Round tunnel reinforcing steel bar storage platform car
By designing a circular tunnel steel bar storage platform truck, the problem of traffic obstruction caused by the stacking of steel bars and construction materials during hydraulic tunnel construction was solved, achieving smooth passage of construction personnel and materials, and improving construction efficiency and space utilization.
Patent Information
- Application Number
- CN202323638271.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During the construction of hydraulic tunnels, steel bars and other construction materials in the concrete lining section are piled on the construction channel, which hinders the passage of construction personnel and construction materials and affects the construction progress.
A circular tunnel steel bar storage platform vehicle is designed, which includes a carrier frame, a support frame and a rotationally connected pulley. Cross beams and guardrails are set on the carrier frame. The support frame forms a space for other equipment to pass through the first and second support frames. The pulleys are driven by slide-rail motors, the surface of the carrier and support frames are covered with anti-corrosion coating, and the load is controlled within 10 tons.
By stacking steel bars and other construction materials on the beams, obstacles on the construction channel are removed, underground construction space is saved, tunnel traffic pressure is relieved, construction personnel and materials are ensured to flow smoothly, and construction progress on other working faces is avoided.
Smart Images

Figure CN221823823U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of hydraulic tunnel construction equipment, and specifically, relates to a circular tunnel steel bar storage platform vehicle. Background Art
[0002] A hydraulic tunnel is a water tunnel dug in a mountain or underground. It can be used for irrigation, power generation, water supply, water discharge, water delivery, construction diversion and navigation. In the construction of hydraulic tunnel concrete lining, the common concrete lining combination is "rebar binding trolley + steel membrane lining trolley".
[0003] When this type of lining combination is used for construction, the steel bars and other construction materials of the concrete lining section are usually piled on the construction passage, which hinders the passage of construction workers and some construction materials that need to be transported to the front, thereby affecting the construction progress of other working surfaces. Utility Model Content
[0004] In order to overcome the problems existing in the background technology, the present application provides a circular tunnel steel bar storage platform vehicle, which aims to solve the problem that the steel bars and other construction materials of the concrete lining section are piled on the construction channel, resulting in obstruction of the passage of construction personnel and some construction materials that need to be transported to the front, thereby affecting the construction progress of other work surfaces.
[0005] To achieve the above objectives, this application is implemented through the following technical solutions:
[0006] A circular tunnel steel bar storage platform vehicle, the circular tunnel steel bar storage platform vehicle comprising a carrier for storing steel bars, a support frame arranged at the lower end of the carrier, and a pulley rotatably connected to the lower end of the support frame;
[0007] The carrier includes a crossbeam and a guardrail, and the guardrail is fixed to the upper end of the crossbeam;
[0008] The support frame includes a first support frame arranged at one end of the beam, and a second support frame arranged at the other end of the beam;
[0009] There are multiple groups of cross beams arranged in parallel at intervals, and there are multiple groups of first support frames and second support frames symmetrically distributed. The multiple groups of cross beams correspond to the multiple groups of first support frames and the multiple groups of second support frames one by one, respectively, and together form a space allowing other equipment to pass through.
[0010] Optionally, the first support frame includes a first column and a first diagonal brace;
[0011] The upper end of the first column is fixedly connected to the lower end of the cross beam, the lower end of the first column is rotatably connected to a pulley, and the first diagonal brace is fixed between the cross beam and the first column.
[0012] Optionally, the second support frame includes a second column and a second diagonal brace;
[0013] The upper end of the second column is fixedly connected to the lower end of the cross beam, the lower end of the second column is rotatably connected to a pulley, and the second diagonal brace is fixed between the cross beam and the first column.
[0014] Optionally, a first staircase is welded to the side wall and the bottom of the first diagonal brace, and a second staircase is welded to the side wall and the bottom of the second diagonal brace.
[0015] Optionally, the pulley is driven by a slide motor.
[0016] Optionally, a first connecting rod is fixed between the two first diagonal braces, and a second connecting rod is fixed between the two second diagonal braces.
[0017] Optionally, the main body of the circular tunnel steel bar storage platform vehicle is 12m long and 6.56m high.
[0018] Optionally, the cross beam is made of H-shaped steel HM340×250, and the first column and the second column are made of H-shaped steel HM294×200.
[0019] Optionally, the surfaces of the carrier and the support frame are covered with an anti-corrosion coating.
[0020] Optionally, the weight limit of the circular tunnel steel bar storage platform vehicle is 10 tons.
[0021] The beneficial effects of the present application are as follows: The present application replaces the traditional method of piling steel bars and other construction materials on the tunnel pavement construction channel by piling them on a beam with a certain height, thereby removing obstacles on the construction channel, saving underground construction space, avoiding tunnel traffic congestion caused by piling construction materials, and greatly alleviating the pressure on tunnel traffic, thereby making the passage of construction personnel and some construction materials that need to be transported to the front smooth, thereby avoiding slowing down the construction progress of other work surfaces. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 is the main view of this application;
[0023] Figure 2 It is a side view of the present application.
[0024] In the figure, 1 is a carrier, 2 is a support frame, 3 is a pulley, 11 is a crossbeam, 12 is a guardrail, 21 is a first support frame, 22 is a second support frame, 211 is a first column, 212 is a first diagonal brace, 213 is a first connecting rod, 221 is a second column, 222 is a second diagonal brace, 223 is a second connecting rod, 2121 is a first staircase, and 2221 is a second staircase. DETAILED DESCRIPTION
[0025] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0026] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0027] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary construction personnel in this field, the specific meanings of the above terms in the present invention can be understood according to the specific situation.
[0028] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0029] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples" or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, construction personnel in this field may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples without contradiction.
[0030] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. Ordinary construction personnel in the field may change, modify, replace and modify the above embodiments within the scope of the present invention.
[0031] The above description is only an optional embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0032] In order to make the purpose, technical solution and beneficial effects of the present application clearer, the preferred embodiments of the present application will be described in detail below in conjunction with the accompanying drawings to facilitate the understanding of construction personnel.
[0033] Embodiment 1:
[0034] See also Figure 1 and Figure 2 A circular tunnel steel bar storage platform vehicle, the circular tunnel steel bar storage platform vehicle comprises a carrier 1 for storing steel bars, a support frame 2 arranged at the lower end of the carrier 1, and a pulley 3 rotatably connected to the lower end of the support frame 2;
[0035] The carrier 1 includes a crossbeam 11 and a guardrail 12, and the guardrail 12 is fixed to the upper end of the crossbeam 11;
[0036] The support frame 2 includes a first support frame 21 disposed at one end of the beam 11, and a second support frame 22 disposed at the other end of the beam 11;
[0037] There are multiple groups of cross beams 11 arranged in parallel at intervals, and there are multiple groups of first support frames 21 and second support frames 22 arranged symmetrically. The multiple groups of cross beams 11 correspond to the multiple groups of first support frames 21 and the multiple groups of second support frames 22 one by one, respectively, and together form a space allowing other equipment to pass through.
[0038] Among them, the steel bars and other construction materials are stacked on the crossbeam 11, which has a certain width. The construction workers stand on the crossbeam 11 to cooperate with the subsequent construction work. By stacking the steel bars and other construction materials on the crossbeam 11 with a certain height, the traditional method of stacking the steel bars and other construction materials on the tunnel pavement construction channel is replaced, thereby removing the obstacles on the construction channel, so that the construction workers and some construction materials that need to be transported to the front can pass smoothly, thereby avoiding slowing down the construction progress of other working surfaces;
[0039] The guardrail 12 has a certain height to prevent construction workers from falling from the crossbeam 11 due to accidents. The guardrail 12 and the crossbeam 11 are connected by bolts and can be quickly disassembled and installed.
[0040] The first support frame 21 and the second support frame 22 are symmetrically distributed at both ends of the beam 11 with the center line of the beam 11 as the symmetry axis, and are used to support the beam 11, as well as the construction workers, steel bars and other construction materials placed on the beam 11;
[0041] Since the crossbeam 11 has a certain height, and the first support frame 21 and the second support frame 22 are symmetrically distributed at both ends of the crossbeam 11, multiple groups of crossbeams 11 and multiple groups of first support frames 21 and multiple groups of second support frames 22 will form a space. Since the steel bars and other construction materials are piled on the crossbeam 11 with a certain height, the space will become open and unobstructed due to the lack of debris. The lack of obstruction of debris allows other equipment to pass quickly, thereby speeding up the construction progress of other work surfaces.
[0042] The circular tunnel steel bar storage platform car shares the same track with the steel bar binding trolley and the steel membrane lining trolley. The rail is P50 and is placed in front of the steel bar binding trolley. The platform car is moved by driving pulley 3, and then the building materials required for the construction are transported to the steel bar storage platform car through the cooperation of the crane. In cooperation with the steel bar binding trolley construction operation, the cooperation of the crane can improve the operation efficiency of the steel bars and speed up the construction progress.
[0043] Embodiment 2:
[0044] See also Figure 1 and Figure 2 , the first support frame 21 includes a first column 211 and a first diagonal brace 212;
[0045] The upper end of the first column 211 is fixedly connected to the lower end of the beam 11 , the lower end of the first column 211 is rotatably connected to the pulley 3 , and the first diagonal brace 212 is fixed between the beam 11 and the first column 211 .
[0046] The first column 211 is used to support one end of the beam 11, and the pulley 3 at the lower end of the first column 211 can drive the first column 211, the first diagonal support 212 and the beam 11 to move;
[0047] By providing the first diagonal brace 212 , a triangular structure is formed among the first column 211 , the cross beam 11 and the first diagonal brace 212 , thereby improving the structural strength and stability of the first support frame 21 , and further increasing the load-bearing capacity of the cross beam 11 .
[0048] The second support frame 22 includes a second column 221 and a second diagonal support 222;
[0049] The upper end of the second column 221 is fixedly connected to the lower end of the beam 11 , the lower end of the second column 221 is rotatably connected to the pulley 3 , and the second diagonal brace 222 is fixed between the beam 11 and the first column 211 .
[0050] The second column 221 is used to support the other end of the beam 11, and the pulley 3 at the lower end of the second column 221 can drive the second column 221, the second diagonal support 222 and the beam 11 to move;
[0051] By providing the second diagonal brace 222 , a triangular structure is formed among the second column 221 , the cross beam 11 and the second diagonal brace 222 , thereby improving the structural strength and stability of the first support frame 21 , and further increasing the load-bearing capacity of the cross beam 11 .
[0052] A first staircase 2121 is welded to the side wall and the bottom of the first diagonal brace 212 , and a second staircase 2221 is welded to the side wall and the bottom of the second diagonal brace 222 .
[0053] The construction workers can climb onto the carrier 1 or climb down the unloading frame 1 through the first staircase 2121 and the second staircase 2221 so as to better perform construction work.
[0054] The pulley 3 is driven by a slide rail motor.
[0055] The track where the pulley 3 is located is consistent with the track where the steel bar binding trolley and the steel film lining trolley are located. The steel rail is P50. The slide rail motor is started to drive the pulley 3 to rotate. The pulley 3 drives the first column 211 and the second column 221 to move synchronously, thereby driving the circular tunnel steel bar storage platform vehicle to move as a whole, so as to cooperate with the construction operation of the steel bar binding trolley;
[0056] A first connecting rod 213 is fixed between the two first diagonal braces 212 , and a second connecting rod 223 is fixed between the two second diagonal braces 222 .
[0057] The first connecting rod 213 can improve the structural strength of the first diagonal brace 212 , thereby increasing the supporting force of the two first diagonal braces 212 ; the second connecting rod 2223 can improve the structural strength of the two second diagonal braces 222 , thereby increasing the supporting force of the two second diagonal braces 222 .
[0058] The main body of the circular tunnel steel bar storage platform vehicle is 12m long and 6.56m high.
[0059] The length of the platform car is designed according to the size of the steel bars used in the construction section to facilitate the stacking of the steel bars, and its height is designed according to the height of other construction equipment below to ensure that other construction equipment can pass smoothly without obstruction.
[0060] The cross beam 11 is made of H-shaped steel HM340×250, and the first column 211 and the second column 221 are made of H-shaped steel HM294×200.
[0061] The cross-sectional characteristics of H-shaped steel are superior to those of traditional I-shaped steel, channel steel and angle steel. H-shaped steel is an economical and efficient profile with a more optimized cross-sectional area distribution and a more reasonable strength-to-weight ratio. The inner sides of the two outer edges of H-shaped steel have no slope and are straight, which makes the welding and splicing of H-shaped steel simpler than that of I-shaped steel, and has better mechanical properties per unit weight, which can save a lot of materials and construction time.
[0062] The surfaces of the carrier 1 and the support frame 2 are both covered with an anti-corrosion coating.
[0063] Anti-corrosion coating refers to a covering layer applied on the metal surface to isolate it from the surrounding medium to control metal corrosion. The anti-corrosion coating has good electrical insulation and water-proof properties, strong adhesion to the metal surface, resistance to chemical damage and certain mechanical strength. By covering the surface of the carrier 1 and the support frame 2 with the anti-corrosion coating, the service life of the platform vehicle can be improved.
[0064] The weight limit of the circular tunnel steel bar storage platform vehicle is 10 tons.
[0065] In order to ensure the service life of the platform vehicle and the safety of construction workers, the load capacity of the circular tunnel steel bar storage platform vehicle is controlled below 10 tons.
[0066] The working process of this application is as follows: when in use, the steel bars and other construction materials are stacked on the carrier 1, the slide rail motor is started, the pulley 3 is driven to rotate, and the pulley 3 drives the support frame 2 to move, thereby driving the circular tunnel steel bar storage platform vehicle to move as a whole to cooperate with the construction operation of the steel bar binding trolley. While the circular tunnel steel bar storage platform vehicle is under construction, other equipment quickly passes under the circular tunnel steel bar storage platform vehicle to operate on other construction surfaces.
[0067] To summarize, the present application replaces the traditional method of stacking steel bars and other construction materials in the tunnel pavement construction channel by stacking steel bars and other construction materials on a beam 11 with a certain height, thereby removing obstacles on the construction channel, saving underground construction space, avoiding tunnel traffic congestion caused by stacking construction materials, and greatly alleviating the pressure on tunnel traffic, thereby making the passage of construction personnel and some construction materials that need to be transported to the front smooth, thereby avoiding slowing down the construction progress of other work surfaces; by setting a support frame 2 to support the carrier 1; by setting a first staircase 2121 and a second staircase 2221, construction personnel can climb onto the carrier 1 or climb down the unloading frame 1 to better carry out construction work; by setting a pulley 3 to drive the circular tunnel steel bar storage platform car to move as a whole, so as to cooperate with the construction work of the steel bar binding trolley; by covering the surfaces of the carrier 1 and the support frame 2 with an anti-corrosion coating, the service life of the platform car is improved.
[0068] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solution of the present application rather than to limit it. Although the present application has been described in detail through the above preferred embodiments, construction personnel in this field should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present application; the dimensions of the drawings are not related to the specific objects, and the dimensions of the objects can be changed arbitrarily.
Claims
1. A circular tunnel steel bar storage platform vehicle, characterized in that: The circular tunnel steel bar storage platform vehicle comprises a carrier (1) for storing steel bars, a support frame (2) arranged at the lower end of the carrier (1), and a pulley (3) rotatably connected to the lower end of the support frame (2); The carrier (1) comprises a crossbeam (11) and a guardrail (12), wherein the guardrail (12) is fixed to the upper end of the crossbeam (11); The support frame (2) comprises a first support frame (21) arranged at one end of the crossbeam (11), and a second support frame (22) arranged at the other end of the crossbeam (11); A plurality of groups of cross beams (11) are arranged in parallel at intervals, and a plurality of groups of first support frames (21) and second support frames (22) are symmetrically distributed. The plurality of groups of cross beams (11) correspond to the plurality of groups of first support frames (21) and the plurality of groups of second support frames (22) one by one, respectively, and together form a space allowing other equipment to pass through.
2. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The first support frame (21) comprises a first upright column (211) and a first diagonal brace (212); The upper end of the first column (211) is fixedly connected to the lower end of the cross beam (11), the lower end of the first column (211) is rotatably connected to the pulley (3), and the first diagonal brace (212) is fixed between the cross beam (11) and the first column (211).
3. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The second support frame (22) comprises a second upright column (221) and a second diagonal brace (222); The upper end of the second column (221) is fixedly connected to the lower end of the crossbeam (11), the lower end of the second column (221) is rotatably connected to the pulley (3), and the second diagonal brace (222) is fixed between the crossbeam (11) and the first column (211).
4. The circular tunnel steel bar storage platform vehicle according to claim 1, 2 or 3, characterized in that: A first staircase (2121) is welded to the side wall and bottom of the first diagonal brace (212), and a second staircase (2221) is welded to the side wall and bottom of the second diagonal brace (222).
5. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The pulley (3) is driven by a slide motor.
6. The circular tunnel steel bar storage platform vehicle according to claim 1, 2 or 3, characterized in that: A first connecting rod (213) is fixed between the two first diagonal braces (212), and a second connecting rod (223) is fixed between the two second diagonal braces (222).
7. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The main body of the circular tunnel steel bar storage platform vehicle is 12m long and 6.56m high.
8. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The cross beam (11) is made of H-shaped steel HM340×250, and the first column (211) and the second column (221) are made of H-shaped steel HM294×200.
9. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The surfaces of the carrier (1) and the support frame (2) are both covered with an anti-corrosion coating.
10. The circular tunnel steel bar storage platform vehicle according to claim 1, characterized in that: The weight limit of the circular tunnel steel bar storage platform vehicle is 10 tons.