Diesel oil double-filling-pipe assembly

By designing the diesel double fuel pipe assembly, the main fuel pipe and the auxiliary fuel pipe share the same fuel port, and independent fueling of the two fuel tanks is achieved through the fuel nozzle baffle and breather pipe, which solves the complex layout and space occupation of traditional dual fuel tank vehicles. Big problem, achieving a highly integrated and space-efficient refueling system.

CN221835229UActive Publication Date: 2024-10-15NINGBO SHUNJIANG AUTO PARTS MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420967403.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-10-15
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

Traditional dual-tank diesel vehicles have their own refueling ports for each fuel tank, resulting in complex vehicle layout, inconvenient installation and large space requirements.

Method used

Design a diesel double refueling pipe assembly, in which the main refueling pipe and the auxiliary refueling pipe share the same refueling port. By setting the refueling nozzle baffle and the breather pipe in the double fuel tank mouth box, the two fuel tanks share a refueling port, and the two fuel tanks share the same refueling port. Clamps and positioning brackets improve connection firmness and installation convenience.

Benefits of technology

It has realized a dual-tank refueling system that takes up less space and is highly integrated, making it convenient to refuel different tanks separately, and is suitable for use in sparsely populated areas with vast land.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221835229U_ABST
    Figure CN221835229U_ABST
Patent Text Reader

Abstract

The utility model discloses a diesel oil double-oil-filling-pipe assembly which comprises a main oil filling pipe, a main breather pipe, an auxiliary oil filling pipe and an auxiliary breather pipe. The main oil filling pipe and the auxiliary oil filling pipe share the same oil filling port, the oil filling port is installed in an upper port of the double-oil-tank port box, a base is welded to the bottom of the double-oil-tank port box, and a main oil filling pipe leading-in hole and an auxiliary oil filling pipe leading-in hole are formed in the base. The upper end of the main oil filling pipe extends into the double-oil-tank port box through the main oil filling pipe leading-in hole, and the upper end of the auxiliary oil filling pipe extends into the double-oil-tank port box through the auxiliary oil filling pipe leading-in hole. An oil gun blocking piece is installed in the double-oil-tank opening box and provided with a main oil gun guide opening and an auxiliary oil gun guide opening. The air outlet end of the main ventilation pipe and the air outlet end of the auxiliary ventilation pipe are both welded and communicated in the double-oil-tank port box and located above the oil gun blocking piece. The oil filling device is high in integration level and small in occupied space, and two oil tanks can share one oil filling port.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of automobile accessories, in particular to a diesel double refueling pipe assembly. Background Art

[0002] Diesel vehicles usually have stronger power than gasoline vehicles, especially in low-speed conditions such as climbing slopes and carrying loads. At present, in order to adapt to the normal use of vehicles in areas with sparse population and few gas stations, some vehicles such as off-road SUVs are also equipped with dual fuel tanks. Traditional dual-tank diesel vehicles generally have their own refueling port and fuel tank cap for each tank. This setting not only makes the overall layout of the vehicle more complicated and inconvenient to install, but also takes up a lot of space in the vehicle. Summary of the invention

[0003] The technical problem to be solved by the utility model is to provide a diesel double refueling pipe assembly which occupies less space, has high integration and enables two fuel tanks to share the same refueling port in view of the current status of the above-mentioned prior art.

[0004] The technical solution adopted by the utility model to solve the above technical problems is:

[0005] A diesel dual refueling pipe assembly comprises a main refueling pipe, a main ventilation pipe, a secondary refueling pipe and a secondary ventilation pipe; the main refueling pipe and the secondary refueling pipe share the same refueling port for refueling fuel, the refueling port is installed in the upper port of the dual fuel tank port box, the bottom of the dual fuel tank port box is sealed and welded with a base, and the base is respectively provided with a main refueling pipe introduction hole and a secondary refueling pipe introduction hole; the upper end of the main refueling pipe extends into the dual fuel tank port box through the main refueling pipe introduction hole, and the upper end of the secondary refueling pipe extends into the dual fuel tank port box through the secondary refueling pipe introduction hole; a refueling gun baffle is installed in the dual fuel tank port box, and a main refueling gun guide port for guiding the gun head of the refueling gun to extend into the main refueling pipe and a secondary refueling gun guide port for guiding the gun head of the refueling gun to extend into the secondary refueling pipe are provided on the refueling gun baffle; the air outlet end of the main ventilation pipe and the air outlet end of the secondary ventilation pipe are both welded and connected in the dual fuel tank port box and are located above the refueling gun baffle.

[0006] To optimize the above technical solutions, the specific measures taken also include:

[0007] The above-mentioned main refueling pipe is assembled from a first main refueling steel pipe, a first main refueling rubber pipe, a second main refueling steel pipe and a second main refueling rubber pipe which are connected in sequence; both ends of the first main refueling rubber pipe and the upper end of the second main refueling rubber pipe are clamped with a large single-ear stepless clamp for improving the connection firmness.

[0008] The main ventilation pipe is composed of a first main ventilation steel pipe, a first main ventilation rubber pipe and a second main ventilation steel pipe which are connected in sequence; both ends of the first main ventilation rubber pipe are clamped with small single-ear stepless clamps for improving the connection firmness.

[0009] The above-mentioned auxiliary refueling pipe is composed of a first auxiliary refueling steel pipe, a first auxiliary refueling rubber pipe and a second auxiliary refueling steel pipe connected in sequence; both ends of the first auxiliary refueling rubber pipe are also clamped with large single-ear stepless clamps for improving the connection firmness.

[0010] The auxiliary ventilation pipe is composed of a first auxiliary ventilation steel pipe, a first auxiliary ventilation rubber pipe and a second auxiliary ventilation steel pipe connected in sequence; both ends of the first auxiliary ventilation rubber pipe are also clamped with small single-ear stepless clamps for improving the connection firmness.

[0011] A first main positioning bracket for locating the spatial position between the first main refueling steel pipe and the first main ventilation steel pipe is welded therebetween; a second main positioning bracket for locating the spatial position between the second main refueling steel pipe and the second main ventilation steel pipe is welded therebetween.

[0012] A first positioning bracket is welded between the first refueling steel pipe and the first ventilation steel pipe for locating the spatial position between the two, a second positioning bracket is welded between the second refueling steel pipe and the second ventilation steel pipe for locating the spatial position between the two, and a small mounting bracket is separately welded on the second ventilation steel pipe relatively close to the tail end.

[0013] The above-mentioned diesel dual refueling pipe assembly is equipped with a first main mounting bracket, and the first main refueling steel pipe, the first main ventilation steel pipe, the first auxiliary refueling steel pipe and the first auxiliary ventilation steel pipe are all fixedly connected to the first main mounting bracket.

[0014] The above-mentioned diesel dual refueling pipe assembly is also equipped with a second main mounting bracket, and the second main refueling steel pipe, the second main ventilation steel pipe, the second auxiliary refueling steel pipe and the second auxiliary ventilation steel pipe are all fixedly connected to the second main mounting bracket.

[0015] The above-mentioned fuel filler port is roll-formed with a double-start thread for matching with the fuel tank cap spiral; the upper end of the first main fuel filler steel pipe is formed with a main fuel filler end which is inserted into the main fuel filler pipe introduction hole; the upper end of the first auxiliary fuel filler steel pipe is formed with an auxiliary fuel filler end which is inserted into the auxiliary fuel filler pipe introduction hole; the inclination angle between the central axis of the main fuel filler end and the central axis of the fuel filler port is 9°, and the angle between the central axis of the auxiliary fuel filler end and the central axis of the fuel filler port is 2.5°.

[0016] Compared with the prior art, the upper ends of the main refueling pipe and the auxiliary refueling pipe of the utility model are both connected to the double fuel tank port box, and a refueling port is installed in the upper port of the double fuel tank port box, so that the main refueling pipe and the auxiliary refueling pipe can share the same refueling port for fuel filling. A refueling gun baffle is installed in the double fuel tank port box, and the refueling gun baffle is provided with a main refueling gun guide port and an auxiliary refueling gun guide port. The main refueling gun guide port and the auxiliary refueling gun guide port can be used to conveniently select whether to refuel the main fuel tank or the auxiliary fuel tank, so as to achieve the purpose of refueling different fuel tanks separately under the condition of sharing the same refueling port. The utility model has high integration, occupies less space, and can enable two fuel tanks to share one refueling port. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the utility model;

[0018] Figure 2 It is an exploded view of the utility model;

[0019] Figure 3 It is a three-dimensional structural schematic diagram of the fuel gun baffle of the utility model;

[0020] Figure 4 It is a three-dimensional structural schematic diagram of the base of the utility model;

[0021] Figure 5 It is a cross-sectional view of the connection structure of the double fuel tank port box of the utility model. DETAILED DESCRIPTION

[0022] The embodiments of the present invention are described in further detail below in conjunction with the accompanying drawings.

[0023] Figures 1 to 5 It is a structural schematic diagram of the utility model.

[0024] The accompanying drawings are as follows: inclination angle α, included angle β, large single-ear stepless clamp G, small single-ear stepless clamp g, first main positioning bracket J1, second main positioning bracket J2, first auxiliary positioning bracket j1, second auxiliary positioning bracket j2, small mounting bracket j3, main refueling pipe 1, first main refueling steel pipe 11, main refueling end 111, first main refueling rubber hose 12, second main refueling steel pipe 13, second main refueling rubber hose 14, main ventilation pipe 2, first main ventilation steel pipe 21, first main ventilation rubber hose 22, second main ventilation steel pipe 23, auxiliary refueling pipe 3, first auxiliary refueling steel pipe 31, auxiliary refueling end 311, first auxiliary refueling rubber hose 32, second auxiliary refueling steel pipe 33, auxiliary ventilation pipe 4, first auxiliary ventilation steel pipe 41, first auxiliary ventilation rubber hose 42, second auxiliary ventilation steel pipe 43, refueling port 5, double-headed thread 5a, double tank port box 6, base 7, main refueling pipe introduction hole 7a, auxiliary refueling pipe introduction hole 7b, refueling gun baffle 8, main refueling gun guide port 8a, auxiliary refueling gun guide port 8b, first main mounting bracket 91, second main mounting bracket 92.

[0025] The utility model discloses a diesel dual refueling pipe assembly, which is installed on a diesel vehicle with a main and auxiliary fuel tanks. The main and auxiliary fuel tanks allow the vehicle to carry more fuel, and are therefore particularly suitable for use in areas with a large area and a sparse population and few gas stations. The dual refueling pipe assembly of the utility model includes a main refueling pipe 1, a main ventilation pipe 2, an auxiliary refueling pipe 3 and an auxiliary ventilation pipe 4. The main refueling pipe 1 is used to refuel the main fuel tank, the auxiliary refueling pipe 3 is used to refuel the auxiliary fuel tank, the main ventilation pipe 2 and the auxiliary ventilation pipe 4 are used to exhaust the air in the fuel tank during refueling, so that the oil and gas can take different pipelines during refueling to avoid fuel back-choking during refueling. Figure 1 As shown, the main refueling pipe 1 and the auxiliary refueling pipe 3 of the utility model share the same refueling port 5 for refueling, and the refueling port 5 is installed in the upper port of the double fuel tank port box 6. Figure 4 and Figure 5 As shown, the bottom of the double fuel tank port box 6 is sealed and welded with a base 7, and the base 7 is respectively provided with a main fuel pipe introduction hole 7a and a secondary fuel pipe introduction hole 7b. The upper end of the main fuel pipe 1 extends into the double fuel tank port box 6 through the main fuel pipe introduction hole 7a, and the upper end of the secondary fuel pipe 3 extends into the double fuel tank port box 6 through the secondary fuel pipe introduction hole 7b. The base 7 is used to fix the main fuel pipe 1 and the secondary fuel pipe 3 and provide guidance for the insertion angle and direction of the main fuel pipe 1 and the secondary fuel pipe 3. A fuel gun baffle 8 is installed at the middle and lower position in the double fuel tank port box 6, as shown in FIG. Figure 3 As shown, the fueling gun baffle 8 is provided with a main fueling gun guide port 8a and a secondary fueling gun guide port 8b. The main fueling gun guide port 8a and the secondary fueling gun guide port 8b are used to provide guidance for the fueling gun when refueling. When refueling is required to the main fuel tank, the tip of the fueling gun can extend into the main fueling pipe 1 through the main fueling gun guide port 8a, and when refueling is required to the secondary fuel tank, the tip of the fueling gun can extend into the main fueling pipe 1 through the secondary fueling gun guide port 8b. Figure 5 As can be seen in the figure, there is a gap between the upper end of the main refueling pipe 1 and the main refueling gun guide port 8a, which is convenient for exhausting when refueling. The outlet end of the main vent pipe 2 and the outlet end of the auxiliary vent pipe 4 are welded and connected in the double tank port box 6 and are located above the refueling gun baffle 8.

[0026] In the embodiment, Figure 2 It can be seen that the main refueling pipe 1 of the utility model is composed of a first main refueling steel pipe 11, a first main refueling rubber pipe 12, a second main refueling steel pipe 13 and a second main refueling rubber pipe 14 which are connected in sequence. Both ends of the first main refueling rubber pipe 12 and the upper end of the second main refueling rubber pipe 14 are clamped with a large single-ear stepless clamp G. Through the binding effect of the large single-ear stepless clamp G, the firmness of the connection between the refueling steel pipe and the refueling rubber pipe can be ensured to prevent it from falling off during use.

[0027] In the embodiment, the main ventilation pipe 2 of the utility model is composed of a first main ventilation steel pipe 21, a first main ventilation rubber hose 22 and a second main ventilation steel pipe 23 connected in sequence. Both ends of the first main ventilation rubber hose 22 are clamped with a small single-ear stepless clamp g for improving the connection firmness.

[0028] In the embodiment, the auxiliary refueling pipe 3 of the utility model is composed of a first auxiliary refueling steel pipe 31, a first auxiliary refueling rubber pipe 32 and a second auxiliary refueling steel pipe 33 connected in sequence. Both ends of the first auxiliary refueling rubber pipe 32 are also clamped with a large single-ear stepless clamp G for improving the connection firmness.

[0029] In the embodiment, the auxiliary ventilation pipe 4 of the utility model is composed of a first auxiliary ventilation steel pipe 41, a first auxiliary ventilation rubber pipe 42 and a second auxiliary ventilation steel pipe 43 connected in sequence. Both ends of the first auxiliary ventilation rubber pipe 42 are also clamped with a small single-ear stepless clamp g for improving the connection firmness.

[0030] The large single-ear stepless clamp G and the small single-ear stepless clamp G of the utility model have the same function, that is, both achieve the purpose of preventing falling off by binding.

[0031] In the embodiment, a first main positioning bracket J1 for locating the spatial position and direction between the first main refueling steel pipe 11 and the first main ventilation steel pipe 21 is welded; the first main positioning bracket J1 is welded at a position close to the upper end of the first main refueling steel pipe 11 and the first main ventilation steel pipe 21. A second main positioning bracket J2 for locating the spatial position and direction between the second main refueling steel pipe 13 and the second main ventilation steel pipe 23 is welded. The second main positioning bracket J2 is welded at a relatively rear position of the second main refueling steel pipe 13.

[0032] In the embodiment, a first auxiliary positioning bracket j1 for locating the spatial position between the first auxiliary refueling steel pipe 31 and the first auxiliary ventilation steel pipe 41 is welded, a second auxiliary positioning bracket j2 for locating the spatial position between the second auxiliary refueling steel pipe 33 and the second auxiliary ventilation steel pipe 43 is welded, and a small mounting bracket j3 is separately welded on the second auxiliary ventilation steel pipe 43 at a position relatively close to the tail end.

[0033] In the embodiment, the diesel dual refueling pipe assembly is equipped with a first main mounting bracket 91 , and the first main refueling steel pipe 11 , the first main ventilation steel pipe 21 , the first auxiliary refueling steel pipe 31 and the first auxiliary ventilation steel pipe 41 are all fixedly connected to the first main mounting bracket 91 .

[0034] In the embodiment, the diesel dual refueling pipe assembly is further provided with a second main mounting bracket 92 , and the second main refueling steel pipe 13 , the second main ventilation steel pipe 23 , the second auxiliary refueling steel pipe 33 and the second auxiliary ventilation steel pipe 43 are all fixedly connected to the second main mounting bracket 92 .

[0035] The first main positioning bracket J1, the second main positioning bracket J2, the first auxiliary positioning bracket j1, the second auxiliary positioning bracket j2, the small mounting bracket j3 and the first main mounting bracket 91 and the second main mounting bracket 92 of the utility model have the same functions and effects, which are to play the role of positioning and installation. In addition to ensuring the spatial direction between pipelines, they can also facilitate the installation of the refueling pipe assembly.

[0036] In the embodiment, the fuel filler port 5 of the utility model is roll-formed with a double-threaded thread 5a for matching with the fuel tank cap screw, and the double-threaded thread 5a allows the fuel tank cap to be tightened by rotating it 90 degrees. Figure 2 and Figure 5 As shown, the upper end of the first main refueling steel pipe 11 of the utility model is formed with a main refueling end 111 that fits with the main refueling pipe introduction hole 7a; the upper end of the first auxiliary refueling steel pipe 31 is formed with an auxiliary refueling end 311 that fits with the auxiliary refueling pipe introduction hole 7b. The inclination angle α between the central axis of the main refueling end 111 and the central axis of the refueling port 5 is 9°, and the angle β between the central axis of the auxiliary refueling end 311 and the central axis of the refueling port 5 is 2.5°.

[0037] In order to adapt the insertion angle of the fuel gun and ensure the smoothness of refueling, such as Figure 5 As shown, the fueling gun baffle 8 of the present invention is bent to form an angle of 170 degrees with the center line as a reference, and the main fueling gun guide port 8a and the auxiliary fueling gun guide port 8b are respectively located on both sides of the center line.

[0038] The best embodiment of the present invention has been explained, and various changes or modifications made by ordinary technicians in this field will not depart from the scope of the present invention.

Claims

1. A diesel dual refueling pipe assembly, comprising a main refueling pipe (1), a main ventilation pipe (2), a secondary refueling pipe (3) and a secondary ventilation pipe (4); wherein: The main refueling pipe (1) and the auxiliary refueling pipe (3) share the same refueling port (5) for refueling, the refueling port (5) is installed in the upper end of the double fuel tank port box (6), the bottom of the double fuel tank port box (6) is sealed and welded with a base (7), and the base (7) is respectively provided with a main refueling pipe introduction hole (7a) and an auxiliary refueling pipe introduction hole (7b); the upper end of the main refueling pipe (1) extends into the double fuel tank port box (6) through the main refueling pipe introduction hole (7a), and the upper end of the auxiliary refueling pipe (3) extends into the double fuel tank port box (6) through the auxiliary refueling pipe introduction hole (7b). The introduction hole (7b) extends into the double fuel tank port box (6); a refueling gun baffle (8) is installed in the double fuel tank port box (6); the refueling gun baffle (8) is provided with a main refueling gun guide port (8a) for guiding the gun head of the refueling gun to extend into the main refueling pipe and a secondary refueling gun guide port (8b) for guiding the gun head of the refueling gun to extend into the secondary refueling pipe (3); the air outlet end of the main ventilation pipe (2) and the air outlet end of the secondary ventilation pipe (4) are both welded and connected in the double fuel tank port box (6) and are located above the refueling gun baffle (8).

2. A diesel dual refueling pipe assembly according to claim 1, characterized in that: The main refueling pipe (1) is composed of a first main refueling steel pipe (11), a first main refueling rubber pipe (12), a second main refueling steel pipe (13) and a second main refueling rubber pipe (14) which are connected in sequence; both ends of the first main refueling rubber pipe (12) and the upper end of the second main refueling rubber pipe (14) are clamped with a large single-ear stepless clamp (G) for improving the connection firmness.

3. A diesel dual refueling pipe assembly according to claim 2, characterized in that: The main ventilation pipe (2) is composed of a first main ventilation steel pipe (21), a first main ventilation rubber hose (22) and a second main ventilation steel pipe (23) which are connected in sequence; both ends of the first main ventilation rubber hose (22) are clamped with a small single-ear stepless clamp (g) for improving the connection firmness.

4. A diesel dual refueling pipe assembly according to claim 3, characterized in that: The auxiliary refueling pipe (3) is composed of a first auxiliary refueling steel pipe (31), a first auxiliary refueling rubber pipe (32) and a second auxiliary refueling steel pipe (33) which are connected in sequence; both ends of the first auxiliary refueling rubber pipe (32) are also clamped with a large single-ear stepless clamp (G) for improving the connection firmness.

5. A diesel dual refueling pipe assembly according to claim 4, characterized in that: The auxiliary ventilation pipe (4) is composed of a first auxiliary ventilation steel pipe (41), a first auxiliary ventilation rubber hose (42) and a second auxiliary ventilation steel pipe (43) which are connected in sequence; both ends of the first auxiliary ventilation rubber hose (42) are also clamped with a small single-ear stepless clamp (g) for improving the connection firmness.

6. A diesel dual refueling pipe assembly according to claim 5, characterized in that: A first main positioning bracket (J1) for locating the spatial position between the first main refueling steel pipe (11) and the first main ventilation steel pipe (21) is welded therebetween; a second main positioning bracket (J2) for locating the spatial position between the second main refueling steel pipe (13) and the second main ventilation steel pipe (23) is welded therebetween.

7. A diesel dual refueling pipe assembly according to claim 6, characterized in that: A first auxiliary positioning bracket (j1) for locating the spatial position between the first auxiliary refueling steel pipe (31) and the first auxiliary ventilation steel pipe (41) is welded therebetween, a second auxiliary positioning bracket (j2) for locating the spatial position between the second auxiliary refueling steel pipe (33) and the second auxiliary ventilation steel pipe (43) is welded therebetween, and a small mounting bracket (j3) is separately welded on the second auxiliary ventilation steel pipe (43) at a position relatively close to the tail end.

8. A diesel dual refueling pipe assembly according to claim 7, characterized in that: The diesel dual refueling pipe assembly is provided with a first main mounting bracket (91), and the first main refueling steel pipe (11), the first main ventilation steel pipe (21), the first auxiliary refueling steel pipe (31) and the first auxiliary ventilation steel pipe (41) are all fixedly connected to the first main mounting bracket (91).

9. A diesel dual refueling pipe assembly according to claim 8, characterized in that: The diesel dual refueling pipe assembly is also equipped with a second main mounting bracket (92), and the second main refueling steel pipe (13), the second main ventilation steel pipe (23), the second auxiliary refueling steel pipe (33) and the second auxiliary ventilation steel pipe (43) are all fixedly connected to the second main mounting bracket (92).

10. A diesel dual refueling pipe assembly according to claim 9, characterized in that: The refueling port (5) is roll-formed with a double-thread (5a) for being screwed together with the fuel tank cap; the upper end of the first main refueling steel pipe (11) is formed with a main refueling end (111) for being inserted into the main refueling pipe introduction hole (7a); the upper end of the first auxiliary refueling steel pipe (31) is formed with an auxiliary refueling end (311) for being inserted into the auxiliary refueling pipe introduction hole (7b); the inclination angle (α) between the central axis of the main refueling end (111) and the central axis of the refueling port (5) is 9°, and the included angle (β) between the central axis of the auxiliary refueling end (311) and the central axis of the refueling port (5) is 2.5°.