Efficient energy-saving water replenishing system
By connecting the reservoir with the circulating cooling pool of the cooling tower of the thermal power plant, natural potential energy is used to realize artesian water replenishment, which solves the problems of high power consumption and high maintenance costs of the circulating cooling water replenishment pump, improves the economic benefits and reliability of the system, and achieves significant energy saving and emission reduction effect.
Patent Information
- Application Number
- CN202323300058.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-05
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-05
AI Technical Summary
Thermal power plants have a large demand for replenishing circulating cooling water, which causes the replenishing pump to consume a large amount of electric energy. Frequent startup and operation can easily lead to equipment damage and high maintenance costs, affecting economic efficiency.
Design an efficient and energy-saving water replenishment system that connects the reservoir and the circulating cooling pool through pipes and valves. It uses the natural potential energy of the reservoir to realize gravity replenishment of the cooling tower, reducing the operating power consumption and maintenance costs of the pump.
By reducing the operating power consumption and maintenance costs of the circulating cooling water make-up pump, the system operation reliability and economic benefits are improved, and energy saving and emission reduction are significantly achieved.
Smart Images

Figure CN221858958U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cooling water replenishment in thermal power plants, in particular to a high-efficiency energy-saving water replenishment system. Background Art
[0002] At present, the circulating cooling water replenishment of the 4×600MW subcritical coal-fired generating units in the thermal power plant is provided by three 20GHX / 2 long-axis deep well pumps. The output of each replenishment pump is 1950~2350m3 / h, and the motor voltage level is 6kV and the power is 350kW.
[0003] The demand for circulating cooling water replenishment is large, resulting in a large amount of electricity consumed by the replenishment pump. According to statistics, the circulating cooling water replenishment pump consumes more than 6.6 million kWh of electricity each year. At the same time, because the circulating cooling water replenishment pump needs to be frequently started and replenished according to system requirements, the circulating cooling water replenishment pump is prone to damage and requires frequent overhaul and maintenance. In addition, the long-axis deep well pump is inconvenient to overhaul, and the procurement cost of spare parts is high, resulting in very high overhaul and maintenance costs for the circulating cooling water replenishment pump. According to statistics, the annual overhaul and maintenance costs of the circulating cooling water replenishment pump exceed 600,000. The circulating cooling water replenishment system consumes a lot of energy and has high overhaul and maintenance costs, which is not conducive to the economic efficiency of the unit. Summary of the invention
[0004] The main purpose of the utility model is to overcome the deficiencies in the prior art and provide a highly efficient and energy-saving water replenishment system. The system can fully utilize the geographical advantages, has high economic benefits and return rates, and can also improve the reliability of system operation and achieve significant energy-saving and emission-reduction effects.
[0005] The technical solution adopted by the utility model to achieve its technical purpose is: an efficient and energy-saving water replenishment system, including a reservoir and a circulating cooling water pool, wherein the reservoir is connected to a water diversion channel a and a water diversion channel b;
[0006] The water diversion channel a is connected with a first branch pipe and a second branch pipe;
[0007] The water diversion channel a is connected to the sixteenth pipeline via the first branch pipe, the eighth pipeline, the eleventh pipeline and the thirteenth pipeline;
[0008] At the same time, the water diversion channel a is connected to one end of the sixteenth pipeline via the second branch pipe, the ninth pipeline, the twelfth pipeline, the fourteenth pipeline and the seventeenth pipeline;
[0009] The water diversion channel b is connected to a third branch pipe;
[0010] The water diversion channel b is connected to one end of the sixteenth pipeline via the third branch pipe, the tenth pipeline, the ninth pipeline, the twelfth pipeline, the fourteenth pipeline and the seventeenth pipeline;
[0011] The thirteenth pipeline is installed with a sixty-fifth valve and a sixty-seventh valve, and the fourteenth pipeline is installed with a sixty-sixth valve and a sixty-eighth valve;
[0012] One end of the sixteenth pipeline is arranged between the sixty-fifth valve and the sixty-seventh valve and connected to the thirteenth pipeline. One end of the seventeenth pipeline is arranged between the sixty-sixth valve and the sixty-eighth valve and connected to the fourteenth pipeline, and the other end is directly connected to one end of the sixteenth pipeline.
[0013] The other end of the sixteenth pipeline is connected to the eighteenth pipeline and the nineteenth pipeline, the sixteenth pipeline is connected to the twenty-fourth pipeline via the eighteenth pipeline, and the sixteenth pipeline is connected to the twenty-fifth pipeline via the nineteenth pipeline.
[0014] Preferably, the twenty-fourth pipeline is connected to the twenty-sixth pipeline and the twenty-seventh pipeline;
[0015] The 26th pipeline is connected to the 30th pipeline and the 31st pipeline, the 30th pipeline is connected to the No. 1 machine water supply tank of the circulating cooling water tank via the 42nd valve, and the 31st pipeline is connected to the No. 1 machine water supply tank of the circulating cooling water tank via the 43rd valve.
[0016] The 27th pipeline is connected to the 32nd pipeline and the 33rd pipeline, and the 32nd pipeline is connected to the No. 2 unit water supply tank of the circulating cooling water tank via the 44th valve, and the 33rd pipeline is connected to the No. 45th valve at the same time.
[0017] Preferably, the twenty-fifth pipeline is connected to a twenty-eighth pipeline and a twenty-ninth pipeline;
[0018] The 28th pipeline is connected to the 34th pipeline and the 35th pipeline, and the 34th pipeline is connected to the No. 3 unit water supply tank of the circulating cooling water tank via the 46th valve, and the 35th pipeline is connected to the No. 3 unit water supply tank via the 47th valve.
[0019] The 29th pipeline is connected to the 36th pipeline and the 37th pipeline. The 36th pipeline is connected to the No. 4 unit water supply tank of the circulating cooling water tank via the 48th valve, and the 37th pipeline is connected to the No. 4 unit water supply tank via the 49th valve.
[0020] Preferably, the 70th valve and the 73rd valve are installed on the 24th pipeline, one end of the 18th pipeline is arranged between the 70th valve and the 73rd valve and connected to the 24th pipeline, and the other end is connected to the 16th pipeline via the 69th valve.
[0021] Preferably, a seventy-second valve and a seventy-sixth valve are installed on the twenty-fifth pipeline, one end of the nineteenth pipeline is arranged between the seventy-second valve and the seventy-sixth valve and connected to the twenty-fifth pipeline, and the other end is connected to the sixteenth pipeline via the seventy-first valve.
[0022] Compared with the prior art, the beneficial effects of the utility model are: the efficient and energy-saving water replenishment system, directly on the basis of the original water replenishment system, connects the circulating cooling water pool of the cooling tower of the thermal power plant with the reservoir for water replenishment by adding pipes, valves and other components, which can make full use of geographical advantages, economic benefits and high rate of return on investment: the geographical location of the reservoir is higher than that of the thermal power plant, and the natural potential energy of the water level of the reservoir is used for gravity replenishment of the circulating cooling water pool of the cooling tower; at the same time, it saves the operating power consumption of the circulating cooling water replenishment pump and the cost of inspection and maintenance, maintenance labor and spare parts, thereby improving the economic benefits and rate of return.
[0023] It can also improve the reliability of system operation and achieve significant energy-saving and emission-reduction effects: after the energy-saving transformation of the water supply system, the cooling tower is supplied with water by the natural potential energy of the reservoir, so that the three circulating cooling water supply pumps are all in standby status, which can not only reduce the maintenance cost of the circulating cooling water supply pump, but also reduce the hidden dangers of failure caused by equipment defects leading to water shortage in the cooling tower circulating cooling water pool, greatly improving the reliability of system operation; at the same time, the circulating cooling water supply pump is in standby status, reducing a large amount of smoke, dust, ash and other waste emissions. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the overall structure of the efficient and energy-saving water replenishment system.
[0025] Figure 2 This is a water replenishment flow chart for connecting the first branch pipe and other components.
[0026] Figure 3 This is a water replenishment flow chart for connecting the second branch pipe and other components.
[0027] Figure 4 This is a water replenishment flow chart for connecting the third branch pipe and other components.
[0028] in:
[0029] 1-Xiangshui Reservoir; 2-Diversion Channel A; 3-Diversion Channel B; 4-First Branch Pipe; 5-Second Branch Pipe; 6-Third Branch Pipe; 7-Tailwater Pool; 8-Eighth Pipe; 9-Ninth Pipe; 10-Tenth Pipe; 11-Eleventh Pipe; 12-Twelfth Pipe; 13-Thirteenth Pipe; 14-Fourteenth Pipe; 15-Strainer Room; 16-Sixteenth Pipe; 17-Seventeenth Pipe; 18-Eighteenth Pipe; 19-Nineteenth Pipe; 20-Circulating Cooling Water Make-up Pump A; 21-Circulating Cooling Water Make-up Pump B; 22-Circulating Cooling Water Make-up Pump Pump C; 23-fire water tank; 24-24th pipeline; 25-25th pipeline; 26-26th pipeline; 27-27th pipeline; 28-28th pipeline; 29-29th pipeline; 30-30th pipeline; 31-31st pipeline; 32-32nd pipeline; 33-33rd pipeline; 34-34th pipeline; 35-35th pipeline; 36-36th pipeline; 37-37th pipeline; 38-Unit 1 water supply tank; 39-Unit 2 water supply tank; 40-Unit 3 water supply tank; 41-Unit 4 No. 1 engine water replenishment tank; 42-42nd valve; 43-43rd valve; 44-44th valve; 45-45th valve; 46-46th valve; 47-47th valve; 48-48th valve; 49-49th valve; 50-50th valve; 51-51st valve; 52-52nd valve; 53-53rd valve; 54-54th valve; 55-55th valve; 56-56th valve; 57-57th valve; 58-58th valve; 59-59th valve ;60-60th valve;61-pressure gauge a;62-valve pressure gauge b;63-63rd valve;64-64th valve;65-65th valve;66-66th valve;67-67th valve;68-68th valve;69-69th valve;70-70th valve;71-71st valve;72-72nd valve;73-73rd valve;74-74th valve;75-75th valve;76-76th valve;77-77th valve;78-78th valve DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below through the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the scope of the utility model. In addition, in the following description, the description of the known structure and technology is omitted to avoid unnecessary confusion of the concept of the utility model.
[0031] In the description of the present utility model, it should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0032] In the description of the present utility model, it should be noted that the terms "center", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", "third" and the like are only used to distinguish descriptions, and cannot be understood as indicating or implying relative importance. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined. The meaning of "several" is one or more, unless otherwise clearly and specifically defined.
[0033] In the description of the present utility model, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. Example 1
[0034] like Figure 1 and Figure 2 As shown, a high-efficiency and energy-saving water replenishment system includes a reservoir 1 and a circulating cooling water pool 38, and the reservoir 1 is connected to a water diversion channel a2 and a water diversion channel b3;
[0035] The water diversion channel a2 is connected to the first branch pipe 4, and the water diversion channel a2 is connected to the sixteenth pipe 16 via the first branch pipe 4, the eighth pipe 8, the eleventh pipe 11 and the thirteenth pipe 13;
[0036] The thirteenth pipeline 13 is provided with a sixty-fifth valve 65 and a sixty-seventh valve 67, and one end of the sixteenth pipeline 16 is arranged between the sixty-fifth valve 65 and the sixty-seventh valve 67 and connected to the thirteenth pipeline 13;
[0037] The other end of the sixteenth pipeline 16 is connected to the eighteenth pipeline 18 and the nineteenth pipeline 19. The sixteenth pipeline 16 is connected to the twenty-fourth pipeline 24 via the eighteenth pipeline 18. Meanwhile, the sixteenth pipeline 16 is connected to the twenty-fifth pipeline 25 via the nineteenth pipeline 19.
[0038] The 70th valve 70 and the 73rd valve 73 are installed on the 24th pipeline 24. One end of the 18th pipeline 18 is arranged between the 70th valve 70 and the 73rd valve 73 and is connected to the 24th pipeline 24, and the other end is connected to the 16th pipeline 16 via the 69th valve 69.
[0039] The seventy-second valve 72 and the seventy-sixth valve 76 are installed on the twenty-fifth pipeline 25. One end of the nineteenth pipeline 19 is arranged between the seventy-second valve 72 and the seventy-sixth valve 76 and connected to the twenty-fifth pipeline 25, and the other end is connected to the sixteenth pipeline 16 via the seventy-first valve 71.
[0040] The twenty-fourth pipeline 24 is connected to the twenty-sixth pipeline 26 and the twenty-seventh pipeline 27;
[0041] The 26th pipeline 26 is connected to the 30th pipeline 30 and the 31st pipeline 31. The 30th pipeline 30 is connected to the No. 1 machine water supply tank 38 of the circulating cooling water tank via the 42nd valve 42, and the 31st pipeline 31 is connected to the No. 1 machine water supply tank 38 via the 43rd valve 43.
[0042] The twenty-seventh pipeline 27 is connected to the thirty-second pipeline 32 and the thirty-third pipeline 33. The thirty-second pipeline 32 is connected to the No. 2 unit water replenishment tank 39 of the circulating cooling water tank via the forty-fourth valve 44, and the thirty-third pipeline 33 is connected to the No. 2 unit water replenishment tank 39 via the forty-fifth valve 45.
[0043] The twenty-fifth pipeline 25 is connected to the twenty-eighth pipeline 28 and the twenty-ninth pipeline 29;
[0044] The 28th pipeline 28 is connected to the 34th pipeline 34 and the 35th pipeline 35. The 34th pipeline 34 is connected to the No. 3 unit water supply tank 40 of the circulating cooling water tank via the 46th valve 44, and the 35th pipeline 35 is connected to the No. 3 unit water supply tank 40 via the 47th valve 47.
[0045] The 29th pipeline 29 is connected to the 36th pipeline 36 and the 37th pipeline 37. The 36th pipeline 36 is connected to the No. 4 unit water replenishment tank 41 of the circulating cooling water tank via the 48th valve 48, and the 37th pipeline 37 is connected to the No. 4 unit water replenishment tank 41 via the 49th valve 49.
[0046] Specifically, when in use, after the system is installed, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 4, 8, 11, 13, 16, 18, 24, 26, 30 (or 31) → into the No. 1 unit water replenishment tank, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 4, 8, 11, 13, 16, 18, 24, 27, 32 (or 33) → into the No. 2 unit water replenishment tank, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 4, 8, 11, 13, 16, 19, 25, 28, 34 (or 35) → into the No. 3 unit water replenishment tank, and the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 4, 8, 11, 13, 16, 19, 25, 29, 36 (or 37) → into the No. 4 unit water replenishment tank. Example 2
[0047] like Figure 1 and Figure 3 As shown, based on the above embodiment, the difference from the above embodiment is that: the high-efficiency energy-saving water replenishment system includes a reservoir 1 and a circulating cooling water pool 38, and the reservoir 1 is connected to a water diversion channel a2 and a water diversion channel b3;
[0048] The water diversion channel a2 is connected to the second branch pipe 5, and the water diversion channel a2 is connected to one end of the sixteenth pipe 16 via the second branch pipe 5, the ninth pipe 9, the twelfth pipe 12, the fourteenth pipe 14 and the seventeenth pipe 17;
[0049] The sixty-sixth valve 66 and the sixty-eighth valve 68 are installed on the fourteenth pipeline 14. One end of the seventeenth pipeline 17 is arranged between the sixty-sixth valve 66 and the sixty-eighth valve 68 and connected to the fourteenth pipeline 14, and the other end is directly connected to one end of the sixteenth pipeline 16.
[0050] The other end of the sixteenth pipeline 16 is connected to the eighteenth pipeline 18 and the nineteenth pipeline 19 . The sixteenth pipeline 16 is connected to the twenty-fourth pipeline 24 via the eighteenth pipeline 18 . Meanwhile, the sixteenth pipeline 16 is connected to the twenty-fifth pipeline 25 via the nineteenth pipeline 19 .
[0051] Specifically, when in use, after the system is installed, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 5, 9, 12, 14, 17, 16, 18, 24, 26, 30 (or 31) → into the No. 1 unit water replenishment tank, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 5, 9, 12, 14, 17, 16, 18, 24, 27, 32 (or 33) → into the No. 2 unit water replenishment tank, the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 5, 9, 12, 14, 17, 16, 19, 25, 28, 34 (or 35) → into the No. 3 unit water replenishment tank, and the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 5, 9, 12, 14, 17, 16, 19, 25, 29, 36 (or 37) → into the No. 4 unit water replenishment tank. Example 3
[0052] like Figure 1 and Figure 4 As shown, based on the above embodiment, the difference from the above embodiment is that: the high-efficiency energy-saving water replenishment system includes a reservoir 1 and a circulating cooling water pool 38, and the reservoir 1 is connected to a water diversion channel a2 and a water diversion channel b3;
[0053] The water diversion channel b3 is connected to the third branch pipe 6, and the water diversion channel b3 is connected to one end of the sixteenth pipe 16 via the third branch pipe 6, the tenth pipe 10, the ninth pipe 9, the twelfth pipe 12, the fourteenth pipe 14 and the seventeenth pipe 17;
[0054] The sixty-sixth valve 66 and the sixty-eighth valve 68 are installed on the fourteenth pipeline 14. One end of the seventeenth pipeline 17 is arranged between the sixty-sixth valve 66 and the sixty-eighth valve 68 and connected to the fourteenth pipeline 14, and the other end is directly connected to one end of the sixteenth pipeline 16.
[0055] The other end of the sixteenth pipeline 16 is connected to the eighteenth pipeline 18 and the nineteenth pipeline 19 . The sixteenth pipeline 16 is connected to the twenty-fourth pipeline 24 via the eighteenth pipeline 18 . Meanwhile, the sixteenth pipeline 16 is connected to the twenty-fifth pipeline 25 via the nineteenth pipeline 19 .
[0056] Specifically, when in use, after the system is installed, the water in the reservoir flows from reservoir 1 → through diversion channel 3 → through pipes 6, 10, 9, 12, 14, 17, 16, 18, 24, 26, 30 (or 31) → into the No. 1 water replenishment tank, and the water in the reservoir flows from reservoir 1 → through diversion channel 2 → through pipes 6, 10, 9, 12, 14, 17, 16, 18, 24, 27, 32 (or 33) → into Entering the No. 2 unit water replenishment tank, the water from the reservoir flows from reservoir 1 → through diversion channel 2 → flows through pipes 6, 10, 9, 12, 14, 17, 16, 19, 25, 28, 34 (or 35) → enter the No. 3 unit water replenishment tank, the water from the reservoir flows from reservoir 1 → through diversion channel 2 → flows through pipes 6, 10, 9, 12, 14, 17, 16, 19, 25, 29, 36 (or 37) → enter the No. 4 unit water replenishment tank.
[0057] The working principle and specific use process of this high-efficiency energy-saving water replenishment system: Use pipelines to directly connect the reservoir with the circulating cooling water pool of the cooling tower of the thermal power plant, and use the geographical location of the reservoir to be higher than the geographical location of the circulating cooling water pool of the cooling tower of the thermal power plant, so that the reservoir water can be used for gravity replenishment of the circulating cooling water pool through natural potential energy, and the valve is used to control and adjust the replenishment amount of the circulating cooling water;
[0058] Furthermore, the new system is optimized based on the original system and can restore the original system operation mode by opening valves 59, 60, 67, 68, 73, and 76 and closing valves 50, 53, 56, 69, and 71 without causing any impact on the original system.
[0059] It should be noted that although the above embodiments have been described in this article, this does not limit the scope of patent protection of the utility model. Therefore, based on the innovative concept of the utility model, changes and modifications to the embodiments described in this article, or equivalent structures, equivalent processes or equivalent functional transformations made using the contents of the utility model specification and drawings, directly or indirectly applying the above technical solutions to other related technical fields, are all included in the scope of protection of the utility model patent.
Claims
1. A highly efficient and energy-saving water replenishment system, comprising a reservoir (1) and a circulating cooling water pool (38), Features: The reservoir (1) is connected to a water diversion channel a (2) and a water diversion channel b (3); The water diversion channel a (2) is connected to a sixteenth pipeline (16) via a first branch pipe (4), an eighth pipeline (8), an eleventh pipeline (11) and a thirteenth pipeline (13); At the same time, the water diversion channel a (2) is connected to one end of the sixteenth pipe (16) via the second branch pipe (5), the ninth pipe (9), the twelfth pipe (12), the fourteenth pipe (14) and the seventeenth pipe (17); The water diversion channel b (3) is connected to one end of the sixteenth pipeline (16) via the third branch pipe (6), the tenth pipeline (10), the ninth pipeline (9), the twelfth pipeline (12), the fourteenth pipeline (14) and the seventeenth pipeline (17); The sixteenth pipeline (16) is connected to the twenty-fourth pipeline (24) via the eighteenth pipeline (18), and the sixteenth pipeline (16) is connected to the twenty-fifth pipeline (25) via the nineteenth pipeline (19).
2. A high-efficiency and energy-saving water replenishment system according to claim 1, Features: The twenty-fourth pipeline (24) is connected to a twenty-sixth pipeline (26) and a twenty-seventh pipeline (27); The twenty-sixth pipeline (26) is connected to the thirtieth pipeline (30) and the thirty-first pipeline (31); the thirtieth pipeline (30) is connected to the No. 1 machine water supply pool (38) of the circulating cooling water pool via the forty-second valve (42), and the thirty-first pipeline (31) is connected to the No. 1 machine water supply pool (38) via the forty-third valve (43); The twenty-seventh pipeline (27) is connected to the thirty-second pipeline (32) and the thirty-third pipeline (33); the thirty-second pipeline (32) is connected to the No. 2 unit water supply tank (39) of the circulating cooling water tank via a forty-fourth valve (44), and the thirty-third pipeline (33) is connected to the No. 2 unit water supply tank (39) via a forty-fifth valve (45).
3. A high-efficiency and energy-saving water replenishment system according to claim 1, Features: The twenty-fifth pipeline (25) is connected to the twenty-eighth pipeline (28) and the twenty-ninth pipeline (29); The twenty-eighth pipeline (28) is connected to the thirty-fourth pipeline (34) and the thirty-fifth pipeline (35); the thirty-fourth pipeline (34) is connected to the No. 3 unit water supply tank (40) of the circulating cooling water tank via a forty-sixth valve (44), and the thirty-fifth pipeline (35) is connected to the No. 3 unit water supply tank (40) via a forty-seventh valve (47); The twenty-ninth pipeline (29) is connected to the thirty-sixth pipeline (36) and the thirty-seventh pipeline (37); the thirty-sixth pipeline (36) is connected to the No. 4 unit water supply tank (41) of the circulating cooling water tank via the forty-eighth valve (48), and the thirty-seventh pipeline (37) is connected to the No. 4 unit water supply tank (41) via the forty-ninth valve (49).
4. A high-efficiency and energy-saving water replenishment system according to claim 1, Features: The twenty-fourth pipeline (24) is provided with a seventy valve (70) and a seventy-third valve (73); one end of the eighteenth pipeline (18) is arranged between the seventy valve (70) and the seventy-third valve (73) and connected to the twenty-fourth pipeline (24); the other end is connected to the sixteenth pipeline (16) via the sixty-ninth valve (69).
5. A high-efficiency and energy-saving water replenishment system according to claim 1, Features: The twenty-fifth pipeline (25) is provided with a seventy-second valve (72) and a seventy-sixth valve (76); one end of the nineteenth pipeline (19) is arranged between the seventy-second valve (72) and the seventy-sixth valve (76) and connected to the twenty-fifth pipeline (25); and the other end is connected to the sixteenth pipeline (16) via the seventy-first valve (71).