Concrete pump output head suitable for filling rear filling seam of secondary structure infilled wall
By designing a concrete pump output head suitable for filling the cracks behind the wall with secondary structures, the V-shaped nozzle, elastic connecting plate, and horizontal holding device are used to achieve adaptive filling of the height and angle of the gaps, solving the problem of incomplete gap filling during construction. problems, improving construction efficiency and project quality.
Patent Information
- Application Number
- CN202420047043.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-09
AI Technical Summary
During construction, the gap formed after the secondary structure fills the wall is difficult to completely fill, causing construction workers to only fill it from the outside when using fine stone concrete, which affects the quality of the project.
A concrete pump output head suitable for filling seams behind secondary structural infill walls is designed. It uses an elastic connection between a V-shaped nozzle and an accordion rubber plate, combined with a horizontal holding device and a telescopic column to achieve self-adaptive height and angle adjustment of the nozzle. Simplify operations.
This equipment can adapt to gaps of different heights in one operation, ensuring that fine stone concrete is fully filled, simplifying the construction process and improving project quality.
Smart Images

Figure CN221856302U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a concrete pump output head suitable for filling seams behind filling walls of secondary structures. Background Art
[0002] In modern construction or decoration, infill walls are a common construction project. Infill walls are often constructed with autoclaved blocks, which are constructed from the lower floor slab to the upper floor slab. Finally, a gap will be formed between the top of the infill wall and the upper floor slab. The height of the gap is 30-50mm, and the construction workers need to use fine stone concrete to fill it 14 days after the completion of the infill wall. Since the infill wall has a certain thickness, it is difficult for the construction workers to use fine stone concrete to fill it. It is often the case that only the outer side is filled and the inner side is not filled properly, which affects the quality of the project. Summary of the invention
[0003] The utility model aims to provide a fine stone concrete pump output head suitable for filling gaps behind secondary structure filling walls, so as to achieve the purpose of simple construction and improved engineering quality.
[0004] The utility model provides a concrete pump output head suitable for filling seams after filling a secondary structure wall, comprising a connecting pipe, one end of which is connected to a discharge pipe of a concrete pump, and the other end of which is connected to a nozzle; the nozzle is V-shaped, comprising a top plate and a bottom plate, the top plate being fixedly connected to the upper part of the connecting pipe, the bottom plate being hinged to the lower part of the connecting pipe, and an elastic connecting plate being arranged between the top plate and the bottom plate.
[0005] Furthermore, the elastic connecting plate is an organ rubber plate.
[0006] Furthermore, a horizontal maintaining device is provided on the connecting pipe, and the horizontal maintaining device includes a sliding sleeve slidably provided on the connecting pipe, and a locking screw is provided on the sliding sleeve; a rotating shaft is provided on the upper and lower sides of the sliding sleeve, a thread is provided at the end of the rotating shaft, and a fixing nut is provided on the thread; a bracket is provided on the rotating shaft, a telescopic column is provided on the bracket, a column perpendicular to the top plate is provided at the end of the telescopic column, and a rotating cylinder is provided on the column.
[0007] Furthermore, the telescopic column comprises a thin rod and a sleeve, and a set screw is arranged on the sleeve.
[0008] Furthermore, an anti-slip structure is provided between the bracket and the sliding sleeve.
[0009] Furthermore, the anti-skid structure is anti-skid teeth arranged on the corresponding surface.
[0010] Furthermore, the bottom plate is fixedly connected to the lower portion of the connecting pipe, and the bottom plate is fixedly connected to the lower portion of the connecting pipe.
[0011] The utility model provides a concrete pump output head suitable for filling gaps behind secondary structure filling walls, which can adapt to gaps of different heights and can perfectly fill the gaps in one operation; the operation is simple, which reduces the workload of construction workers and improves the quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 It is a schematic diagram of the nozzle self-adaptation of the utility model;
[0014] Figure 3 It is a structural schematic diagram of the horizontal maintaining device of the utility model;
[0015] Figure 4 It is a schematic diagram of the structure of the utility model when it is working. DETAILED DESCRIPTION
[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0017] like Figure 1 As shown, the utility model discloses a concrete pump output head suitable for filling gaps after filling walls of secondary structures, comprising a connecting pipe 1, the connecting pipe is a hard pipe, one end of the connecting pipe is connected to the discharge pipe of the concrete pump and is fixed with a clamp;
[0018] The other end of the connecting pipe is connected to the nozzle 2; the nozzle is V-shaped as a whole, including a top plate 3 and a bottom plate 4, the top plate is fixedly connected to the upper part of the connecting pipe, the bottom plate is hinged to the lower part of the connecting pipe, and an elastic connecting plate 5 is arranged between the top plate and the bottom plate, and the elastic connecting plate is an accordion rubber plate; under such a setting, Figure 2 As shown, as long as the top plate is matched with the top surface of the gap, the bottom plate can sag by gravity to match with the bottom surface of the gap, thereby achieving the purpose of nozzle height self-adaptation; during the working process, the nozzle will be filled with fine stone concrete. At this time, the top plate and bottom plate of the nozzle will better match with the top and bottom surfaces of the gap, thereby achieving the fine stone concrete in the nozzle to fill the gap.
[0019] In order to reduce the burden on construction workers and keep the fine stone concrete pump output head in better coordination with the gap, the following Figure 3The horizontal holding device 6 shown in the figure comprises a sleeve 7 slidably arranged on the connecting pipe, a set screw is arranged on the sleeve, and the sleeve can be fixed on the connecting pipe by adjusting the set screw; a rotating shaft is arranged on the upper and lower sides of the sleeve, a thread is arranged at the end of the rotating shaft, and a fixing nut 8 is arranged on the thread; a bracket 9 is rotatably arranged on the rotating shaft, and an anti-skid tooth is arranged between the bracket and the sleeve as an anti-skid structure, and the fixing nut is screwed to fix the bracket on the sleeve to prevent it from rotating;
[0020] Two telescopic columns 10 are arranged on the bracket, and the telescopic columns include a thin rod and a sleeve, and a set screw is arranged on the sleeve. A column 11 perpendicular to the top plate is arranged at the end of the telescopic column, and a rotating cylinder 12 is sleeved on the column, and the rotating cylinder is used to cooperate with the wall 13; the nozzle is inserted into the gap, the length of the telescopic column is adjusted and fixed, the position of the rotating bracket is adjusted and fixed, and the rotating cylinder is aligned with the wall to determine the angle between the nozzle and the wall.
[0021] In another embodiment, the bottom plate is fixedly connected to the lower portion of the connecting pipe; during operation, the bottom plate is matched with the bottom surface of the gap, and when the nozzle is filled with fine stone concrete, the fine stone concrete pushes the top plate upward, so that the top plate is matched with the top surface of the gap, thereby achieving self-adaptation of the nozzle height.
[0022] like Figure 4 As shown, when the utility model is in use, one side of the gap is blocked by a baffle, the nozzle is tilted so that the nozzle completely covers the thickness of the wall, the bracket and the telescopic rod are adjusted and fixed so that the rotating cylinder cooperates with the wall, the concrete pump is started, and the speed is controlled to move in the direction shown in the figure, so that the gap can be filled in one time.
[0023] The utility model provides a concrete pump output head suitable for filling gaps behind secondary structure filling walls, which can adapt to gaps of different heights and can perfectly fill the gaps in one operation; the operation is simple, which reduces the workload of construction workers and improves the quality of the project.
[0024] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. The concrete pump output head is suitable for filling the gaps after filling the secondary structure wall, which is characterized by: It comprises a connecting pipe (1), one end of which is connected to the discharge pipe of a concrete pump, and the other end of which is connected to a nozzle (2); the nozzle is V-shaped, and comprises a top plate (3) and a bottom plate (4); the top plate is fixedly connected to the upper part of the connecting pipe, the bottom plate is hinged to the lower part of the connecting pipe, and an elastic connecting plate (5) is arranged between the top plate and the bottom plate.
2. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 1 is characterized in that: The elastic connecting plate is an organ rubber plate.
3. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 1 is characterized in that: The connecting pipe is provided with a horizontal holding device (6), comprising a sliding sleeve (7) slidably arranged on the connecting pipe, and a set screw is arranged on the sliding sleeve; a rotating shaft is arranged on the upper and lower sides of the sliding sleeve, a thread is arranged at the end of the rotating shaft, and a fixing nut is arranged on the thread; a bracket (9) is arranged on the rotating shaft, a telescopic column (10) is arranged on the bracket, a column (11) perpendicular to the top plate is arranged at the end of the telescopic column, and a rotating cylinder (12) is sleeved on the column.
4. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 3 is characterized in that: The telescopic column comprises a thin rod and a sleeve, and a set screw is arranged on the sleeve.
5. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 3 is characterized in that: According to the above, an anti-slip structure is arranged between the bracket and the sliding sleeve.
6. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 5 is characterized in that: The anti-skid structure is anti-skid teeth arranged on the corresponding surface.
7. The concrete pump discharge head suitable for filling gaps after filling walls of secondary structures according to claim 1 is characterized in that: The bottom plate is fixedly connected to the lower part of the connecting pipe, and the bottom plate is fixedly connected to the lower part of the connecting pipe.
Citation Information
Cited By
Concrete pump output head suitable for filling rear filling seam of secondary structure infilled wall
CN224228305U
