Goaf mineralization filling water inrush prevention analog simulation test device
By designing a three-dimensional stress evolution similar test device to simulate the three-dimensional stress environment and water inrush process in the goaf, it solves the problem that existing technology cannot simulate fault formation and lateral loads, and realizes the simulation of water inrush in the coal seam floor and roof and mine The study of chemical filling process improves the authenticity of the experiment and the accuracy of monitoring.
Patent Information
- Application Number
- CN202420319004.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-21
AI Technical Summary
The existing goaf backfill device cannot simulate the formation process of faults with different heights, and cannot apply lateral loads to similar test models. It ignores the problem of water inrush from the coal seam roof, and cannot simulate the carbon dioxide mineralization process. The monitoring technology needs to be further improved.
Design a three-dimensional stress evolution similar test device including a test body, a loading system, a water-bearing system, a mining system and a mineralized filling system. The three-dimensional loading mechanism simulates axial and radial stress, sets up an aquifer and simulates the water above the coal seam. layer, using a data acquisition system for real-time monitoring, simulating water inrush from the bottom and roof of the coal seam, and studying the mineralization filling process.
It achieves a true simulation of the stress environment of underground coal and rock strata, improves the reliability and accuracy of water inrush experiments, and can study the law of coal seam water inrush and mineralization filling process, which has important theoretical and practical significance.
Smart Images

Figure CN221826883U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of goaf mining test devices, and more specifically relates to a goaf mineralized filling water burst prevention similarity simulation test device. Background Art
[0002] my country is rich in coal resources, but the geological conditions are complex, which makes geological disasters occur frequently in coal mining. With the further increase of coal mining depth and mining intensity, the threat of Ordovician limestone karst water in the bottom plate is becoming more and more serious, especially in the mining face with fault structure, the problem of water inrush prevention is more prominent.
[0003] For a long time, the main technologies used for backfilling goafs at home and abroad include dry filling, water-sand filling, and cemented filling. Traditional goaf management methods have problems such as high cost, poor effect, and environmental pollution. Therefore, coal mining technology filled with materials such as gangue has received widespread attention. This technology mainly fills the goaf with waste such as gangue in the goaf of the mine during the coal mining process to form a stable support body to achieve the management and utilization of the goaf. Due to the particularity of the water inrush problem, people cannot observe the process of fault mining activation and the formation of water inrush channels on site, and many factors have been greatly simplified in the theoretical analysis process.
[0004] In the prior art, although process similarity test devices are used for simulation monitoring, it is impossible to simulate the formation process of faults with different drop heights, and the stress state of similar materials, the formation of water inrush channels, etc. are easily affected by the outside world, thereby affecting the monitoring results of the test data. Moreover, it is impossible to load lateral loads on the similar test model as a whole, and it is even more impossible to invert the stress state of the coal-bearing strata in which the lateral load increases linearly with the increase of burial depth.
[0005] Moreover, the existing device cannot simulate the situation where the aquifer is located above the coal seam. It can only simulate the water inrush problem of the coal seam floor, ignoring the water inrush problem of the coal seam roof. In addition, the existing device does not simulate the filling and carbon dioxide mineralization process of the goaf. Moreover, the monitoring technology for the formation process of the water inrush channel still needs to be further improved and perfected. Therefore, it is necessary to design a three-dimensional stress evolution similarity test device. Utility Model Content
[0006] The utility model aims at the technical problems existing in the prior art and provides a similar simulation test device for preventing water inrush in mineralized filling of goaf areas.
[0007] In order to solve the above technical problems, the utility model includes a test body, which is connected to a loading system and a water bearing system, and also includes a mining system and a mineralization filling system. A test space is provided inside the test body, and an aquifer is provided in the test space. A baffle is connected to the test space, and the mining system and the mineralization filling system are both detachably connected to the test space of the test body.
[0008] The loading system includes a three-dimensional loading mechanism, which applies stress to the test body in the axial and radial directions. The three-dimensional loading mechanism includes a loading drive part and an elastic moving part connected to the loading drive. The test body is also connected to a data acquisition system, and the bearing water system and the data acquisition system are both connected to the test space of the test body.
[0009] Preferably, a support is connected to the test body, baffles are arranged around the test space and connected to the support, an operation window is arranged on the baffles, and the baffles include upper and lower baffles, left and right baffles and side baffles.
[0010] Preferably, at least one aquifer is provided, and the aquifer is arranged horizontally or approximately horizontally, and an aquifer baffle is arranged on the periphery of the aquifer, and the aquifer baffle is connected to the water-bearing system.
[0011] Preferably, a permeable plate is provided between the aquifer and the internal space, a water inlet is provided on the aquifer baffle, the water-bearing system is connected to the water inlet, a pressure stabilizing device is connected to the water inlet, and an information sensor is connected to the pressure stabilizing device.
[0012] Preferably, the pressure stabilizing device is connected to a flow regulating system, the water inlet and the water-bearing system as well as the water inlet and the pressure stabilizing device are connected via connecting pipes, and sealing members are provided on the connecting pipes.
[0013] Preferably, the loading system includes a top plate loading mechanism, a bottom plate loading mechanism and a side plate loading mechanism, the aquifer is arranged inside the top plate loading mechanism and the bottom plate loading mechanism, the loading mechanisms are each provided with a hydraulic press and a pressure plate connected to the hydraulic press, and the pressure plate is connected to the test space.
[0014] Preferably, a plurality of load-bearing springs are connected to the pressure plate, and the load-bearing springs are arranged perpendicular to the pressure plate.
[0015] Preferably, the water-carrying system includes a water adding device, which includes a water tank, a water pump and a water pipe, and the water pipe is provided with a control valve and a pressure gauge.
[0016] Preferably, the data acquisition system includes a stress sensing system and an ultrasonic monitoring system. The stress sensing system includes a stress sensor, an information receiver and an information processor. The ultrasonic monitoring system includes a sound wave transmitting device, a sound wave receiving device and an information processing device.
[0017] Preferably, the mining system includes a power device, a mining device and a coal output device, the mineralization filling system includes a filling system and a mineralization system, the filling system is provided with a material transport device and a filling device, and the mineralization system is provided with a gas transmission device and a gas monitoring device.
[0018] Compared with the prior art, the utility model has the following beneficial effects:
[0019] The utility model can truly simulate the stress environment and water inrush experiment of underground coal and rock formations. The operation is simple. Through the cooperation of the test subject, the loading system and the water bearing system, the situation that the aquifer is located above the coal seam can be simulated, and the simulation of water inrush from the bottom plate of the coal seam and the top plate of the coal seam can be realized. In addition, the data of the goaf can be collected and monitored in real time through the data acquisition system, so that the authenticity of the simulation can be achieved, and the reliability and accuracy of the monitoring are high. Through the test device, the filling process of the goaf, the mineralization process of carbon dioxide, and the related force transmission performance and stress distribution of mineralized filling bodies of different strengths, heights, and shapes under constant load and impact dynamic load conditions can also be studied. It has important theoretical and practical significance for studying the water inrush process of underground coal seams, the law of water inrush, and the mineralization filling process of the goaf. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0021] Figure 1 The structure diagram of the simulation test device of the utility model is shown in FIG. Figure 1 ;
[0022] Figure 2 The structure diagram of the simulation test device of the utility model is shown in FIG. Figure 2 ;
[0023] Figure 3 It is a structural schematic diagram of the external operating window of the utility model;
[0024] Figure 4 It is a structural schematic diagram of the loading system of the utility model;
[0025] Figure 5 This is a schematic diagram of the structure of the operating window in the utility model;
[0026] Figure 6 This is a schematic diagram of the information collection process of the ultrasonic monitoring system of the utility model;
[0027] Figure 7This is a schematic diagram of the mining and mineralization filling process of the utility model.
[0028] Explanation of symbols in the figure:
[0029] 1. Test subject; 11. Coal seam; 12. Roof and floor rock strata; 2. Loading system; 21. Roof loading mechanism; 211. Second hydraulic press; 212. Second hydraulic device; 213. Pressurized roof; 22. Floor loading mechanism; 221. First hydraulic press; 222. First hydraulic device; 223. Pressurized floor; 23. Side plate loading mechanism; 231. Third hydraulic press; 232. Pressurized side plate; 24. Load spring; 3. Aquifer; 31. Upper aquifer; 32. Lower aquifer; 4. Baffle; 41. Upper and lower baffles; 42. Left and right baffles; 43. Side baffles; 431. Middle baffle; 432. Horizontal plate; 44. Aquifer baffle; 441. Water inlet; 5. Support; 6. External operating window; 7. Permeable plate; 8. Internal operating window; 9. Mining system; 10. Mineralized filling system; 101. Ultrasonic generating device; 102. Ultrasonic receiving device. DETAILED DESCRIPTION
[0030] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0031] See also Figure 1 , Figure 7 The utility model provides a similar simulation test device for preventing water inrush in mineralized filling in goaf, including a test body 1, to which a loading system 2 and a water bearing system are connected, and also includes a mining system and a mineralized filling system 10. A test space is provided inside the test body 1, in which an aquifer 3 is provided, and a baffle 4 is connected to the test space, and the mining system and the mineralized filling system 10 are both detachably connected to the test space of the test body 1;
[0032] The loading system 2 includes a three-dimensional loading mechanism, which performs stress loading on the test body 1 in the axial and radial directions. The three-dimensional loading mechanism includes a loading drive part and an elastic moving part connected to the loading drive; the test body 1 is also connected to a data acquisition system, and the bearing water system and the data acquisition system are both connected to the test space of the test body 1.
[0033] The utility model can truly simulate the stress environment and water inrush experiment of underground coal and rock formations, and is easy to operate. Through the cooperation of the test subject 1, the loading system 2 and the water bearing system, it provides experimental conditions for the prevention of water inrush in the underground goaf mineralized filling, and provides a flexible and adaptable visual simulation test device. In addition, the goaf data can be collected and monitored in real time through the data acquisition system. The simulation device is intuitive, flexible and efficient. Through the test device, the force transmission performance, stress distribution and coal seam water inrush form of mineralized filling bodies of different strengths, heights and shapes under constant load and impact dynamic load conditions can be studied. It has important theoretical and practical significance for studying the process and law of water inrush in underground coal seams.
[0034] Specifically, Figure 2 As shown, the test body 1 is a square structure as a whole. The test space inside the test body 1 is a place for construction, mining, filling, mineralization, and information collection of similar models. The test body 1 is supported and connected by a support 5. The baffle 4 is arranged on the support 5, and the baffle 4 is arranged around the test space. The baffle 4 provides a relatively closed simulation test environment for the test body 1, and at the same time facilitates the configuration and laying of simulation materials.
[0035] In this embodiment, the baffle 4 includes upper and lower baffles 41, left and right baffles 42 and side baffles 43 respectively arranged around the test space, and the side baffle 43 includes a middle baffle 431, a horizontal plate 432 and an aquifer baffle 44. The baffles are connected in multiple directions to build a stable test space for similar models.
[0036] Furthermore, as a preferred embodiment of the present invention, the left and right baffles 42 are transparent baffle structures, which facilitate observation of the development dynamics of the internal test space through a visual structure setting.
[0037] And the left and right baffles 42 are provided with external operation windows 6, such as Figure 3 As shown, the external operating window 6 is a baffle structure that can be slid open. Through the external operating window 6, it is convenient to open the window at a suitable position to find the coal seam position for model excavation when conducting similar tests.
[0038] like Figure 2 As shown, in this embodiment, the construction of the test body 1 mainly includes a coal seam 11, top and bottom rock layers 12 and an aquifer 3. The aquifer 3 includes an upper aquifer 31 and a lower aquifer 32. The aquifer 3 is arranged horizontally or approximately horizontally. A permeable plate 7 is provided between the aquifer 3 and the internal test space, and the permeable plate 7 is used to simulate the water permeability and water inrush laws of the coal seam.
[0039] Specifically, the permeable plate 7 is horizontally arranged, and the permeable plate 7 arranged inside the aquifer 3 is a movable connection structure. The permeable plate 7 is composed of five permeable plates connected together, and permeable holes are evenly distributed on the permeable plate 7, through which coal seam permeability simulation is performed.
[0040] Furthermore, an aquifer baffle 44 is provided on the outer periphery of the upper aquifer 31 and the lower aquifer 32, and the aquifer baffle 44 is used to prevent the internal water from flowing out, thereby ensuring the internal tightness and the effectiveness of the test. In addition, a water inlet 441 is provided on the aquifer baffle 44, and the water inlet 441 is connected to the water-bearing system. A pressure stabilizing device is connected to the water inlet 441, and the pressure stabilizing device is used to stabilize the system flow.
[0041] Furthermore, during the construction of the actual test body 1, adaptive adjustments can be made to the angle arrangement of the aquifer according to the actual geological conditions of the working surface.
[0042] In this embodiment, the aquifer baffle 44 is connected to a water-bearing system, and the water-bearing system is arranged outside the aquifer baffle 44 , and water is added to the aquifer 3 and the flow rate is adjusted through the water-bearing system.
[0043] Specifically, the water-carrying system includes a water adding device, which includes a water tank, a water pump and a water pipe. The end of the water pipe is connected to the aquifer. A control valve and a pressure gauge are provided on the water pipe. The water supply switch of the water pipe is controlled by the control valve, and the pressure gauge monitors the pressure of the transported carrying water.
[0044] Furthermore, as a preferred embodiment of the utility model, the pressure stabilizing device is connected with an information sensor and a flow regulating system, and the water inlet and the water carrying system and the water inlet and the pressure stabilizing device are connected by connecting pipes. In order to improve the durability of the device, the connecting pipe is selected to be a cylindrical pipe with high temperature resistance and corrosion resistance and a diameter slightly larger than the diameter of the connecting system pipe. In order to improve the sealing of the device, the connection between the connecting pipe and other systems is an airtight connection with a sealing element, and the sealing element is easy to disassemble.
[0045] like Figure 4 As shown, in this embodiment, the loading system 2 includes a top plate loading mechanism 21, a bottom plate loading mechanism 22 and a side plate loading mechanism 23. Through the stress loading mechanisms in multiple directions, the same or different pressures can be applied to the test subject 1 to simulate the stress conditions in different directions of the coal seam. Among them, the top plate loading mechanism 21 is set at the top of the test space, the bottom plate loading mechanism 22 is set at the bottom of the test space, and two side plate loading mechanisms 23 are provided, and are symmetrically arranged on both sides of the test space.
[0046] Specifically, the bottom plate loading mechanism 22 includes a first hydraulic press 221, a first hydraulic device 222 and a pressurized bottom plate 223. The first hydraulic press 221 drives the first hydraulic device 222 to operate. The pressurized bottom plate 223 is connected to the end of the first hydraulic press 221. The pressurized bottom plate 223 is horizontally arranged to apply stable pressure to the internal test space. A plurality of load-bearing springs 24 are connected to the pressurized bottom plate 223. The plurality of load-bearing springs 24 are evenly distributed in sequence and the load-bearing springs 24 are vertically arranged to the pressurized bottom plate 223. The end of the first hydraulic device 222 is connected to the permeable plate of the lower aquifer, and the permeable plates on both sides of the pressurized bottom plate 223 close to the pressurized side plates are elastic retractable plates, which are convenient for position adjustment.
[0047] Furthermore, the top plate loading mechanism 21 has a similar structure to the bottom plate loading mechanism 22, and includes a second hydraulic press 211, a second hydraulic device 212 and a pressurized top plate 213. The second hydraulic press 211 drives the second hydraulic device 212 to operate. The pressurized top plate 213 is connected to the end of the second hydraulic press 211. The pressurized top plate 213 is horizontally arranged to apply a stable pressure to the internal test space. A plurality of load-bearing springs 24 are connected to the pressurized top plate 213. The load-bearing springs 24 are vertically arranged to the pressurized top plate 213. The end of the second hydraulic device 212 is connected to the permeable plate of the upper aquifer.
[0048] In this embodiment, the side plate loading mechanism 23 includes a third hydraulic press 231, a third hydraulic device and a pressurizing side plate 232. The third hydraulic press 231 drives the third hydraulic device to operate. The pressurizing side plate 232 is connected to the end of the third hydraulic press 231. The pressurizing side plate 232 is vertically arranged to apply a stable pressure to the internal test space. A plurality of load-bearing springs 24 are connected to the pressurizing side plate 232, and the load-bearing springs 24 are vertically arranged to the pressurizing side plate 232.
[0049] Furthermore, the aquifer 3 of this embodiment is arranged inside the top plate loading mechanism 21 and the bottom plate loading mechanism 22, and an inner operation window 8 is arranged on the pressurized side plate 232, such as Figure 5 As shown, the inner operating window 8 is composed of nine freely detachable baffle structures.
[0050] Furthermore, in this embodiment, after the similar model is built, the mining system 9 and the mineralization filling system 10 are used to sequentially perform mining, filling and mineralization simulation on the working face and the goaf.
[0051] Specifically, the mining system 9 includes a power device, a retractable mining drill bit, and a coal outlet chute, and the mining system 9 is used to simulate coal seam mining; the mineralization filling system 10 includes a filling system and a mineralization system, the filling system includes a filling device, a supporting device, and a feed pipe, and a stirring device is provided in the filling device, and the filling of the goaf is simulated by the filling system; the mineralization system includes a carbon dioxide storage tank, a gas delivery device and a carbon dioxide monitoring device, and the mineralization of the goaf is simulated by the mineralization system.
[0052] Furthermore, the power device, mining device and coal discharge device provided in the mining system 9, the material transportation equipment and filling equipment provided in the filling system, and the gas transmission device and gas monitoring device provided in the mineralization system can be adaptively equipped and adjusted according to the actual coal seam simulation needs, and this part of the structure can be selected and constructed using existing technology. The description of the mining system, filling system and mineralization system will not be elaborated here.
[0053] Furthermore, in this embodiment, the data acquisition system is used to monitor, collect and process the coal and rock layer information inside the test space. Specifically, the data acquisition system includes a stress sensing system and an ultrasonic monitoring system, the stress sensing system includes a stress sensor, an information receiver and an information processor, and the ultrasonic monitoring system includes an ultrasonic transmitting device 101, an ultrasonic receiving device 102 and an information processing device.
[0054] The utility model is also provided with a control system, which is provided with a control terminal and a display device. The data acquisition system is connected to the control system. The collected information can be analyzed and processed through the control system, which facilitates intuitive monitoring of various data collected by the data acquisition system, thereby realizing intelligent test processing and control.
[0055] The specific test process of the utility model is:
[0056] S1. Material ratio: According to the pre-set hydrogeological conditions of the coal seam working face with faults to be simulated and the properties of the coal seam, roof and floor strata, determine the ratio of similar simulation materials for each rock stratum, including the pressurized water conduction zone, protective layer zone, floor crushing zone, coal seam, direct roof, basic roof and curved sinking zone, so as to determine the amount of various raw materials required for each rock stratum.
[0057] S2. Material configuration: According to the properties of the material components of each rock layer, such as the pressurized water lifting zone, protective layer zone, bottom plate crushing zone, coal seam, direct roof, basic roof and curved sinking zone, various aggregates and binders required for each layer are weighed strictly in proportion and configured into similar materials.
[0058] Specifically, the mineralized filling body is composed of a group of levels with a fly ash to cement mass ratio of 4:1, a proportion of coal gangue less than 5 mm of 45%, a maximum particle size of 2 cm, an ash-to-aggregate ratio of 1:2 (or cement: fly ash: aggregate = 1:4:6), a mass concentration of 76 (82)%, and a proportion of fine aggregate of 45%, which can meet the engineering requirements of slump, stratification and setting time.
[0059] S3. Model laying: fix the height of the permeable plate to keep it horizontal, lay the coal seam floor simulation material on the permeable plate of the test support, and lay the simulation materials of the pressure water lifting zone, protective layer zone, floor crushing zone, coal seam, direct roof, basic roof, and curved sinking zone in sequence, and lay stress sensors on the upper and lower floors and both sides of the coal seam;
[0060] After the simulated material is dried, water is added to the lower aquifer 32. The location of the simulated aquifer can be selected according to actual conditions, and the rock layer can be laid. After laying, the sealing type of the device is checked to ensure that there will be no water leakage during the operation of the machine.
[0061] S4, model loading: turn on the hydraulic device, the pressure stabilizing device and the water adding device, simulate the constant or impact top plate pressure through the permeable plate of the pressurized top plate 213, simulate the lateral horizontal load that increases linearly with the burial depth through the pressurized side plate 232, and simulate the bottom vertical load through the pressurized bottom plate 223.
[0062] The hydraulic device and the pressure stabilizing device jointly control the pressure plate to simulate the ground pressure environment of each part, and the water adding device and the pressure stabilizing device jointly control the water pressure of the aquifer to simulate the real pressure of the confined water layer. Since the upper and lower permeable plates on both sides are elastic expansion plates, it can prevent damage to the equipment during the loading process. The connection method of the pressure side plate 232 and the hydraulic press is a three-way movable connection to truly simulate the horizontal load that increases linearly with the burial depth.
[0063] S5. Model excavation: open the external operation window, open the internal operation window at a suitable position according to the laying conditions of the rock layer to find the location of the coal seam, and then use the power device of the mining system's mining device to control the drill bit for simulated excavation. A support frame can be placed at the opening according to the situation, and the excavated coal is transported out of the working face through the coal outlet chute.
[0064] Based on the similarity ratio of the three-dimensional model, the excavation size of each step of the model is calculated, the normal operation of the coal mining face is simulated, and the stress changes of the upper and lower floors of the coal seam are observed in real time.
[0065] S6, Model filling: When the mining system excavates to a certain distance, it stops excavating, such as Figure 7As shown, the filling device of the filling system 10 is used to fill the goaf with the evenly stirred mineralized filling material through a feed pipe. During filling, partitions and sealing plates must be placed in advance to fix the shape of the mineralized filling body. The size of the sealing plate is slightly larger than the opening size to ensure that the sealing plate fits tightly to the opening; a channel is reserved for the passage of the mining drill bit and the discharge of coal, thereby facilitating continued mining.
[0066] During the filling process, the pressure changes of the upper and lower floors of the coal seam are recorded during the solidification of the mineralized filling body. After the mineralized filling body solidifies, the excavation can continue, and the mined coal slag can be transported out through the reserved coal outlet channel to continue filling the goaf area. Alternatively, the mineralized filling body can be prepared in advance according to a certain shape, height, and strength and placed directly in the goaf.
[0067] S7. Mineralization simulation: After the goaf is filled, carbon dioxide is injected into the filling area through the sealing plate installed during filling using a gas transmission device, and the concentration of carbon dioxide is changed through a control system to simulate the actual goaf mineralization filling process. The concentration change of carbon dioxide is monitored in real time through a monitoring device.
[0068] S8. Signal acquisition and processing: During the simulated excavation and mineral filling, the ultrasonic generator 101 and the ultrasonic receiver 102 of the ultrasonic monitoring system are used synchronously to collect the time, intensity, angle, wave velocity, etc. of the sound wave reflection on the front and rear transparent baffles, and the three-dimensional crack distribution and water inrush conditions inside the coal seam are automatically drawn through the information processor computer. The stress sensor is used to collect the pressure distribution during the mining and filling and mineralization processes above and below the coal seam.
[0069] Moreover, the utility model provides a voltage stabilizing device, which is connected to the hydraulic device and the information sensor, and controls the loading process of the hydraulic press and the aquifer through the voltage stabilizing device to achieve a real simulation process.
[0070] Furthermore, during the experiment, by changing the model geological and boundary conditions and filling methods, such as coal seam burial depth, aquifer water pressure, fault inclination, rock formation properties and thickness, vertical load and horizontal load, the strength, height and shape of the mineralized filling body are controlled and changed, and the above test steps are repeated to study the mining pressure, aquifer thickness, aquifer water pressure, fault inclination, mining depth, lateral load, working face advancement distance and the force transmission performance, stress distribution and coal seam water inrush form of the mineralized filling body under constant load and impact dynamic load conditions under different filling environments, and reproduce the formation process of mining activation and water inrush channel of pressurized faults under different geological and boundary conditions.
[0071] The utility model can study the force transmission performance, stress distribution and coal seam water inrush forms of mineralized filling bodies with different strengths, heights and shapes under constant load and impact dynamic load conditions through similar test devices, and can overcome the problem that existing devices are unable to simulate coal seam water inrush problems and the mineralization filling process of goafs, as well as the influence of mineralized filling bodies with different strengths, heights and shapes on the destruction of bottom rock strata, crack expansion, penetration and water inrush forms after goaf filling.
[0072] The utility model can truly simulate the stress environment and water inrush experiment of underground coal and rock formations, and the operation is simple. Through the cooperation of the test body 1, the loading system 2 and the water bearing system, the situation that the aquifer is located above the coal seam can be simulated, and the simulation of water inrush from the bottom plate of the coal seam and the top plate of the coal seam can be realized. In addition, the ultrasonic monitoring system of the data acquisition system can collect and monitor the goaf data in real time, and the authenticity of the simulation can be achieved, and the reliability and accuracy of the monitoring are high. Through the test device, the filling process of the goaf, the mineralization process of carbon dioxide, and the related force transmission performance and stress distribution of mineralized filling bodies of different strengths, heights, and shapes under constant load and impact dynamic load conditions can also be studied. It has important theoretical and practical significance for studying the water inrush process, water inrush law, and mineralization filling process of the goaf in the underground coal seam.
[0073] In the description of the present invention, it should be understood that terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0074] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0075] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A similar simulation test device for preventing water inrush in mineralized filling of goaf, comprising a test body, to which a loading system and a water bearing system are connected, characterized in that: It also includes a mining system and a mineralized filling system. A test space is provided inside the test body. An aquifer is provided in the test space. A baffle is connected to the test space. The mining system and the mineralized filling system are both detachably connected to the test space of the test body. The loading system includes a three-dimensional loading mechanism, which performs stress loading on the test body in axial and radial directions. The three-dimensional loading mechanism includes a loading drive part and an elastic moving part connected to the loading drive; the test body is also connected to a data acquisition system, and the water-bearing system and the data acquisition system are both connected to the test space of the test body.
2. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 1, characterized in that: The test body is connected with a support, the baffle is arranged around the test space and connected with the support, the baffle is provided with an operation window, and the baffle includes upper and lower baffles, left and right baffles and side baffles.
3. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 1, characterized in that: The aquifer is provided with at least one layer, and the aquifer is arranged horizontally or approximately horizontally, and an aquifer baffle is arranged on the periphery of the aquifer, and the aquifer baffle is connected to the water bearing system.
4. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 3, characterized in that: A permeable plate is arranged between the aquifer and the internal space, a water inlet is arranged on the aquifer baffle, the water-bearing system is connected to the water inlet, a pressure stabilizing device is connected to the water inlet, and an information sensor is connected to the pressure stabilizing device.
5. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 4, characterized in that: The pressure stabilizing device is connected with a flow regulating system, the water inlet and the water bearing system as well as the water inlet and the pressure stabilizing device are connected via connecting pipes, and the connecting pipes are provided with sealing elements.
6. A similar simulation test device for preventing water inrush in goaf mineralization filling according to any one of claims 1 to 5, characterized in that: The loading system includes a top plate loading mechanism, a bottom plate loading mechanism and a side plate loading mechanism. The aquifer is arranged inside the top plate loading mechanism and the bottom plate loading mechanism. The loading mechanisms are each provided with a hydraulic press and a pressure plate connected to the hydraulic press. The pressure plate is connected to the test space.
7. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 6, characterized in that: A plurality of load-bearing springs are connected to the pressure plate, and the load-bearing springs are arranged vertically to the pressure plate.
8. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 1, characterized in that: The water-carrying system comprises a water adding device, which comprises a water tank, a water pump and a water delivery pipe, and the water delivery pipe is provided with a control valve and a pressure gauge.
9. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 1, characterized in that: The data acquisition system includes a stress sensing system and an ultrasonic monitoring system. The stress sensing system includes a stress sensor, an information receiver and an information processor. The ultrasonic monitoring system includes a sound wave transmitting device, a sound wave receiving device and an information processing device.
10. A similar simulation test device for preventing water inrush in goaf mineralization filling according to claim 1, characterized in that: The mining system includes a power device, a mining device and a coal output device, the mineralization filling system includes a filling system and a mineralization system, the filling system is provided with a material transport device and a filling device, and the mineralization system is provided with a gas transmission device and a gas monitoring device.
