Imitation stone PC pavement brick

By designing drainage channels and deodorizing boxes in imitation stone PC pavement tiles, and using plant essential oil particles to reduce the impact of odor, the odor problem in the existing technology is solved, and hygiene and convenience are improved.

CN221837347UActive Publication Date: 2024-10-15ANHUI GAOZONG NEW MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322874959.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-26
Publication Date
2024-10-15
Estimated Expiration
2033-10-26

AI Technical Summary

Technical Problem

After the existing stone-like PC pavement tiles are used for a long time, peculiar smell will be produced in the drainage channel, which affects the hygiene and convenience during use.

Method used

A kind of stone-like PC pavement tile was designed, including a water inlet slit running through the surface of the pavement tile body. Deodorizing boxes are installed on the inner walls on both sides of the water inlet slit. A drainage channel is set below. During cleaning, the fan-shaped brush rotates ninety degrees along the drainage line. The groove moves, and the plant essential oil particles emit aromatic odor through the gas exchange holes, reducing the impact of odor.

Benefits of technology

It effectively reduces the impact of odor inside the drainage channel on the outside world, improves the safety and hygiene during use of pavement tiles, and increases convenience and aromatic experience during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837347U_ABST
    Figure CN221837347U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of PC pavement bricks, and discloses an imitation stone PC pavement brick. According to the pavement brick, a water inlet seam is formed in the surface of the pavement brick body in a penetrating mode, deodorization boxes are fixedly installed on the inner walls of the two sides of the water inlet seam, and a drainage through groove is formed in the lower portion of the water inlet seam and penetrates through the interior of the pavement brick body. According to the pavement brick, the oval groove is formed in the pavement brick body, during cleaning, the fan-shaped brush is rotated by 90 degrees behind the interior of the drainage through groove, the fan-shaped brush moves in the length direction of the drainage through groove, garbage in the drainage through groove is pushed to move, finally the garbage is cleaned out of the drainage through groove, and meanwhile the drainage through groove emits peculiar smell to the outside after being used for a long time; meanwhile, the plant essential oil particles can penetrate through the gas exchange holes to emit aromatic odor to the outside of the deodorization box, so that the influence of peculiar smell in the drainage through groove on the outside is reduced, and the safety and sanitation of the whole pavement brick body in the using process are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of PC pavement bricks, and specifically relates to a kind of imitation stone PC pavement bricks. Background Art

[0002] With the continuous progress of society, the real estate industry has developed rapidly, and the building materials used in real estate have also been well applied, and people's requirements for building materials have continued to increase. In recent years, with the rapid development of the construction and decoration industries, the demand for various types of stone materials has increased, and the consumption of natural stone resources and environmental pollution have become more and more serious. Therefore, precast concrete PC component materials have emerged. This material is a concrete material similar to some natural stone effects made by concrete molding technology, surface treatment, coloring, shaping and other methods. PC components precast by concrete have been made into floor tiles, pavement tiles, etc., and have been promoted for use.

[0003] For example, the application with the publication number CN209412646U discloses a PC stone brick, which relates to the field of road bricks, including a brick body, a plurality of mutually parallel oval grooves are formed in the brick body, a drainage slit is formed on one side of the brick body along the length direction of the oval groove, the drainage slit is connected to the oval groove, and a plurality of convex strips are fixed on the inner wall of the oval groove along its length direction. In view of the problem that garbage in the drainage channel is difficult to clean in the prior art, the utility model provides drainage slits and oval grooves, and when cleaning, a fan-shaped brush is inserted into the oval groove through the drainage slit, rotated and moved along the length direction of the drainage slit, pushing the garbage in the oval groove to one end of the oval groove, and finally leaving the oval groove, thereby cleaning the garbage.

[0004] However, after the oval groove in the application is used for a long time, there will be odor inside, and the odor will be emitted to the outside through the drainage seam, thereby affecting the hygiene and convenience during use. Utility Model Content

[0005] The purpose of this application is to provide a stone-like PC pavement brick in order to solve the above-mentioned problems.

[0006] The technical solution adopted in this application is as follows: a stone-like PC pavement brick, comprising a pavement brick body, a surface of which is penetrated by a water inlet gap, deodorizing boxes are fixedly installed on the inner walls on both sides of the water inlet gap, a drainage groove is provided below the water inlet gap, and the drainage groove penetrates the interior of the pavement brick body.

[0007] By adopting the above technical scheme, an oval groove is opened in the pavement brick body. When cleaning, the fan-shaped brush is rotated ninety degrees inside the drainage groove and moved along the length direction of the drainage groove to push the garbage in the drainage groove to move, and finally the garbage is cleaned out of the drainage groove. At the same time, after being used for a long time, the drainage groove will emit odor to the outside, and the plant essential oil particles will pass through the gas exchange holes to emit a fragrant smell to the outside of the deodorizing box, thereby reducing the impact of the odor inside the drainage groove on the outside, and improving the safety and hygiene of the pavement brick body during the overall use.

[0008] In a preferred embodiment, the interior of the deodorizing box is filled with plant essential oil particles, a gas exchange hole is opened on an opposite side of the deodorizing box, and the gas exchange hole is communicated with the interior of the deodorizing box.

[0009] By adopting the above technical solution, the smell of the plant essential oil particles can be easily emitted outwards, thereby improving the convenience during use.

[0010] In a preferred embodiment, an anti-leakage net is provided between the plant essential oil particles and the gas exchange holes, and the mesh diameter of the anti-leakage net is smaller than the particle diameter of the plant essential oil particles.

[0011] By adopting the above technical solution, the plant essential oil particles will not leak out from the gas exchange holes.

[0012] In a preferred embodiment, a mounting head is fixedly mounted on a side surface of the deodorizing box close to the inner wall of the water inlet slit, and a plug-in groove matching the mounting head is formed on the side wall of the water inlet slit.

[0013] By adopting the above technical solution, the deodorizing box is made detachable, thereby increasing the convenience of the deodorizing box when in use.

[0014] In a preferred embodiment, side snap-in strips are fixedly mounted on the front and rear side surfaces of the pavement brick body, and a side surface of the pavement brick body opposite to the side snap-in strip is provided with a limiting snap-in groove matched with the side snap-in strip.

[0015] By adopting the above technical solution, the pavement brick body is made more secure during installation and fixation.

[0016] In a preferred embodiment, a fixed plug plate is fixedly connected to a lateral side of the pavement brick body, and an adapting plug groove is provided at a position of the pavement brick body opposite to the fixed plug plate.

[0017] By adopting the above technical solution, it is convenient to fix and install the pavement brick body at the front and back, so that the adjacent pavement brick bodies are more firmly installed and fixed.

[0018] In a preferred embodiment, a feeding port is provided at one end of one side of the deodorizing box, and a sealing port piston is provided at the feeding port, and a lifting handle bar is fixedly installed at the center of the sealing port piston.

[0019] By adopting the above technical solution, it is easy to replace the plant essential oil particles inside the deodorizing box, thereby increasing the convenience during use.

[0020] In summary, due to the adoption of the above technical solution, the beneficial effects of this application are:

[0021] In the present application, an oval groove is opened in the pavement brick body. When cleaning, the fan-shaped brush is rotated ninety degrees inside the drainage groove and moved along the length direction of the drainage groove to push the garbage in the drainage groove to move, and finally the garbage is cleaned out of the drainage groove. At the same time, after being used for a long time, the drainage groove will emit odor to the outside, and at the same time, the plant essential oil particles will pass through the gas exchange holes to emit a fragrant smell to the outside of the deodorizing box, thereby reducing the impact of the odor inside the drainage groove on the outside world and improving the safety and hygiene of the pavement brick body during the overall use. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the main structure of the pavement brick of this application;

[0023] Figure 2 This is a schematic diagram of the back of the pavement brick body in this application;

[0024] Figure 3 This is a schematic diagram of the internal structure of the deodorizing box in this application.

[0025] Markings in the figure: 1. Pavement brick body; 2. Drainage groove; 3. Water inlet joint; 4. Deodorizing box; 5. Side clip strip; 6. Limit clip groove; 7. Fixed plug plate; 8. Sealing piston; 9. Lifting handle strip; 10. Adapter slot; 11. Installation head; 12. Anti-leakage net; 13. Gas exchange hole; 14. Plant essential oil particles. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in combination with the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0027] Reference Figure 1-3 ,

[0028] Example:

[0029] A stone-like PC pavement brick comprises a pavement brick body 1, a water inlet slit 3 is formed through the surface of the pavement brick body 1, deodorizing boxes 4 are fixedly installed on the inner walls on both sides of the water inlet slit 3, a drainage groove 2 is provided below the water inlet slit 3, and the drainage groove 2 penetrates the interior of the pavement brick body 1. By forming an oval groove in the pavement brick body 1, when cleaning, a fan-shaped brush is brushed inside the drainage groove 2 and then rotated ninety degrees, and moved along the length direction of the drainage groove 2 to push the garbage in the drainage groove 2 to move, and finally the garbage is cleaned out of the drainage groove 2. At the same time, after being used for a long time, the drainage groove 2 will emit odor to the outside, and at the same time, the plant essential oil particles 14 will penetrate the gas exchange holes 13 to emit a fragrant smell to the outside of the deodorizing box 4, thereby reducing the influence of the odor inside the drainage groove 2 on the outside, and improving the safety and hygiene of the pavement brick body 1 during the overall use.

[0030] The interior of the deodorizing box 4 is filled with plant essential oil particles 14, and a gas exchange hole 13 is opened on the opposite side of the deodorizing box 4, and the gas exchange hole 13 is interconnected with the interior of the deodorizing box 4, so as to facilitate the odor of the plant essential oil particles 14 to be emitted outward, thereby improving the convenience during use.

[0031] An anti-leakage net 12 is arranged between the plant essential oil particles 14 and the gas exchange holes 13 . The mesh diameter of the anti-leakage net 12 is smaller than the particle diameter of the plant essential oil particles 14 , so that the plant essential oil particles 14 will not leak out of the gas exchange holes 13 .

[0032] A mounting head 11 is fixedly mounted on one side of the deodorizing box 4 near the inner wall of the water inlet slit 3, and a plug-in groove matching the mounting head 11 is provided on the side wall of the water inlet slit 3, so that the deodorizing box 4 is detachable, increasing the convenience of the deodorizing box 4 when in use.

[0033] Side snap-in strips 5 are fixedly installed on the front and rear sides of the pavement brick body 1, and a side of the pavement brick body 1 opposite to the side snap-in strip 5 is provided with a limiting snap-in groove 6 adapted to the side snap-in strip 5, so that the pavement brick body 1 is more firmly fixed when installed.

[0034] A fixed plug plate 7 is fixedly connected to one lateral side of the pavement brick body 1, and an adapting plug groove 10 is provided at the position opposite to the fixed plug plate 7, so as to facilitate the front and rear fixed installation of the pavement brick body 1, making the adjacent pavement brick bodies 1 more firmly installed.

[0035] An addition port is provided at one end of one side of the deodorizing box 4, and a sealing port piston 8 is provided at the addition port. A lifting handle bar 9 is fixedly installed at the center of the sealing port piston 8, which is convenient for replacing the plant essential oil particles 14 inside the deodorizing box 4, thereby increasing the convenience during use.

[0036] The implementation principle of an embodiment of the imitation stone PC pavement brick of the present application is: when in use, an oval groove is opened in the pavement brick body 1. When cleaning, the fan-shaped brush is brushed inside the drainage groove 2 and then rotated ninety degrees, and moved along the length direction of the drainage groove 2 to push the garbage in the drainage groove 2 to move, and finally the garbage is cleaned out of the drainage groove 2. At the same time, after a long period of use, the drainage groove 2 will emit odor to the outside, and the plant essential oil particles 14 will penetrate the gas exchange holes 13 to emit a fragrant smell to the outside of the deodorizing box 4, thereby reducing the impact of the odor inside the drainage groove 2 on the outside, and improving the safety and hygiene of the pavement brick body 1 during the overall use.

[0037] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A stone-like PC pavement brick, comprising a pavement brick body (1), Features: A water inlet slit (3) is provided through the surface of the pavement brick body (1), a deodorizing box (4) is fixedly mounted on the inner walls on both sides of the water inlet slit (3), a drainage groove (2) is provided below the water inlet slit (3), and the drainage groove (2) runs through the interior of the pavement brick body (1).

2. The imitation stone PC pavement brick according to claim 1, Features: The interior of the deodorizing box (4) is filled with plant essential oil particles (14), and a gas exchange hole (13) is provided on an opposite side of the deodorizing box (4), and the gas exchange hole (13) is communicated with the interior of the deodorizing box (4).

3. The imitation stone PC pavement brick according to claim 2, Features: An anti-leakage net (12) is provided between the plant essential oil particles (14) and the gas exchange holes (13); the mesh diameter of the anti-leakage net (12) is smaller than the particle diameter of the plant essential oil particles (14).

4. The imitation stone PC pavement brick according to claim 1, Features: A mounting head (11) is fixedly mounted on a side surface of the deodorizing box (4) close to the inner wall of the water inlet slit (3), and a plug-in groove matching the mounting head (11) is provided on the side wall of the water inlet slit (3).

5. The imitation stone PC pavement brick according to claim 1, Features: Side clamping strips (5) are fixedly mounted on the front and rear sides of the pavement brick body (1), and a limiting clamping groove (6) adapted to the side clamping strip (5) is provided on the side of the pavement brick body (1) opposite to the side clamping strip (5).

6. The imitation stone PC pavement brick according to claim 1, Features: A fixed plug plate (7) is fixedly connected to a transverse side surface of the pavement brick body (1), and an adaption plug groove (10) is provided at a position opposite to the fixed plug plate (7) of the pavement brick body (1).

7. The imitation stone PC pavement brick according to claim 1, Features: A feeding port is provided at one end of one side of the deodorizing box (4), and a sealing port piston (8) is arranged at the feeding port. A lifting handle bar (9) is fixedly installed at the center of the sealing port piston (8).