Anchor following type slip form secondary lining construction tool
By designing anchor-following sliding form secondary lining construction tools, using anchor rods to fix the gantry mechanism and setting up longitudinal beams and cross beams, the problems of low construction efficiency and high safety risks in the secondary lining of small-span tunnels have been solved, and high stability has been achieved. Safety and low-cost construction results.
Patent Information
- Application Number
- CN202420026107.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-03
AI Technical Summary
The existing secondary lining construction tools for small-span tunnels have problems such as low construction efficiency, difficulty in controlling project quality, high safety risks, and high equipment costs.
An anchor-mounted sliding form secondary lining construction tool was designed, including a gantry mechanism, a traveling mechanism, a support mechanism and a telescopic mechanism. The anchor rod is connected to the tunnel top support anchor rod to achieve stable fixation of the formwork. 30b and 20b tools are used. It is made of steel beams and has longitudinal beams and cross beams to avoid single point stress on a single formwork. The structure is simple, light and fast.
It achieves high stability and low cost of secondary lining construction, saves time, labor and equipment costs, and improves construction efficiency and project quality and safety.
Smart Images

Figure CN221823814U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to an anchor-type sliding formwork secondary lining construction tool. Background Art
[0002] Secondary lining is cast concrete or reinforced concrete lining constructed inside the primary support during tunnel construction, and together with the primary support, it forms a composite lining. Compared with primary support, secondary lining refers to the inner lining constructed with concrete and other materials after the tunnel has been initially supported, in order to strengthen support, optimize route drainage system, beautify appearance, and facilitate the installation of communication, lighting, monitoring and other facilities, so as to meet the requirements of modern highway tunnel construction.
[0003] Secondary lining trolleys are often used in secondary lining construction. Tunnel secondary lining trolleys are indispensable special equipment in the secondary lining of the tunnel construction process. However, secondary lining trolleys are mostly large-scale and complex mechanical equipment, suitable for large-span tunnel construction, but for some small-span tunnels of 3-6 meters, they are often not applicable. At present, the secondary lining construction of small-span tunnels is mostly completed with the assistance of traditional temporary brackets and simple templates. This traditional method has low construction efficiency, difficult to control project quality and high safety risks. There are also some trolleys suitable for small spans in the prior art, but in order to improve the stability of the support, this trolley often needs to be equipped with a relatively large portal frame and hydraulic system, which has a complex structure and high cost. Utility Model Content
[0004] The purpose of the utility model is to provide an anchor-type slipform secondary lining construction tool to solve the above-mentioned technical problems. The secondary lining construction tool of this technical solution has a simple structure, is light and fast to transfer, and has high stability, thereby greatly saving time, labor and equipment costs.
[0005] To achieve the above-mentioned purpose, the technical solution of the utility model is: an anchor-type slipform secondary lining construction tool, comprising a gantry mechanism and a walking mechanism arranged at the bottom of the gantry mechanism, the walking mechanism facilitates the construction movement of the construction tool, a supporting mechanism is arranged on the periphery of the gantry mechanism, a telescopic mechanism is arranged on the supporting mechanism, the supporting mechanism is used to fix the telescopic mechanism, the telescopic mechanism is connected to the formwork mechanism, the telescopic mechanism can make the formwork mechanism telescope to realize formwork erection and demoulding, anchor rods are also arranged at intervals on the periphery of both ends of the gantry mechanism, which are connected to the supporting anchor rods on the top of the tunnel through the anchor rods, and the gantry mechanism is well fixed by the anchoring tension of the anchor rods, so that the support effect of the formwork is very good.
[0006] Furthermore, two gantry mechanisms are provided, and the two gantry mechanisms are arranged along the length direction of the tunnel. The gantry mechanism includes a vertical beam and a top beam, and the top beam is arc-shaped.
[0007] Furthermore, the support mechanism is arranged at intervals along the outer edges of the two vertical beams and the two top beams between the two door frame mechanisms.
[0008] Furthermore, the vertical beam and the top beam are made of 30b I-beam.
[0009] Furthermore, the supporting mechanism is a 20b I-beam.
[0010] Furthermore, the anchor rod passes through the vertical beam and the horizontal beam of the door clamp mechanism and is fixed to the vertical beam and the horizontal beam by bolts.
[0011] Furthermore, the formwork mechanism includes a side formwork and a top formwork, the side formwork is arranged on the outside between the two vertical beams, and the top formwork is arranged above the two top beams. The side formwork is a square plate, and the side formwork is an arc-shaped plate.
[0012] Furthermore, the template structure is formed by splicing a plurality of single templates, a plurality of longitudinal beams are arranged at intervals on the inner side of the single template, and a plurality of transverse beams are arranged at intervals on the longitudinal beams. This design can avoid single-point force on the single template and avoid damage to the single template.
[0013] Furthermore, a plurality of the telescopic mechanisms are arranged at intervals on the supporting mechanism, and the telescopic ends of the telescopic mechanisms are connected to the crossbeams of the single template.
[0014] Furthermore, the telescopic mechanism is a jack or a cylinder.
[0015] Compared with the prior art, the beneficial effects of the utility model are:
[0016] The utility model provides an anchor-type slipform secondary lining construction tool, which is connected to the supporting anchor rods on the top of the tunnel through anchor rods, and the anchoring tension of the anchor rods is used to fix the door frame mechanism well, so that the supporting effect of the formwork is very good; by simplifying the door frame mechanism, the equipment cost is reduced; by arranging longitudinal beams and transverse beams on the single formwork, the single formwork will not be subjected to single-point force, the structure is more stable, and the single formwork will not be easily damaged. The secondary lining construction tool of this technical solution has a simple structure, is light and fast to transfer, and has high stability, thereby greatly saving time, labor and equipment costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1This is the axonometric diagram of the overall structure of the utility model in use state;
[0019] Figure 2 This is the main view of the overall structure of the utility model;
[0020] Figure 3 This is a schematic diagram of the internal structure of the utility model;
[0021] Figure 4 For this utility model Figure 3 A schematic diagram of the enlarged structure in the middle.
[0022] Numbers in the figure: 1. gantry mechanism; 2. supporting mechanism; 3. telescopic mechanism; 4. formwork mechanism; 5. tunnel; 6. anchor rod; 7. single formwork; 8. cross beam; 9. longitudinal beam; 10. walking mechanism; 11. vertical beam; 12. top beam; 13. side formwork, 14. top formwork. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Example 1
[0025] like Figure 1-4 As shown, an anchor-type slipform secondary lining construction tool includes a portal mechanism 1 and a walking mechanism 10 arranged at the bottom of the portal mechanism 1. The walking mechanism 10 facilitates the construction movement of the construction tool. Two portal mechanisms 1 are provided, and the two portal mechanisms 1 are arranged along the length direction of the tunnel 5. The portal mechanism 1 includes a vertical beam 11 and a top beam 12, and the top beam 12 is arc-shaped.
[0026] A support mechanism 2 is arranged on the periphery of the portal mechanism 1, and the support mechanism 2 is arranged at intervals along the outer edges of the two vertical beams 11 and the two top beams 12 between the two portal mechanisms 1. A telescopic mechanism 3 is arranged on the support mechanism 2, and the support mechanism 2 is used to fix the telescopic mechanism 3. The telescopic mechanism 3 is connected to the template mechanism 4. A plurality of telescopic mechanisms 3 are arranged at intervals on the support mechanism 2. The template mechanism 4 is composed of a plurality of single templates 7. A plurality of longitudinal beams 9 are arranged at intervals on the inner side of the single template 7, and a plurality of cross beams 8 are arranged at intervals on the longitudinal beams 9. This design can prevent the single template 7 from being subjected to single-point force and damage to the single template 7.
[0027] The telescopic end of the telescopic mechanism 3 is connected to the cross beam 8 of the single template 7. The telescopic mechanism 3 can make the template mechanism 4 telescopic to achieve template erection and demoulding. Anchor rods 6 are also arranged at intervals on the periphery of both ends of the portal mechanism 1. The anchor rods 6 penetrate the vertical beams 11 and the cross beams 8 of the door clamp mechanism and are fixed to the vertical beams 11 and the cross beams 8 by bolts. The anchor rods 6 are connected to the support anchor rods 6 at the top of the tunnel 5, and the portal mechanism 1 is well fixed by the anchoring tension of the anchor rods 6, so that the support effect of the template is very good.
[0028] The template mechanism 4 includes a side template 13 and a top template 14. The side template 13 is arranged outside between the two vertical beams 11, and the top template 14 is arranged above between the two top beams 12. The side template 13 is a square plate, and the side template 13 is an arc plate.
[0029] Example 2
[0030] This embodiment is based on the embodiment 1, and its further solution is: specifically, the telescopic mechanism 3 is a jack or a cylinder, the vertical beam 11 and the top beam 12 are made of 30b I-beam, and the supporting mechanism 2 is a 20b I-beam.
[0031] The production process of this device:
[0032] A 30b I-beam of appropriate length is selected as the material of the vertical beam 11. Each vertical beam 11 is welded by two 30b I-beam flanges. A 30b I-beam is selected from the top beam 12 for bending to form an arc, which is also welded by two 30b I-beam flanges. Finally, the vertical beam 11 and the top beam 12 are welded to form a gantry of the gantry mechanism 1. Two gantries are made and placed at both ends. Casters are installed at the bottom ends of the four vertical beams 11 as the walking mechanism 10. A 20b I-beam of appropriate length is selected as the supporting mechanism 2. The two ends of the supporting mechanism 2 are respectively welded to the outside of the vertical beams 11 and the top beam 12 at both ends. Multiple supporting mechanisms 2 are welded at intervals, and then holes are positioned and punched on the supporting mechanism 2 for installing the telescopic mechanism 3, which is selected as a cylinder here. Holes are punched at intervals on the vertical beams 11 and the top beam 12 as anchors. The mounting point of the rod 6 is then used to make a single formwork 7 of appropriate size. The single formwork 7 of the side formwork 13 is a flat box structure with an open side. The bottom surface of the single formwork 7 serves as a supporting surface. The side formwork 13 is a box with an arc-shaped cross section. A plurality of longitudinal beams 9 are welded vertically at intervals inside the single formwork 7, 3 of which are selected here. Two cross beams 8 are welded at the upper and lower ends of the longitudinal beams 9. The longitudinal beams 9 and cross beams 8 of the single formwork 7 of the top formwork 14 are both arc-shaped. The telescopic rods of the four cylinders on the two supporting mechanisms 2 are respectively connected to the corresponding four end points of the corresponding two cross beams 8. In this way, a single formwork 7 is controlled by four cylinders. Therefore, a relatively large size of the single formwork 7 can be selected. A small number of single formworks 7 can be spliced into a side formwork 13 or a top formwork 14. According to the prior art, an observation window and a concrete access port are provided on a certain single formwork 7.
[0033] Usage process:
[0034] The track of the walking mechanism 10 is positioned and installed inside the tunnel 5, and the construction tool is moved to the track by the winch equipment, and then all the parts are assembled, and the oil cylinder is operated, and then the top template 14 is positioned and erected. After the top template 14 is in place, the side template 13 is erected, and then one end of the anchor rod 6 is installed on the top beam 12 and the vertical beam 11 by bolts, and the other end is connected to the supporting anchor point of the tunnel 5. At this time, the door frame mechanism 1 is fixed, and after the side template 13 and the top template 14 are in place, the end templates are installed at both ends of the door clamp mechanism for sealing, and then concrete pouring can be carried out, and finally demolding. The other construction processes of this construction tool are the same as the prior art.
[0035] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. An anchor-type slipform secondary lining construction tool, characterized in that: The invention comprises a gantry mechanism (1) and a walking mechanism (10) arranged at the bottom of the gantry mechanism (1); a supporting mechanism (2) is arranged on the periphery of the gantry mechanism (1); a telescopic mechanism (3) is arranged on the supporting mechanism (2); the supporting mechanism (2) is used to fix the telescopic mechanism (3); the telescopic mechanism (3) is connected to a template mechanism (4); the telescopic mechanism (3) can make the template mechanism (4) telescopic; and anchor rods (6) are arranged at intervals on the periphery of both ends of the gantry mechanism (1).
2. The anchor-type slipform secondary lining construction tool according to claim 1, characterized in that: Two gantry mechanisms (1) are provided, and the two gantry mechanisms (1) are arranged along the length direction of the tunnel (5). The gantry mechanism (1) comprises a vertical beam (11) and a top beam (12), and the top beam (12) is arc-shaped.
3. The anchor-type slipform secondary lining construction tool according to claim 2 is characterized in that: The support mechanism (2) is arranged at intervals along the outer edges of the two vertical beams (11) and the two top beams (12) between the two door frame mechanisms (1).
4. The anchor-type slipform secondary lining construction tool according to claim 3 is characterized in that: The anchor rod (6) passes through the vertical beam (11) and the horizontal beam (8) of the door clamp mechanism, and is fixed to the vertical beam (11) and the horizontal beam (8) by bolts.
5. The anchor-type slipform secondary lining construction tool according to claim 4 is characterized in that: The template mechanism (4) comprises a side template (13) and a top template (14), wherein the side template (13) is arranged on the outside between the two vertical beams (11), and the top template (14) is arranged above the two top beams (12), and the side template (13) is a square plate, and the side template (13) is an arc-shaped plate.
6. The anchor-type slipform secondary lining construction tool according to claim 5 is characterized by: The template mechanism (4) is formed by splicing a plurality of single templates (7), a plurality of longitudinal beams (9) are arranged at intervals on the inner side of the single template (7), and a plurality of transverse beams (8) are arranged at intervals on the longitudinal beams (9).
7. The anchor-type slipform secondary lining construction tool according to claim 6 is characterized by: A plurality of the telescopic mechanisms (3) are arranged at intervals on the support mechanism (2), and the telescopic ends of the telescopic mechanisms (3) are connected to the crossbeam (8) of the single template (7).