6. Limiting piece; 7. Protective cover; 8. Base; 100. Salt outlet. DETAILED DESCRIPTION

[0027] The utility model will be further described below in conjunction with the accompanying drawings.

[0028] like Figures 1 to 3As shown, a ton bag hanging device of one embodiment of the utility model includes a support frame 1, a winch 2, a pulley 3, a pull rope 4 and a hook 5, the winch 2 is arranged on one side of the support frame 1, the pulley 3 is arranged on the top of the support frame 1, the pull rope 4 passes through the slide groove of the pulley 3, the first end of the pull rope 4 is connected to the winch 2, and the hook 5 is arranged at the second end of the pull rope 4.

[0029] The hook 5 can hook the lifting lug of a ton bag (not shown in the figure), and the pulley 3 arranged on the support frame 1 enables the draw rope 4 to remain in a tensioned state. By operating the winch 2, the draw rope 4 can pull the lifting lug, thereby fully opening the ton bag. After the salt falls from the salt outlet 100, there is no need for frequent manual adjustments to the ton bag, which can increase the capacity of the ton bag, reduce the spillage of salt, and reduce the labor intensity of workers.

[0030] Furthermore, the support frame 1 includes a column 11 and a beam 12 connected vertically to each other, and a pulley 3 is provided on each of the column 11 and the beam 12. The column 11 enables the hook 5 to be at a higher height, so that the ton bag can be fully opened, and the beam 12 enables the ton bag to be spaced a distance from the column 11, so that the ton bag can expand laterally to a certain extent. The pulley 3 enables the pull rope 4 to be arranged along the support frame 1 and maintained in a tensioned state.

[0031] Furthermore, the support frame 1 further includes an extension portion 13, which is disposed at one end of the beam 12 away from the column 11. Figure 3 As shown, the extension portion 13 is provided with a through hole 131 for the pull rope 4 to pass through. By passing the pull rope 4 through the through hole 131, the pull rope 4 can only swing slightly, thereby preventing it from coming off the pulley 3 due to excessive shaking.

[0032] like Figure 1 and Figure 3 As shown, a limiter 6 is provided on the pull rope 4, and the limiter 6 is located between the extension portion 13 and the hook 5. The limiter 6 can prevent the hook 5 from directly contacting the support frame 1, that is, the rising height of the hook 5 is limited, so as to avoid the hook 5 from bearing too much weight and causing the ton bag suspension device to be overstressed as a whole, thereby protecting the structure of the ton bag suspension device.

[0033] Specifically, the stopper 6 is spherical, and the diameter of the stopper 6 is larger than the aperture of the through hole 131, so that the stopper 6 cannot pass through the through hole 131. In addition, the spherical stopper 6 has the same posture no matter how it rotates, and when the stopper 6 abuts against the extension 13, it has better stability.

[0034] like Figure 1 As shown, the ton bag hanging device also includes a protective cover 7, which is arranged on the support frame 1, and the pulley 3 is located inside the protective cover 7, so that the protective cover 7 can protect the pulley 3 and prevent excessive salt particles from adhering to the pulley 3.

[0035] exist Figure 1 In the embodiment shown, the winch 2 is a two-way self-locking winch. When the hook 5 needs to be hung on the ton bag, the hook 5 is adjusted to a lower height by rotating the winch 2. After the hook 5 is hung on the ton bag, the winch 2 is rotated again to raise the hook 5, and the ton bag is fully opened. After the ton bag is full, the winch 2 is rotated in the opposite direction to lower the hook 5 to a certain height, and the hook 5 is removed from the ton bag. The winch 2 is a two-way self-locking winch. Whether the hook 5 is in the process of rising or falling, the winch 2 can be prevented from rotating when the operator is not operating, thereby improving the convenience and safety of the operation.

[0036] exist Figure 1 and Figure 2 In the illustrated embodiment, the ton bag hanging device includes a base 8, and the support frame 1 is arranged on the base 8. The base 8 provides a flat and stable installation position for the support frame 1. The support frame 1 and the base 8 can be detachably connected by fasteners such as screws.

[0037] The support frames 1 are arranged in pairs on the base 8. If there is only one pair of support frames 1, the ton bag hanging device is used to hang ton bags with two lifting ears; if there are two pairs of support frames 1, the ton bag hanging device is used to hang ton bags with four lifting ears; if there are three pairs of support frames 1, the ton bag hanging device is used to hang ton bags with six lifting ears.

[0038] The distance between the winch 2 and the base 8 is less than 1 m, which is convenient for a person to stand on the base 8 to operate the winch 2 .

[0039] Although the present invention has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A ton bag hanging device, characterized in that: include: Support frame; A winch, wherein the winch is arranged on one side of the support frame; A pulley, the pulley being arranged on the top of the support frame; A pull rope, the pull rope passes through a slide groove of the pulley, and a first end of the pull rope is connected to the winch; and A hook is arranged at the second end of the pull rope.

2. The ton bag hanging device according to claim 1, characterized in that: The support frame comprises a column and a beam vertically connected to each other, and the pulley is arranged on both the column and the beam.

3. The ton bag hanging device according to claim 2, characterized in that: The support frame also includes an extension portion, which is arranged at an end of the beam away from the column, and a through hole is provided on the extension portion for the pull rope to pass through.

4. The ton bag hanging device according to claim 3, characterized in that: The pull rope is provided with a limiting piece, and the limiting piece is located between the extending portion and the hook.

5. The ton bag hanging device according to claim 4, characterized in that: The limiting member is spherical, and the diameter of the limiting member is larger than the aperture of the through hole.

6. The ton bag hanging device according to any one of claims 1 to 5, characterized in that: It also includes a protective cover, which is arranged on the supporting frame, and the pulley is located inside the protective cover.

7. The ton bag hanging device according to any one of claims 1 to 5, characterized in that: The winch is a bidirectional self-locking winch.

8. The ton bag hanging device according to any one of claims 1 to 5, characterized in that: It also includes a base, and the support frame is arranged on the base.

9. The ton bag hanging device according to claim 8, characterized in that: The supporting frames are arranged in pairs on the base.

10. The ton bag hanging device according to claim 8, characterized in that: The distance between the winch and the base is less than 1 m.