Low-lying tunnel entrance construction period water retaining system with multiple guarantees

By designing a multi-guaranteed water retaining system at the entrance of a low-lying tunnel, including a retaining sill, drainage system and intelligent early warning control, the problem that existing technology cannot effectively cope with extreme weather and short-term heavy rainfall is solved, and rapid response and efficient drainage are achieved. , to ensure construction safety.

CN221877947UActive Publication Date: 2024-10-22POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323441892.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-10-22
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

During the construction of the existing low-lying tunnel entrance, it is unable to effectively deal with the safety hazards caused by short-term heavy rainfall and extreme weather. The traditional water retaining device is complex and costly, making it difficult to achieve rapid response and effective drainage.

Method used

A multi-guarantee system including a water retaining sill, a drainage system in front of the sill, a water retaining device at the entrance of the cave, a drainage system in front of the cave and an intelligent early warning control system is designed. The water level sensing module and driving device are used to realize automatic control and multi-level water retaining measures. Combined with weather warning and automatic control, it ensures quick response and efficient drainage.

Benefits of technology

It achieves multiple guarantees during the construction of low-lying tunnel entrances, quickly responds to various emergencies, has a simple mechanical structure, low cost, and can be easily combined with multiple control methods to ensure construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877947U_ABST
    Figure CN221877947U_ABST
Patent Text Reader

Abstract

The utility model discloses a low-lying tunnel entrance construction period water retaining system with multiple guarantees, which comprises a water retaining ridge, a ridge front drainage system, a hole opening water retaining device, a hole front drainage system and an intelligent early warning control system, a multi-guarantee control system is constructed by manual control after weather early warning or automatic control in an intelligent control module mode and automatic control in a water level sensing module mode, and the driving device controls the baffle to be lowered at proper time, so that sudden rainstorm and flood at the entrance of the low-lying tunnel under various conditions can be effectively dealt with, and the service life of the low-lying tunnel is prolonged. The system is simple in structure, practical, reliable, efficient, high in intelligence and automation level and wide in application range and object.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel devices, in particular to a water retaining system for a low-lying tunnel entrance during construction with multiple safeguards. Background Art

[0002] Tunnels are a widely used underground project, and their construction and operation play an important role in improving the quality of urban environment, protecting the ecological environment, and utilizing water resources. Considering the operation needs, tunnels are generally designed to be along the slope, with high elevation of the tunnel entrance and low elevation of the exit. Due to the terrain conditions and the layout of the tunnel line, the tunnel entrance is sometimes arranged in a low-lying area, and the surrounding water may flow into the tunnel, posing a huge safety hazard to the construction personnel in the tunnel; in addition, the construction period of tunnels is generally long and will be constructed across the flood season. In recent years, extreme weather has become more frequent, and the safe construction of tunnels will face more severe challenges.

[0003] At present, the general consideration for water blocking at the entrance of low-lying tunnels is to place bagged soil around the tunnel entrance. When heavy rain occurs, personnel are arranged to use bagged soil to block the entrance, and at the same time notify the personnel in the tunnel to evacuate. This plan is relatively slow and cannot cope with short-term heavy rainfall.

[0004] In order to solve the problem of underground engineering flooding, for underground buildings such as basements, garages, and traffic tunnels, China Utility Model Patent CN204940211U discloses a top-down water-blocking door, and China Utility Model Patent CN 105756535 B discloses a top-down flood-proof water-blocking door with a double water-retaining plate structure. Both structures are composed of door frames, columns, and liftable water-retaining plates. Compared with CN204940211U, the liftable water-retaining plate of CN 105756535 B is adjusted to two pieces, which can be selected according to the water-retaining height. However, the transmission devices of the above two structures are relatively complex, mainly for permanent buildings, with relatively high costs, and difficult operation and maintenance, and cannot effectively deal with the temporary drainage problem during the construction period of the low-lying tunnel entrance. Utility Model Content

[0005] In view of the shortcomings of the prior art, the purpose of the utility model is to provide a low-lying tunnel entrance construction period water retaining system with multiple protections, which can provide a safer protection for the low-lying tunnel construction period. To this end, the utility model adopts the following technical solutions:

[0006] A water retaining system for the construction period of a low-lying tunnel entrance with multiple safeguards, characterized in that it comprises a water retaining sill, a drainage system in front of the sill, a water retaining device at the tunnel entrance, a drainage system in front of the tunnel, and an intelligent early warning control system; the drainage system in front of the sill, the water retaining sill, the drainage system in front of the tunnel, and the water retaining device at the tunnel entrance are arranged in sequence at the tunnel entrance, and the intelligent early warning control system controls the motors in the drainage system in front of the sill, the drainage system in front of the tunnel, and the water retaining device at the tunnel entrance; the intelligent early warning control system is provided with a water level sensing module;

[0007] The hole water retaining device is composed of a door slot, a baffle and a driving device; the baffle is composed of multiple stages.

[0008] In addition to the above-mentioned technical solutions, the present invention can also adopt the following further technical solutions, which can be used in combination:

[0009] The water retaining sill is composed of a front slope, a top and a rear slope; the front drainage system is located in front of the water retaining sill, and includes a first drainage ditch, a first sump, a first water pump and a drainage pipeline. The first sump is located at the foot of the slope at both ends of the front slope of the sill, and the first drainage ditch is distributed on both sides of the access road and is connected to the first sump; the first water pump pumps out the accumulated water in the sump through the drainage pipeline; the first water pump is connected to the intelligent early warning control system and is controlled by it.

[0010] The door groove includes sliding grooves arranged from top to bottom on both sides of the tunnel entrance, and a receiving groove arranged at the bottom, and the receiving groove is connected to the sliding groove; the length of the baffle is equivalent to the width of the tunnel entrance, and a docking groove is arranged at the upper end of the baffle, and a flange matching the docking groove is arranged at the lower end of the baffle. When multiple baffles are used in combination, the flange at the lower end of the upper baffle can fit tightly with the docking groove at the upper end of the lower baffle.

[0011] The driving device is composed of an external shell, a limit groove, a traction spring, a slide rail, a force transmission pulley group and a tension line; the external shell includes an assembly port, an openable assembly port cover, a lower release port and a reserved hole, the assembly port is arranged at the top of the external shell, and is used to sequentially install the baffle into the limit groove; the reserved hole is arranged at the bottom corner of the outer side of the external shell; the lower release port is located at the bottom of the external shell, the lower release port is slightly larger than the size of the baffle, the baffle can pass smoothly, and the lower release port is opposite to the door slot; one end of the traction spring is in contact with the The outer shell is connected to the outer shell, and the other end is connected to the limit slot, and the limit slot is pulled to slide along the slide rail laid at the bottom of the driving device; the limit slot is used to store the baffle, and is composed of a shell, a partition, a slot hole, and a baffle. The upper part of the limit slot shell is open, and a plurality of partitions are arranged in the limit slot shell to separate and store the baffles. The bottom of each partition forming a compartment is provided with the slot hole, and the size of the slot hole matches the size of the lower opening. The baffle is located at the lower part of the slot hole, and is connected to the shell at the side edge of the slot hole by a hinge, and the hinge is parallel to the tunnel opening. The slide rails are arranged in the width direction, and when the limiting groove moves along the slide rail and the slot hole is aligned with the lower release port, the baffle is flipped under the action of gravity, and the baffle falls from the lower release port; the slide rails are arranged at the bottom of the external shell, and multiple slide rails are evenly arranged along the width direction of the tunnel opening, including two end slide rails and a middle slide rail, the two end slide rails are arranged outside the slot hole position, and the two ends are connected to the side wall of the external shell; the middle slide rail is arranged at the lower part of the slot hole position, one end is connected to the outer side wall of the external shell, and the other end is to the edge of the lower release port; the force transmission The pulley block includes a traction pulley and a steering pulley, wherein the traction pulley is fixed at the middle of the outer shell and is located at the outside of the limit groove, and the steering pulley is composed of four fixed pulleys, which are arranged in groups of two and symmetrically on both sides, respectively located at the lower part of the traction pulley and the upper part of the reserved hole, one end of the tension line is connected to the outer side of the limit groove, and then is wound around the traction pulley, vertically extended downward, and is divided into two at the upper part of the steering pulley, respectively wound around the steering pulleys on both sides, passed through the reserved hole, and connected to the water level sensing module;

[0012] The water level sensing module is arranged on both sides in front of the tunnel entrance and below the driving device, and specifically includes a counterweight, a floating block, a tension spring and a fixed frame. The lower part of the tension spring is fixed on the counterweight, and the upper part is connected to the tension line. The counterweight relies on its own gravity to pull the tension line to pull the limit groove through the force transmission pulley group, so that the limit groove is in the initial position. The floating block is composed of multiple stages with the same number of stages as the baffle, and they are all fixed on the tension line at intervals. The height of each level of the floating block corresponds to the falling time of a baffle; the counterweight, the tension spring, and the floating block are all assembled in the fixed frame, and the floating block can move along the cavity of the fixed frame. The side of the fixed frame is provided with a grille hole to prevent interference and damage from foreign objects; the tension spring, the floating block, and the traction spring construct a force balance system through the tension line and the force transmission pulley group.

[0013] The water level sensing module adopts a tension sensor or a water level sensor, and drives the limit groove to move through the control system after sensing the water level.

[0014] The pre-tunnel drainage system is located in front of the tunnel entrance, and includes an intercepting ditch, a sump, a water pump group and a drainage pipe. The sump is arranged on both sides of the road in front of the tunnel entrance. The intercepting ditch is distributed on both sides of the road and in front of the tunnel entrance, and is connected to the sump. The water pump group is installed next to the sump. The drainage pipe is connected to the drainage pipe in the tunnel to form a drainage network. The top elevation of the sump and the intercepting ditch is consistent with the elevation of the road surface in front of the tunnel.

[0015] The intelligent early warning control system includes an automatic control system that can control the start and stop of each motor in the water retaining system. The automatic control system includes the water level sensing module. The automatic control system is connected to the motor through a control line. The intelligent early warning control system can also be provided with a meteorological early warning module to receive meteorological data and connect to the automatic control system. At the same time, the automatic control system can also be provided with an alarm located in the tunnel. After receiving heavy rain or flood information, it can promptly notify the construction personnel in the tunnel to evacuate and activate the water retaining system.

[0016] Compared with the prior art, the utility model has the following advantages and beneficial effects: 1) Using water retaining sill as the primary water retaining measure, manual control after meteorological warning or automatic control in intelligent control module mode as the secondary water retaining measure, automatic control in water level sensing module mode as the tertiary water retaining measure, with multiple safeguards, fast response, able to cope with various emergencies, practical, reliable and efficient; 2) The driving device composed of a counterweight block, a floating block, a tension spring and a fixed frame has a simple mechanical structure, is easy to assemble and disassemble, and has low cost, and is convenient to combine with a variety of control methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1It is a schematic diagram of the overall structure of the water retaining system of the low-lying tunnel entrance during the construction period of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the water retaining device of the entrance of a low-lying tunnel during the construction period of the water retaining system of the utility model;

[0019] Figure 3 This is a schematic diagram of the baffle structure of the utility model of the water retaining device for the opening;

[0020] Figure 4 A schematic diagram of the structure of the drive device of the utility model;

[0021] Figure 5 It is a top view of the driving device of the utility model;

[0022] Figure 6 It is a cross-sectional view of the partial structure of the driving device of the utility model;

[0023] Figure 7 This is a detailed structural diagram of the water level sensing module of the utility model;

[0024] Figure 8 It is a schematic diagram of the intelligent early warning control system of the utility model. Implementation

[0025] In order to enable those skilled in the art to better understand the technical solution of the utility model, the preferred implementation scheme of the utility model is described below in conjunction with specific embodiments. However, it should be understood that the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. The positional relationship described in the drawings is only used for illustrative purposes and cannot be understood as a limitation on this patent.

[0026] The following is combined with Figures 1 to 7 The specific embodiments are provided to further illustrate the present invention, but are not intended to limit the present invention. Example

[0027] like Figures 1 to 6As shown, the utility model is a water retaining system for the construction period of a low-lying tunnel entrance with multiple safeguards, which includes a water retaining sill 1, a drainage system in front of the sill 2, a water retaining device at the entrance of the tunnel 3, a drainage system in front of the tunnel 4 and an intelligent early warning control system 6. The drainage system in front of the sill 2, the water retaining sill 1, the drainage system in front of the tunnel 4, and the water retaining device at the entrance of the tunnel are arranged in sequence, and the drainage system in front of the sill 2, the drainage system in front of the tunnel 4 and the water retaining device at the entrance of the tunnel can all be controlled by the intelligent early warning control system 6. The intelligent early warning control system controls the drainage system in front of the sill, the drainage system in front of the tunnel and the water retaining device at the entrance of the tunnel; the intelligent early warning control system is provided with a water level sensing module 5.

[0028] Among them, the water retaining sill 1 is arranged in front of the tunnel entrance and can be made of materials such as concrete or rubber. As the first water retaining measure, it is specifically composed of a front slope 101, a top 102 and a rear slope 103. The slopes of the front slope 101 and the rear slope 103 are about 10%, which can meet the daily driving needs of vehicles; the height of the top 102 is determined by comprehensively considering the driving needs and the upstream water level; the front drainage system 2 is located in the front part 1 of the water retaining sill, specifically including a drainage ditch 201, a sump 202, a water pump 203 and a drainage pipeline 204. The sump 202 is located at the foot of the slope at both ends of the front slope 101, and the drainage ditches 201 are distributed on both sides of the access road and are connected to the sump 202; the water pump 203 is installed on the side of the sump 202, and the accumulated water in the sump 202 is pumped away through the drainage pipeline 204.

[0029] The tunnel entrance water retaining device 3 is arranged in combination with the tunnel entrance structure, and is composed of a door slot 301, a baffle 302, and a driving device 303; the door slot 301 is located on both sides and the bottom of the tunnel entrance, and the door slot 301 is provided with a slide slot 3011 from top to bottom on both sides of the tunnel entrance, and a receiving groove 3012 is provided at the bottom, and the receiving groove 3012 is connected to the slide slot 3011, and the groove width is slightly larger than the baffle 302, and the bottom of the receiving groove 3012 is thickened and anchored to the bottom plate of the tunnel entrance, and a rubber pad is provided in the receiving groove 3012 The baffle 302 is composed of multiple stages, the length of the baffle 302 is equivalent to the width of the tunnel entrance, a docking groove 3021 is set at the upper end of the baffle 302, and a flange 3022 matching the docking groove 3021 is set at the lower end of the baffle 302. When multiple baffles 302 are used in combination, the flange 3022 at the lower end of the upper baffle can be tightly fitted with the docking groove 3021 at the upper end of the lower baffle, and the flange 3022 at the lower end of the baffle and the docking groove 3021 at the upper end are also provided with rubber gaskets 3023 respectively.

[0030] The driving device 303 is composed of an external shell 3031, a baffle limiting groove 3032, a traction spring 3033, a slide rail 3034, a force transmission pulley block 3035 and a tension line 3036. The external shell 3031 includes an assembly port 30311, a cover plate 30312, a lowering port 30313 and a reserved hole 30314. The assembly port 30311 is arranged at the top of the external shell 3031, and is used to sequentially install each baffle 302 into the limiting groove 3032. The cover plate 30312 is connected to the assembly port 30311 by a hinge, and the assembly port 30311 can be completely covered; the reserved hole 30314 is arranged at the bottom corner of the outer side of the external shell 3031; the lowering port 30313 is located at the bottom of the external shell 3031, and the lowering port 30313 is slightly larger than the size (length and thickness) of the baffle 302. , the baffle 302 can pass smoothly, and the lower opening 30313 is directly opposite to the door slot 301; one end of the traction spring 3033 is connected to the external shell 3031 / fixed end, and the other end is connected to the limiting groove 3032, pulling the limiting groove 3032 to slide along the slide rail 3034 set at the bottom of the driving device 303, and the direction of the slide rail 3034 is perpendicular to the length direction of the external shell 3031; the limiting groove 3032 is used to store the baffle 302, which is composed of a shell 30321, a partition 30322, a slot 30323, and a baffle 30324. The shell 30321 is provided with a plurality of partitions 3032 2 is used to separate the baffle 302. Each partition 30322 forms a compartment with a slot hole 30323 at the bottom. The size of the slot hole 30323 is the same as that of the lower opening 30313. The baffle 30324 is located at the lower part of the slot hole 30323 and is connected to the slot hole side edge shell 30321 through a hinge 303241. The hinge 303241 is arranged parallel to the width direction of the tunnel entrance. When the limit slot 3032 moves along the slide rail 3034 and the slot hole 30323 is aligned with the lower opening 30313, the baffle 30324 flips under the action of gravity. After the baffle 302 falls from the lower opening 30313, the baffle 30 2, the two sides of the door slot 301 are clamped into the slide groove 3011 of the door slot 301, and fall into the receiving groove 3012 at the bottom of the door slot 301 along the slide groove 3011; the slide rails 3034 are arranged at the bottom of the external shell 3031, and multiple slide rails are evenly arranged along the width direction of the tunnel entrance, including two end slide rails 30341 and a middle slide rail 30342, the two end slide rails 30341 are arranged outside the slot hole 30323, and the two ends are connected to the side wall of the external shell 3031; the middle slide rail 30342 is arranged at the lower part of the slot hole 30323, one end is connected to the outer side wall of the external shell 3031, and the other end reaches the edge of the lower release opening 30313;The force transmission pulley group 3035 includes a traction pulley 30351 and a steering pulley 30352. The traction pulley 30351 is fixed in the middle of the outer shell 3031 and is located outside the limit groove 3032. The steering pulley 30352 is composed of four fixed pulleys, two fixed pulleys in a group, symmetrically arranged on both sides, respectively located at the lower part of the traction pulley 30351 and the upper part of the reserved hole 30314. One end of the tension line 3036 is connected to the outer side of the limit groove 3032, then wound on the traction pulley 30351, vertically extended downward, and divided into two at the upper part of the steering pulley 30352, respectively wound around the steering pulleys 30352 on both sides, passed through the reserved hole 30314, and connected to the water level sensing module 5. The traction spring 3033 is arranged on the opposite side of the tension line 3036, as a traction limit groove 3032 to the slot hole 30323 aligned with the release 30313. ;

[0031] The water level sensing module 5 is arranged on both sides in front of the tunnel entrance, below the driving device 303, and specifically includes a counterweight 501, a floating block 502, a tension spring 503 and a fixed frame 504. The lower part of the tension spring 503 is fixed on the counterweight 501, and the upper part is connected to the tension line 3036. The counterweight 501 relies on its own gravity to pull the tension line 3036 to pull the limit groove 3032 through the force transmission pulley group 3035, so that the limit groove 3032 is in the initial position. The floating block 502 is composed of multiple stages, all of which are fixed on the tension line 3036, specifically composed of a first-level floating block 5021, a second-level floating block 5022, and a third-level floating block 5023. The first-level floating block 5021 is arranged slightly below the ground, the second-level floating block 5022 is arranged slightly below the top of the bottom baffle 302, and the third-level floating block 5023 is arranged slightly below the top of the second baffle 302. The counterweight block 501, the tension spring 503, and the floating block 502 are all assembled in the fixed frame 504. The floating block 502 can move along the cavity of the fixed frame 504. The fixed frame 504 has grille holes on the side to prevent foreign interference and damage. The tension spring 503, the floating block 502, and the traction spring 3033 form a force balance system through the tension line 3036 and the force transmission pulley group 3035.

[0032] The drainage system 4 in front of the tunnel is located in front of the tunnel entrance, including a water intercepting ditch 401, a water collection tank 402, a water pump group 403 and a drainage pipe 404. The water collection tank 402 is arranged on both sides of the road in front of the tunnel entrance. The water intercepting ditch 401 is distributed on both sides of the road and in front of the tunnel entrance, and is connected to the water collection tank 402. The water pump group 403 is installed next to the water collection tank 402. The drainage pipe 404 is connected to the drainage pipe in the tunnel to form a drainage network. The top elevation of the water collection tank 402 and the water intercepting ditch 401 is consistent with the elevation of the road surface in front of the tunnel. The fixed frame 504 of the water level sensing module 5 is arranged on the inner side of the water collection tank 402, and the top elevation of the first-level floating block 5021 is slightly lower than the top elevation of the water collection tank 402.

[0033] The intelligent early warning control system 6 includes an automatic control system that can control the start and stop of each motor in the water retaining system. The automatic control system includes the water level sensing module 5. The automatic control system is connected to the motor through a control line. The intelligent early warning control system 6 can also be provided with a meteorological early warning module to receive meteorological data and connect to the automatic control system. At the same time, the automatic control system can also be provided with an alarm located in the tunnel. The intelligent early warning control system 6 can also be provided with a manual module to manually control the motor. The floating block 502 can also be directly lifted manually to make the baffle 302 fall to block the water (so that the traction spring 3033 pulls the limit groove 3032 to the slot hole 30323 to align with the release 30313). The tension line 3036 is wrapped around the motor stirring wheel. The motor can drive the stirring wheel to wrap the tension line 3036 to lift the floating block 502, so that the baffle 302 falls to block the water. The meteorological warning module establishes an information connection with the local meteorological department. After receiving the information of heavy rain or flood, it promptly notifies the construction personnel in the cave to evacuate and activate the water retaining system, or in the control mode of the intelligent control module, starts the motor through the control line to make the baffle 302 fall to retain water. The water level sensing module control mode is a bottom-line solution to deal with sudden heavy rain or flood when there is no meteorological warning.

[0034] Based on the above tunnel inlet water retaining system, the following operations are performed:

[0035] When water comes from upstream, it will first be blocked by the water retaining sill 1, and the water will flow into the drainage ditches 201 and the sump 202 on both sides. If the terrain in front of the water retaining sill 1 is relatively flat, the water flow can be accumulated in front of the sill when it is small. After the upstream water level drops, the accumulated water will flow out by itself or be pumped away by the installed water pump 203; when the incoming water is large, it will go over the water retaining sill 1 and enter the area in front of the tunnel entrance. The water will first flow into the intercepting ditch 401 and the sump 402. When the intercepting ditch 401 and the sump 402 are about to be full, the first-level floating block 5021 is acted upon by the buoyancy and transmits force through the tension line 3036, pulling the tension spring 503 at the bottom. According to Hooke's law, the tension spring 503 is stretched a corresponding distance according to the size of the buoyancy, and the first-level floating block 5021 floats up and passes through the tension line 3036. 036 and the force transmission pulley group 3035 restore the balance, the traction spring 3033 rebounds and pulls the limit slot 3032 to move along the slide rail 3034, when the slot hole 30323 is aligned with the lower release port 30313, the baffle 30324 flips over under the action of gravity, and after the baffle 302 falls from the lower release port 30313, the two sides of the baffle 302 are stuck in the slide slot 3011 of the door slot 301, and fall into the receiving groove 3012 at the bottom of the door slot 301 along the slide slot 3011; as the water level in front of the tunnel continues to rise, the secondary floating block 5022 and the tertiary floating block 5023 are floated up in turn, driving the secondary baffle 5022 and the tertiary baffle 5023 to fall, the multi-stage baffles 502 are combined together to block water, and the water pump group 403 synchronously pumps water out.

[0036] When there is a weather warning, after receiving the information of heavy rain or flood, the on-site personnel will promptly notify the construction personnel in the cave to evacuate and activate the manual control, and directly lift the floating block 502 manually to make the baffle 302 fall to block the water; or in the control mode of the intelligent control module, the floating block 502 is lifted by the motor stirring wheel to stir the winding tension line 3036 to make the baffle 302 fall to block the water. When there is no warning, the water level sensing module control mode is used as a backup plan to deal with sudden heavy rain or flood situations when there is no weather warning.

[0037] The baffle 302 can be reset by opening the cover 30312, manually lifting the baffle 302 through the lower opening 30313, taking out the assembly opening 30311 from the front cavity of the limiting groove, and then putting it back into the limiting groove 3032. Example

[0038] Compared with Example 1, the difference of this embodiment is that the water level sensing module 5 can be replaced by a tension sensor or a water level sensor. After sensing the water level, the motor is controlled by an automatic control system, and the limit groove 3032 is driven to move by the operation of the motor.

[0039] According to the description and drawings of the utility model, those skilled in the art can easily manufacture or use the utility model, which is a low-lying tunnel entrance construction period water retaining system with multiple protections, and can produce the positive effects recorded in the utility model.

[0040] Unless otherwise specified, in the present invention, if there are terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicating orientation or positional relationship, they are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the orientation or positional relationship in the present invention are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood in combination with the drawings and according to specific circumstances. In addition, the terms "first", "second", "third", "fourth", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0041] Unless otherwise specified and limited, in the present invention, the terms "disposed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent changes made to the above embodiments based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A low-lying tunnel entrance construction period water retaining system with multiple safeguards, characterized by It includes a water retaining sill, a drainage system in front of the sill, a water retaining device at the entrance of the cave, a drainage system in front of the cave, and an intelligent early warning control system; the drainage system in front of the sill, the water retaining sill, the drainage system in front of the cave, and the water retaining device at the entrance of the cave are arranged in sequence at the entrance of the tunnel, and the intelligent early warning control system controls the motors in the drainage system in front of the sill, the drainage system in front of the cave, and the water retaining device at the entrance of the cave; the intelligent early warning control system is provided with a water level sensing module; The hole water retaining device is composed of a door slot, a baffle and a driving device; the baffle is composed of multiple stages.

2. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 1, characterized in that: The water retaining sill is composed of a front slope, a top and a rear slope; the front drainage system is located in front of the water retaining sill, and includes a first drainage ditch, a first sump, a first water pump and a drainage pipeline. The first sump is located at the foot of the slope at both ends of the front slope of the sill, and the first drainage ditch is distributed on both sides of the access road and is connected to the first sump; the first water pump pumps out the accumulated water in the sump through the drainage pipeline; the first water pump is connected to the intelligent early warning control system and is controlled by it.

3. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 1, characterized in that: The door groove includes sliding grooves arranged from top to bottom on both sides of the tunnel entrance, and a receiving groove arranged at the bottom, and the receiving groove is connected to the sliding groove; the length of the baffle is equivalent to the width of the tunnel entrance, and a docking groove is arranged at the upper end of the baffle, and a flange matching the docking groove is arranged at the lower end of the baffle. When multiple baffles are used in combination, the flange at the lower end of the upper baffle can fit tightly with the docking groove at the upper end of the lower baffle.

4. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 1, characterized in that: The driving device is composed of an external shell, a limit groove, a traction spring, a slide rail, a force transmission pulley group and a tension line; the external shell includes an assembly port, an openable assembly port cover, a lower release port and a reserved hole, the assembly port is arranged at the top of the external shell, and is used to sequentially install the baffle into the limit groove; the reserved hole is arranged at the bottom corner of the outer side of the external shell; the lower release port is located at the bottom of the external shell, the lower release port is slightly larger than the size of the baffle, the baffle can pass smoothly, and the lower release port is opposite to the door slot; one end of the traction spring is in contact with the The outer shell is connected to the outer shell, and the other end is connected to the limit slot, and the limit slot is pulled to slide along the slide rail laid at the bottom of the driving device; the limit slot is used to store the baffle, and is composed of a shell, a partition, a slot hole, and a baffle. The upper part of the limit slot shell is open, and a plurality of partitions are arranged in the limit slot shell to separate and store the baffles. The bottom of each partition forming a compartment is provided with the slot hole, and the size of the slot hole matches the size of the lower opening. The baffle is located at the lower part of the slot hole, and is connected to the shell at the side edge of the slot hole by a hinge, and the hinge is parallel to the tunnel opening. The slide rails are arranged in the width direction, and when the limiting groove moves along the slide rail and the slot hole is aligned with the lower release port, the baffle is flipped under the action of gravity, and the baffle falls from the lower release port; the slide rails are arranged at the bottom of the external shell, and multiple slide rails are evenly arranged along the width direction of the tunnel opening, including two end slide rails and a middle slide rail, the two end slide rails are arranged outside the slot hole position, and the two ends are connected to the side wall of the external shell; the middle slide rail is arranged at the lower part of the slot hole position, one end is connected to the outer side wall of the external shell, and the other end is to the edge of the lower release port; the force transmission The pulley block includes a traction pulley and a steering pulley, the traction pulley is fixed at the middle of the external shell and is located at the outside of the limit groove, the steering pulley is composed of four fixed pulleys, the fixed pulleys are grouped in two and symmetrically arranged on both sides, respectively located at the lower part of the traction pulley and the upper part of the reserved hole, one end of the tension line is connected to the outer side of the limit groove, then wound around the traction pulley, vertically extended downward, and divided into two at the upper part of the steering pulley, respectively wound around the steering pulleys on both sides, passed through the reserved hole, and connected to the water level sensing module.

5. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 4, characterized in that: The water level sensing module is arranged on both sides in front of the tunnel entrance and below the driving device, and specifically includes a counterweight, a floating block, a tension spring and a fixed frame. The lower part of the tension spring is fixed on the counterweight, and the upper part is connected to the tension line. The counterweight relies on its own gravity to pull the tension line to pull the limit groove through the force transmission pulley group, so that the limit groove is in the initial position. The floating block is composed of multiple stages with the same number of stages as the baffle, and they are all fixed on the tension line at intervals. The height of each level of the floating block corresponds to the falling time of a baffle; the counterweight, the tension spring, and the floating block are all assembled in the fixed frame, and the floating block can move along the cavity of the fixed frame. The side of the fixed frame is provided with a grille hole to prevent interference and damage from foreign objects; the tension spring, the floating block, and the traction spring construct a force balance system through the tension line and the force transmission pulley group.

6. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 4, characterized in that: The water level sensing module adopts a tension sensor or a water level sensor, and drives the limit groove to move through the control system after sensing the water level.

7. A low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 1, characterized in that: The pre-tunnel drainage system is located in front of the tunnel entrance, and includes an intercepting ditch, a sump, a water pump group and a drainage pipe. The sump is arranged on both sides of the road in front of the tunnel entrance. The intercepting ditch is distributed on both sides of the road and in front of the tunnel entrance, and is connected to the sump. The water pump group is installed next to the sump. The drainage pipe is connected to the drainage pipe in the tunnel to form a drainage network. The top elevation of the sump and the intercepting ditch is consistent with the elevation of the road surface in front of the tunnel.

8. The low-lying tunnel entrance construction period water retaining system with multiple safeguards according to claim 1 is characterized by: The intelligent early warning control system includes an automatic control system that can control the start and stop of each motor in the water retaining system. The automatic control system includes the water level sensing module. The automatic control system is connected to the motor through a control line. The intelligent early warning control system can also be provided with a meteorological early warning module to receive meteorological data and connect to the automatic control system. At the same time, the automatic control system can also be provided with an alarm located in the tunnel. After receiving heavy rain or flood information, it can promptly notify the construction personnel in the tunnel to evacuate and activate the water retaining system.