Rapidly-assembled building construction fence
By introducing splicing components and movable components into the construction fence, the problems of unstable angles and inconvenient splicing of the existing construction fences are solved, the angles can be flexibly adjusted and fixed, the length of the fence is extended, the construction time and the number of assembly times are reduced, and the Improve construction efficiency.
Patent Information
- Application Number
- CN202420403246.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-04
AI Technical Summary
The existing construction fence is unstable when adjusting and fixing the angle between adjacent protective frames, and it is difficult to achieve effective splicing when it needs to be enclosed in a circle or polygon. The short length of the protective frames requires splicing when the construction site is isolated. The more, the longer it takes.
A quick-assembly construction fence is designed, which uses splicing components and movable components to achieve angle adjustment and fixation through structures such as chutes, sliders, clamps, movable plates and springs, and extends the length of the fence to reduce the number of assembly times. .
It achieves stability and flexible adjustment of the angles between adjacent construction fences, reduces the number of assembly times of construction fences, and improves construction efficiency and adaptability.
Smart Images

Figure CN221856441U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction guardrails, in particular to a fast-assembled building construction fence. Background Art
[0002] Building construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said that it is the process of turning various lines on the design drawings into physical objects at designated locations. In the process of building construction, in order to isolate the construction site from the external environment and make the construction site a relatively closed space, measures are taken, including walls built with various masonry materials, maintenance bodies composed of various formed plates, etc. However, two adjacent protective frames are welded together, making it difficult to adjust the angle between the two adjacent protective frames. If two adjacent protective frames need to avoid buildings, or multiple protective frames need to form a circle, the existing construction fence is difficult to achieve.
[0003] In order to solve the above problems, the national publication number CN217602308U discloses "a construction fence" which connects two adjacent protective frames together by using a universal ball joint, so that the angle between the two adjacent protective frames can be adjusted, so that the construction fence can avoid buildings. At the same time, multiple protective frames can be spliced in various shapes such as circular, elliptical, and polygonal, effectively improving the adaptability of the construction fence. However, the device still has certain defects in actual use. For example, although the device can adjust the angle between two adjacent protective frames, it cannot fix the angle of the two protective frames and cannot ensure the stability of the angle between the two protective frames. In addition, in order to ensure that the protective frames are easy to transport, the length of the protective frames of the device is relatively short. Therefore, when isolating the construction site, more protective frames need to be spliced, which takes a long time. Utility Model Content
[0004] The utility model aims to solve the shortcomings existing in the background technology and provide a quickly assembled building construction fence. Two adjacent construction fences can be spliced by means of splicing components, and the angle stability between adjacent construction fences can be ensured. The fence can be moved and extended by means of movable components to extend the length of the construction fence, thereby reducing the number of times the construction fence is assembled.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a quickly assembled construction fence, comprising: a left vertical plate, a fence, a right vertical plate, an extension fence, a storage component and a splicing component, the fence being connected to the inner side of the left vertical plate, a right vertical plate being provided on one side of the outer end of the fence, an extension fence being connected to the inner side of the right vertical plate, a movable component being provided between the fence and the extension fence for moving the extension fence, a splicing component being provided on one side of the outer end of the left vertical plate and one side of the outer end of the right vertical plate for splicing the left vertical plate and the right vertical plate.
[0006] Furthermore, the movable component includes: a slide groove opened on one side of the outer end of the fence, a slider connected to one side of the outer end of the extension fence and slidably connected to the slide groove, a clamping block arranged on one side of the outer end of the slider, one end of the clamping block is semicircular, and two clamping grooves are opened on one side of the outer end of the fence and are conductive to the slide groove, and the clamping block is slidably connected to the clamping groove.
[0007] A movable groove is provided on one side of the outer end of the slider, a movable plate is provided inside the movable groove, one side of the outer end of the movable plate is connected with the clamping block, a spring is provided between the outer end of the movable plate and the movable groove on the other side, a push rod is provided inside the clamping groove, one end of the push rod is connected to a push plate, both sides of the outer end of the push rod are connected with limiting blocks, both sides of the outer end of the clamping slot are provided with limit grooves that slide with the limit blocks, a convex protrusion is connected to one side of the outer end of the fence, and a convex groove that is slidably connected with the protrusion is provided on one side of the outer end of the extension fence.
[0008] Furthermore, the splicing assembly includes: a horizontal plate connected to one side of the outer end of the right vertical plate, a vertical rod connected to the top of the horizontal plate, a splicing block arranged on one side of the outer end of the left vertical plate, a splicing hole opened at the top of the splicing block and slidably connected to the vertical rod, a fixed block connected to one side of the outer end of the splicing block, and one side of the outer end of the fixed block is connected to the left vertical plate.
[0009] An arc-shaped fitting plate is connected to one side of the inner wall of the splicing hole, an arc-shaped plate is arranged on one side of the outer end of the fitting plate, an arc-shaped clamping plate is connected to one side of the outer end of the arc-shaped plate, a pull rod is connected to one side of the outer end of the arc-shaped plate, one end of the pull rod is connected to a pull plate, driving plates are connected to both sides of the outer end of the pull rod, a pulling groove which is conductive to the splicing hole is provided on one side of the outer end of the splicing block, driving grooves which are slidably connected to the driving plate are provided on both sides of the outer end of the pulling groove, and a telescopic spring is provided between one side of the outer end of the driving plate and the driving groove.
[0010] The utility model provides a fast-assembly construction fence, which has the following beneficial effects:
[0011] The advantage of the utility model is that two adjacent construction fences can be spliced together through the splicing assembly, and the splicing assembly of the device can not only adjust the angle between adjacent construction fences, but also ensure that the angle between the two construction fences has good stability, and the movable assembly can move the extension fence to extend the length of the construction fence, so that when isolating construction sites of the same length, the number of times the construction fences are assembled can be reduced, and the use of the construction fences is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0013] Figure 2 It is a sectional view of the overall structure of the utility model.
[0014] Figure 3 It is a schematic diagram of the stretch fence structure of the utility model.
[0015] Figure 4 This is a schematic diagram of the fence structure of the present utility model.
[0016] Figure 5 This is a schematic diagram of the pull rod structure of the utility model.
[0017] Figure 6 It is a schematic diagram of the structure of the splicing block of the utility model.
[0018] Figure 7 It is a schematic diagram of the movable plate structure of the utility model.
[0019] Figure 8 This is a schematic diagram of the push rod structure of the utility model.
[0020] Fig. 9 This is a top view of the fence block structure of the present utility model.
[0021] Fig.10 It is a top view of the splicing block structure of the utility model.
[0022] Fig.11 For the utility model Fig. 9 Enlarged view of point A in .
[0023] Fig.12 For the utility model Fig.10 A magnified image of point A.
[0024] Figure 1-12Middle: 1-left vertical plate; 101-fence; 102-right vertical plate; 103-extension fence; 2-slide; 201-slider; 202-block; 203-slot; 3-movable slot; 301-movable plate; 302-spring; 4-push rod; 401-push plate; 402-limit block; 403-limit slot; 404-bump; 405-groove; 5-horizontal plate; 501-vertical rod; 502-joining block; 503-joining hole; 6-fixing block; 7-fitting plate; 701-arc plate; 702-clamping plate; 8-pull rod; 801-pull plate; 802-driving plate; 803-pull slot; 804-driving slot; 805-telescopic spring. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.
[0026] The embodiment of the present application provides a fast-assembled construction fence, which can realize the splicing of two adjacent construction fences through the splicing assembly, and the device splicing assembly can not only adjust the angle between adjacent construction fences, but also ensure that the angle between the two construction fences has good stability. The movable assembly can move the stretch fence to extend the length of the construction fence, so that when isolating construction sites of the same length, the number of construction fence assembly times can be reduced, which is convenient for the use of the construction fence. It should be noted that the description order of the following embodiments is not intended to limit the preferred order of the embodiments.
[0027] The present application is described in detail below with reference to the accompanying drawings and specific implementation methods.
[0028] Example:
[0029] See also Figure 1-12 In the present embodiment, a quick-assembled construction fence is provided, comprising: a left vertical plate 1, a fence 101, a right vertical plate 102, an extension fence 103, a storage component and a splicing component, the fence 101 is connected to the inner side of the left vertical plate 1, a right vertical plate 102 is provided on one side of the outer end of the fence 101, the extension fence 103 is connected to the inner side of the right vertical plate 102, a movable component is provided between the fence 101 and the extension fence 103 for moving the extension fence 103, and a splicing component is provided on one side of the outer end of the left vertical plate 1 and one side of the outer end of the right vertical plate 102 for splicing the left vertical plate 1 and the right vertical plate 102.
[0030] In this embodiment, two adjacent construction fences can be spliced together through the splicing assembly, and the splicing assembly of the device can not only adjust the angle between adjacent construction fences, but also ensure that the angle between the two construction fences has good stability. The movable assembly can move the extension fence 103 to extend the length of the construction fence, so that when isolating construction sites of the same length, the number of times the construction fences are assembled can be reduced, thereby facilitating the use of the construction fences.
[0031] In some embodiments, the movable component includes: a slide groove 2 opened on one side of the outer end of the fence 101, a slider 201 connected to one side of the outer end of the extension fence 103 and slidably connected to the slide groove 2, a block 202 arranged on one side of the outer end of the slider 201, one end of the block 202 is semicircular, and two slots 203 opened on one side of the outer end of the fence 101 and connected to the slide groove 2, the block 202 is slidably connected to the slot 203, and the construction fence is formed by the left vertical plate 1 and the fence 101, the right vertical plate 102 and the extension fence 103. When using the construction fence, the push plate 401 can be pressed to push the push rod 4 and the block 202, and the block 202 can push the movable plate 301 to compress the spring 302 until one end of the block 202 is released from The card slot 203 slides out into the slide slot 2. At this time, the stretch fence 103 is driven to move toward the right vertical plate 102 through the right vertical plate 102, and the slide slot 2 and the slider 201 ensure that the stretch fence 103 moves on the back of the fence 101. The slider 201 directly drives the movable slot 3 to move to align with another card slot 203. At this time, the elastic force of the spring 302 pushes the movable plate 301 to drive one end of the card block 202 to insert into the card slot 203, and fix the position of the stretch fence 103. The stretch fence 103 will be extended from the back of the fence 101, thereby lengthening the length of the entire construction fence, so that when isolating construction sites of the same length, the number of times the construction fence is assembled can be reduced, and the efficiency of disassembly and assembly of the construction fence can be enhanced.
[0032] Among them, a movable groove 3 is opened on one side of the outer end of the slider 201, and a movable plate 301 is arranged inside the movable groove 3. One side of the outer end of the movable plate 301 is connected with the card block 202, and a spring 302 is arranged between the outer end of the movable plate 301 and the movable groove 3 through the other side. When it is necessary to store the extension fence 103, the push plate 401 is pressed in the opposite direction of the fence 101 to push one end of the card block 202 to slide out of the card groove 203. At this time, the extension fence 103 can be moved toward the left vertical plate 1 through the slider 201 and the slide groove 2, so that the extension fence 103 is stored behind the fence 101, and until the slider 201 is moved to align with another card groove 203, at this time, the card block 202 is pushed by the elastic force of the spring 302, so that one end of the card block 202 is inserted into the card groove 203, thereby fixing the extension fence 103 on the back of the fence 101, thereby reducing the occupied area of the entire construction fence and facilitating the transportation of the construction fence.
[0033] Among them, a push rod 4 is arranged inside the slot 203, one end of the push rod 4 is connected to a push plate 401, both sides of the outer end of the push rod 4 are connected to limit blocks 402, both sides of the outer end of the slot 203 are provided with limit grooves 403 that slide with the limit blocks 402, one side of the outer end of the fence 101 is connected with a convex protrusion 404, and one side of the outer end of the extension fence 103 is provided with a convex groove 405 that slides with the protrusion 404. When the extension fence 103 drives the slider 201 in When moving in the slide groove 2, the protrusion 404 also slides in the groove 405, and the extension fence 103 is limited by the convex protrusion 404 and the groove 405 to prevent the extension fence 103 from separating from the fence 101, and the limiting groove 403 and the limiting block 402 are used to limit the push rod 4 to prevent the push rod 4 from completely sliding out of the slot 203, and when the push rod 4 moves, the limiting block 402 will be driven to slide in the limiting groove 403 to ensure the normal movement of the push rod 4.
[0034] In some embodiments, the splicing assembly includes: a horizontal plate 5 connected to one side of the outer end of the right vertical plate 102, a vertical rod 501 connected to the top of the horizontal plate 5, a splicing block 502 arranged on one side of the outer end of the left vertical plate 1, and a splicing hole 503 opened at the top of the splicing block 502 and slidably connected to the vertical rod 501. When it is necessary to splice the construction fence, the pull rod 8, the arc plate 701 and the clamping plate 702 are driven to move in the direction of the pull groove 803 by applying force to the pull plate 801, and the pull rod 8 will drive the driving plate 802 to move in the driving groove 804 to compress the telescopic spring 805, and then one of the construction fences is lifted, so that its splicing hole 503 is opened. 3 can be inserted to the outside of the vertical rod 501 on one side of the other construction fence. At this time, no force is applied to the pull plate 801. The elastic force of the telescopic spring 805 pushes the driving plate 802 to drive the pull rod 8, the arc plate 701 and the clamping plate 702 to move toward the vertical rod 501 until one side of the clamping plate 702 is in contact with the vertical rod 501, and the vertical rod 501 is clamped between the clamping plate 702 and the bonding plate 7. The clamping plate 702 and the bonding plate 7 can be made of rubber material to prevent the vertical rod 501 from rotating in the splicing hole 503, thereby ensuring the angular stability between the two construction fences and ensuring the rapid assembly of the two adjacent construction fences.
[0035] Among them, one side of the outer end of the splicing block 502 is connected to a fixed block 6, and one side of the outer end of the fixed block 6 is connected to the left vertical board 1. The splicing block 502 is connected to one side of the left vertical board 1 through the fixed block 6, and the height of the splicing block 502 is higher than the height of the left vertical board 1, so that when two construction fences are spliced at different angles, the use of the pull plate 801 can be guaranteed.
[0036] Among them, an arc-shaped bonding plate 7 is connected to one side of the inner wall of the splicing hole 503, and an arc-shaped plate 701 is arranged on one side of the outer end of the bonding plate 7, and an arc-shaped clamping plate 702 is connected to one side of the outer end of the arc-shaped plate 701. When it is necessary to adjust the splicing angle of the two construction fence components, the pull rod 8, the arc-shaped plate 701 and the clamping plate 702 are driven to move by applying force to the pull plate 801 until the clamping plate 702 is separated from the vertical rod 501. At this time, one of the construction fences can be rotated, and the vertical rod 501 can be rotated in the splicing hole 503 to adjust the angle between the two construction fences. After the construction fence angle is adjusted, no force is applied to the pull plate 801, so that the clamping plate 702 is pushed by the elastic force of the telescopic spring 805, so that the vertical rod 501 is clamped between the clamping plate 702 and the bonding plate 7.
[0037] Among them, a pull rod 8 is connected to one side of the outer end of the curved plate 701, and a pull plate 801 is connected to one end of the pull rod 8. Driving plates 802 are connected to both sides of the outer end of the pull rod 8. A pull groove 803 that is connected to the splicing hole 503 is opened on one side of the outer end of the splicing block 502, and driving grooves 804 that are slidably connected to the driving plate 802 are opened on both sides of the outer end of the pull groove 803. A telescopic spring 805 is arranged between one side of the outer end of the driving plate 802 and the driving groove 804. When dismantling the construction fence, the pull plate 801 is used to pull the pull rod 8, the curved plate 701 and the clamping plate 702 until the clamping plate 702 no longer fits the vertical rod 501. At this time, one of the construction fences can be lifted until the vertical rod 501 slides out of the splicing hole 503, and the two construction fences are separated. In this cycle, the installed construction fences can be dismantled one by one.
[0038] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0039] The above is a detailed introduction to a quick-assembly construction fence provided in an embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the technical solution and its core idea of the present application. Ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A fast-assembly construction fence, characterized in that: include: A left vertical board (1), a fence (101), a right vertical board (102), an extension fence (103), a storage component and a splicing component; A fence (101) is connected to the inner side of the left vertical board (1), a right vertical board (102) is arranged on one side of the outer end of the fence (101), an extension fence (103) is connected to the inner side of the right vertical board (102), a movable component is arranged between the fence (101) and the extension fence (103), and is used to move the extension fence (103), and a splicing component is arranged on one side of the outer end of the left vertical board (1) and one side of the outer end of the right vertical board (102), and is used to splice the left vertical board (1) and the right vertical board (102).
2. The fast-assembly construction fence according to claim 1, characterized in that: The activity components include: A slide groove (2) provided on one side of the outer end of the fence (101); A sliding block (201) connected to one side of the outer end of the extension fence (103) and slidably connected to the sliding groove (2); A clamping block (202) is arranged on one side of the outer end of the sliding block (201), and one end of the clamping block (202) is semicircular; Two clamping grooves (203) are provided on one side of the outer end of the fence (101) and are in communication with the slide groove (2). The clamping block (202) is slidably connected to the clamping grooves (203).
3. The fast-assembly construction fence according to claim 2, characterized in that: A movable groove (3) is provided on one side of the outer end of the slider (201), a movable plate (301) is arranged inside the movable groove (3), one side of the outer end of the movable plate (301) is connected to the clamping block (202), and a spring (302) is arranged between the other side of the outer end of the movable plate (301) and the movable groove (3).
4. The fast-assembly construction fence according to claim 2, characterized in that: A push rod (4) is arranged inside the slot (203), one end of the push rod (4) is connected to a push plate (401), both sides of the outer end of the push rod (4) are connected to limit blocks (402), both sides of the outer end of the slot (203) are provided with limit grooves (403) that slide with the limit blocks (402), one side of the outer end of the fence (101) is connected to a convex protrusion (404), and one side of the outer end of the extension fence (103) is provided with a convex groove (405) that slides with the protrusion (404).
5. The fast-assembly construction fence according to claim 1, characterized in that: The splicing assembly comprises: A horizontal plate (5) connected to one side of the outer end of the right vertical plate (102); A vertical rod (501) connected to the top of the horizontal plate (5); A splicing block (502) disposed on one side of the outer end of the left vertical plate (1); A splicing hole (503) is provided at the top of the splicing block (502) and is slidably connected to the vertical rod (501).
6. The fast-assembly construction fence according to claim 5, characterized in that: One side of the outer end of the splicing block (502) is connected to a fixing block (6), and one side of the outer end of the fixing block (6) is connected to the left vertical plate (1).
7. The fast-assembly construction fence according to claim 5, characterized in that: An arc-shaped bonding plate (7) is connected to one side of the inner wall of the splicing hole (503), an arc-shaped plate (701) is arranged on one side of the outer end of the bonding plate (7), and an arc-shaped clamping plate (702) is connected to one side of the outer end of the arc-shaped plate (701).
8. The fast-assembly construction fence according to claim 7, characterized in that: A pull rod (8) is connected to one side of the outer end of the arc plate (701), and a pull plate (801) is connected to one end of the pull rod (8). Both sides of the outer end of the pull rod (8) are connected to driving plates (802). A pull groove (803) which is in communication with the splicing hole (503) is provided on one side of the outer end of the splicing block (502), and driving grooves (804) which are slidably connected to the driving plate (802) are provided on both sides of the outer end of the pull groove (803). A telescopic spring (805) is provided between one side of the outer end of the driving plate (802) and the driving groove (804).