Prefabricated step type traffic rod piece foundation and traffic rod piece assembly

The prefabricated stepped traffic pole foundation simplifies the construction process, adapts to complex municipal pipelines, realizes the reuse of foundations, solves the problems of low construction efficiency and environmental pollution of traditional traffic poles, and reduces production costs and environmental impact.

CN221855583UActive Publication Date: 2024-10-18NORTH CHINA MUNICIPAL ENG DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323121191.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-20
Publication Date
2024-10-18
Estimated Expiration
2033-11-20

AI Technical Summary

Technical Problem

The construction process of traditional traffic pole foundation is cumbersome, the construction efficiency is low, it cannot adapt to complex underground municipal pipelines, and it cannot be reused after dismantling, resulting in waste of resources and environmental pollution.

Method used

A prefabricated stepped traffic pole foundation is used, including a stepped traffic pole prefabricated foundation and a leveling platform. A gravel cushion is set at the bottom and a leveling platform is set on the top. The internal embedded parts pass through the foundation and the platform to achieve fixed connection. Reinforced concrete special-shaped structure, concrete encapsulation is provided at the connection position, and anchor bolts and lock nuts are used to achieve fixation.

Benefits of technology

Simplify the construction process, shorten the construction period, adapt to complex municipal pipelines, achieve basic reuse, and reduce production costs and environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855583U_ABST
    Figure CN221855583U_ABST
Patent Text Reader

Abstract

The utility model provides a prefabricated stepped traffic rod piece foundation and traffic rod piece assembly, including traffic rod piece, leveling platform and stepped traffic rod piece prefabricated foundation, the stepped traffic rod piece prefabricated foundation bottom is provided with broken stone hardcore, the top surface is provided with the leveling platform, the interior is provided with embedded part, and the traffic rod piece prefabricated foundation is provided with the leveling platform. The top end of the embedded part penetrates through the top face of the stepped traffic rod piece prefabricated foundation and the leveling platform, and fixed connection between the stepped traffic rod piece prefabricated foundation and the traffic rod piece is achieved. The device is prefabricated, simple in structure, capable of being directly arranged in a soil body, free of cast-in-place, few in construction procedures and short in construction period; the method can well adapt to complex underground municipal pipelines, and land saving is achieved while the construction progress is guaranteed; and after being dismounted, the device can be repeatedly used, does not cause resource waste and environmental pollution, and has relatively high practical value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of municipal road engineering construction, in particular to a prefabricated stepped traffic pole foundation and a traffic pole assembly. Background Art

[0002] In recent years, my country's municipal road industry has developed rapidly, and a considerable-scale municipal road network system has been formed. With the continuous growth of urbanization construction scale and transportation demand, municipal roads have gradually entered the peak period of renovation and renewal. With the vigorous development of all aspects of social economy, the role of infrastructure guarantee has become increasingly important.

[0003] At present, most of the traditional traffic pole foundation construction adopts the method of pouring concrete on site, which takes a long time to construct, is difficult to dismantle and cannot be recycled, and is easy to cause environmental pollution. At the same time, traditional foundations mostly adopt rectangular and cylindrical structures. When the foundation conflicts with underground municipal pipelines, construction will be difficult to carry out. Chinese patent CN114150598A discloses a traffic sign column and its construction method, which includes the following steps: excavating a foundation trench; pouring a cement cushion layer; tying a steel cage; hanging a steel cage; supporting a steel formwork; pouring concrete for the column foundation; steaming and baking concrete; removing steaming and baking equipment; installing columns; installing signs. However, this construction method has cumbersome procedures, low construction efficiency of traffic sign columns, long construction period, and cannot adapt to complex underground municipal pipelines. It cannot be reused after dismantling, resulting in waste of resources and environmental pollution.

[0004] Therefore, it is very necessary to study a traffic pole equipment foundation that adapts to the concept of environmental protection and conservation and can simplify the construction process. Utility Model Content

[0005] The purpose of the utility model is to overcome the deficiencies in the above-mentioned prior art and to provide a prefabricated stepped traffic pole foundation and a traffic pole assembly. The traffic pole foundation is prefabricated, has a simple structure, can be directly arranged in the soil, does not require cast-in-place, has few construction processes, and has a short construction period. It can adapt well to complex underground municipal pipelines, and achieve land conservation while ensuring construction progress. It can be reused after dismantling, will not cause waste of resources and environmental pollution, and has strong practical value.

[0006] As conceived above, the technical solution of the utility model is: a prefabricated stepped traffic pole foundation and a traffic pole assembly, characterized in that it includes a traffic pole, a leveling platform and a prefabricated foundation for a stepped traffic pole, a gravel cushion layer is arranged at the bottom of the prefabricated foundation for the stepped traffic pole, a leveling platform is arranged on the top surface, and embedded parts are arranged inside, and the top of the embedded parts passes through the top surface of the prefabricated foundation for the stepped traffic pole and the leveling platform to realize the fixed connection between the prefabricated foundation for the stepped traffic pole and the traffic pole.

[0007] Preferably, a concrete encapsulation is provided at the connection position between the traffic bar and the prefabricated foundation of the stepped traffic bar.

[0008] Preferably, the prefabricated foundation of the stepped traffic pole member adopts a reinforced concrete special-shaped structure, which has a steel bar structure inside.

[0009] Preferably, the steel structure includes a plurality of main bars arranged from left to right along the foundation axis and a plurality of stirrups arranged vertically on the top and bottom surfaces of the prefabricated foundation of the stepped traffic pole, and a plurality of stirrups are welded between the main bars from top to bottom.

[0010] Preferably, a positioning flange is embedded in the top of the leveling platform, and a stiffening flange matching the positioning flange is provided at the bottom of the traffic pole. After the embedded part passes through the positioning flange and the stiffening flange, the stiffening flange is pressed against the positioning flange to achieve a fixed connection between the traffic pole and the prefabricated foundation of the stepped traffic pole.

[0011] Preferably, a positioning nut is embedded inside the leveling platform.

[0012] Preferably, the embedded parts are anchor bolts.

[0013] Preferably, a hook is provided at the bottom end of the anchor bolt.

[0014] Preferably, the anchor bolt is provided with a locking nut.

[0015] Compared with the prior art, the utility model provides a prefabricated stepped traffic bar foundation and a traffic bar assembly, which has the following beneficial effects:

[0016] 1. It is prefabricated and can be mass-produced. The disassembled foundation can be reused, which reduces the production cost;

[0017] 2. There are fewer construction processes and a shorter construction period, which reduces the impact on surrounding travel and reduces the travel costs of residents;

[0018] 3. Adapt to underground municipal pipelines, avoid unnecessary municipal pipeline rerouting in the design, and save project budget;

[0019] 4. It can be arranged directly in the soil without casting, thus avoiding the pollution caused by the concrete pouring process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0022] Figure 2 This is the front view of the cross-sectional structure of the utility model;

[0023] Figure 3 This is a right side view of the cross-sectional structure of the utility model;

[0024] Figure 4 This is a top view of the cross-sectional structure of the utility model;

[0025] Figure 5 Schematic diagram of the main reinforcement;

[0026] Figure 6 Schematic diagram of stirrups A and B;

[0027] Figure 7 Schematic diagram of stirrups C and D

[0028] Figure 8 This is a schematic diagram of the base connection;

[0029] Fig. 9 It is a top view of the positioning flange;

[0030] Fig.10 It is a side view of the positioning flange;

[0031] Fig.11 It is the top view of the stiffening flange;

[0032] Fig.12 It is the side view of the stiffening flange;

[0033] Fig.13 This is a schematic diagram of the ground foot.

[0034] In the figure: 1. Traffic pole; 2. Leveling platform; 3. Prefabricated foundation of stepped traffic pole; 4. Gravel cushion; 5. Main reinforcement A; 6. Main reinforcement B; 7. Stirrup A; 8. Stirrup B; 9. Stirrup C; 10. Stirrup D; 11. Positioning flange; 12. Anchor bolt; 13. Positioning nut; 14. Reinforcing flange; 15. Washer; 16. Reinforcing nut; 17. Anti-loosening nut; 18. Concrete encapsulation; 19. Municipal pipeline. DETAILED DESCRIPTION

[0035] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0036] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0037] For the convenience of description, if the words "upper" and "lower" appear in the present invention, they only indicate that they are consistent with the upper and lower directions of the drawings themselves, and do not limit the structure. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0038] As introduced in the background technology, the existing traffic pole foundations are mostly cast-in-place gravity construction, which takes a long time to construct, is difficult to dismantle and cannot be recycled, and easily causes environmental pollution. At the same time, when it conflicts with underground municipal pipelines, construction will be difficult to carry out. In response to the above problems, this application proposes a prefabricated stepped traffic pole foundation.

[0039] Referring to the accompanying drawings, the utility model provides a prefabricated stepped traffic pole foundation and a traffic pole assembly, including a traffic pole, a leveling platform and a prefabricated foundation for the stepped traffic pole. The bottom of the prefabricated foundation for the stepped traffic pole is provided with a gravel cushion layer that can prevent the overall structure from settling, the top surface is provided with a leveling platform, and a plurality of embedded parts are provided inside. The top of the embedded parts passes through the top surface of the prefabricated foundation for the stepped traffic pole and the leveling platform to achieve a fixed connection between the prefabricated foundation for the stepped traffic pole and the traffic pole.

[0040] Preferably, the prefabricated foundation of the stepped traffic bar adopts a reinforced concrete special-shaped structure, which has a steel bar structure inside. The steel bar structure includes a plurality of main bars A and a plurality of main bars B arranged from left to right along the foundation axis direction, and a steel bar with a diameter of 16 mm is used. A plurality of stirrups A and stirrups B are arranged from top to bottom between the main bars A and B. The stirrups are welded and fixed to the main bars and arranged along the foundation axis direction. The main bars A and B are made of steel bars with a diameter of 12 mm. The steel bar structure also includes a plurality of stirrups C and a plurality of stirrups D arranged vertically on the top and bottom surfaces of the prefabricated foundation of the stepped traffic bar. The plurality of stirrups C and a plurality of stirrups D are fixed by welding to form a steel cage. The stirrups C and a plurality of stirrups D are made of steel bars with a diameter of 8 mm. The prefabricated foundation of the stepped traffic bar of this embodiment can avoid municipal pipelines.

[0041] Preferably, the leveling platform adopts a concrete structure and is cast from C40 slightly expanding concrete, so as to provide the traffic pole with a relatively flat installation plane. A positioning flange 11 is embedded on the top, and the top surface of the positioning flange is flush with the top surface of the leveling platform. The number of embedded parts matches the number of mounting holes on the positioning flange, and a positioning nut is threadedly connected thereon. The positioning nut is embedded inside the leveling platform and is pressed and contacted with the bottom surface of the positioning flange. A stiffening flange matching the positioning flange is provided at the bottom end of the traffic pole, and the stiffening flange is in contact with the positioning flange. The embedded part passes through the positioning flange and the stiffening flange, and after placing a gasket and tightening the stiffening nut, the stiffening nut presses the stiffening flange onto the positioning flange, thereby realizing a fixed connection between the traffic pole and the prefabricated foundation of the stepped traffic pole.

[0042] Preferably, the embedded part is an anchor bolt, on which a locking nut is screwed, the locking nut is located above the stiffening nut, and the locking nut presses the stiffening nut to prevent the stiffening nut from loosening.

[0043] Preferably, a hook is provided at the bottom end of the anchor bolt to enhance the fixing strength between the anchor bolt and the foundation.

[0044] Preferably, a concrete encapsulation is provided at the connection position between the traffic bar and the prefabricated foundation of the stepped traffic bar. Specifically, the concrete encapsulation is provided on the upper surface of the stiffening flange, wrapping the bottom of the traffic bar, the top of the anchor bolt, the stiffening nut and the anti-loosening nut. The concrete encapsulation is cast with C30 concrete.

[0045] During the construction of the utility model, the foundation trench is first dug, and the geogrid is placed at the bottom and the side. When in use, the prefabricated foundation of the stepped traffic rod described in the embodiment is placed in the processed foundation trench, the traffic rod is lifted, the stiffening flange is placed on the positioning flange, the mounting holes of the two flanges are aligned, the top of the anchor bolt passes through the stiffening flange, the gasket is placed, and then the stiffening nut and the anti-loosening nut are tightened to complete the fixation of the traffic rod. After the fixation of the traffic rod is completed, concrete is poured to encapsulate it. When the traffic rod needs to be adjusted or discarded, it can be disassembled and separated from the prefabricated stepped traffic rod foundation, and the foundation can be reused after being pulled out.

[0046] Finally, all the undescribed parts of the present invention adopt mature products and mature technical means in the prior art.

[0047] Although the above describes the specific implementation methods of the utility model in combination with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A prefabricated stepped traffic bar foundation and a traffic bar assembly, characterized in that: It includes a traffic pole, a leveling platform and a prefabricated foundation for the stepped traffic pole. A crushed stone cushion layer is arranged at the bottom of the prefabricated foundation for the stepped traffic pole, a leveling platform is arranged on the top surface, and embedded parts are arranged inside. The top of the embedded parts passes through the top surface of the prefabricated foundation for the stepped traffic pole and the leveling platform to realize the fixed connection between the prefabricated foundation for the stepped traffic pole and the traffic pole.

2. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 1, characterized in that: Concrete encapsulation is provided at the connection position between the traffic bar and the prefabricated foundation of the stepped traffic bar.

3. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 1, characterized in that: The prefabricated foundation of the stepped traffic pole adopts a reinforced concrete special-shaped structure, and has a steel bar structure inside.

4. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 3, characterized in that: The steel structure includes a plurality of main bars arranged from left to right along the foundation axis and a plurality of stirrups arranged vertically on the top and bottom surfaces of the prefabricated foundation of the stepped traffic rod, and a plurality of stirrups are welded between the main bars from top to bottom.

5. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 1, characterized in that: A positioning flange is embedded in the top of the leveling platform, and a stiffening flange matching the positioning flange is provided at the bottom of the traffic pole. After the embedded part passes through the positioning flange and the stiffening flange, the stiffening flange is pressed against the positioning flange to achieve a fixed connection between the traffic pole and the prefabricated foundation of the stepped traffic pole.

6. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 1, characterized in that: A positioning nut is embedded inside the leveling platform.

7. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 1, characterized in that: The embedded parts are anchor bolts.

8. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 7, characterized in that: The bottom end of the anchor bolt is provided with a hook.

9. The prefabricated stepped traffic bar foundation and traffic bar assembly according to claim 7, characterized in that: The anchor bolt is provided with a locking nut.