Construction engineering investigation sampling equipment

By designing automated construction engineering survey sampling equipment, the motor drives the shaft and adjustment plate to drive the fixed tube to rotate, allowing the soil to be automatically loaded into the sampling tube. This solves the problem of soil integrity being damaged due to manual operation of existing equipment, and improves efficiency. Efficiency and accuracy of the sampling process.

CN221859975UActive Publication Date: 2024-10-18SICHUAN GUOQI TESTING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323629769.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-18
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

Existing construction engineering survey sampling equipment is difficult to separate the soil from the pipe body after soil sampling, requiring manual operation, which can easily damage the integrity of the sampled soil.

Method used

A sampling equipment including an equipment rack, motor, shaft, adjusting rod, fixed tube and sampling tube is designed. The motor drives the movement of the shaft and adjusting plate, drives the fixed tube to rotate, and automatically loads the soil into the sampling tube. Use the limit frame and spring to realize the separation and reset of the pipe body.

Benefits of technology

After soil sampling, it is easy to separate from the pipe body and automatically loaded into the sampling pipe to prevent damage to the sampled soil and ensure soil integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221859975U_ABST
    Figure CN221859975U_ABST
Patent Text Reader

Abstract

The utility model discloses construction engineering investigation sampling equipment which comprises an equipment frame, moving blocks are installed on the left side and the right side of the top of the equipment frame in a sliding mode, adjusting rods are rotatably installed at the bottoms of the moving blocks, adjusting plates are hinged to the bottoms of the adjusting rods, and the adjusting plates are installed on the inner side of the equipment frame in an up-down sliding mode; the second motor is installed at the top of the adjusting plate, and the movable end of the second motor is fixedly connected with a fixing frame through a coupler; the inner side of the fixing frame is fixedly connected with the fixing pipe, the inner side of the fixing pipe is sleeved with a sampling pipe, the left side of the equipment frame is provided with a first motor, and the output end of the first motor is fixedly connected with a shaft rod. According to the construction engineering investigation sampling equipment, soil is conveniently separated from the pipe body after being sampled, the soil is automatically loaded into the sampling pipe, and the integrity of the sampled soil is prevented from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a construction engineering survey sampling device. Background Art

[0002] Engineering survey refers to the activities of mapping, exploring and testing the terrain, geology, hydrology and other conditions, and providing corresponding results and data in order to meet the needs of planning, design, construction, operation and comprehensive management of engineering construction. Engineering survey requires soil sampling.

[0003] The currently commonly used construction engineering survey and sampling equipment has the following defects: it is not convenient to separate the soil from the tube body after sampling, and the soil needs to be manually taken out and put into the sampling tube, which easily destroys the integrity of the sampled soil. Therefore, we propose a construction engineering survey and sampling equipment to solve the above problems. Utility Model Content

[0004] The utility model aims to provide a construction engineering survey sampling device to solve the problem of the currently commonly used construction engineering survey sampling device proposed in the above background technology that it is not convenient to separate the soil from the tube body after soil sampling, and the soil needs to be manually taken out and loaded into the sampling tube, which easily destroys the integrity of the sampled soil.

[0005] To achieve the above purpose, the utility model provides the following technical solution: a construction engineering survey sampling device, comprising:

[0006] An equipment rack, wherein moving blocks are slidably mounted on both left and right sides of the top of the equipment rack, and an adjusting rod is rotatably mounted on the bottom of the moving block, an adjusting plate is hingedly connected to the bottom of the adjusting rod, and the adjusting plate is slidably mounted on the inner side of the equipment rack;

[0007] A second motor, wherein the second motor is mounted on the top of the adjustment plate, and a movable end of the second motor is fixedly connected to a fixing frame via a coupling;

[0008] A fixed tube is fixedly connected to the inner side of the fixed frame, and a sampling tube is sleeved on the inner side of the fixed tube.

[0009] Preferably, a first motor is installed on the left side of the equipment rack, and an output end of the first motor is fixedly connected to a shaft rod;

[0010] Wherein, the outer surface of the shaft rod is a bidirectional threaded structure, and the connection between the shaft rod and the moving block is a threaded connection.

[0011] Preferably, limit frames are slidably mounted on both left and right sides of the top of the sampling tube, and the outer side of the limit frame is connected to a spring for resetting the limit frame outward.

[0012] Preferably, the limiting frame and the fixing frame are connected by a snap-fit ​​connection, and the bottom cross-sections of the fixing tube and the sampling tube are both inclined structures.

[0013] Compared with the prior art, the utility model has the following beneficial effects: the construction engineering survey sampling equipment is convenient for separating the soil from the tube body after sampling, and automatically puts the soil into the sampling tube to prevent the integrity of the sampled soil from being damaged;

[0014] Casters are provided at the bottom of the equipment frame. The equipment frame is moved to the sampling point, and the shaft rod is driven to rotate by the first motor. During the movement of the shaft rod inward, the adjusting plate is driven downward by the adjusting rod. At the same time, the second motor drives the fixed frame to rotate, so that the fixed frame drives the fixed tube to rotate, and the fixed tube performs rotary drilling sampling during the downward movement. The sampling tube is arranged on the inner side of the fixed tube, so that the soil enters the interior of the sampling tube. After the sampling is completed, the fixed tube moves upward, and the sampling tube resets the limit frame through the spring, so that the limit frame is fixed to the fixed frame, and the limit frame is pulled inward to separate it from the fixed frame, so that the sampling tube and the internal soil are separated from the fixed tube and taken out upward, so that the user can directly take out the sampling tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the front cutaway structure of the utility model;

[0016] Figure 2 For this utility model Figure 1 The enlarged structural diagram at A in the middle;

[0017] Figure 3 For this utility model Figure 1 Enlarged structural diagram at B in the middle.

[0018] In the figure: 1. Equipment frame; 2. First motor; 3. Shaft; 4. Moving block; 5. Adjusting rod; 6. Adjusting plate; 7. Second motor; 8. Fixed frame; 9. Fixed tube; 10. Sampling tube; 11. Limiting frame; 12. Spring. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 The utility model provides a technical solution: a construction engineering survey sampling device, comprising:

[0021] The equipment rack 1 has moving blocks 4 slidably mounted on both left and right sides of the top of the equipment rack 1, and an adjusting rod 5 is rotatably mounted on the bottom of the moving block 4, an adjusting plate 6 is hingedly connected to the bottom of the adjusting rod 5, and the adjusting plate 6 is slidably mounted on the inner side of the equipment rack 1;

[0022] A second motor 7, the second motor 7 is mounted on the top of the adjustment plate 6, and a movable end of the second motor 7 is fixedly connected to a fixing frame 8 via a coupling;

[0023] The fixed tube 9 is fixedly connected to the inner side of the fixed frame 8, and the inner side of the fixed tube 9 is sleeved with a sampling tube 10.

[0024] A first motor 2 is installed on the left side of the equipment frame 1, and the output end of the first motor 2 is fixedly connected to a shaft rod 3; wherein the outer surface of the shaft rod 3 is a bidirectional threaded structure, and the connection method between the shaft rod 3 and the moving block 4 is a threaded connection, so that the shaft rod 3 drives the moving block 4 to move left and right by rotating.

[0025] Limiting frames 11 are slidably mounted on both left and right sides of the top of the sampling tube 10 , and the outer side of the limiting frame 11 is connected to a spring 12 for resetting it outwards, and the limiting frame 11 is reset by the spring 12 .

[0026] The connection between the limiting frame 11 and the fixing frame 8 is a snap-fit ​​connection, and the bottom cross-sections of the fixing tube 9 and the sampling tube 10 are both inclined structures, and sampling is performed through the sampling tube 10.

[0027] When using the construction engineering survey sampling equipment, if Figure 1-Figure 3 Casters are provided at the bottom of the equipment frame 1. The equipment frame 1 is moved to the sampling point, and the shaft rod 3 is driven to rotate by the first motor 2. During the movement of the shaft rod 3 inward, the adjusting plate 6 is driven downward by the adjusting rod 5. At the same time, the second motor 7 drives the fixed frame 8 to rotate, so that the fixed frame 8 drives the fixed tube 9 to rotate, and the fixed tube 9 is rotated during the downward movement to perform rotary drilling sampling. The sampling tube 10 is arranged on the inner side of the fixed tube 9, so that the soil enters the interior of the sampling tube 10. After the sampling is completed, the fixed tube 9 moves upward, and the sampling tube 10 resets the limit frame 11 through the spring 12, so that the limit frame 11 is fixed to the fixed frame 8, and the limit frame 11 is pulled inward to separate it from the fixed frame 8, so that the sampling tube 10 and the internal soil are separated from the fixed tube 8 and taken out upward, so that the user can directly take out the sampling tube 10. This is the entire working process of the construction engineering survey sampling equipment.

[0028] The contents not described in detail in this specification belong to the prior art known to the professional and technical personnel in this field. The standard parts used in this utility model can be purchased from the market, and the special-shaped parts can be customized according to the description and the drawings. The specific connection methods of each part adopt the conventional means such as bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt the conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here.

[0029] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A construction engineering survey sampling device, characterized in that: include: An equipment rack (1), wherein moving blocks (4) are slidably mounted on both left and right sides of the top of the equipment rack (1), and an adjusting rod (5) is rotatably mounted on the bottom of the moving block (4), and an adjusting plate (6) is hingedly connected to the bottom of the adjusting rod (5), and the adjusting plate (6) is slidably mounted on the inner side of the equipment rack (1) in an up-and-down manner; A second motor (7), the second motor (7) being mounted on the top of the adjustment plate (6), and a movable end of the second motor (7) being fixedly connected to a fixing frame (8) via a coupling; A fixed tube (9), the inner side of the fixed frame (8) is fixedly connected with the fixed tube (9), and the inner side of the fixed tube (9) is sleeved with a sampling tube (10).

2. A construction engineering survey sampling device according to claim 1, characterized in that: A first motor (2) is installed on the left side of the equipment frame (1), and a shaft (3) is fixedly connected to the output end of the first motor (2); The outer surface of the shaft (3) is in a bidirectional threaded structure, and the shaft (3) and the moving block (4) are connected in a threaded manner.

3. A construction engineering survey sampling device according to claim 1, characterized in that: Limiting frames (11) are slidably mounted on both left and right sides of the top of the sampling tube (10), and the outer side of the limiting frame (11) is connected to a spring (12) for resetting the limiting frame outwards.

4. A construction engineering survey sampling device according to claim 3, characterized in that: The connection between the limiting frame (11) and the fixing frame (8) is a snap-fit ​​connection, and the bottom cross-sections of the fixing tube (9) and the sampling tube (10) are both inclined structures.