Surrounding rock stabilizing structure for long tunnel construction

By adopting the design of guard plates, springs, clamps and buffer structures during tunnel construction, the assembly process is simplified and the stability of the surrounding rock is improved. The problems of extended construction period and poor adaptability to changes in the surrounding rock in the existing technology are solved and achieved. for safer and more stable tunnel construction.

CN221823825UActive Publication Date: 2024-10-11SHANGHAI XIANXING CONSTR SUPERVISION CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420560114.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-11
Estimated Expiration
2034-03-22

Smart Images

  • Figure CN221823825U_ABST
    Figure CN221823825U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of tunnel supporting structures, and discloses a surrounding rock stabilizing structure for long tunnel construction, which comprises two protective plates, buffer components are arranged on opposite sides of the two protective plates, a top cover is arranged at the tops of the two protective plates, and embedded plates are fixedly connected to the left side and the right side of the bottom of the top cover. Clamping grooves are formed in the two ends of the opposite sides of the two embedding plates correspondingly, two springs are fixedly connected to the tops of the opposite sides of the two protection plates correspondingly, clamping blocks are fixedly connected to the sides, away from each other, of the springs on the left side and the right side correspondingly, and the sides, away from each other, of the clamping blocks on the left side and the right side are connected into the multiple clamping grooves in the left side and the right side in an embedded mode correspondingly; pull rods are fixedly connected to the sides, away from each other, of the clamping blocks on the left side and the right side. According to the utility model, through the mutual cooperation of the protective plate, the spring, the clamping block, the top cover and the embedded plate, the simplified assembly process and the modular design, the overall efficiency of construction can be improved, and workers can complete the assembly task more quickly, so that the construction period is shortened, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel support structures, in particular to a surrounding rock stabilizing structure for long tunnel construction. Background Art

[0002] A tunnel is an underground passage formed by artificial excavation or drilling, usually used in the fields of transportation, water conservancy, mining, energy, etc. In tunnel engineering, the stability of the surrounding rock structure is one of the key factors to ensure the safe and effective operation of the tunnel, and improve the overall safety and reliability of the tunnel. This is crucial to ensure that the tunnel is not affected by surrounding rock collapse, rock burst and other problems during operation.

[0003] Chinese patent announcement number: CN206092004U discloses a loess tunnel construction initial support device, including a steel arch frame, an advance small conduit and a mesh sprayed concrete support layer, the steel arch frame is composed of an I-beam, a steel plate joint, and a high-strength bolt group, and two adjacent steel arch frames are connected by reinforced steel bars, and a locking anchor assembly is provided on both sides of a single steel arch frame, the advance small conduit is arranged along the tunnel excavation contour line, and the tail end of the advance small conduit is welded and fixed to the steel arch frame, and the mesh sprayed concrete support layer is composed of a steel mesh and a concrete layer wrapped around the outside of the steel mesh. The utility model optimizes the overall structure and has the characteristics of timely support, good flexibility, high density, good stress conditions, safe construction, good long-term stability of the surrounding rock, good tight adhesion with the surrounding rock, close contact with the surrounding rock without gaps, and common bearing deformation with the surrounding rock.

[0004] The construction process of the support device is too complicated. During the construction process, it is necessary to weld steel bars and pour cement according to the tunnel and surrounding rock data, which makes the construction process too long and prolongs the project period. At the same time, since the assembly process of the surrounding rock stabilization structure is complicated and rigid, it is difficult to flexibly adapt to changes, resulting in difficulty in adjustment. This situation can be effectively avoided by prefabricated components. Therefore, a surrounding rock stabilization structure for long tunnel construction is proposed to solve the above problems. Utility Model Content

[0005] In order to make up for the above shortcomings, the utility model provides a surrounding rock stabilization structure for long tunnel construction, aiming to improve the problems in the prior art that the cumbersome construction process leads to a prolonged construction period, increased costs and affects the engineering plan.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a surrounding rock stabilization structure for long tunnel construction, comprising two guard plates, a buffer assembly is provided on the opposite sides of the two guard plates, a top cover is provided on the top of the two guard plates, and a mosaic plate is fixedly connected on the left and right sides of the bottom of the top cover, and the two ends of the opposite sides of the two mosaic plates are provided with a slot, and the tops of the opposite sides of the two guard plates are fixedly connected with two springs, and the separated sides of the springs on the left and right sides are fixedly connected with a block, and the separated sides of the left and right sides of the blocks are respectively embedded in the multiple slots on the left and right sides, and the separated sides of the left and right sides of the blocks are fixedly connected with a pull rod.

[0007] Through the above technical solution, the pull rod is pulled to drive the block to retract into the limit groove, and then the two side engaging plates at the bottom of the top cover are abutted against the positioning groove. The tension of the loose pull rod spring is released to push the block into the slot, and the top cover can be installed on the top of the two guard plates to complete the installation.

[0008] Further, the buffer assembly includes two buffer plates, and the two buffer plates are respectively slidably connected to the opposite sides of the two guard plates, and the upper and lower ends of the two buffer plates are fixedly connected to the opposite sides of the two guard plates, and the left and right sides have multiple buffer blocks respectively fixedly connected to the opposite sides of the two guard plates, and the middle parts of the two buffer plates are fixedly connected to multiple evenly distributed return springs, and the left and right sides have multiple return springs respectively fixedly connected to the opposite sides of the two guard plates.

[0009] Through the above technical solution, through the design of the slidingly connected buffer plate, buffer block and reset spring, it is possible to effectively mitigate external impacts and provide a stable buffering effect. At the same time, it has the functions of reset and rebound, making the system more adaptable to the influence of external vibrations and impacts.

[0010] Furthermore, the front and rear sides of the two guard plates are fixedly connected with mounting plates, and the middle parts of the mounting plates on the left and right sides are slidably connected with a plurality of bolts.

[0011] Through the above technical solution, bolts are driven into the surrounding rock to fix the guard plate through the mounting plate, thereby increasing the stability of the overall structure.

[0012] Furthermore, positioning grooves are provided on the tops of the two guard plates, and the two engaging plates are respectively engaged and connected in the two positioning grooves.

[0013] Through the above technical solution, a reliable connection method is achieved by setting a positioning groove on the top of the guard plate to connect with the interlocking plate, which helps to ensure that the guard plates in the system are accurately positioned, thereby improving the connection accuracy between the guard plate and the top cover.

[0014] Furthermore, limiting grooves are provided inside the front and rear ends of the top sides of the two guard plates, the springs on the left and right sides are fixedly connected to the limiting grooves on the left and right sides on the opposite sides, and the clamping blocks on the left and right sides are slidably connected to the limiting grooves on the left and right sides on the opposite sides.

[0015] Through the above technical solution, by opening limit grooves at the front and rear ends of the top sides of the two guard plates, accurate position limiting is provided for the spring and the clamping block.

[0016] Furthermore, the spring is sleeved on the outer circumference of the pull rod.

[0017] Through the above technical solution, the spring sleeve is arranged on the outer periphery of the pull rod, ensuring that the spring can be contracted simultaneously when the pull rod pulls the clamping block.

[0018] Furthermore, the two buffer plates are fixedly connected with sliders on both upper and lower sides, and the two guard plates are provided with sliding grooves inside on both upper and lower sides, and the two sliders are slidably connected in the sliding grooves on both upper and lower sides respectively.

[0019] Through the above technical solution, sliders are set on the upper and lower sides of the buffer plate, and corresponding sliding grooves are set on the upper and lower sides of the guard plate, allowing the buffer plate to slide in opposite directions relative to the guard plate, providing a certain degree of buffering and shock absorption effect, which helps to absorb external impacts and reduce structural vibration.

[0020] Furthermore, a plurality of evenly distributed mounting blocks are fixedly connected to the upper and lower sides of the bolt, and tension plates are rotatably arranged in the middle of the plurality of mounting blocks on the upper and lower sides.

[0021] Through the above technical solution, the tension plate provides additional tensioning force during the bolt installation process, increases the friction or resistance with the surrounding rock, thereby enhancing the fixing effect, so that the bolt can be more firmly embedded and fixed in the surrounding rock.

[0022] The utility model has the following beneficial effects:

[0023] 1. In the utility model, through the mutual cooperation of the guard plate, spring, block, top cover and interlocking plate, the design of the guard plates and top cover on both sides can make the assembly process simpler, reduce the complexity of assembly, enable workers to complete the assembly work more easily and quickly, reduce the risks in on-site construction, help improve the work safety of workers, and reduce the possibility of accidents.

[0024] 2. In the utility model, through the mutual cooperation of the buffer plate, buffer block, return spring and guard plate, the buffer structure can absorb the stress and deformation caused by underground excavation, reduce the surface settlement, help protect surface buildings and infrastructure, prevent ground settlement caused by construction, and play an important role in preventing tunnel collapse, support structure damage and other problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a three-dimensional schematic diagram of a surrounding rock stabilization structure for long tunnel construction proposed by the utility model;

[0026] Figure 2 A schematic diagram of the structure of a spring for a surrounding rock stabilizing structure for long tunnel construction proposed by the utility model;

[0027] Figure 3 This is a schematic diagram of the structure of a top cover of a surrounding rock stabilization structure for long tunnel construction proposed by the utility model;

[0028] Figure 4 This is a schematic diagram of the structure of a buffer plate of a surrounding rock stabilization structure for long tunnel construction proposed by the utility model;

[0029] Figure 5 The utility model is a schematic diagram of the structure of bolts for a surrounding rock stabilizing structure for long tunnel construction.

[0030] Legend:

[0031] 1. Guard plate; 2. Top cover; 3. Engraving plate; 4. Spring; 5. Block; 6. Slot; 7. Pull rod; 8. Positioning slot; 9. Limiting slot; 10. Buffer plate; 11. Buffer block; 12. Reset spring; 13. Slider; 14. Slide slot; 15. Mounting plate; 16. Bolt; 17. Mounting block; 18. Tension plate. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0033] Reference Figure 1-3The utility model provides an embodiment: a surrounding rock stabilizing structure for long tunnel construction, comprising two guard plates 1, a buffer assembly is provided on the opposite side of the two guard plates 1, a top cover 2 is provided on the top of the two guard plates 1, and a mosaic plate 3 is fixedly connected to the left and right sides of the bottom of the top cover 2, a positioning groove 8 is provided on the top of the two guard plates 1, and the two mosaic plates 3 are respectively embedded in the two positioning grooves 8, and the two ends of the opposite side of the two mosaic plates 3 are provided with a card slot 6, and the top of the opposite side of the two guard plates 1 is fixedly connected with two springs 4, Limiting grooves 9 are provided inside the front and rear ends of the top sides of the two guard plates 1. The left and right springs 4 are fixedly connected to the limiting grooves 9 on the left and right sides on the sides facing each other, and the left and right springs 4 are fixedly connected to the separated sides with clamping blocks 5. The left and right clamping blocks 5 are slidingly connected to the limiting grooves 9 on the left and right sides on the sides facing each other, and the separated sides of the left and right clamping blocks 5 are respectively embedded in multiple clamping grooves 6 on the left and right sides. The separated sides of the left and right clamping blocks 5 are fixedly connected with pull rods 7, and the springs 4 are sleeved on the outer periphery of the pull rod 7 that extends through one end of the limiting groove 9.

[0034] Specifically, the guard plate 1 is used to constitute the main part of the surrounding rock stabilization structure, the top cover 2 is used to cover the top of the guard plate 1, and plays a role of protection and support. The left and right sides of the bottom are fixedly connected with the embedded plates 3, and the embedded plates 3 are used to connect the top cover 2 and the guard plate 1 to enhance the stability of the overall structure. They are respectively embedded in the positioning grooves 8 on the top of the guard plate 1. The positioning grooves 8 are used to ensure the correct positioning of the embedded plates 3. Positioning grooves 8 are opened on the tops of the two guard plates 1, so that the embedded plates 3 can be accurately embedded therein to ensure the stability of the connection. The card slots 6 are located at the two ends of the opposite side of the embedded plate 3, which are used to be embedded with the card block 5 to increase the firmness of the connection. The spring 4 is used to provide elastic support for the card block 5. The limit grooves 9 are located inside the front and rear ends of the top side of the guard plate 1 to limit the movement range of the spring 4 and increase the stability of the structure. The pull rod 7 is used to facilitate pulling the card block 5 to adjust its fixed position.

[0035] Reference Figure 1 , Figure 2 and Figure 4 The buffer assembly includes two buffer plates 10, which are slidably connected to the opposite sides of the two guard plates 1 respectively, and the upper and lower ends of the separated sides of the two buffer plates 10 are fixedly connected with buffer blocks 11, and the separated sides of multiple buffer blocks 11 on the left and right sides are respectively fixedly connected to the opposite sides of the two guard plates 1, and the middle parts of the separated sides of the two buffer plates 10 are fixedly connected with multiple evenly distributed return springs 12, and the separated sides of the left and right sides of the return springs 12 are respectively fixedly connected to the opposite sides of the two guard plates 1, and the upper and lower sides of the two buffer plates 10 are fixedly connected with sliders 13, and the upper and lower sides of the two guard plates 1 are provided with slide grooves 14, and the two sliders 13 are slidably connected in the slide grooves 14 on the upper and lower sides respectively.

[0036] Specifically, the buffer assembly is used to provide a buffering effect against tunnel vibration and impact and increase the stability of the structure. The buffer plate 10 is used to provide a buffering effect against tunnel vibration and impact. The two buffer plates 10 are respectively slidably connected to the opposite sides of the two guard plates 1 to form the main body of the entire buffer assembly. The buffer blocks 11 are located at the upper and lower ends of the separated side of the buffer plate 10 to increase the buffering effect. The separated sides of multiple buffer blocks 11 on the left and right sides are respectively fixedly connected to the opposite sides of the two guard plates 1 to provide additional buffering support. The reset spring 12 is located in the middle of the separated side of the buffer plate 10 to restore the buffer plate 10 to its initial position to ensure the reset function of the buffer plate 10.

[0037] Reference Figure 1 and Figure 5 The two guard plates 1 are fixedly connected with mounting plates 15 on the front and rear sides, and a plurality of bolts 16 are slidably connected in the middle of the left and right mounting plates 15. A plurality of evenly distributed mounting blocks 17 are fixedly connected on the upper and lower sides of the bolts 16, and a tension plate 18 is rotatably provided in the middle of the plurality of mounting blocks 17 on the upper and lower sides.

[0038] Specifically, the mounting plate 15 is located on the front and rear sides of the guard plate 1 to provide additional support. The bolt 16 is located on the mounting plate 15. The upper and lower sides are fixedly connected with evenly distributed mounting blocks 17. The mounting blocks 17 are fixedly connected to the upper and lower sides of the bolt 16 to support the installation of the tension plate 18. The tension plate 18 is used to provide tension and support to ensure the stability of the bolt 16 nailed in the surrounding rock.

[0039] Working principle: the guard plate 1 and the top cover 2 constitute the main part of the surrounding rock stabilization structure. Pulling the pull rod 7 drives the block 5 to shrink into the limit groove 9, so that the engaging plates 3 on both sides of the bottom of the top cover 2 can be engaged in the positioning grooves 8 on the top of the two guard plates 1. Loosening the pull rod 7, the spring 4 releases the tension and pushes the block 5 to engage in the slot 6, so that the top cover 2 can be fixed on the top of the two guard plates 1. The vibration and impact generated by the tunnel construction are transmitted through the buffer assembly to reduce the impact on the surrounding rock stabilization structure. After the buffer plate 10 is impacted, the reset spring 12 plays a role to restore the buffer plate 10 to its initial position, thereby maintaining the stability of the entire structure. The bolts 16 are nailed into the surrounding rock, and the tension plate 18 provides tension and support to ensure the stability of the bolts 16 nailed in the surrounding rock.

[0040] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A surrounding rock stabilization structure for long tunnel construction, comprising two guard plates (1), Features: A buffer assembly is provided on the opposite sides of the two guard plates (1); a top cover (2) is provided on the top of the two guard plates (1); a chimeric plate (3) is fixedly connected to the left and right sides of the bottom of the top cover (2); a clamping groove (6) is provided at both ends of the opposite sides of the two chimeric plates (3); two springs (4) are fixedly connected to the tops of the opposite sides of the two guard plates (1); a clamping block (5) is fixedly connected to the separated sides of the springs (4) on the left and right sides; the separated sides of the clamping blocks (5) on the left and right sides are respectively chimerically connected to the multiple clamping grooves (6) on the left and right sides; and a pull rod (7) is fixedly connected to the separated sides of the clamping blocks (5) on the left and right sides.

2. A surrounding rock stabilization structure for long tunnel construction according to claim 1, Features: The buffer assembly comprises two buffer plates (10), the two buffer plates (10) are respectively slidably connected to the opposite sides of the two guard plates (1), the upper and lower ends of the separated sides of the two buffer plates (10) are fixedly connected with buffer blocks (11), the separated sides of a plurality of buffer blocks (11) on the left and right sides are respectively fixedly connected to the opposite sides of the two guard plates (1), the middle parts of the separated sides of the two buffer plates (10) are respectively fixedly connected with a plurality of evenly distributed return springs (12), and the separated sides of the return springs (12) on the left and right sides are respectively fixedly connected to the opposite sides of the two guard plates (1).

3. A surrounding rock stabilization structure for long tunnel construction according to claim 1, Features: The front and rear sides of the two guard plates (1) are fixedly connected to mounting plates (15), and the middle parts of the mounting plates (15) on the left and right sides are slidably connected to a plurality of bolts (16).

4. A surrounding rock stabilization structure for long tunnel construction according to claim 1, Features: The tops of the two guard plates (1) are each provided with a positioning groove (8), and the two engaging plates (3) are respectively engaged and connected in the two positioning grooves (8).

5. The surrounding rock stabilization structure for long tunnel construction according to claim 1, Features: Limiting grooves (9) are provided inside the front and rear ends of the top sides of the two guard plates (1); the springs (4) on the left and right sides facing each other are fixedly connected in the limiting grooves (9) on the left and right sides respectively; and the clamping blocks (5) on the left and right sides facing each other are slidably connected in the limiting grooves (9) on the left and right sides respectively.

6. A surrounding rock stabilization structure for long tunnel construction according to claim 1, Features: The spring (4) is sleeved on the outer circumference of the pull rod (7).

7. A surrounding rock stabilization structure for long tunnel construction according to claim 2, Features: The two buffer plates (10) are fixedly connected with sliders (13) on both upper and lower sides, and the two guard plates (1) are provided with slide grooves (14) on both upper and lower sides. The two sliders (13) are slidably connected in the slide grooves (14) on both upper and lower sides, respectively.

8. The surrounding rock stabilization structure for long tunnel construction according to claim 3, Features: A plurality of evenly distributed mounting blocks (17) are fixedly connected to the upper and lower sides of the bolt (16), and tension plates (18) are rotatably disposed in the middle of the plurality of mounting blocks (17) on the upper and lower sides.

Citation Information

Cited By

  • Pipe shed for advanced pre-supporting of weak surrounding rock tunnel

    CN119466886A

  • A pipe shed for advanced pre-support of soft surrounding rock tunnels

    CN119466886B