Crawler-type walking spiral pile drilling machine

By installing the hydraulic auger drill on the excavator and combining it with the excavator's hydraulic system, the problem of high price of multi-functional drilling rig equipment is solved, and the low-cost and efficient construction of hot-dip galvanized spiral ground piles is achieved.

CN221822905UActive Publication Date: 2024-10-11SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420167802.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-11
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

The high price of existing multi-functional drilling rig equipment leads to high construction costs of hot-dip galvanized spiral ground piles.

Method used

Design a crawler-type walking spiral ground pile drilling rig. By installing the hydraulic spiral drilling rig on the front end of the excavator's forearm and connecting it to the hydraulic system of the excavator through a fixed frame, the commercial price of the drill rig is reduced and the hot-dip galvanized spiral ground pile drilling rig is satisfied. Pile construction requirements.

Benefits of technology

It greatly reduces construction costs, improves construction mobility and efficiency, and achieves efficient construction of hot-dip galvanized spiral ground piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822905U_ABST
    Figure CN221822905U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction equipment, and particularly discloses a crawler-type walking spiral ground pile drilling machine which comprises an excavator, a fixing frame, a hydraulic spiral drilling machine and a hot galvanizing spiral ground pile. The fixing frame is detachably installed at the front end of a small arm of the excavator, the hydraulic spiral drilling machine is detachably installed on the fixing frame, an oil inlet pipe and an oil return pipe of the hydraulic spiral drilling machine are connected with a hydraulic system of the excavator, and the output end of the hydraulic spiral drilling machine penetrates through the fixing frame to be connected with the hot galvanizing spiral ground pile. The crawler-type walking spiral ground pile drilling machine has the advantages of being easy to manufacture and install, high in construction maneuverability, high in construction efficiency and the like, and after the hydraulic spiral drilling machine is combined with an excavator, construction of a hot galvanizing spiral ground pile can be met, and meanwhile the construction cost can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to a crawler-type walking spiral pile drilling machine. Background Art

[0002] At present, the foundation of photovoltaic brackets and the light steel structure foundation of flower and vegetable greenhouses all use hot-dip galvanized spiral piles, which need to be constructed with multi-functional drilling rigs. Since the price of multi-functional drilling rigs is relatively high, the construction cost is high. Utility Model Content

[0003] In order to solve the above problems, the utility model provides a crawler type walking spiral pile drilling machine.

[0004] The technical solution adopted by the utility model is:

[0005] A crawler-type walking spiral pile drilling rig comprises an excavator, a fixed frame, a hydraulic spiral drill and a hot-dip galvanized spiral pile; the fixed frame is detachably mounted on the front end of the forearm of the excavator, the hydraulic spiral drill is detachably mounted on the fixed frame, the oil inlet pipe and the oil return pipe of the hydraulic spiral drill are connected to the hydraulic system of the excavator, and the output end of the hydraulic spiral drill passes through the fixed frame and is connected to the hot-dip galvanized spiral pile.

[0006] Furthermore, the fixing frame includes an upper end plate of the fixing frame, a channel steel connecting piece and a lower end plate of the fixing frame; the channel steel connecting piece is vertically arranged, the top of the channel steel connecting piece is fixedly connected to one side of the bottom surface of the upper end plate of the fixing frame, and the bottom of the channel steel connecting piece is fixedly connected to one side of the top surface of the lower end plate of the fixing frame; the upper end plate of the fixing frame and the lower end plate of the fixing frame are symmetrically arranged, and a U-shaped fixing frame is formed after being connected by the channel steel connecting piece; the upper end plate of the fixing frame can be detachably connected to the front end of the forearm of the excavator by a first bolt; the other side of the lower end plate of the fixing frame is provided with an installation groove for matching the hydraulic auger rig, and a steel U-shaped clamp for fixing the hydraulic auger rig; the channel steel connecting piece is symmetrically provided with connecting ear plates for matching the hydraulic auger rig.

[0007] Furthermore, the hydraulic spiral drill rig includes a drill rig body and a drill rig output end; the drill rig body is located in the installation groove of the lower end plate of the fixed frame, and the relative position of the drill rig body and the lower end plate of the fixed frame is fixed by a steel U-shaped clamp; a plug plate is provided on the top of the drill rig body, which can be inserted between two connecting ear plates of the channel steel connector and connected to the two connecting ear plates by a pin; the bottom of the drill rig body passes through the lower end plate of the fixed frame to form a drill rig output end, which is connected to the hot-dip galvanized spiral pile through the drill rig output end.

[0008] Furthermore, a drilling rod capable of being inserted into the hot-dip galvanized spiral ground pile is provided at the bottom of the drilling rig output end, and a plurality of second bolts capable of being connected to the hot-dip galvanized spiral ground pile are arranged around the drilling rig output end.

[0009] Furthermore, the bottom of the hot-dip galvanized spiral ground pile is a spiral ground pile drill bit, and the top of the spiral ground pile is provided with a flange for detachable connection with the output end of the drilling rig; a through hole for the drilling rig drill rod to pass through is provided at the center of the flange, and a plurality of waist-shaped holes for matching the second bolts are circumferentially arranged on the flange.

[0010] The beneficial effects of the utility model are:

[0011] The crawler walking spiral pile drilling rig can install the hydraulic spiral drill rig to the front end of the excavator's forearm through a fixed frame. The market price of the hydraulic spiral drill rig is much lower than that of a multi-functional drilling rig, thereby greatly reducing the construction cost. After the hydraulic spiral drill rig is combined with the excavator, the hydraulic spiral drill rig can meet the construction of hot-dip galvanized spiral piles, and at the same time, the excavator makes the device have higher construction mobility and construction efficiency.

[0012] In summary, the crawler walking spiral pile drilling rig has the advantages of simple manufacturing and installation, strong construction mobility and high construction efficiency. It can solve the construction problems of hot-dip galvanized spiral piles while greatly reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is an overall schematic diagram of the crawler-type walking spiral pile drilling rig of the utility model;

[0014] Figure 2 This is a schematic diagram of the installation of the fixed frame and the excavator of the utility model;

[0015] Figure 3 This is a schematic diagram of the installation of the fixed frame and the hydraulic auger drill of the utility model;

[0016] Figure 4 This is a schematic diagram of the installation of the hydraulic auger drill and the hot-dip galvanized spiral pile of the utility model;

[0017] Figure 5 This is a schematic diagram of the structure of the flange of the utility model;

[0018] In the figure, 1 is an excavator, 2 is a fixed frame, 3 is a hydraulic auger, 4 is a hot-dip galvanized spiral ground pile, 5 is a small arm, 6 is an oil inlet pipe, 7 is an oil return pipe, 8 is an upper end plate of the fixed frame, 9 is a channel steel connector, 10 is a lower end plate of the fixed frame, 11 is a first bolt, 12 is a steel bar U-shaped clamp, 13 is a connecting ear plate, 14 is a drilling rig body, 15 is an output end of the drilling rig, 16 is a latch, 17 is a drilling rod, 18 is a second bolt, 19 is a spiral ground pile drill bit, 20 is a flange, 21 is a through hole, and 22 is a waist-shaped hole. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings of the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] This embodiment provides a crawler type walking spiral pile drilling machine, such as Figure 1 As shown, the crawler-type walking spiral pile drilling machine includes an excavator 1, a fixed frame 2, a hydraulic spiral drill 3 and a hot-dip galvanized spiral pile 4; the excavator 1 removes the bucket, and the hydraulic spiral drill 3 is installed on the arm 5 of the excavator 1 through the fixed frame 2. The crawler-type walking spiral pile drilling machine is moved by the excavator 1, and the hydraulic spiral drill 3 is vertically moved, and the hot-dip galvanized spiral pile 4 is driven to rotate by the hydraulic spiral drill 3 to perform pile construction.

[0021] Specifically, Figure 1 and Figure 2 As shown, the fixing frame 2 includes a fixing frame upper end plate 8, a channel steel connector 9 and a fixing frame lower end plate 10. The channel steel connector 9 is arranged vertically, the top of the channel steel connector 9 is fixedly connected to one side of the bottom surface of the fixing frame upper end plate 8, and the bottom of the channel steel connector 9 is fixedly connected to one side of the top surface of the fixing frame lower end plate 10; the fixing frame upper end plate 8 and the fixing frame lower end plate 10 are symmetrically arranged, and a U-shaped fixing frame 2 is formed after being connected by the channel steel connector 9. The fixing frame upper end plate 8 can be detachably connected to the front end of the arm 5 of the excavator 1 through the first bolt 11; thereby, when the excavator 1 needs to perform excavation construction, the fixing frame 2 is removed to restore the installation of the bucket, and when the ground pile construction is required, the fixing frame 2 is installed on the front end of the arm 5 of the excavator 1. The other side of the fixing frame lower end plate 10 is provided with an installation groove for matching the hydraulic auger 3, and a steel bar U-shaped clamp 12 that can fix the hydraulic auger 3; the channel steel connector 9 is symmetrically provided with a connecting ear plate 13 for matching the hydraulic auger 3.

[0022] like Figure 1 and Figure 3 As shown, the hydraulic auger 3 is a commercially available finished product, and the hydraulic auger 3 includes a auger body 14 and a auger output end 15. A plug plate is provided on the top of the auger body 14, and a auger output end 15 is formed at the bottom of the auger body 14. A auger rod 17 capable of being inserted into the hot-dip galvanized spiral pile 4 is provided at the bottom of the auger output end 15, and four second bolts 18 capable of being connected to the hot-dip galvanized spiral pile 4 are arranged around the auger output end 15. Figure 1 , Figure 3 and Figure 4 As shown, the bottom of the hot-dip galvanized spiral pile 4 is a spiral pile drill bit 19, and the top is provided with a flange 20 for detachably connecting with the output end 15 of the drilling rig; Figure 5 As shown, a through hole 21 for the drill rod 17 to pass through is provided at the center of the flange 20 , and four waist-shaped holes 22 for the second bolts 18 are provided circumferentially on the flange 20 .

[0023] The installation process of the crawler walking spiral pile drilling rig is as follows:

[0024] like Figure 1 and Figure 2 As shown, the excavator 1 removes the bucket, and the upper end plate 8 of the fixing frame can be bolted to the front end of the arm 5 of the excavator 1 through the first bolt 11; after the fixing frame 2 is installed, as shown in FIG. Figure 3 As shown, the drilling body 14 of the hydraulic auger drilling rig 3 is placed in the installation groove of the lower end plate 10 of the fixed frame, and at the same time, the plug plate on the top of the drilling body 14 is ensured to be inserted between the two connecting ear plates 13 of the channel steel connecting member 9; then the drilling body 14 is connected to the two connecting ear plates 13 by the latch 16, and at the same time, the steel U-shaped clamp 12 fixes the drilling body 14 and the lower end plate 10 of the fixed frame. At this time, the bottom of the drilling body 14 passes through the lower end plate 10 of the fixed frame, so that the drilling output end 15 can be connected to the hot-dip galvanized spiral pile 4; finally, the oil inlet pipe 6 and the oil return pipe 7 of the hydraulic auger drilling rig 3 are connected to the hydraulic system of the excavator 1, and the crawler walking spiral pile drilling rig is installed.

[0025] Use this crawler type walking spiral pile drilling rig to carry out pile construction:

[0026] like Figure 1 As shown, after the crawler-type walking spiral pile drilling machine is installed, it is driven to the pile construction area; the commercially purchased hot-dip galvanized spiral pile 4 is erected manually, and the flange 20 on the top of the hot-dip galvanized spiral pile 4 is kept horizontal; the arm 5 of the excavator 1 is moved, so that the drill rod 17 at the bottom of the drill output end 15 is inserted into the hot-dip galvanized spiral pile 4 through the central through hole 21 of the flange 20, and then the flange 20 is slightly rotated manually to connect the drill output end 15 with the flange 20 through the second bolt 18. Finally, the hydraulic system of the excavator 1 and the hydraulic spiral drill 3 are started, and the hydraulic spiral drill 3 rotates clockwise to screw the hot-dip galvanized spiral pile 4 into the soil layer; otherwise, the hydraulic spiral drill 3 rotates counterclockwise to pull the spiral pile out of the soil layer.

[0027] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A crawler type walking spiral pile drilling machine, characterized in that: The crawler-type walking spiral pile drilling machine comprises an excavator, a fixed frame, a hydraulic spiral drill and a hot-dip galvanized spiral pile; the fixed frame is detachably mounted on the front end of the forearm of the excavator, the hydraulic spiral drill is detachably mounted on the fixed frame, the oil inlet pipe and the oil return pipe of the hydraulic spiral drill are connected to the hydraulic system of the excavator, and the output end of the hydraulic spiral drill passes through the fixed frame and is connected to the hot-dip galvanized spiral pile.

2. The crawler type walking spiral pile drilling machine according to claim 1, characterized in that: The fixing frame includes an upper end plate of the fixing frame, a channel steel connecting piece and a lower end plate of the fixing frame; the channel steel connecting piece is vertically arranged, the top of the channel steel connecting piece is fixedly connected to one side of the bottom surface of the upper end plate of the fixing frame, and the bottom of the channel steel connecting piece is fixedly connected to one side of the top surface of the lower end plate of the fixing frame; the upper end plate of the fixing frame and the lower end plate of the fixing frame are symmetrically arranged, and a U-shaped fixing frame is formed after being connected by the channel steel connecting piece; the upper end plate of the fixing frame can be detachably connected to the front end of the forearm of the excavator by a first bolt; the other side of the lower end plate of the fixing frame is provided with an installation groove for matching the hydraulic auger rig, and a steel U-shaped clamp for fixing the hydraulic auger rig; the channel steel connecting piece is symmetrically provided with connecting ear plates for matching the hydraulic auger rig.

3. The crawler type walking spiral pile drilling machine according to claim 2 is characterized in that: The hydraulic screw drill comprises a drill body and a drill output end; the drill body is located in the mounting groove of the lower end plate of the fixing frame, and the relative position of the drill body and the lower end plate of the fixing frame is fixed by a steel bar U-shaped clamp; a plug plate is provided on the top of the drill body, which can be inserted between two connecting ear plates of the channel steel connector and connected to the two connecting ear plates by a plug pin; the bottom of the drill body passes through the lower end plate of the fixing frame to form a drill output end, which is connected to the hot-dip galvanized spiral pile through the drill output end.

4. The crawler-type walking spiral pile drilling machine according to claim 3 is characterized in that: A drilling rod capable of being inserted into the hot-dip galvanized spiral ground pile is provided at the bottom of the drilling rig output end, and a plurality of second bolts capable of being connected to the hot-dip galvanized spiral ground pile are arranged around the drilling rig output end.

5. The crawler-type walking spiral pile drilling machine according to claim 4, characterized in that: The bottom of the hot-dip galvanized spiral ground pile is a spiral ground pile drill bit, and the top of the spiral ground pile is provided with a flange for detachable connection with the output end of the drilling rig; a through hole for the drilling rig drill rod to pass through is provided at the center of the flange, and a plurality of waist-shaped holes for the second bolts are circumferentially arranged on the flange.