New and old roadbed splicing structure
By using a structure of reinforcements, main reinforcement rods, auxiliary rods, stirrups and steel mesh between the new and old roadbeds, combined with ladder connections, the problem of uneven pavement caused by the settlement of the old and new roadbeds is solved, and the integrity of the roadway is improved and prevented. Enhanced settling ability.
Patent Information
- Application Number
- CN202323454768.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-19
AI Technical Summary
In road reconstruction and expansion projects, settlement deformation between the old and new roadbeds leads to cracks in the embankments and damage to the road surface. The existing technology only uses support rods to support between the old and new roadbeds. After a long time, the different settlement degrees cause the support rods to tilt and the road surface to become unstable. smooth.
A spliced structure of old and new roadbeds including old roadbed, reinforcements, main reinforcement poles, auxiliary poles, stirrups, steel mesh and steps is used to connect the original concrete layer and the new concrete layer through the main reinforcement pole and auxiliary poles, and is reinforced with steel mesh. Anti-settlement ability, and the new and old roadbeds are closely connected through stairs to form an overall structure.
It effectively prevents pavement fractures, improves pavement flatness and anti-settlement capabilities, solves the problem of uneven pavement caused by tilting of support rods, and enhances the connection strength and integrity between new and old roadbeds.
Smart Images

Figure CN221837343U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of roadbed, in particular to a new and old roadbed splicing structure. Background Art
[0002] In road reconstruction and expansion projects, settlement and deformation often occur between the new and old embankments, which leads to embankment cracking and road surface damage. Improper treatment measures at the junction of the new and old roadbeds are the main causes of embankment cracking and road surface damage.
[0003] The patent document with announcement number: CN219972833U discloses "a new and old roadbed splicing structure". When supporting the support plate, the rotating block is rotated, and the rotating block can drive the connecting plate to move downward. The connecting plate can insert the ground cone into the ground when it moves downward. While the connecting plate moves downward, it can drive the second support rod to move downward, so that the support plate can be supported. The support plate is supported by the first support rod and the second support rod. However, in the above device, only the support rod is used for support between the new and old roadbeds. Due to the different settlement degrees of the new and old roadbeds, the support rod will tilt after a long time, resulting in an uneven road surface. Therefore, it is necessary to provide a new and old roadbed splicing structure to solve the above technical problems. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a new and old roadbed splicing structure with good anti-settlement performance.
[0005] The new and old roadbed splicing structure provided by the utility model comprises an old roadbed, an original concrete layer is arranged on the top of the old roadbed, an original road surface layer is arranged on the top of the original concrete layer, a new roadbed is arranged on the outer side of the old roadbed, and a reinforcement piece is arranged on the top of the new roadbed.
[0006] In order to keep the road surface smooth, the utility model provides a new and old roadbed splicing structure. Preferably, a new concrete layer is arranged on the outer side of the reinforcement member, and a new road surface layer is arranged on the top of the new concrete layer.
[0007] In order to improve the connection strength between the new and old road surfaces, the utility model provides a new and old roadbed splicing structure. Preferably, the reinforcement member includes a main reinforcement rod fixedly connected to the inside of the original concrete layer, and a secondary rod is fixedly connected to the outer side of the main reinforcement rod.
[0008] In order to improve the anti-settling performance of the road surface, the utility model provides a new and old roadbed splicing structure. Preferably, the outer side of the auxiliary rod is fixedly connected with a stirrup, and the outer side of the stirrup is provided with a wire mesh.
[0009] In order to improve the firmness of the reinforcement member, the utility model provides a new and old roadbed splicing structure, preferably, the bottom of the main reinforcement rod is fixedly connected with a support rod, and the bottom of the support rod is fixedly connected with a reinforcement plate.
[0010] In order to improve the bite between the new and old roadbeds, the utility model provides a new and old roadbed splicing structure, preferably, the outer side of the old roadbed is provided with steps.
[0011] In order to fix the wire mesh, the utility model provides a new and old roadbed splicing structure. Preferably, the outer side of the wire mesh is fixedly connected with a connecting sleeve, and the outer side of the auxiliary rod is fixedly connected with a connecting rod.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The new and old roadbed splicing structure is a structure in which the old roadbed and the new roadbed are connected together by steps, so that the connection between the new and old roadbeds is tighter, and the integrity of the roadbed is improved. The main reinforcement rod and the auxiliary rod are used to connect the original concrete layer and the new concrete layer, so that the new and old concrete layers form a whole, which can effectively prevent the road surface from breaking. The wire mesh forms the top of the main reinforcement rod and the auxiliary rod into a whole, thereby improving the anti-settling ability of the road surface, and solves the problem that in the existing device, only the support rod is used to support between the new and old roadbeds. Due to the different settlement degrees of the new and old roadbeds, the support rod will tilt after a long time, resulting in an uneven road surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A structural schematic diagram of a preferred embodiment of the new and old roadbed splicing structure provided by the utility model;
[0015] Figure 2 It is a structural schematic diagram of the reinforcement member of the utility model;
[0016] Figure 3 for Figure 2 Schematic diagram of the enlarged structure at point A in the middle.
[0017] Numbers in the figure: 1. Old roadbed; 2. Original concrete layer; 3. Original pavement layer; 4. New roadbed; 5. New concrete layer; 6. New pavement layer; 7. Steps; 8. Reinforcement; 801. Main reinforcement rod; 802. Auxiliary rod; 803. Stirrups; 804. Wire mesh; 9. Support rod; 10. Reinforcement plate; 11. Connecting sleeve; 12. Connecting rod. DETAILED DESCRIPTION
[0018] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0019] Please refer to Figure 1 , Figure 2 and Figure 3,in Figure 1 A structural schematic diagram of a preferred embodiment of the new and old roadbed splicing structure provided by the utility model; Figure 2 It is a structural schematic diagram of the reinforcement member of the utility model; Figure 3 for Figure 2 A schematic diagram of the enlarged structure at A in the middle. A new and old roadbed splicing structure includes an old roadbed 1, an original concrete layer 2 is arranged on the top of the old roadbed 1, the original concrete layer 2 is cast on the top of the old roadbed 1, an original pavement layer 3 is arranged on the top of the original concrete layer 2, the original pavement layer 3 is an asphalt layer cast on the top of the original concrete layer 2, a new roadbed 4 is arranged on the outside of the old roadbed 1, a reinforcing member 8 is arranged on the top of the new roadbed 4, and the reinforcing member 8 is arranged to strengthen the connection strength between the new and old roadbeds.
[0020] In this embodiment, the reinforcement member 8 is a rigid structure, which plays a supporting and reinforcing role between the new and old roadbeds.
[0021] As a technical optimization solution of the utility model, a new concrete layer 5 is arranged on the outside of the reinforcement 8, the new concrete layer 5 is cast on the top of the new roadbed 4, the reinforcement 8 is cast inside the new concrete layer 5, and a new pavement layer 6 is arranged on the top of the new concrete layer 5. The new pavement layer 6 is also an asphalt layer like the original pavement layer 3 and is cast on the top of the new concrete layer 5.
[0022] In this embodiment: the original concrete layer 2 and the new concrete layer 5 can strengthen the strength of the roadbed, and the new and old road surface layers can improve the smoothness of the road surface.
[0023] As a technical optimization solution of the utility model, the reinforcement part 8 includes a main reinforcement rod 801 fixedly connected to the inside of the original concrete layer 2, the main reinforcement rod 801 is welded to the inside of the original concrete layer 2, and the outer side of the main reinforcement rod 801 is fixedly connected with a secondary rod 802, and the secondary rod 802 is welded to the outer side of the main reinforcement rod 801. The main reinforcement rod 801 and the secondary rod 802 are used to connect and reinforce the original concrete layer 2 and the new concrete layer 5, so as to prevent the different settlement degrees of the new and old pavements from causing adverse conditions such as pavement rupture.
[0024] In this embodiment, the main reinforcing rod 801 and the auxiliary rod 802 are used to connect the original concrete layer 2 and the new concrete layer 5, so that the new and old concrete layers form a whole, which can effectively prevent the road surface from breaking.
[0025] As a technical optimization solution of the utility model, the outer side of the auxiliary rod 802 is fixedly connected with a stirrup 803, and the stirrup 803 is welded to the outer side of the auxiliary rod 802. The auxiliary rod 802 is connected by the stirrup 803 to improve the overall strength. The outer side of the stirrup 803 is provided with a wire mesh 804, and the wire mesh 804 is clamped on the outer side of the stirrup 803 through a connecting sleeve 11 and a connecting rod 12. The wire mesh 804 is used to improve the anti-settling ability.
[0026] In this embodiment: stirrups 803 connect the auxiliary rods 802 together to improve the strength, and the wire mesh 804 forms the main reinforcement rod 801 and the top of the auxiliary rod 802 into a whole, thereby improving the anti-settling ability of the road surface.
[0027] As a technical optimization solution of the utility model, the bottom of the main reinforcement rod 801 is fixedly connected with a support rod 9, and the support rod 9 is welded to the bottom of the main reinforcement rod 801. The bottom of the support rod 9 is fixedly connected with a reinforcement plate 10, and the reinforcement plate 10 is welded to the bottom of the support rod 9. The support rod 9 and the reinforcement plate 10 are used to improve the firmness between the roadbed and the reinforcement member 8, thereby further improving the anti-subsidence performance of the road surface.
[0028] In this embodiment: the support rod 9 is used to play a supporting role between the reinforcement member 8 and the foundation, and the reinforcement plate 10 is used to increase the ground contact area of the support rod 9 to improve the firmness.
[0029] As a technical optimization solution of the utility model, a step 7 is arranged on the outside of the old roadbed 1. The step 7 has two levels. The old roadbed 1 and the new roadbed 4 are connected together by the step 7, so that the connection between the new and old roadbeds is tighter.
[0030] In this embodiment, the old roadbed 1 and the new roadbed 4 are connected together by the step 7, so that the connection between the old and new roadbeds is tighter, thereby improving the integrity of the roadbed.
[0031] As a technical optimization solution of the utility model, the outer side of the wire mesh 804 is fixedly connected with a connecting sleeve 11, and the connecting sleeve 11 is welded to the outer side of the wire mesh 804. The outer side of the auxiliary rod 802 is fixedly connected with a connecting rod 12, and the connecting rod 12 is welded to the outer side of the auxiliary rod 802. The wire mesh 804 is fixed on the auxiliary rod 802 by using the connecting sleeve 11 and the connecting rod 12.
[0032] In this embodiment, the connecting sleeve 11 on the wire mesh 804 is clamped onto the outer side of the connecting rod 12 on the auxiliary rod 802 , so that the wire mesh 804 can be fixed on the outer side of the auxiliary rod 802 .
[0033] The working principle of a new and old roadbed splicing structure provided by the utility model is as follows:
[0034] A step 7 is opened on the outside of the old roadbed 1, and then the new roadbed 4 is laid on the outside of the old roadbed 1. The old roadbed 1 and the new roadbed 4 are connected together through the step 7, so that the connection between the new and old roadbeds is tighter, and the integrity of the roadbed is improved. The main reinforcement rod 801 is fixed inside the original concrete layer 2, and the auxiliary rod 802 is welded to the outside of the main reinforcement rod 801. Then, concrete is poured on the outside of the reinforcement member 8. After the concrete reaches a certain height, the wire mesh 804 is fixed to the outside of the auxiliary rod 802, and then the pouring is continued to form a new concrete layer 5, and finally the new pavement layer 6 is poured. The main reinforcement rod 801 and the auxiliary rod 802 are used to connect the original concrete layer 2 and the new concrete layer 5, so that the new and old concrete layers form a whole, which can effectively prevent the road surface from breaking. The wire mesh 804 forms the top of the main reinforcement rod 801 and the auxiliary rod 802 into a whole, thereby improving the anti-subsidence ability of the road surface.
[0035] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A new and old roadbed splicing structure, It is characterized in that The invention comprises an old roadbed (1), wherein an original concrete layer (2) is arranged on the top of the old roadbed (1), an original road surface layer (3) is arranged on the top of the original concrete layer (2), a new roadbed (4) is arranged on the outer side of the old roadbed (1), and a reinforcing member (8) is arranged on the top of the new roadbed (4).
2. The new and old roadbed splicing structure according to claim 1, It is characterized in that A new concrete layer (5) is arranged on the outer side of the reinforcement member (8), and a new pavement layer (6) is arranged on the top of the new concrete layer (5).
3. The new and old roadbed splicing structure according to claim 1, It is characterized in that The reinforcing member (8) comprises a main reinforcing rod (801) fixedly connected to the inside of the original concrete layer (2), and a secondary rod (802) is fixedly connected to the outside of the main reinforcing rod (801).
4. The new and old roadbed splicing structure according to claim 3, It is characterized in that The outer side of the secondary rod (802) is fixedly connected with a stirrup (803), and the outer side of the stirrup (803) is provided with a wire mesh (804).
5. The new and old roadbed splicing structure according to claim 3, It is characterized in that The bottom of the main reinforcement rod (801) is fixedly connected to a support rod (9), and the bottom of the support rod (9) is fixedly connected to a reinforcement plate (10).
6. The new and old roadbed splicing structure according to claim 1, It is characterized in that The outer side of the old roadbed (1) is provided with steps (7).
7. The new and old roadbed splicing structure according to claim 4, It is characterized in that The outer side of the wire mesh (804) is fixedly connected to a connecting sleeve (11), and the outer side of the auxiliary rod (802) is fixedly connected to a connecting rod (12).