Embedded foundation bolt assembly of steel structure factory building

By introducing a conical seat and an adjusting strut mechanism into the anchor bolt assembly, the problem of cumbersome nut removal during the existing anchor bolt size fixing and pre-embedding process is solved, and the rapid fixation and versatility of the anchor bolts are achieved. Improved fixation firmness and scope of application.

CN221878382UInactive Publication Date: 2024-10-22HANDAN URBAN DEV INVESTMENT GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420969841.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing anchor bolts have fixed dimensions and a single application range. The fixing and disassembly of nuts during the pre-embedded pouring process is cumbersome and requires many operating steps.

Method used

An anchor bolt assembly including a conical seat and an adjusting strut mechanism is designed. The conical seat and hexagonal nut slot are used to quickly fix the anchor bolts. The bolt length and contact area are adjusted by adjusting the strut mechanism to adapt to different foundation types. .

Benefits of technology

The quick fixing and multifunctionality of anchor bolts are achieved, the operating steps are reduced, and the fixing firmness and scope of application are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878382U_ABST
    Figure CN221878382U_ABST
Patent Text Reader

Abstract

The utility model discloses an embedded foundation bolt assembly of a steel structure factory building, which comprises a base plate embedded on the upper surface of a concrete foundation, and further comprises conical seats uniformly embedded on the lower surface of the base plate; the foundation screw rod penetrates through the foundation bolt hole in a sliding manner; and the support rod adjusting mechanism is positioned below the foundation screw rod. According to the utility model, the conical seat is arranged, so that the foundation bolt can be quickly fixed by utilizing the locking of the upper nut and the lower nut, the disassembly of the nuts is avoided, the operation steps are reduced, and the foundation bolt is more convenient and quicker to cast; according to the foundation bolt formed by splicing the foundation screw rod and the supporting rod adjusting mechanism, on one hand, the length of the foundation bolt can be adjusted through the supporting rod adjusting mechanism, the application range of the foundation bolt can be widened, the foundation bolt can meet more use requirements, and on the other hand, the contact area between the foundation bolt and concrete can be increased through the supporting rod adjusting mechanism; and the foundation bolt is fixed more firmly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of steel structure related equipment, in particular to a pre-buried anchor bolt assembly of a steel structure workshop. Background Art

[0002] Most steel structure workshops are composed of connecting steel, welding it to form a steel frame, and covering its surface to form a steel structure workshop. When constructing a steel structure workshop, the connecting steel columns are fixed to the surface of the foundation and fixed with nuts. The foundation is mostly a concrete structure. When the concrete structure is poured, the anchor bolts need to be embedded in the cast body.

[0003] However, the existing anchor bolts are mostly of fixed length, which results in a relatively single application range. Secondly, when the anchor bolts are embedded and cast, nuts are mostly used to fix them on the pads. After casting, the pads are disassembled, and the operation process is relatively cumbersome. Utility Model Content

[0004] In order to solve the problems raised in the above background technology, the utility model provides a pre-buried anchor bolt assembly for a steel structure factory building.

[0005] To achieve the above-mentioned purpose, the technical solution of the utility model is a pre-buried anchor bolt assembly for a steel structure workshop, comprising a base plate, which is embedded on the upper surface of a concrete foundation, and also comprising:

[0006] The conical seat is evenly embedded on the lower surface of the base plate, and the upper surface is flush with the upper surface of the base plate. The lower surface is provided with a hexagonal nut groove, the center of the upper surface of the hexagonal nut groove is provided with an anchor bolt hole, and the upper surface is provided with a fastening groove, which is connected with the anchor bolt hole;

[0007] The anchor screw rod is slid through the anchor bolt hole, and a lower nut is installed on it. The lower nut is movably embedded in the hexagonal nut groove, and an upper nut is installed on it. The upper nut is located in the fastening groove;

[0008] The adjustment support rod mechanism is located below the anchor bolt and includes:

[0009] A connecting short rod is located at the lower end of the anchor screw, a fixing stud is arranged at the upper end thereof, the fixing stud is threadedly installed in the threaded hole at the lower end of the anchor screw, and fixing pins are arranged on both sides of the lower end thereof;

[0010] The upper connecting rod is movably mounted on the fixed pins connecting the two sides of the short rod, and the number of the upper connecting rod is two and they are in sliding contact;

[0011] A lower connecting rod is located at the lower end of the two upper connecting rods, and there are two of them, one of which is located on the outside of the upper connecting rods, and the other is located on the inside of the upper connecting rods, and is connected to the two upper connecting rods by locking bolts and locking nuts;

[0012] The lower pin shaft is located below the two lower connecting rods and is movably connected with the two lower connecting rods.

[0013] As a pre-buried anchor bolt assembly of a steel structure factory building of the utility model, the shaft diameter of the connection between the lower pin shaft and the lower connecting rod is smaller than the shaft diameter of the lower pin shaft.

[0014] As a pre-buried anchor bolt assembly of a steel structure factory building of the utility model, the locking bolt structure is the same as the lower pin shaft structure.

[0015] As a pre-buried anchor bolt assembly of a steel structure factory building of the utility model, the angle between the adjusting support rod mechanism and the central axis of the base plate is 45°.

[0016] As a pre-buried anchor bolt assembly of a steel structure factory building of the utility model, the locking nut is a butterfly nut, and the upper connecting rod and the lower connecting rod are fixed by the locking force of the locking bolt.

[0017] As a pre-buried anchor bolt assembly of a steel structure factory building of the utility model, a reinforcing plate is arranged between the conical seats, and the reinforcing plate is fixedly connected to the base plate.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] 1. By setting the conical seat, the anchor bolts can be quickly fixed by locking the upper and lower nuts, avoiding the disassembly of the nuts, reducing the operation steps, and making the casting of the anchor bolts more convenient and quick.

[0020] 2. The anchor bolts made of anchor screws and adjusting strut mechanisms can, on the one hand, be used to adjust the length of the anchor bolts, thereby increasing the application range of the anchor bolts and meeting more usage requirements; on the other hand, the adjusting strut mechanism can be used to increase the contact area with the concrete, making the anchor bolts more firmly fixed.

[0021] 3. By using the anchor bolts composed of the anchor screw and the adjusting strut mechanism, the application range of the device can be improved by replacing the anchor screws of different sizes, so that the device can be embedded in various types of foundations. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of a pre-buried anchor bolt assembly of a steel structure factory building described in the utility model;

[0023] Figure 2 The utility model Figure 1 Bottom view of

[0024] Figure 3 It is a side view of the adjusting support rod mechanism of the utility model;

[0025] In the figure:

[0026] 1. Base plate; 2. Conical seat; 21. Hexagonal nut groove; 22. Anchor bolt hole; 23. Fastening groove; 24. Reinforcement plate; 3. Anchor screw; 31. Lower nut; 32. Upper nut; 4. Adjustment strut mechanism; 41. Connecting short rod; 411. Fixing pin; 42. Upper connecting rod; 43. Lower connecting rod; 431. Locking bolt; 432. Locking nut; 44. Lower pin shaft. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] The utility model provides a technical solution, such as Figure 1-Figure 3 As shown; a pre-buried anchor bolt assembly for a steel structure factory building, including a base plate 1, which is embedded on the upper surface of a concrete foundation, and also includes: a conical seat 2, which is evenly embedded on the lower surface of the base plate 1, and the upper surface is flush with the upper surface of the base plate 1, and the lower surface is provided with a hexagonal nut groove 21, the center of the upper surface of the hexagonal nut groove 21 is provided with an anchor bolt hole 22, and the upper surface is provided with a fastening groove 23, which is connected with the anchor bolt hole 22.

[0029] In the embodiment of the utility model, the setting of the conical seat 2 can, on the one hand, improve the fixing strength between the anchor bolt and the base plate 1, so that the combination of the base plate 1 and the anchor bolt is more stable. On the other hand, by using the setting of the hexagonal nut groove 21 and the fastening groove 23, when the anchor bolt is fixed, its nut can be embedded in the conical seat 2, ensuring the parallelism of the upper surface of the base plate 1, and at the same time making the anchor bolt and the base plate 1 more firmly fixed.

[0030] In the embodiment of the utility model, the hexagonal nut groove 21 is used to fit the lower nut 31 on the anchor screw 3, which can facilitate the fixation of the lower nut 31 and make the fixation of the anchor screw 3 more convenient and quick.

[0031] The anchor screw 3 slides through the anchor bolt hole 22 , and a lower nut 31 is installed thereon. The lower nut 31 is movably embedded in the hexagonal nut groove 21 , and an upper nut 32 is installed thereon. The upper nut 32 is located in the fastening groove 23 .

[0032] In the embodiment of the utility model, the upper nut 32 of the anchor screw 3 is located in the fastening groove 23, and at the same time it is completely located in the fastening groove 23, which can effectively prevent the upper nut 32 from being higher than the upper surface of the base plate 1, ensuring sufficient contact with the base plate 1 when the steel structure column is erected. At the same time, the upper nut 32 does not need to be removed, making its installation simpler and more convenient.

[0033] In the embodiment of the utility model, the base plate 1 can be embedded in the upper surface of the concrete foundation, or can be completely cast inside the concrete foundation.

[0034] The adjusting strut mechanism 4 is located below the anchor screw 3, and includes: a connecting short rod 41, located at the lower end of the anchor screw 3, a fixing stud is arranged at the upper end of the connecting short rod 41, and the fixing stud is threadedly installed in the threaded hole at the lower end of the anchor screw 3, and fixing pins 411 are arranged on both sides of the lower end; an upper connecting rod 42, movably installed on the fixing pins 411 on both sides of the connecting short rod 41, and the number is two and in sliding contact; a lower connecting rod 43, located at the lower end of the two upper connecting rods 42, the number is two, and one of the lower connecting rods 43 is located on the outer side of the upper connecting rod 42, and the other lower connecting rod 43 is located on the inner side of the upper connecting rod 42, and is connected to the two upper connecting rods 42 by a locking bolt 431 and a locking nut 432; a lower pin shaft 44, located below the two lower connecting rods 43, and movably connected to the two lower connecting rods 43.

[0035] In the embodiment of the utility model, the upper connecting rod 42 and the lower connecting rod 43 are matched and tightened and adjusted by the locking bolt 431 and the locking nut 432, so that the staff can adjust the height between the upper connecting rod 42 and the lower connecting rod 43 according to the actual situation, and then control the contact height with the foundation, so that it can fully contact with the foundation and improve the embedded end of the connection between the anchor bolt and the foundation.

[0036] In the embodiment of the utility model, by using the lower connecting rod 43 located outside the upper connecting rod 42, the length of the lower connecting rod 43 and the upper connecting rod 42 can be fully extended, thereby reducing their occupied area to facilitate the handling and transportation of the device.

[0037] In the embodiment of the utility model, the threaded connection between the connecting short rod 41 and the anchor bolt 3 can improve the assembly efficiency of the anchor bolt on the one hand, and on the other hand, the adjusting support rod mechanism 4 can be installed on different anchor bolts 3 to meet different anchor bolt usage requirements and improve the application range of the device.

[0038] In the present invention, the shaft diameter of the connection between the lower pin shaft 44 and the lower connecting rod 43 is smaller than the shaft diameter of the lower pin shaft 44, which can ensure the stability of the lower connecting rod 43 and prevent it from shaking, thereby ensuring the compactness of concrete during pouring.

[0039] In the present invention, the structure of the locking bolt 431 is the same as that of the lower pin shaft 44 , thereby ensuring the stability of the connection between the upper connecting rod 42 and the lower connecting rod 32 .

[0040] In the utility model, the included angle between the center axis of the support rod mechanism 4 and the base plate 1 is adjusted to 45°, which fully increases the contact area and contact strength with the foundation, so that the anchor bolts are more firmly combined with the foundation.

[0041] In the present invention, the locking nut 432 is a butterfly nut, and uses the locking force of the locking bolt 431 to fix the upper connecting rod 42 and the lower connecting rod 43; it is convenient for the staff to adjust, making the adjustment simpler and more convenient.

[0042] In the utility model, a reinforcing plate 24 is arranged between the conical seats 2, and the reinforcing plate 24 is fixedly connected to the base plate 1; on the one hand, the strength of the base plate 1 can be improved, and on the other hand, the shaking of the device during casting can be reduced to ensure the stability of the installation.

[0043] When using the utility model, the staff takes out the anchor screw 3, installs the lower nut 31 on the anchor screw 3, and tightens it, then inserts the lower end of the anchor screw 3 into the anchor bolt hole 22, and makes the upper end of the anchor screw 3 extend out of the base plate 1, then inserts the lower nut 31 into the hexagonal nut groove 21, then installs the upper nut on the anchor screw 3, and tightens it, at this time, the upper nut 32 is completely embedded in the fastening groove 23;

[0044] Subsequently, the staff takes out the adjusting support rod mechanism 4, and then moves the connecting short rod 41 to the lower end of the anchor screw 3, and fixes the two by threaded connection, and then the staff loosens the locking nut 432 and the locking bolt 431, and rotates the upper connecting rod 42 and the lower connecting rod 43 to adjust them to a suitable angle, and then tightens the locking nut 432;

[0045] Then the staff can place the base plate 1 into the casting trough, and then use the casting of concrete to embed the anchor bolts into the foundation.

[0046] During the installation of the device, the staff can adjust the installation angle of the short rod mechanism 4 by connecting the short rod 41 with the threaded connection of the anchor screw 3, so that it is 45° with the center of the base plate 1, thereby ensuring full contact between the foundation and the adjusting support rod mechanism 4, and the firmness of the anchor bolt and the foundation.

[0047] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pre-buried anchor bolt assembly for a steel structure workshop, comprising a base plate, which is embedded on the upper surface of a concrete foundation, characterized in that: Also includes: The conical seat is evenly embedded on the lower surface of the base plate, and the upper surface is flush with the upper surface of the base plate. The lower surface is provided with a hexagonal nut groove, the center of the upper surface of the hexagonal nut groove is provided with an anchor bolt hole, and the upper surface is provided with a fastening groove, which is connected with the anchor bolt hole; The anchor screw rod is slid through the anchor bolt hole, and a lower nut is installed on it. The lower nut is movably embedded in the hexagonal nut groove, and an upper nut is installed on it. The upper nut is located in the fastening groove; The adjustment support rod mechanism is located below the anchor bolt and includes: A connecting short rod is located at the lower end of the anchor screw, a fixing stud is arranged at the upper end thereof, the fixing stud is threadedly installed in the threaded hole at the lower end of the anchor screw, and fixing pins are arranged on both sides of the lower end thereof; The upper connecting rod is movably mounted on the fixed pins connecting the two sides of the short rod, and the number of the upper connecting rod is two and they are in sliding contact; A lower connecting rod is located at the lower end of the two upper connecting rods, and there are two of them, one of which is located on the outside of the upper connecting rods, and the other is located on the inside of the upper connecting rods, and is connected to the two upper connecting rods by locking bolts and locking nuts; The lower pin shaft is located below the two lower connecting rods and is movably connected with the two lower connecting rods.

2. The embedded anchor bolt assembly of a steel structure factory building according to claim 1, characterized in that: The shaft diameter of the connection between the lower pin shaft and the lower connecting rod is smaller than the shaft diameter of the lower pin shaft.

3. The embedded anchor bolt assembly of a steel structure factory building according to claim 2, characterized in that: The locking bolt structure is the same as the lower pin structure.

4. The embedded anchor bolt assembly of a steel structure factory building according to claim 1, characterized in that: The included angle between the adjusting support rod mechanism and the central axis of the base plate is 45°.

5. The embedded anchor bolt assembly of a steel structure factory building according to claim 1, characterized in that: The locking nut is a butterfly nut, and uses the locking force with the locking bolt to fix the upper connecting rod and the lower connecting rod.

6. The embedded anchor bolt assembly of a steel structure factory building according to claim 1, characterized in that: A reinforcing plate is arranged between the conical seats, and the reinforcing plate is fixedly connected to the base plate.