Waterproof board trolley and secondary lining trolley integrated construction system

By connecting the waterproof slab trolley with the secondary lining trolley and equipping it with a lifting mechanism, the problems of unstable equipment and physical exertion of personnel during tunnel construction were solved, achieving a more efficient and safer construction process.

CN221856736UActive Publication Date: 2024-10-18THE FIFTH ENG CO LTD OF CHINA TIESIJU CIVIL ENG GRP +6
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420018298.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-10-18
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

In existing tunnel construction, the waterproof slab trolley and the secondary lining trolley are independent, which leads to crowding and unstable walking when placed in a narrow tunnel. Construction workers need to frequently climb ladders to check quality, which consumes physical strength and poses safety risks.

Method used

An integrated construction system of the waterproof slab trolley and the second lining trolley is designed. The waterproof slab trolley and the second lining trolley are connected together through the connecting structure and lifting mechanism, which increases the stability and realizes different functions through the lifting mechanism. The movement of the height platform reduces the need for construction personnel to move repeatedly in the platform workshop.

Benefits of technology

It solves the problems of tunnel space congestion and construction stability, improves the walking stability of construction equipment, reduces the physical consumption of construction personnel, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856736U_ABST
    Figure CN221856736U_ABST
Patent Text Reader

Abstract

The utility model provides a waterproof board trolley and secondary lining trolley integrated construction system which comprises a waterproof board trolley, a secondary lining trolley, a connecting structure for connecting the waterproof board trolley and the secondary lining trolley and a lifting mechanism arranged on the connecting structure, a first girder is arranged on the lower portion of the waterproof board trolley, and a second girder is arranged on the lower portion of the secondary lining trolley. The connecting structure comprises connecting cross beams connecting the first girder and the second girder, connecting main beams located between the adjacent connecting cross beams and connecting secondary beams arranged between the connecting main beams at intervals, a plurality of first working platforms are arranged on the waterproof board trolley, and a plurality of second working platforms are arranged on the second lining trolley. The lifting mechanism comprises a vertically arranged lifting track, a sliding plate sliding along the lifting track and a platform plate fixedly connected to the sliding plate, two construction trolleys are connected, the space utilization rate of a tunnel and the walking stability of the trolleys are improved, meanwhile, constructors can move between the two trolleys more conveniently, and operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel engineering, in particular to an integrated construction system of a waterproof plate trolley and a secondary lining trolley. Background Art

[0002] The general sequence of tunnel construction is to tie steel bars, hang geotextiles, lay waterproof boards, and finally pour the second lining concrete on the first lining concrete of the tunnel. Among them, tying steel bars, hanging geotextiles and laying waterproof boards are generally completed by waterproof board trolleys, while pouring the second lining concrete is completed using the second lining trolley.

[0003] In the prior art, the waterproof board trolley and the secondary lining trolley are two independent construction trolleys, which are installed separately. It is very crowded to place two construction trolleys in a narrow tunnel, and the waterproof board trolley is mainly pushed by a loader. The waterproof board trolley is easily overturned, unstable, and fallen apart during the pushing process. In addition, in tunnel engineering, after laying the waterproof board or pouring the secondary lining concrete, the staff needs to use ladders to perform secondary processing on the laying quality of the waterproof board and the pouring of the secondary lining concrete on each trolley. For example, the height of some large tunnels is as high as more than 10 meters. It is very energy-consuming to move repeatedly on two construction trolleys, which is very likely to cause accidents. Utility Model Content

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide an integrated construction system of a waterproof board trolley and a secondary lining trolley, aiming to solve the technical problems mentioned in the background technology.

[0005] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:

[0006] A construction system integrating a waterproof board trolley and a secondary lining trolley, comprising a waterproof board trolley for laying waterproof boards, a secondary lining trolley for pouring secondary lining concrete, a connecting structure connecting the waterproof board trolley and the secondary lining trolley, and a lifting mechanism arranged on the connecting structure, wherein a first beam is arranged at the lower portion of the waterproof board trolley, a second beam is arranged at the lower portion of the secondary lining trolley, the connecting structure comprises a connecting cross beam connecting the first beam and the second beam, a connecting main beam located between adjacent connecting cross beams, and a connecting secondary beam arranged at intervals between the connecting main beams, the waterproof board trolley is provided with a plurality of first working platforms along the vertical direction, the secondary lining trolley is provided with a plurality of second working platforms along the vertical direction, the lifting mechanism comprises a vertically arranged lifting rail, a sliding plate sliding along the lifting rail, and a platform plate fixedly connected to the sliding plate, the platform plate being used to transport workers to the first working platform and the second working platform.

[0007] Compared with the prior art, the beneficial effects of the utility model are:

[0008] The waterproof board trolley and the secondary lining trolley are connected together through a connecting structure, so that the space of the tunnel is no longer crowded, and the connecting structure is a structure composed of multiple connecting main beams and connecting secondary beams, and has excellent stability. At the same time, the waterproof board trolley and the secondary lining trolley move together, which can improve the stability of the two when walking. After the waterproof board is laid, the waterproof board trolley and the secondary lining trolley are started to move together, and the secondary lining trolley is moved to the construction surface, so that the two construction processes of laying the waterproof board and pouring the secondary lining concrete can be smoothly transitioned. Finally, by arranging a lifting mechanism on the connecting structure, when it is necessary to inspect the laying quality of the waterproof board and the pouring quality of the secondary lining concrete, the construction personnel can move to the first working platform or the second working platform at different heights through the platform plate, without having to move repeatedly on the two trolleys through the stairs, which effectively saves physical energy.

[0009] Furthermore, the lifting mechanism also includes a lower mounting plate fixedly connected to the connecting structure, and an upper mounting plate fixedly connected to the upper part of the lifting track, a lead screw is provided between the lower mounting plate and the upper mounting plate, and the sliding plate is connected to the lead screw.

[0010] Furthermore, a motor is provided above the upper mounting plate, and a motor shaft of the motor is connected to the lead screw.

[0011] Furthermore, the lifting mechanism also includes a protective frame body arranged around the platform plate, the protective frame body is made of a steel frame structure, and the protective frame body is used to enclose the platform plate.

[0012] Furthermore, the first working platform includes a first transition plate arranged close to the platform plate, a first support plate connected to the first transition plate, and a first guardrail arranged on the first support plate, and the second working platform includes a second transition plate arranged close to the platform plate, a second support plate connected to the second transition plate, and a second guardrail arranged on the second transition plate.

[0013] Furthermore, the waterproof board trolley includes a first gantry and a construction mechanism arranged on the first gantry, the construction mechanism includes a first rotating shaft located above the middle of the first gantry, telescopic arms arranged at both ends of the first rotating shaft, and a connecting rod arranged between the two telescopic arms, and a waterproof cloth roll is hung on the connecting rod.

[0014] Furthermore, the second lining trolley includes a second portal frame, a top mold system located above the second portal frame, and side mold systems located on both sides of the second portal frame.

[0015] Furthermore, the integrated construction system of the waterproof board trolley and the secondary lining trolley also includes a walking system located below the waterproof board trolley and the secondary lining trolley, and a track system arranged in cooperation with the walking system, and the waterproof board trolley and the secondary lining trolley move on the track system through the walking system. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the integrated construction system of the waterproof board trolley and the secondary lining trolley in the embodiment of the utility model;

[0017] Figure 2 for Figure 1 Structural schematic diagram of the middle connecting structure and lifting mechanism;

[0018] Figure 3 for Figure 1 Structural diagram of the middle waterproof board trolley;

[0019] Figure 4 for Figure 1 Structural diagram of the middle second lining trolley;

[0020] Figure 5 for Figure 4 A magnified view of part A;

[0021] Description of main component symbols:

[0022]

[0023]

[0024] The following specific implementation manner will further illustrate the present utility model in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0025] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0026] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0028] See also Figures 1 to 5 , shown is an integrated construction system of a waterproof board trolley and a secondary lining trolley in an embodiment of the utility model, comprising a waterproof board trolley 20 for laying waterproof boards, a secondary lining trolley 10 for pouring secondary lining concrete, a connecting structure 30 connecting the waterproof board trolley 20 and the secondary lining trolley 10, and a lifting mechanism 40 arranged on the connecting structure 30, the lower part of the waterproof board trolley 20 is provided with a first beam 23, the lower part of the secondary lining trolley 10 is provided with a second beam 15, the connecting structure 30 includes a connecting crossbeam 31 connecting the first beam 23 and the second beam 15, a position The connecting main beams 32 between adjacent connecting cross beams 31, and the connecting secondary beams 33 spaced between the connecting main beams 32, the waterproof board trolley 20 is provided with a plurality of first working platforms 22 along the vertical direction, the secondary lining trolley 10 is provided with a plurality of second working platforms 14 along the vertical direction, the lifting mechanism 40 includes a vertically arranged lifting rail 44, a sliding plate 46 sliding along the lifting rail 44, and a platform plate 47 fixedly connected to the sliding plate 46, and the platform plate 47 is used to transport the staff to the first working platform 22 and the second working platform 14.

[0029] It should be noted that the first beam 23 and the second beam 15 are both located at the feet of the waterproof board trolley 20 and the secondary lining trolley 10, and are large in size, so they can withstand axial tension, and the mesh structure formed by the connecting main beam 32, the connecting secondary beam 33, and the connecting cross beam 31 can improve the stability when the waterproof board trolley 20 pulls the secondary lining trolley 10, and prevent the connecting cross beam 31 from being damaged due to the tension borne by the two connecting cross beams 31 alone.

[0030] It can be understood that the waterproof board trolley 20 and the secondary lining trolley 10 are connected together through the connecting structure 30, so that the space of the tunnel is no longer crowded, and the connecting structure 30 is a structure composed of multiple connecting main beams 32 and connecting secondary beams 33, and has excellent stability. At the same time, the waterproof board trolley 20 and the secondary lining trolley 10 move together, which can improve the stability of the two when walking. After the waterproof board is laid, the waterproof board trolley 20 and the secondary lining trolley 10 are started to move together, and the secondary lining trolley 10 is moved to the construction surface, so that the two construction processes of laying the waterproof board and pouring the secondary lining concrete can be smoothly transitioned. Finally, by arranging a lifting mechanism 40 on the connecting structure 30, when it is necessary to inspect the laying quality of the waterproof board and the pouring quality of the secondary lining concrete, the construction personnel can move to the first working platform 22 or the second working platform 14 at different heights through the platform plate 47, without having to move repeatedly on the two trolleys through the stairs, which effectively saves physical energy.

[0031] Specifically, the lifting mechanism 40 also includes a lower mounting plate 41 fixedly connected to the connecting structure 30, and an upper mounting plate 42 fixedly connected to the top of the lifting track 44, a lead screw 45 is provided between the lower mounting plate 41 and the upper mounting plate 42, and the sliding plate 46 is connected to the lead screw 45; a motor 43 is provided above the upper mounting plate 42, and the motor 43 shaft of the motor 43 is connected to the lead screw 45.

[0032] It can be understood that installing the mounting plate on the connecting structure 30 can ensure sufficient strength and stability. When it is necessary to control the lifting of the platform plate 47, the motor 43 can be controlled to drive the screw 45 to rotate, so that the sliding plate 46 drives the platform plate 47 to move along the lifting track 44. Since the platform plate 47 is only used to load construction personnel, there is no need for too much reinforcement structure, so that the lifting mechanism 40 itself has a very light weight and will not cause excessive bending moment in the middle of the connecting structure 30.

[0033] Preferably, the lifting mechanism 40 further includes a protective frame body disposed around the platform plate 47 , wherein the protective frame body is made of a steel frame structure and is used to enclose the platform plate 47 .

[0034] It can be understood that the protective frame provided around the platform plate 47 is mainly used to protect the construction personnel on the platform plate 47, and prevent the construction personnel from slipping and falling during the raising and lowering of the platform plate 47, thereby preventing major safety accidents. The steel frame structure is adopted because steel is lightweight and high-strength, which can reduce the weight of the connecting structure 30 while ensuring the strength, and prevent the middle part of the connecting structure 30 from being bent due to excessive bending moment.

[0035] Preferably, the protection frame can be connected to the secondary lining trolley 10 , so that the secondary lining trolley 10 can bear part of the load of the protection frame, further reducing the deformation risk of the connection structure 30 .

[0036] Furthermore, the first working platform 22 includes a first transition plate 221 arranged near the platform plate 47, a first support plate 222 connected to the first transition plate 221, and a first guardrail 223 arranged on the first support plate 222, and the second working platform 14 includes a second transition plate 141 arranged near the platform plate 47, a second support plate 142 connected to the second transition plate 141, and a second guardrail 143 arranged on the second transition plate 141.

[0037] It can be understood that when the platform plate 47 rises, it will pass through the first working platform 22 and the second working platform 14 at each height. The construction workers first move from the platform plate 47 to the first transition plate 221 or the second transition plate 141, and then move to the first support plate 222 or the second support plate 142 to perform construction work, wherein the first guardrail 223 and the second guardrail 143 can prevent the construction workers from accidentally falling during work.

[0038] It should be noted that since the protective frame is relatively high, in order to ensure the stability of the protective frame, diagonal braces need to be set at both ends of the protective frame that are not facing the second lining trolley 10 and the waterproof board trolley 20. People need to pass through the two ends of the protective frame facing the second lining trolley 10 and the waterproof board trolley 20, so diagonal braces are not set.

[0039] Furthermore, the waterproof board trolley 20 includes a first gantry 21 and a construction mechanism arranged on the first gantry 21, the construction mechanism includes a first rotating shaft located above the middle of the first gantry 21, telescopic arms 24 arranged at both ends of the first rotating shaft, and a connecting rod arranged between the two telescopic arms 24, and a waterproof cloth roll 25 is hung on the connecting rod.

[0040] It can be understood that the first door frame 21 is mainly used to support the entire waterproof board trolley 20, and multiple first working platforms 22 are located on both sides of the first door frame 21. A first working platform 22 is also provided on the upper part of the construction mechanism, and each first working platform 22 can be reached by a lifting mechanism 40;

[0041] The telescopic arms 24 are located at both ends of the waterproof board trolley 20. Since the telescopic arms 24 need to draw an arc, the first transition plate 221 cannot protrude to the outside of the first door frame 21, otherwise it will be hit by the telescopic arms 24. Therefore, a ladder is required on the platform plate 47 to temporarily connect the platform plate 47 and the first working platform 22.

[0042] Furthermore, the secondary lining trolley 10 includes a second portal frame 11 , a top mold system 13 located above the second portal frame 11 , and side mold systems located on both sides of the second portal frame 11 .

[0043] It can be understood that the second gantry 11 is used to bear the load of the second lining trolley 10, the top formwork system 13 is used to push the top formwork to the top of the tunnel arc, and the side formwork system 12 is used to push the side formwork to the side wall of the tunnel. Multiple second working platforms 14 are located on both sides of the second gantry 11 and the top formwork system 13.

[0044] Furthermore, the integrated construction system of the waterproof board trolley and the secondary lining trolley also includes a walking system (not shown in the figure) located below the waterproof board trolley 20 and the secondary lining trolley 10, and a track system (not shown in the figure) arranged in coordination with the walking system, and the waterproof board trolley 20 and the secondary lining trolley 10 are moved on the track system through the walking system.

[0045] The workflow of this utility model is as follows:

[0046] First, the waterproof board trolley 20 and the secondary lining trolley 10 are connected through the connecting structure 30, wherein the waterproof board trolley 20 is located at the front end of the travel, and then the lifting mechanism 40 is set up on the connecting structure 30 to start working;

[0047] First, the waterproof board trolley 20 is driven to the first working surface. The staff comes to the first working platform 22 through the lifting mechanism 40 to tie the steel bars and hang the geotextile. Then the telescopic arm 24 is started to drive the waterproof cloth to draw an arc around the waterproof board trolley 20 to lay the waterproof board. The staff checks the laying quality of the waterproof board on the second working platform 14. After confirmation, the waterproof board trolley 20 and the second lining trolley 10 are driven forward for a distance so that the second lining trolley 10 is located on the construction surface to pour the second lining concrete. The waterproof board trolley 20 is now located on the second construction surface to tie the steel bars, hang the geotextile, and lay the waterproof board. According to this construction step, the construction work of each working surface is completed in sequence;

[0048] During this period, the workers can work back and forth between the first working platforms 22 and the second working platforms 14 through the lifting mechanism 40, thereby improving work efficiency.

[0049] In summary, the integrated construction system of the waterproof board trolley and the second lining trolley in the above-mentioned embodiment of the utility model connects the waterproof board trolley and the second lining trolley together through a connecting structure, so that the space of the tunnel is no longer crowded, and the connecting structure is a structure composed of multiple connecting main beams and connecting secondary beams, and has excellent stability. At the same time, the waterproof board trolley and the second lining trolley move together, which can improve the stability of the two when walking. After the waterproof board is laid, the waterproof board trolley and the second lining trolley are started to move together, and the second lining trolley is moved to the construction surface, so that the two construction processes of laying the waterproof board and pouring the second lining concrete can be smoothly transitioned. Finally, by arranging a lifting mechanism on the connecting structure, when it is necessary to inspect the laying quality of the waterproof board and the pouring quality of the second lining concrete, the construction personnel can move to the first working platform or the second working platform at different heights through the platform plate, without the need to move repeatedly on the two trolleys through the stairs, which effectively saves physical energy.

[0050] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0051] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. An integrated construction system of a waterproof board trolley and a secondary lining trolley, characterized in that: It includes a waterproof board trolley for laying waterproof boards, a second lining trolley for pouring second lining concrete, a connecting structure connecting the waterproof board trolley and the second lining trolley, and a lifting mechanism arranged on the connecting structure, the waterproof board trolley is provided with a first beam at the lower part, the second lining trolley is provided with a second beam at the lower part, the connecting structure includes a connecting cross beam connecting the first beam and the second beam, a connecting main beam located between adjacent connecting cross beams, and a connecting secondary beam arranged at intervals between the connecting main beams, the waterproof board trolley is provided with a plurality of first working platforms along the vertical direction, the second lining trolley is provided with a plurality of second working platforms along the vertical direction, the lifting mechanism includes a vertically arranged lifting track, a sliding plate sliding along the lifting track, and a platform plate fixedly connected to the sliding plate, and the platform plate is used to transport workers to the first working platform and the second working platform.

2. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: The lifting mechanism also includes a lower mounting plate fixedly connected to the connecting structure and an upper mounting plate fixedly connected to the upper part of the lifting track. A lead screw is arranged between the lower mounting plate and the upper mounting plate, and the sliding plate is connected to the lead screw.

3. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 2 is characterized in that: A motor is arranged above the upper mounting plate, and a motor shaft of the motor is connected to the lead screw.

4. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: The lifting mechanism also includes a protection frame body arranged around the platform plate, the protection frame body is made of a steel frame structure, and the protection frame body is used to enclose the platform plate.

5. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: The first working platform includes a first transition plate arranged close to the platform plate, a first support plate connected to the first transition plate, and a first guardrail arranged on the first support plate; the second working platform includes a second transition plate arranged close to the platform plate, a second support plate connected to the second transition plate, and a second guardrail arranged on the second transition plate.

6. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: The waterproof board trolley includes a first gantry and a construction mechanism arranged on the first gantry. The construction mechanism includes a first rotating shaft located above the middle of the first gantry, telescopic arms arranged at both ends of the first rotating shaft, and a connecting rod arranged between the two telescopic arms, and a waterproof cloth roll is hung on the connecting rod.

7. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: The second lining trolley includes a second door frame, a top mold system located above the second door frame, and side mold systems located on both sides of the second door frame.

8. The integrated construction system of waterproof board trolley and secondary lining trolley according to claim 1 is characterized in that: It also includes a walking system located below the waterproof board trolley and the secondary lining trolley, and a track system arranged in cooperation with the walking system. The waterproof board trolley and the secondary lining trolley move on the track system through the walking system.