Waste gas utilization device of gluing machine

By designing a waste gas utilization device in the glue coating machine, including filtering, purification and combustion functions, the problem of waste gas treatment of the glue coating machine is solved, effective purification of waste gas and resource reuse are achieved, and environmental protection and resource utilization efficiency are improved.

CN221847684UActive Publication Date: 2024-10-18苏州群鑫纸制品科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420312465.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-18
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing glue applicator produces a large amount of waste gas during use, but lacks effective treatment devices, resulting in environmental pollution and resource waste.

Method used

A waste gas utilization device for the glue coating machine is designed, including a collection device, an air guide purification device and a combustion furnace. The particulate impurities are filtered through the suction hood, the air guide purification box reduces the PM2.5 concentration, and the combustion furnace is used for exhaust gas combustion. and secondary utilization to generate thermal energy.

Benefits of technology

It effectively filters and purifies waste gas to prevent it from being discharged into the environment, while improving the utilization rate of waste gas and realizing waste gas recovery and resource reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221847684U_ABST
    Figure CN221847684U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste gas utilization device of a gluing machine. The waste gas utilization device comprises a gluing machine frame, a gluing device is fixedly installed inside the gluing machine frame, a collecting device is fixedly installed on the surface of the gluing machine frame, gas guiding and purifying devices are fixedly installed on the two sides of the collecting device, and combustion furnaces are fixedly installed on the surfaces of the gas guiding and purifying devices. According to the utility model, the filter holes are formed in the suction hood, so that particle impurities in waste gas generated in the gluing process can be filtered out and fall into the waste recovery box to be stored, the particle impurities are effectively prevented from entering the gas guide purification device together to influence the equipment, and meanwhile, the impurities are convenient to clean; by installing the combustion furnace, waste gas generated by gluing can be combusted, the waste gas is effectively recycled and prevented from being exhausted into air to influence the surrounding environment, meanwhile, the waste gas can be secondarily utilized, the waste gas is combusted to generate heat energy for other work needing to be heated, and the resource utilization rate is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of glue coating machines, in particular to a waste gas utilization device of glue coating machines. Background Art

[0002] Glue coating machine is also called coating machine, glue scraper, automatic glue sprayer, etc. It is a kind of mechanical equipment mainly used to apply liquid glue on the surface of textiles, paper boxes or leather. There are many types of existing glue coating machines. The coating machine uses air pressure to spray liquids such as glue or paint onto the required products. The equipment adopts three-axis linkage and automatic operation. It is also equipped with computer programming to control the path spraying. The spraying thickness and time can be set, which is simple and easy to operate. There will be a certain amount of waste gas emissions during the use of the glue coating machine. The factory faces a large amount of spraying work every day, and a large amount of waste gas will be generated in this process. However, most of the existing spraying equipment does not have the function of waste gas treatment. In the long run, it will have an impact on people’s living environment and does not conform to the green environmental protection concept of sustainable development.

[0003] In the prior art, a Chinese patent document with a publication number of CN213409748U is proposed to solve the above technical problems. The technical solution disclosed in the patent document is as follows: A waste gas treatment device for a gluing machine, comprising a body, a conveying roller installed inside the body, a cloth wound around the outside of the conveying roller, and an air guide component installed inside the body and located on one side of the conveying roller. The outer end of the body is located on one side of the air guide component and is rotatably connected to an air supply pipeline. An air suction hood used in conjunction with the air guide component is installed at one end of the air supply pipeline, and the air suction hood is connected to the air supply pipeline. A driving motor is installed inside the air supply pipeline, and a fan is installed at the output end of the driving motor located inside the air supply pipeline. In the utility model, the driving motor is started to drive the fan to rotate, thereby accelerating the air flow speed in the air supply pipeline, and forming an air pressure difference with the air in the air suction hood. The air suction hood sucks the air discharged by the air guide component into the internal cavity through the hole groove, and discharges it upward along the air supply pipeline under the action of the fan, and is finally absorbed and processed by the exhaust machine, so that the device has an environmental protection effect.

[0004] In order to solve the problem that the existing spraying equipment does not have the function of exhaust gas treatment, the existing technology adopts the method of setting up an exhaust fan to absorb and discharge for treatment, but it is still laborious and cannot be reused, which leads to the problem of exhaust gas discharge polluting the environment and waste. Utility Model Content

[0005] The purpose of the utility model is to provide a waste gas utilization device for a glue coating machine to solve the problems raised in the above background technology.

[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0007] The waste gas utilization device of the glue coating machine comprises a glue coating machine frame, a glue coating device is fixedly installed inside the glue coating machine frame, a collecting device is fixedly installed on the surface of the glue coating machine frame, air guide purification devices are fixedly installed on both sides of the collecting device, and a combustion furnace is fixedly installed on the surface of the air guide purification device;

[0008] The air guiding and purifying device comprises an air guiding unit and a purifying unit, and the air guiding unit is fixedly mounted on both sides of the collecting device.

[0009] A further improvement of the technical solution of the utility model is that the glue coating machine frame includes a side support plate, a transverse support rod is fixedly installed on the inner surface of the side support plate, and an equipment chassis is fixedly installed inside the side support plate.

[0010] A further improvement of the technical solution of the utility model is that the glue coating device includes a driving motor fixedly mounted on the surface of the side support plate, a rotating shaft is fixedly mounted on the output end of the driving motor, and the surface of the rotating shaft and the inner surface of the side support plate are movably connected, a conveying cylinder is fixedly mounted on the surface of the rotating shaft, and a secondary cylinder is fixedly mounted inside the side support plate.

[0011] A further improvement of the technical solution of the utility model is that the collecting device includes an air suction hood fixedly mounted on the surface of the side support plate, the interior of the air suction hood is provided with filter holes, and a waste recovery box is arranged below the air suction hood. By opening the filter holes inside the air suction hood, particulate impurities in the exhaust gas generated during the gluing process can be filtered out and dropped into the waste recovery box for storage, effectively preventing them from entering the air guide purification device and affecting the equipment, and also facilitating the cleaning of impurities.

[0012] A further improvement of the technical solution of the utility model is that the air guide unit includes an air guide box fixedly installed on the top surface of the air suction hood, air guide pipes are fixedly installed on both sides of the air guide box, and an air pressure fan is fixedly installed on the surface of the air guide pipe.

[0013] A further improvement of the technical solution of the utility model is that the purification unit includes a purification box fixedly installed on the bottom surface of the air duct, an air supply pipe is fixedly installed on the surface of the purification box, and the model of the purification box is a fresh air system PM2.5 duct purification box. By installing the purification box, PM2.5 and other substances in the exhaust gas can be purified, the concentration of the exhaust gas can be reduced, and the rear-end combustion furnace can burn safer and more fully, effectively improving the utilization rate of the exhaust gas.

[0014] A further improvement of the technical solution of the utility model is that: the combustion furnace includes a combustion furnace body fixedly installed at one end of the air supply pipe, a combustion groove is opened on the surface of the combustion furnace body, a support frame is fixedly installed on the top surface of the combustion furnace body, and the number of the combustion furnace bodies is two groups. By installing the combustion furnace, the waste gas generated by the glue coating can be burned, and the waste gas is effectively recovered and treated to prevent it from being discharged into the air and affecting the surrounding environment. At the same time, the waste gas can also be reused to burn it to generate heat energy for other work that requires heating.

[0015] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:

[0016] 1. The utility model provides a waste gas utilization device for a glue coating machine. By opening a filter hole inside the air suction hood, particulate impurities in the waste gas generated during the glue coating process can be filtered out and dropped into a waste recovery box for storage, effectively preventing them from entering the air purification device and affecting the equipment, and also facilitating the cleaning of impurities.

[0017] 2. The utility model provides a waste gas utilization device for the glue coating machine. By installing a combustion furnace, the waste gas generated by the glue coating can be burned, and the waste gas is effectively recovered and processed to prevent it from being discharged into the air and affecting the surrounding environment. At the same time, the waste gas can also be reused to generate heat energy for other work that requires heating.

[0018] 3. The utility model provides a waste gas utilization device for a glue coating machine. By installing a purification box, PM2.5 and other substances in the waste gas can be purified to reduce the concentration of the waste gas, making the combustion of the rear combustion furnace safer and more complete, thereby effectively improving the utilization rate of the waste gas. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the utility model;

[0020] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;

[0021] Figure 3 This is a schematic diagram of the structure of the glue coating device of the utility model;

[0022] Figure 4 This is a schematic diagram of the structure of the collection device of the utility model;

[0023] Figure 5 This is a schematic diagram of the combustion furnace structure of the utility model.

[0024] In the figure: 1. Gluing rack; 2. Gluing device; 3. Collecting device; 4. Air guide and purification device; 5. Combustion furnace; 11. Side support plate; 12. Horizontal support rod; 13. Equipment chassis; 21. Driving motor; 22. Rotating shaft; 23. Conveying cylinder; 24. Auxiliary cylinder; 31. Suction hood; 32. Filter hole; 33. Waste recovery box; 41. Air guide box; 42. Air guide pipe; 43. Air pressure fan; 44. Purification box; 45. Air supply pipe; 51. Combustion furnace body; 52. Combustion tank; 53. Support frame. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with the embodiments:

[0026] Example 1

[0027] like Figure 1-5 As shown, the utility model provides a waste gas utilization device for a glue coating machine, including a glue coating machine frame 1, the glue coating frame 1 includes a side support plate 11, a cross support rod 12 is fixedly installed on the inner surface of the side support plate 11, an equipment chassis 13 is fixedly installed inside the side support plate 11, a glue coating device 2 is fixedly installed inside the glue coating frame 1, the glue coating device 2 includes a driving motor 21 fixedly installed on the surface of the side support plate 11, a rotating shaft 22 is fixedly installed on the output end of the driving motor 21, and the surface of the rotating shaft 22 is movably connected to the inner surface of the side support plate 11, a conveying cylinder 23 is fixedly installed on the surface of the rotating shaft 22, a secondary cylinder 24 is fixedly installed inside the side support plate 11, a collecting device 3 is fixedly installed on the surface of the glue coating frame 1, and air guide purification devices 4 are fixedly installed on both sides of the collecting device 3. A combustion furnace 5 is fixedly installed on the surface of the purification device 4; the air-guiding purification device 4 includes an air-guiding unit and a purification unit, the air-guiding units are fixedly installed on both sides of the collecting device 3, the air-guiding unit includes an air-guiding box 41 fixedly installed on the top surface of the air suction hood 31, air-guiding pipes 42 are fixedly installed on both sides of the air-guiding box 41, and an air pressure fan 43 is fixedly installed on the surface of the air-guiding pipe 42. The purification unit includes a purification box 44 fixedly installed on the bottom surface of the air-guiding pipe 42, and an air supply pipe 45 is fixedly installed on the surface of the purification box 44. The model of the purification box 44 is a PM2.5 duct purification box for a fresh air system. By installing the purification box 44, PM2.5 and other substances in the exhaust gas can be purified, and the concentration of the exhaust gas can be reduced, so that the combustion of the rear-end combustion furnace 5 is safer and more sufficient, and the utilization rate of the exhaust gas is effectively improved.

[0028] Example 2

[0029] like Figure 1-5As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, the collecting device 3 includes an air suction hood 31 fixedly mounted on the surface of the side support plate 11, and a filter hole 32 is opened inside the air suction hood 31, and a waste recovery box 33 is arranged below the air suction hood 31. By opening the filter hole 32 inside the air suction hood 31, particulate impurities in the exhaust gas generated during the gluing process can be filtered out and dropped into the waste recovery box 33 for storage, which effectively prevents them from entering the air guide purification device 4 together and affecting the equipment, and also facilitates the cleaning of impurities.

[0030] Example 3

[0031] like Figure 1-5 As shown, on the basis of Examples 1-2, the utility model provides a technical solution: preferably, the combustion furnace 5 includes a combustion furnace body 51 fixedly installed at one end of the air supply pipe 45, a combustion groove 52 is provided on the surface of the combustion furnace body 51, a support frame 53 is fixedly installed on the top surface of the combustion furnace body 51, and the number of the combustion furnace bodies 51 is two groups. By installing the combustion furnace 5, the waste gas generated by the glue coating can be burned, and the waste gas can be effectively recovered and treated to prevent it from being discharged into the air and affecting the surrounding environment. At the same time, the waste gas can also be reused to burn it to generate heat energy for other work that requires heating.

[0032] The following is a detailed description of the working principle of the waste gas utilization device of the glue coating machine.

[0033] like Figure 1-5 As shown, when the waste gas utilization device is used, the equipment chassis 13 and the drive motor 21 are started to rotate the conveying cylinder 23 to carry out the glue coating work. When waste gas is generated during glue coating, the waste gas will enter the air suction hood 31 and filter out some impurities through the filter hole 32 and fall into the waste recovery box 33. The waste gas then passes through the air guide box 41 and enters the air guide pipe 42. At this time, it is necessary to start the air pressure fan 43 on the air guide pipe 42 to form an air pressure difference inside the pipe to drive the waste gas forward. When the waste gas passes through the purification box 44, it will be preliminarily purified to reduce its concentration, and then enter the combustion furnace body 51 through the air supply pipe 45. By placing a combustion fire in the combustion tank 52, the waste gas is ignited to generate heat energy, and then the raw materials to be heated can be placed on the support frame 53 for heating.

[0034] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A waste gas utilization device for a glue coating machine, comprising a glue coating machine frame (1), characterized in that: A glue coating device (2) is fixedly installed inside the glue coating frame (1), a collecting device (3) is fixedly installed on the surface of the glue coating frame (1), air guide purification devices (4) are fixedly installed on both sides of the collecting device (3), and a combustion furnace (5) is fixedly installed on the surface of the air guide purification device (4); The air guide and purification device (4) comprises an air guide unit and a purification unit, and the air guide unit is fixedly mounted on both sides of the collection device (3).

2. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The glue coating machine frame (1) comprises a side support plate (11), a transverse support rod (12) is fixedly mounted on the inner surface of the side support plate (11), and an equipment chassis (13) is fixedly mounted inside the side support plate (11).

3. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The glue coating device (2) comprises a driving motor (21) fixedly mounted on the surface of the side support plate (11); a rotating shaft (22) is fixedly mounted on the output end of the driving motor (21); the surface of the rotating shaft (22) and the inner surface of the side support plate (11) are movably connected; a conveying cylinder (23) is fixedly mounted on the surface of the rotating shaft (22); and a secondary cylinder (24) is fixedly mounted inside the side support plate (11).

4. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The collecting device (3) comprises an air suction hood (31) fixedly mounted on the surface of the side support plate (11), a filter hole (32) is provided inside the air suction hood (31), and a waste recovery box (33) is arranged below the air suction hood (31).

5. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The air guide unit comprises an air guide box (41) fixedly mounted on the top surface of the air suction hood (31), air guide pipes (42) fixedly mounted on both sides of the air guide box (41), and an air pressure fan (43) fixedly mounted on the surface of the air guide pipe (42).

6. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The purification unit comprises a purification box (44) fixedly mounted on the bottom surface of the air guide pipe (42), an air supply pipe (45) fixedly mounted on the surface of the purification box (44), and the model of the purification box (44) is a fresh air system PM2.5 duct purification box.

7. The waste gas utilization device of the glue coating machine according to claim 1, characterized in that: The combustion furnace (5) comprises a combustion furnace body (51) fixedly mounted on one end of an air supply pipe (45), a combustion groove (52) being provided on the surface of the combustion furnace body (51), a support frame (53) being fixedly mounted on the top surface of the combustion furnace body (51), and the number of the combustion furnace bodies (51) is two groups.