Efficient spraying equipment for thermal insulation pipe production
By introducing a workbench and lifting mechanism into the spraying equipment for the production of thermal insulation pipes, using motor-driven worm and worm gear systems to achieve spraying of different lengths, and fixing pipes of different inner diameters through knobs and gear mechanisms, this solves the problem that existing equipment cannot completely The problem of incompatibility between spraying and inner diameter is improved, and the spraying efficiency and quality are improved.
Patent Information
- Application Number
- CN202420168018.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-24
AI Technical Summary
Existing spraying equipment for the production of insulation pipes cannot achieve complete spraying when processing insulation pipes that are too long, and when the inner diameters of the insulation pipes are different, the support plates cannot fully fit, resulting in a decrease in spraying efficiency and quality.
An efficient spraying equipment including a workbench and an insulation pipe lifting mechanism is designed. The motor-driven worm and worm gear system enables the nozzle to spray insulation pipes of different lengths, and the knobs and gear mechanisms are used to fix the insulation pipes of different inner diameters. Ensure the stability of the spraying process.
It achieves efficient spraying of insulation pipes of different lengths and inner diameters, improves the efficiency and quality of spraying equipment, and avoids multiple disassembly and shaking problems.
Smart Images

Figure CN221869012U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of spraying equipment, in particular to a high-efficiency spraying equipment for producing thermal insulation pipes. Background Art
[0002] The insulated pipe includes an inner steel pipe, a middle insulation layer and an outer protective layer. During the production process of the insulated pipe, the outer wall of the inner steel pipe needs to be sprayed with anti-corrosion paint to increase the anti-corrosion performance of the insulated pipe.
[0003] For example, a spraying device for the production of insulated pipes with the authorization announcement number "CN219804832U" fixes the inner steel pipe of the insulated pipe on a rotating disk through a tightening mechanism, and drives the rotating disk to rotate through the rotating mechanism, so that the steel pipe rotates. At this time, the spraying mechanism is started, and the anti-corrosion paint is sprayed on the outer surface of the steel pipe through the spraying mechanism, and the drying mechanism is started at the same time, and the anti-corrosion paint on the outer surface of the steel pipe is dried by the drying mechanism, thereby achieving uniform spraying of anti-corrosion paint on the outer surface of the steel pipe inside the insulation pipe, accelerating the drying speed of the anti-corrosion paint, and improving the spraying effect and efficiency of the device. However, when the insulation pipe is too long, the spraying equipment cannot completely spray the insulation pipe. After one end of the insulation pipe is sprayed, the insulation pipe needs to be reinstalled and the other end needs to be sprayed, which reduces the working efficiency of the spraying device. At the same time, the spraying equipment for the insulation pipe fixes the insulation pipe by a tightening plate, but when the inner diameter of the insulation pipe is different, the tightening plate cannot completely fit against the inner wall of the insulation pipe, which causes the insulation pipe to shake during spraying, thereby reducing the working quality of the spraying equipment. Utility Model Content
[0004] The purpose of the utility model is to solve the problem that when the size of the insulation pipe is too long, the spraying equipment cannot completely spray the insulation pipe. After one end of the insulation pipe is sprayed, the insulation pipe needs to be reinstalled and then the other end needs to be sprayed, which reduces the working efficiency of the spraying device and the insulation pipe is fixed by the tightening plate. However, when the inner diameter of the insulation pipe is different, the tightening plate cannot be completely fitted to the inner wall of the insulation pipe, which causes the insulation pipe to shake during spraying, thereby reducing the working quality of the spraying equipment. A high-efficiency spraying equipment for insulation pipe production is proposed.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A high-efficiency spraying equipment for the production of thermal insulation pipes is designed, including a workbench, an thermal insulation pipe lifting mechanism is arranged on the outside of the workbench, and the thermal insulation pipe lifting mechanism includes a shell, the outer wall of the shell is fixedly connected to the workbench, the inner wall of the shell is fixedly connected to the motor through a bracket, the output shaft of the motor is fixedly connected to the worm, the outer wall of the worm is rotatably connected to the shell through a bearing and a bracket, the outer wall of the worm is meshed with the worm wheel, the outer wall of the worm wheel is rotatably connected to the shell through a pin shaft, the outer wall of the worm wheel is fixedly connected to one end of a first connecting rod, the other end of the first connecting rod is movably connected to the second connecting rod through a pin shaft, and the other end of the second connecting rod is movably connected to the lifting platform through a pin shaft and a bracket.
[0007] Preferably, the surface of the workbench is slidably connected to the lifting platform, and the lower end of the workbench is fixed to the ground by a bracket and bolts.
[0008] Preferably, an insulation tube fixing mechanism is provided inside the lifting platform, and the insulation tube fixing mechanism includes a knob and a limit block, the protruding part of the knob is rotatably connected to the lifting platform through a bearing, the protruding part of the knob is fixedly connected to the first gear, the outer wall of the first gear is meshed with the second gear, the outer wall of the second gear is slidably connected to the clamping column through a curved groove, the outer wall of the clamping column passes through the lifting platform through a sliding groove, the outer wall of the clamping column is slidably connected to the lifting platform through the sliding groove, the outer wall of the limit block is slidably connected to the lifting platform through a through hole, one end of the limit block is tightly pressed against the first gear, and the other end of the limit block is tightly pressed against the push plate.
[0009] Preferably, the upper end of the workbench is fixedly connected to a material storage box, the upper end of the material storage box is fixedly connected to a discharge pipe, the other end of the discharge pipe is fixedly connected to a first vertical plate, and a plurality of nozzles are installed on an outer wall of the first vertical plate.
[0010] Preferably, the upper surface of the workbench is fixedly connected to the hot air blower, the upper end of the hot air blower is fixedly connected to the exhaust duct, the other end of the exhaust duct is fixedly connected to the second vertical plate, and the outer wall of the second vertical plate is fixedly connected to the exhaust port.
[0011] Preferably, a heat-insulating pipe is placed on the upper end of the lifting platform, and the inner wall of the heat-insulating pipe is pressed against the pressing column.
[0012] The utility model proposes an efficient spraying equipment for the production of insulation pipes, which has the beneficial effect that through the cooperation of the workbench and the insulation pipe lifting mechanism, the machine drives the worm to rotate, the worm drives the worm wheel to rotate, the worm wheel drives the first connecting rod to rotate, the first connecting rod drives the second connecting rod to rotate, the second connecting rod drives the lifting platform to move, and the lifting platform drives the insulation pipe to rise and fall. Through the above-mentioned method, the spray head can spray the insulation pipes of different lengths without multiple disassembly, which improves the working efficiency of the spraying equipment.
[0013] Through the cooperation of the lifting platform and the insulation pipe fixing mechanism, the knob drives the first gear to rotate, the first gear drives the second gear to rotate, and the second gear drives the clamping column to move. When the clamping columns are all close to the inner wall of the insulation pipe, the push plate drives the limit block to move, and the limit block presses the first gear to prevent the first gear from rotating. The above method can fix insulation pipes with different inner diameters, thereby improving the working quality of the spraying equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 for Figure 1 A schematic front cross-sectional view of
[0016] Figure 3 for Figure 1 Schematic diagram of top view;
[0017] Figure 4 for Figure 2 a side cross-sectional schematic diagram of the middle shell;
[0018] Figure 5 for Figure 2 Schematic diagram of the top view and section of the middle lifting platform.
[0019] In the figure: 1. workbench, 2. insulation pipe lifting mechanism, 201. shell, 202. motor, 203. worm, 204. worm wheel, 205. first connecting rod, 206. second connecting rod, 207. lifting platform, 3. insulation pipe fixing mechanism, 301. knob, 302. first gear, 303. tightening column, 304. second gear, 305. push plate, 306. limit block, 4. storage box, 5. discharge pipe, 6. nozzle, 7. hot air blower, 8. exhaust pipe, 9. second vertical plate, 10. exhaust port, 11. first vertical plate, 12. insulation pipe. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with the accompanying drawings:
[0021] See attached Figure 1-5In the present embodiment, a high-efficiency spraying equipment for the production of thermal insulation pipes includes a workbench 1. A thermal insulation pipe lifting mechanism 2 is arranged outside the workbench 1. The thermal insulation pipe lifting mechanism 2 includes a shell 201. The outer wall of the shell 201 is fixedly connected to the workbench 1. The workbench 1 fixes the position of the shell 201. The inner wall of the shell 201 is fixedly connected to the motor 202 through a bracket. The shell 201 fixes the position of the motor 202. The size of the motor 202 is selected according to actual needs and can be selected to meet the work needs. The output shaft of the motor 202 is fixedly connected to the worm 203. The motor 202 drives the worm 203 to rotate. The outer wall of the worm 203 rotates with the shell 201 through a bearing and a bracket. The worm 203 rotates in the housing 201, and the outer wall of the worm 203 is meshed with the worm wheel 204. The worm 203 drives the worm wheel 204 to rotate. The outer wall of the worm wheel 204 is rotationally connected to the housing 201 through a pin shaft. The worm wheel 204 rotates in the housing 201. The outer wall of the worm wheel 204 is fixedly connected to one end of the first connecting rod 205. The worm wheel 204 drives the first connecting rod 205 to rotate. The other end of the first connecting rod 205 is movably connected to the second connecting rod 206 through a pin shaft. The first connecting rod 205 drives the second connecting rod 206 to rotate. The other end of the second connecting rod 206 is movably connected to the lifting platform 207 through a pin shaft and a bracket. The second connecting rod 206 drives the lifting platform 207 to move.
[0022] See attached Figure 5 In the present embodiment, a high-efficiency spraying device for producing an insulation pipe is provided. An insulation pipe fixing mechanism 3 is arranged inside the lifting platform 207. The insulation pipe fixing mechanism 3 includes a knob 301 and a limit block 306. The protruding portion of the knob 301 is rotatably connected to the lifting platform 207 through a bearing. The knob 301 rotates on the lifting platform 207. The protruding portion of the knob 301 is fixedly connected to the first gear 302. The knob 301 drives the first gear 302 to rotate. The outer wall of the first gear 302 is meshed and connected with the second gear 304. The first gear 302 drives the second gear 304 to rotate. The outer wall of the second gear 304 is connected to the tightening column through a curved groove. 303 is slidably connected, the second gear 304 drives the clamping column 303 to move, the outer wall of the clamping column 303 passes through the lifting platform 207 through the sliding groove, the outer wall of the clamping column 303 is slidably connected to the lifting platform 207 through the sliding groove, the clamping column 303 slides on the lifting platform 207, the outer wall of the limit block 306 is slidably connected to the lifting platform 207 through the through hole, the limit block 306 slides on the lifting platform 207, one end of the limit block 306 is tightly pressed against the first gear 302, the limit block 306 prevents the first gear 302 from rotating, and the other end of the limit block 306 is tightly pressed against the push plate 305, and the push plate 305 drives the limit block 306 to move.
[0023] See attached Figure 1 , Figure 2 and Figure 3: In the present embodiment, a high-efficiency spraying equipment for the production of insulation pipes is provided, the surface of the workbench 1 is slidably connected to the lifting platform 207, the lifting platform 20 slides on the workbench 1, the lower end of the workbench 1 is fixed to the ground by a bracket and bolts, the upper end of the workbench 1 is fixedly connected to the storage box 4, the upper end of the storage box 4 is fixedly connected to the discharge pipe 5, the other end of the discharge pipe 5 is fixedly connected to the first vertical plate 11, a plurality of nozzles 6 are installed on the outer wall of the first vertical plate 11, the upper surface of the workbench 1 is fixedly connected to the hot air blower 7, the size of the hot air blower 7 is selected according to actual needs, and the selection can meet the work needs, the upper end of the hot air blower 7 is fixedly connected to the exhaust pipe 8, the other end of the exhaust pipe 8 is fixedly connected to the second vertical plate 9, the outer wall of the second vertical plate 9 is fixedly connected to the exhaust port 10, an insulation pipe 12 is placed on the upper end of the lifting platform 207, the inner wall of the insulation pipe 12 is tightly pressed against the tightening column 303, and the tightening column 303 prevents the insulation pipe 12 from moving.
[0024] Working principle:
[0025] When using this high-efficiency spraying equipment for the production of thermal insulation pipes:
[0026] Fixed stage:
[0027] First, the operator places the insulation pipe 12 to be sprayed on the lifting platform 207, and then the operator turns the knob 301, the knob 301 drives the first gear 302 to rotate, the first gear 302 drives the second gear 303 to rotate, and the second gear 304 drives the clamping column 303 to move. When the clamping column 303 is completely close to the inner wall of the insulation pipe 12, the operator stops turning the knob 301, and then the operator pushes the push plate 305, the push plate 306 drives the limit block 306 to move, and the limit block 306 presses the first gear 302 to prevent the first gear 302 from rotating, so that the insulation pipe 12 is out of the limit.
[0028] Spraying stage:
[0029] Connect the external power supply of the nozzle 6, start the nozzle 6, the nozzle 6 draws out the paint in the storage box 4, and the paint enters the nozzle 6 through the discharge pipe 5, and is sprayed to the surface of the insulation pipe 12 through the nozzle. Then the operator installs the other side of the insulation pipe 12 on the nozzle 6 in the above manner, and the nozzle 6 sprays the other end of the insulation pipe 12. At the same time, connect the external power supply of the hot air blower 7, start the hot air blower 7, and the hot air blower 7 blows the heated air through the exhaust port 10 to the insulation pipe 12 to dry the paint on the surface of the insulation pipe 12. When it is necessary to process the insulation pipe 12 with an oversized size, the external power supply of the motor 202 is connected, the motor 202 is started, the motor 202 drives the worm 203 to rotate, the worm 203 drives the worm wheel 204 to rotate, the worm wheel 204 drives the first connecting rod 205 to rotate, the first connecting rod 205 drives the second connecting rod 206 to rotate, the second connecting rod 206 drives the lifting platform 207 to move, the lifting platform 207 drives the insulation pipe 12 to rise and fall, so that the nozzle 6 can spray the insulation pipes 12 of different lengths. After the spraying is completed, the operator pulls the push plate 305 outward, and the knob 301 drives the tightening column 303 away from the insulation pipe 12 in the above manner, and then the operator removes the insulation pipe 12 to complete the efficient spraying work of the insulation pipe production.
[0030] Although the present invention has been shown and described with reference to the preferred embodiments, it will be understood by those skilled in the art that various changes in form and details may be made therein within the scope of the claims.
Claims
1. A high-efficiency spraying device for producing thermal insulation pipes, comprising a workbench (1), characterized in that: An insulation pipe lifting mechanism (2) is provided outside the workbench (1), and the insulation pipe lifting mechanism (2) comprises a shell (201), the outer wall of the shell (201) is fixedly connected to the workbench (1), the inner wall of the shell (201) is fixedly connected to the motor (202) via a bracket, the output shaft of the motor (202) is fixedly connected to the worm (203), the outer wall of the worm (203) is rotatably connected to the shell (201) via a bearing and a bracket, the outer wall of the worm (203) is meshingly connected to a worm wheel (204), the outer wall of the worm wheel (204) is rotatably connected to the shell (201) via a pin shaft, the outer wall of the worm wheel (204) is fixedly connected to one end of a first connecting rod (205), the other end of the first connecting rod (205) is movably connected to a second connecting rod (206) via a pin shaft, and the other end of the second connecting rod (206) is movably connected to a lifting platform (207) via a pin shaft and a bracket.
2. The high-efficiency spraying equipment for producing thermal insulation pipes according to claim 1 is characterized in that: The surface of the workbench (1) is slidably connected to the lifting platform (207), and the lower end of the workbench (1) is fixed to the ground via a bracket and bolts.
3. The high-efficiency spraying equipment for producing thermal insulation pipes according to claim 1 is characterized in that: The interior of the lifting platform (207) is provided with a heat preservation pipe fixing mechanism (3), the heat preservation pipe fixing mechanism (3) comprising a knob (301) and a limit block (306), the protruding portion of the knob (301) being rotatably connected to the lifting platform (207) via a bearing, the protruding portion of the knob (301) being fixedly connected to a first gear (302), the outer wall of the first gear (302) being meshingly connected to a second gear (304), and the outer wall of the second gear (304) being meshingly connected to a second gear (304). The locking block (306) is slidably connected to the locking column (303) via a curved groove; the outer wall of the locking column (303) penetrates the lifting platform (207) via a sliding groove; the outer wall of the locking column (303) is slidably connected to the lifting platform (207) via the sliding groove; the outer wall of the limiting block (306) is slidably connected to the lifting platform (207) via a through hole; one end of the limiting block (306) is tightly pressed against the first gear (302); and the other end of the limiting block (306) is tightly pressed against the push plate (305).
4. The high-efficiency spraying equipment for producing thermal insulation pipes according to claim 1 is characterized in that: The upper end of the workbench (1) is fixedly connected to a material storage box (4), the upper end of the material storage box (4) is fixedly connected to a discharge pipe (5), the other end of the discharge pipe (5) is fixedly connected to a first vertical plate (11), and a plurality of nozzles (6) are mounted on an outer wall of the first vertical plate (11).
5. The high-efficiency spraying equipment for producing thermal insulation pipes according to claim 1 is characterized in that: The upper surface of the workbench (1) is fixedly connected to the hot air blower (7), the upper end of the hot air blower (7) is fixedly connected to the exhaust pipe (8), the other end of the exhaust pipe (8) is fixedly connected to the second vertical plate (9), and the outer wall of the second vertical plate (9) is fixedly connected to the exhaust port (10).
6. The high-efficiency spraying equipment for producing thermal insulation pipes according to claim 1 is characterized in that: A heat preservation pipe (12) is placed on the upper end of the lifting platform (207), and the inner wall of the heat preservation pipe (12) is tightly pressed against the pressing column (303).
