Foundation optimization structure of sluice ladder stand

By prefabricating the arm on the outer side of the sluice pier as the basic structure of the sluice ladder, it solves the problems of high investment, construction difficulty and uneven settlement caused by independent pile foundations in the existing technology, achieves structural integrity and settlement control, and reduces Investment and construction difficulty.

CN221877995UActive Publication Date: 2024-10-22NORTHWEST A & F UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420613893.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-10-22
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

The existing sluice ladder's basic structure requires high investment and difficult construction due to its independent pile foundation, and is prone to uneven settlement, affecting the connection between the steel ladder and the hoisting machine room.

Method used

The prefabricated arms on the outside of the sluice gate pier serve as the bottom support structure of the center column steel spiral staircase. An integrated structure is formed through concrete pouring. The embedded steel plate and rubber buffer layer are used to increase the fixing force, and fixing bolts are used to fix the center column. Cancel the The independent pile foundation adopts the same structure as the gate pier.

Benefits of technology

It simplifies the construction process, reduces investment, controls settlement unevenness, improves structural integrity and adaptability, and reduces the difficulty of later maintenance and management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877995U_ABST
    Figure CN221877995U_ABST
Patent Text Reader

Abstract

The utility model discloses a foundation optimization structure of a sluice ladder stand, a support arm is prefabricated on the outer side of a sluice pier on one side edge of the outer side of a sluice, the support arm is used as a bottom support structure of the sluice ladder stand in the shape of a center pillar type steel spiral trapezoid, and the top surface of the support arm is flush with the bottom surface of the sluice pier. According to the foundation optimization structure of the water gate crawling ladder, the relative position relation of the water gate and the steel crawling ladder is utilized, the lower foundation of the steel crawling ladder is researched, the novel foundation optimization structure of the water gate crawling ladder is provided, structural safety of the crawling ladder is guaranteed, sedimentation is well controlled, investment can be saved, and construction difficulty is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation structures of water gate ladders, in particular to a foundation optimization structure of water gate ladders. Background Art

[0002] The sluice gate is a common hydraulic structure in water conservancy projects. It is generally a reinforced concrete structure with a lock chamber and gate at the bottom and a frame bridge and hoisting and closing machine room at the top. The gate opening and closing equipment is in the hoisting and closing machine room at the top. The hoisting and closing machine room is located on the frame bridge. The height of the frame bridge is determined according to the height of the gate and is generally more than 3m. The operator must climb the ladder to the hoisting and closing machine room to open and close the gate. The ladder is mostly a steel ladder, which is close to the gate pier. Its lower foundation is determined according to the height of the steel ladder and the lower soil. The foundation of the sluice ladder is generally a concrete base. Since most of the bases are located on the backfill soil of the sluice gate, some projects use pile foundations under the ladder foundation to reduce the settlement difference between the ladder and the upper structure of the sluice gate, which has achieved good results, but increased investment and construction difficulty.

[0003] As for the ladder of the hoisting and closing machine room at the top of the sluice, the existing conventional scheme is to use the ordinary steel ladder and steel spiral ladder recommended in the "Steel Ladder" atlas. If the sluice gate 500 is relatively large, and the frame bridge 200 supported by a plurality of separated racks 300 at the bottom of the hoisting and closing machine room 100 is relatively high, in order to make the layout compact, a center column type steel spiral ladder is often selected as the sluice ladder 600, which is connected to the center column 700. The diameter of the spiral ladder is approximately within 2m. In order to reduce settlement, especially the settlement difference with the hoisting and closing machine room 100 at the top of the sluice, the lower foundation is mostly an independent pile foundation 800. The specific structure diagram is as follows Figure 1 shown.

[0004] Since this foundation scheme is an independent pile foundation, the project investment is large, and the distance to the pier 400 of the sluice gate 500 is close, which makes construction difficult. At the same time, since the settlement of the pile and the sluice gate cannot be kept completely consistent, uneven settlement is prone to occur, resulting in problems in the connection between the steel ladder and the upper opening and closing machine room. Utility Model Content

[0005] The utility model aims to overcome the deficiencies and defects of the prior art and to provide a foundation optimization structure for a sluice ladder.

[0006] A foundation optimization structure for a sluice ladder, wherein a support arm is prefabricated on the outside of a gate pier on one side of the outside of the sluice as the bottom support structure of the sluice ladder in the shape of a central column steel spiral ladder, and the top surface of the support arm is flush with the bottom surface of the gate pier.

[0007] Wherein, the support arm and the gate pier are an integrated structure, which are formed into one piece by pouring concrete.

[0008] Wherein, the support arm is a right-angled trapezoidal structure, the bottom of which is an inclined waist of a right-angled trapezoid, and the lower bottom is connected to the gate pier.

[0009] Wherein, the middle column of the sluice ladder is fixed by fixing bolts vertically embedded in the second phase concrete of the support arm.

[0010] Wherein, a groove for pouring is reserved at the fixing position of the middle column of the support arm, and the second-phase concrete is poured in the groove.

[0011] Among them, a pre-buried steel plate and a rubber buffer layer are arranged in sequence from top to bottom under the top of the second-phase concrete, and the steel plate base of the central column is arranged on the top of the rubber buffer layer.

[0012] The steel bars at the bottom of the embedded steel plate are welded to the embedded steel bar members embedded in the grooves of the support arms, and the bottom of the embedded steel bar members is provided with hooks to enhance the fixing force between the embedded steel bar members and the support arms.

[0013] There are four fixing bolts arranged in a rectangular shape and locked by nuts at the top. A hook is prefabricated at the bottom of the bolt and embedded in the groove of the support arm to enhance the fixing force between the bolt and the support arm.

[0014] Wherein, the groove used for casting is a rectangular groove.

[0015] The utility model utilizes the relative position relationship between the sluice and the steel ladder, studies the lower foundation of the steel ladder, and proposes a new foundation optimization structure of the sluice ladder of the present application, which ensures the structural safety of the ladder, controls the settlement, saves investment, and reduces the difficulty of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the basic structure of a sluice ladder in the prior art.

[0017] Figure 2 It is a schematic diagram of the foundation optimization structure of the sluice ladder of the utility model.

[0018] Figure 3 for Figure 2 It is a local enlarged schematic diagram.

[0019] Figure 4 The figure is a side view schematic diagram of the connection between the center column and the support arm of the sluice ladder.

[0020] Figure 5 Another side view of the connection between the center column and the support arm of the sluice ladder.

[0021] Figure 6 It is a top view schematic diagram of the connection between the center column and the support arm of the sluice ladder. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0023] The foundation optimization structure of the sluice ladder in the embodiment of the utility model fully considers the structural characteristics of the center column type steel spiral ladder, cancels the independent pile foundation under the center column of the steel spiral ladder, adopts the foundation type with the same structure as the pier of the sluice, and extends the support arm outside the pier to support the steel ladder.

[0024] like Figures 2 to 6 As shown, the foundation optimization structure of the sluice ladder of the embodiment of the utility model is that a support arm 900 is prefabricated on the outer side of the pier 400 on the side of the sluice as the bottom support structure of the sluice ladder 600 in the shape of a central column type steel spiral ladder.

[0025] The support arm 900 and the gate pier 400 in the above embodiment are an integrated structure, which is formed into one piece by concrete pouring.

[0026] In a preferred embodiment, the support arm 900 is a right-angled trapezoidal structure, the bottom of which is an inclined waist of a right-angled trapezoid, and the lower bottom is connected to the gate pier.

[0027] As a preferred embodiment, the gate pier 400 is 1800 mm away from the free end of the support arm (i.e., the upper base of the right-angled trapezoid is the distance b1), and the distance between the center of the middle column 700 of the middle column type steel spiral ladder-shaped water gate ladder 600 and the gate pier is b.

[0028] As a preferred embodiment, the height of the free end of the support arm 900 is 500 mm (ie, the size a of the upper base of the right-angled trapezoid), and the size of the lower base where the support arm 900 is connected to the gate pier 400 is 900 mm.

[0029] In one embodiment, the distance c between the sluice ladder 600 and the nearest rack 300 meets the requirements and is consistent with the prior art, and the diameter D of the sluice ladder is consistent with the sluice ladder in the prior art and remains unchanged. The top of the rack 300 supports the frame bridge 200 to support the opening and closing machine room 100.

[0030] When the structure of the support arm 900 is used to support the central column 700, the fixing structure is preferably bolted, and the fixing is achieved by the fixing bolts 10 vertically extending into the dry second-phase concrete of the support arm.

[0031] In an optional embodiment, a groove is formed at the fixed position of the middle column of the support arm 900, and the second-phase concrete 30 is poured in the groove. An embedded steel plate 10 (preferably 10 mm thick) and a rubber buffer layer 50 (preferably 20 mm thick) are arranged in sequence from top to bottom under the top of the second-phase concrete 30, and a steel plate base 60 (preferably 10 mm thick) of the middle column is arranged on the top of the rubber buffer layer.

[0032] The bolts 10 are multiple, preferably 4, arranged in a rectangular shape, with the embedded steel plate buried in the concrete, and the upper part passes through the embedded steel plate 40, the rubber buffer layer 50 and the steel plate base 60, and is locked by a nut at the top. The bottom of the bolt 10 is prefabricated with a hook to enhance its fixing force with the support arm.

[0033] The steel bar 70 at the bottom of the embedded steel plate 40 is welded to the embedded steel bar member 20 , and a hook is provided at the bottom of the embedded steel bar member to enhance the fixing force between the embedded steel bar member and the support arm.

[0034] The specific processing steps of the optimized structure of the sluice ladder foundation proposed by the utility model are as follows:

[0035] 1) Determine the height h and size D of the steel ladder 600 of the hoisting and closing machine room 100 according to the height of the frame bridge 200 of the sluice, and clarify the distance b between the center of the steel ladder and the gate pier on the side of the gate chamber.

[0036] 2) The distance b1 of the extension of the support arm 900 is determined according to the distance b between the center line of the steel ladder (sluice ladder 600) and the gate pier 400 at the side of the gate chamber.

[0037] 3) Calculate the weight of the steel ladder based on its size. First, check the overall stability of the gate chamber. Then determine the end size a and root size a1 of the gate pier arm through structural calculations, and calculate the reinforcement.

[0038] 4) The main connecting part of the arm structure of the gate pier on the side of the gate chamber is cast and constructed at the same time as the sluice gate. Since the processing and installation of the steel ladder is often carried out in the later stage, in order to ensure the accuracy of the construction, the second phase concrete 30 and embedded parts (including embedded steel bars 20 and embedded bolts 10) and other equipment are reserved.

[0039] 5) After the steel ladder of the sluice is processed, the embedded parts of the basic equipment (including the embedded steel plate 40 and the steel bar 70 welded at the bottom) are installed in place, the steel bar 70 is welded to the embedded steel bar 20, and then the second-phase concrete 30 is poured. After the second-phase concrete 30 is poured to reach the strength, it is used as the foundation of the steel ladder, and the upper facilities are installed on it. At the same time, a rubber pad is set between the base and the embedded steel plate 40 as a rubber buffer layer 50 to reduce the impact on the base.

[0040] Compared with the conventional foundation scheme, the scheme of the ladder foundation optimization structure of the utility model has the following advantages:

[0041] 1) The technology is feasible and easy to construct.

[0042] The use of a type of support arm set on the side pier of the gate chamber allows for casting and construction to be carried out simultaneously with the gate body, simplifying the construction process, avoiding the secondary construction of the original pile foundation, and reducing the impact on the gate body.

[0043] 2) The structure has strong integrity and good settlement control effect.

[0044] Since the foundation of the ladder is an arm extending from the side pier of the sluice, it not only plays a good supporting role, but also forms an integral structure between the ladder and the lock chamber, avoiding the uneven settlement problem caused by the separate structure and greatly facilitating subsequent maintenance and management.

[0045] 3) Strong adaptability and economical investment.

[0046] The ladder foundation of the present application can well adapt to different geological conditions and structural types of sluice gates, and has strong adaptability. At the same time, since only part of the arm concrete engineering volume is increased, it greatly saves investment compared with traditional pile foundations.

[0047] The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the utility model.

[0048] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. The foundation optimization structure of the sluice ladder is characterized by: A support arm is prefabricated on the outside of a gate pier on one side of the outside of the water gate, serving as a bottom supporting structure of a water gate ladder in the shape of a center column steel spiral ladder, and the top surface of the support arm is flush with the bottom surface of the gate pier.

2. The foundation optimization structure of the sluice ladder according to claim 1 is characterized in that: The support arm and the gate pier are an integrated structure, and are formed as a whole by pouring concrete.

3. The foundation optimization structure of the sluice ladder according to claim 1 is characterized in that: The support arm is a right-angled trapezoidal structure, the bottom of which is an inclined waist of a right-angled trapezoid, and the lower bottom is connected to the gate pier.

4. The foundation optimization structure of the sluice ladder according to claim 1 is characterized in that: The middle column of the sluice ladder is fixed by fixing bolts vertically embedded in the second-phase concrete of the support arm.

5. The foundation optimization structure of the sluice ladder according to claim 4 is characterized in that: A groove for pouring is reserved at the fixing position of the middle column of the support arm, and the second-phase concrete is poured in the groove.

6. The foundation optimization structure of the sluice ladder according to claim 5 is characterized in that: An embedded steel plate and a rubber buffer layer are arranged in sequence from top to bottom under the top of the second-phase concrete, and a steel plate base of the central column is arranged on top of the rubber buffer layer.

7. The foundation optimization structure of the sluice ladder according to claim 6 is characterized in that: The steel bars at the bottom of the embedded steel plate are welded to the embedded steel bar pieces embedded in the grooves of the support arms, and the bottom of the embedded steel bar pieces is provided with hooks to enhance the fixing force between the embedded steel bar pieces and the support arms.

8. The foundation optimization structure of the sluice ladder according to claim 4 is characterized in that: There are four fixing bolts arranged in a rectangular shape and locked by nuts at the top. The bottom of the bolts is prefabricated with hooks, which are embedded in the grooves of the support arms to enhance the fixing force between the bolts and the support arms.

9. The foundation optimization structure of the sluice ladder according to claim 5 is characterized in that: The groove for casting is a rectangular groove.