Hole-entering reinforcing structure for soft broken large-section shallow-buried tunnel underneath passing expressway
By arranging the slope casting body, the opening lining body and the floor casting body at the tunnel entrance, combined with the pipe piles and steel pipes, a stable reinforcement structure is formed, which solves the problem of the weak self-supporting ability of the surrounding rock in the existing technology and realizes the protection of the tunnel. The effective reinforcement and long-term support of the opening reduce construction risks.
Patent Information
- Application Number
- CN202420491928.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-14
AI Technical Summary
When the existing tunnel entrance pre-reinforcement device is in use, the surrounding rock has weak self-supporting capabilities and is difficult to effectively support the tunnel entrance for a long time, resulting in high construction risks, especially in shallow burial, crushing, landslides, collapses and other areas where collapse is more likely to occur.
A reinforced structure including slope pouring body, opening lining body and floor pouring body is adopted, combined with pipe piles and steel pipes to form a stable continuum, and the support is enhanced by anchor rods and pouring beams to ensure the long-term stability of the opening.
It effectively improves the reinforcement capacity of the tunnel opening, ensures the reliability of construction and long-term support of the tunnel opening, and reduces construction risks.
Smart Images

Figure CN221856716U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel construction, in particular to a tunnel reinforcement structure for a weak and broken large-section shallow-buried tunnel under a highway. Background Art
[0002] When constructing tunnels under expressways, it is necessary to drill holes. However, the rock mass at the entrance of the tunnel is severely weathered and prone to rock collapse. Therefore, the construction risk is high when entering the tunnel. At present, most of them use the pipe shed method to enter the tunnel. Its main principle is to rely on driving steel pipes along the tunnel excavation direction in the outer circle of the tunnel, and reinforce the rock mass at the entrance of the tunnel by grouting in the pipe. The internal rock mass is excavated under the protection and support of the pipe shed. When it is necessary to prevent rock collapse, the entrance section needs to be pre-reinforced. However, there are problems with the existing entrance pre-reinforcement device when it is used. The tunnel entrance cover layer is thin, the self-supporting ability of the surrounding rock is relatively weak, and some even have no self-supporting ability. Therefore, the most important thing in the construction of the entrance section is to improve the self-supporting ability of the surrounding rock to ensure the excavation and subsequent operations. Especially in shallow buried, broken, landslide, collapse, weak, groundwater-rich and weak interlayer areas that are prone to slippage and collapse, it is more necessary to take comprehensive pre-reinforcement measures. At present, most of the structures used for reinforcement and protection of the tunnel entrance section cannot provide long-term and effective support for the tunnel entrance, which may cause collapse at the tunnel entrance and lead to danger. Utility Model Content
[0003] In view of the above shortcomings of the prior art, the purpose of the utility model is to provide a reinforcement structure for a weak and broken large-section shallow buried tunnel under a highway, which can effectively reinforce the tunnel entrance, ensure the reliability of tunnel construction, and provide long-term support for the tunnel entrance.
[0004] In order to achieve the above-mentioned purpose and other related purposes, the utility model proposes a reinforcement structure for a weak and broken large-section shallow buried tunnel under a highway, comprising:
[0005] The slope cast body is set above the tunnel opening;
[0006] The portal lining is set at the edge of the tunnel portal contour;
[0007] The bottom plate casting is set at the bottom of the tunnel opening;
[0008] The side slope casting body is integrated with the bottom plate casting body, and pipe piles are arranged on the joint surface between the side slope casting body and the bottom plate casting body, and the pipe piles are implanted in the bottom of the tunnel;
[0009] The steel pipes are arranged at intervals along the circumferential direction of the portal lining body, and the steel pipes are arranged along the length direction of the tunnel.
[0010] In one embodiment of the utility model, anchor rods are provided on the slope casting body, and a plurality of groups of anchor rods are arranged at intervals along the length direction and the width direction of the slope casting body.
[0011] In one embodiment of the utility model, a casting beam is provided at the connection end between the slope casting body and the bottom plate casting body, a trough body is provided on the bottom plate casting body, and the casting beam is cast in the trough body.
[0012] In one embodiment of the present invention, the steel pipes are arranged in two rows at intervals along the thickness direction of the opening lining body.
[0013] In one embodiment of the utility model, the steel pipe includes a head-end screw-in pipe and a connecting pipe, the tail end of the steel pipe is connected to the pipe pile drilling equipment and screwed into the soil; one end of the connecting pipe is connected to the tail end pipe mouth of the head-end screw-in pipe; the tail end pipe mouth of the head-end screw-in pipe is provided with an internally threaded pipe section, one end of the connecting pipe is provided with an externally threaded pipe section, the pipe mouth of the externally threaded pipe section is provided with a trumpet guide pipe, the small-size end pipe mouth section of the trumpet guide pipe extends into the tail end pipe mouth of the head-end screw-in pipe, and the externally threaded pipe section is threadedly connected with the internally threaded pipe section.
[0014] In one embodiment of the utility model, a screw-in head is provided at the head end of the head-end screw-in tube, and the screw-in head is in the shape of a truncated cone as a whole.
[0015] In one embodiment of the utility model, a first table surface is provided on one end of the internally threaded pipe section and the inner wall of the head-end screw-in pipe, the outer diameter of the large-size end of the horn guide pipe is smaller than the outer diameter of the externally threaded pipe section, and a first sealing gasket is provided on the horn guide pipe. When the connecting pipe is screwed into the tail end of the head-end screw-in pipe, the first sealing gasket abuts against the first table surface.
[0016] In one embodiment of the utility model, a second table surface is provided at the tail end of the head-end screw-in tube, the outer diameter of the externally threaded pipe section is smaller than the outer diameter of the connecting pipe, and a second sealing gasket is provided at the connection position between one end of the externally threaded pipe section and the connecting pipe, and when the connecting pipe is screwed into the tail end of the head-end screw-in tube, the second sealing gasket abuts against the second table surface.
[0017] In one embodiment of the utility model, steel bars are inserted into the first-end screw-in tube and the connecting tube.
[0018] By adopting the above technical scheme, the technical effect of the utility model is that: during the actual construction of the tunnel entrance reinforcement structure, the bottom plate casting body is first cast to form a stable bottom plate support, and then the slope casting body is cast to realize the support of the tunnel entrance slope, and the entrance lining body is constructed on the slope casting body to form a tunnel guide wall, and pipe piles are arranged on the joint surface of the slope casting body and the bottom plate casting body, so that the slope casting body, the entrance lining body and the bottom plate casting body form a stable continuum, and steel pipes are spaced in the circumferential direction of the entrance lining body to form a pipe shed, thereby ensuring the stability of the entire reinforcement structure. The reinforcement structure can effectively reinforce the tunnel entrance, ensure the reliability of tunnel construction, and provide long-term support for the entrance. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 It is a schematic diagram of the structure of the reinforcement structure of a weak and broken large-section shallow buried tunnel under a highway in one embodiment of the utility model;
[0021] Figure 2 It is a front view of a reinforcement structure for a weak and broken large-section shallow buried tunnel under a highway in one embodiment of the utility model;
[0022] Figure 3 It is a schematic structural diagram of a bottom plate casting body in one embodiment of the utility model;
[0023] Figure 4 It is a schematic plan view of a steel pipe in one embodiment of the utility model;
[0024] Figure 5 This is a schematic structural diagram of a first end screw-in pipe and a connecting pipe in a steel pipe in one embodiment of the utility model;
[0025] Figure 6 It is a schematic cross-sectional structure diagram of a first end screw-in pipe and a connecting pipe in a steel pipe in one embodiment of the utility model;
[0026] Figure 7 The utility model is a schematic diagram of the cross-sectional structure of the first end screw-in tube in one embodiment. DETAILED DESCRIPTION
[0027] The following is an explanation of the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.
[0028] It should be noted that the illustrations provided in this embodiment are only used to schematically illustrate the basic concept of the present invention. Therefore, the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0029] See also Figure 1 and Figure 2 As shown, when faced with the construction of a tunnel under a highway, it is necessary to drill a hole, but the rock mass at the entrance section is mostly severely weathered, and rock collapse disasters are prone to occur, so the construction risk is high when the tunnel enters the hole. In this regard, the utility model provides a reinforcement structure for a weak and broken large-section shallow buried tunnel under a highway, which can effectively solve the problem of unstable support at the entrance. The reinforcement structure includes: a slope casting body 10, which is arranged above the tunnel entrance; a tunnel entrance lining body 20, which is arranged at the edge of the tunnel entrance contour; a bottom plate casting body 30, which is arranged at the bottom surface of the tunnel entrance; the slope casting body 10 and the bottom plate casting body 30 are combined into one, and pipe piles 40 are arranged on the joint surface of the slope casting body 10 and the bottom plate casting body 30, and the pipe piles 40 are implanted in the tunnel bottom; steel pipes 50 are arranged at intervals along the circumferential direction of the tunnel entrance lining body 20, and the steel pipes 50 are arranged along the length direction of the tunnel.
[0030] In one embodiment, the bottom plate casting body is first cast to form a stable bottom plate support, and then the slope casting body is cast to support the tunnel portal slope, and the portal lining body is constructed on the slope casting body to form a tunnel guide wall. Pipe piles are arranged on the joint surface of the slope casting body and the bottom plate casting body, so that the slope casting body, the portal lining body and the bottom plate casting body form a stable continuum, and steel pipes are spaced in the circumferential direction of the portal lining body to form a pipe shed, thereby ensuring the stability of the entire reinforcement structure. The reinforcement structure can effectively reinforce the tunnel portal, ensure the reliability of tunnel construction, and provide long-term support for the portal.
[0031] In one embodiment, in order to ensure reliable fixation of the slope casting body 10 to the slope, anchor rods 11 are provided on the slope casting body 10 , and a plurality of groups of anchor rods 11 are arranged at intervals along the length direction and the width direction of the slope casting body 10 .
[0032] Holes can be drilled in advance by a drilling machine, and multiple anchor rods 11 are arranged at intervals along the length and width directions of the slope, and then the slope casting body 10 is cast at one end of the anchor rod 11, thereby ensuring reliable combination of the slope casting body 10 and the slope.
[0033] In one embodiment, in order to make the slope casting body 10 and the bottom plate casting body 30 form a whole and ensure the reliability of support, a casting beam 12 is provided at the connecting end of the slope casting body 10 and the bottom plate casting body 30, and a trough body 31 is provided on the bottom plate casting body 30, and the casting beam 12 is located in the trough body 31 and cast and formed.
[0034] In one embodiment, the bottom plate casting body 30 is cast in advance. After the bottom plate casting body 30 is formed, a groove body 31 is reserved on the bottom plate casting body 30, a steel cage is tied into the groove body 31, and a casting beam 12 is cast to form the bottom edge of the slope casting body 10, thereby ensuring the reliability of the combination of the slope casting body 10 and the bottom plate casting body 30.
[0035] In one embodiment, in order to ensure the stability of the support for the tunnel portal, the steel pipes 50 are arranged in two rows at intervals along the thickness direction of the portal lining body 20 .
[0036] In one embodiment, see Figures 4 to 7 As shown, the steel pipe 50 includes a head-end screw-in pipe 51 and a connecting pipe 52, the tail end of the steel pipe 50 is connected to the pipe pile drilling equipment and screwed into the soil; one end of the connecting pipe 52 is connected to the tail end pipe mouth of the head-end screw-in pipe 51; the tail end pipe mouth of the head-end screw-in pipe 51 is provided with an internally threaded pipe section 511, one end of the connecting pipe 52 is provided with an externally threaded pipe section 521, the pipe mouth of the externally threaded pipe section 521 is provided with a trumpet guide pipe 522, the small-sized end pipe mouth section of the trumpet guide pipe 522 extends into the tail end pipe mouth of the head-end screw-in pipe 51, and the externally threaded pipe section 521 is threadedly connected with the internally threaded pipe section 511.
[0037] During the construction of the steel pipe 50, the head end screw-in pipe 51 is first screwed into the soil by means of a pipe pile drilling device, and the connecting pipe 52 is also screwed into the soil by means of the pipe pile drilling device, and the trumpet guide pipe 522 is brought close to the tail end of the head end screw-in pipe 51, and can be accurately introduced into the head end screw-in pipe 51 until the external threaded pipe section 521 of the connecting pipe 52 is threadedly connected with the internal threaded pipe section 511 of the head end screw-in pipe 51, thereby realizing a quick connection between the head end screw-in pipe 51 and the connecting pipe 52, and the number of connecting pipes 52 is set according to the use requirements, and the tail end of the connecting pipe 52 is also provided with an internal threaded pipe section, which can quickly improve the connection between the steel pipes screwed into the soil and improve the construction efficiency.
[0038] In one embodiment, in order to ensure that the first end screw-in pipe 51 is quickly screwed into the soil, a steel pipe screw-in head 513 is provided at the first end of the first end screw-in pipe 51, and the steel pipe screw-in head 513 is in a truncated cone shape as a whole.
[0039] In one embodiment, in order to ensure a reliable connection between the end of the first-end screw-in tube 51 and the connecting tube 52, so that the end of the first-end screw-in tube 51 and the connecting tube 52 form a whole, one end of the internally threaded tube section 511 and the inner wall of the first-end screw-in tube 51 are provided with a first table 512, the outer diameter of the large-size end of the horn guide tube 522 is smaller than the outer diameter of the externally threaded tube section 521, and a first sealing gasket 53 is sleeved on the horn guide tube 522. When the connecting tube 52 is screwed into the tail end of the first-end screw-in tube 51, the first sealing gasket 53 abuts against the first table 512.
[0040] In one embodiment, when the connecting tube 52 is screwed into the pipe opening of the tail end of the head-end screw-in tube 51, the first sealing gasket 53 on the trumpet guide tube 522 abuts against the first table 512 at the tail end of the head-end screw-in tube 51, thereby achieving sealing between the tube end of the head-end screw-in tube 51 and the connecting tube 52, and grouting can be directly injected into the connecting tube 52.
[0041] In one embodiment, the tail end pipe opening of the head end screw-in tube 51 is provided with a second table 514, the outer diameter of the externally threaded pipe section 521 is smaller than the outer diameter of the connecting pipe 52, and a second sealing gasket 54 is provided at the connection position between one end of the externally threaded pipe section 521 and the connecting pipe 52. When the connecting pipe 52 is screwed into the tail end of the head end screw-in tube 51, the second sealing gasket 54 abuts against the second table 514.
[0042] In one embodiment, in order to ensure the support strength of the first-end screw-in tube 51 and the connecting tube 52 , steel bars 55 are inserted into the first-end screw-in tube 51 and the connecting tube 52 .
[0043] In one embodiment, grouting holes are opened on the pipe walls of the first end screw-in pipe 51 and the connecting pipe 52, and multiple groups of grouting holes are opened along the pipe bodies of the first end screw-in pipe 51 and the connecting pipe 52.
[0044] In summary, during the actual construction of the tunnel reinforcement structure, the bottom plate casting body 30 is first cast to form a stable bottom plate support, and then the slope casting body 10 is cast to support the tunnel portal slope. The portal lining body 20 is constructed on the slope casting body 10 to form a tunnel guide wall. Pipe piles 40 are arranged on the joint surface of the slope casting body 10 and the bottom plate casting body 30, so that the slope casting body 10, the portal lining body 20 and the bottom plate casting body 30 form a stable continuum. Steel pipes 50 are spaced in the circumferential direction of the portal lining body 20 to form a pipe shed, thereby ensuring the stability of the entire reinforcement structure. The reinforcement structure can effectively reinforce the tunnel portal, ensure the reliability of tunnel construction, and provide long-term support for the portal.
[0045] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope involved in the present application is not limited to the technical solution formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the concept of the utility model, such as a technical solution formed by replacing the above-mentioned features with (but not limited to) technical features with similar functions disclosed in this application.
[0046] Except for the technical features described in the specification, the other technical features are known technologies to those skilled in the art. In order to highlight the innovative features of the present utility model, the other technical features will not be described in detail here.
Claims
1. A reinforcement structure for a weak and broken large-section shallow tunnel under a highway, characterized in that: include: The slope casting body (10) is arranged above the tunnel opening; The tunnel opening lining body (20) is arranged at the edge of the tunnel opening contour; A bottom plate cast body (30) is arranged at the bottom surface of the tunnel opening; The side slope casting body (10) and the bottom plate casting body (30) are combined into one body, and pipe piles (40) are arranged on the joint surface between the side slope casting body (10) and the bottom plate casting body (30), and the pipe piles (40) are implanted in the bottom of the tunnel; The steel pipes (50) are arranged at intervals along the circumferential direction of the tunnel opening lining body (20), and the steel pipes (50) are arranged along the length direction of the tunnel.
2. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 1 is characterized in that: Anchor rods (11) are provided on the slope casting body (10), and a plurality of groups of the anchor rods (11) are arranged at intervals along the length direction and the width direction of the slope casting body (10).
3. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 1 is characterized in that: A casting crossbeam (12) is provided at the connection end between the side slope casting body (10) and the bottom plate casting body (30), a trough body (31) is provided on the bottom plate casting body (30), and the casting crossbeam (12) is cast and formed in the trough body (31).
4. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 1 is characterized in that: The steel pipes (50) are arranged in two rows at intervals along the thickness direction of the opening lining body (20).
5. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 1 or 4, characterized in that: The steel pipe (50) comprises a head-end screw-in pipe (51) and a connecting pipe (52); the tail end of the steel pipe (50) is connected to a pipe pile drilling device and screwed into the soil; one end of the connecting pipe (52) is connected to the tail end pipe opening of the head-end screw-in pipe (51); the tail end pipe opening of the head-end screw-in pipe (51) is provided with an internally threaded pipe section (511); one end of the connecting pipe (52) is provided with an externally threaded pipe section (521); the pipe opening of the externally threaded pipe section (521) is provided with a trumpet guide pipe (522); the small-sized end pipe opening section of the trumpet guide pipe (522) extends into the tail end pipe opening of the head-end screw-in pipe (51), and the externally threaded pipe section (521) is threadedly connected to the internally threaded pipe section (511).
6. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 5 is characterized in that: A steel pipe screw-in head (513) is provided at the head end of the head end screw-in tube (51), and the steel pipe screw-in head (513) is in the shape of a truncated cone as a whole.
7. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 5 is characterized in that: A first table surface (512) is provided between one end of the internally threaded pipe section (511) and the inner wall of the head-end screw-in pipe (51); the outer diameter of the large-size end of the horn guide pipe (522) is smaller than the outer diameter of the externally threaded pipe section (521); a first sealing gasket (53) is sleeved on the horn guide pipe (522); when the connecting pipe (52) is screwed into the rear end of the head-end screw-in pipe (51), the first sealing gasket (53) abuts against the first table surface (512).
8. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 7 is characterized in that: The tail end of the head-end screw-in tube (51) is provided with a second table surface (514); the outer diameter of the externally threaded tube section (521) is smaller than the outer diameter of the connecting tube (52); a second sealing gasket (54) is provided at the connection position between one end of the externally threaded tube section (521) and the connecting tube (52); when the connecting tube (52) is screwed into the tail end of the head-end screw-in tube (51), the second sealing gasket (54) abuts against the second table surface (514).
9. The reinforcement structure for a weak and broken large-section shallow tunnel under a highway according to claim 5 is characterized in that: Steel bars (55) are inserted into the first-end screw-in tube (51) and the connecting tube (52).