Steel bar formwork positioning construction structure
By designing the connection mechanism in the steel formwork, including movable shafts, barrier plates, traction springs and fastening bolts, the problem of offset and looseness during the formwork splicing process is solved, ensuring the stability and construction efficiency of concrete pouring.
Patent Information
- Application Number
- CN202420441833.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-07
AI Technical Summary
The existing steel formwork is prone to deflection, loosening and collapse during the splicing process, affecting the stability of concrete pouring.
By designing the connection mechanism, including the movable shaft, blocking plate, traction spring and fastening bolts, the first plate frame and the second plate frame can be easily spliced and disassembled, ensuring that the movable shaft remains stable in the movable groove and avoiding template deviation.
It achieves stable splicing and disassembly of steel formwork, ensures the stability of concrete pouring, and improves construction efficiency and safety.
Smart Images

Figure CN221878826U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a steel bar template positioning construction structure. Background Art
[0002] Steel formwork is a steel formwork used for concrete pouring. In addition to steel formwork, there are also wooden formwork, plywood formwork, etc. Steel formwork is widely used in construction projects due to its multiple uses and beautiful concrete pouring. In existing construction sites, when pouring, steel formwork is needed to fix the cement. After the cement pouring solidifies, the steel formwork can be removed.
[0003] The prior art has the following deficiencies: when the existing steel bar formwork is used for concrete pouring, it is easy for the two steel bar formworks to be offset when spliced together, and the two steel bar formworks cannot be stably connected during the splicing process, which makes the steel bar formworks easy to loosen and collapse during the pouring process, thereby affecting the stable pouring of concrete.
[0004] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Utility Model Content
[0005] The purpose of the utility model is to provide a steel bar formwork positioning construction structure, which can conveniently splice the first plate frame and the second plate frame through the connection between the plug-in plate and the connecting groove, and at the same time the connecting plate can connect two adjacent movable shafts, the blocking plate can block the movable shaft, and at the same time the reinforcing plate can fix the movable shaft by rotating the fastening bolts, so that the movable shaft can remain stable inside the movable groove, making the splicing and disassembly of the first plate frame and the second plate frame more convenient, and can avoid the offset of the formwork body during the splicing process, so as to solve the above-mentioned deficiencies in the technology.
[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a steel bar template positioning construction structure, including a template body, and also including:
[0007] Two connecting mechanisms are provided, which are respectively arranged on the inner walls at both ends of the connection position of the template body, and are used to reinforce the connection of the template body;
[0008] The template body comprises a first plate frame and a second plate frame, and movable shafts are fixedly installed on the outer walls of both ends of the first plate frame and the second plate frame on one side opposite to each other, and a blocking plate is fixedly installed on the outer wall of one end of the movable shaft;
[0009] The connecting mechanism includes a connecting plate, and movable grooves are provided on the inner walls on both sides of the connecting plate. The inner walls of the two movable grooves are movably connected to the outer walls of two movable shafts at the same end respectively, and traction springs are fixedly installed on the inner walls on the opposite sides of the two movable grooves. A reinforcement plate is fixedly installed on the side of the traction spring away from the inner wall of the movable groove. The reinforcement plate is movably connected to the outer wall of the adjacent movable shaft, and a fastening bolt is arranged between the reinforcement plate and the inner wall of the adjacent movable groove.
[0010] Preferably, the template body comprises four connecting grooves, and the four connecting grooves are respectively opened on the inner walls at both ends of the opening side of the first plate frame.
[0011] Preferably, two plug-in boards are fixedly mounted on both ends of a side of the second plate frame close to the first plate frame, and outer walls of the plug-in boards are movably connected to inner walls of adjacent connection grooves.
[0012] Preferably, the connecting mechanism comprises a mounting groove, and two mounting grooves are provided, and the two mounting grooves are respectively opened on the inner wall of one side opposite to the two movable grooves.
[0013] Preferably, the height dimension of the movable groove is the same as the diameter dimension of the movable shaft, and the diameter dimension of the mounting groove is the same as the diameter dimension of the blocking plate.
[0014] Preferably, the inner walls on the opposite sides of the two movable grooves are respectively threadedly connected to two fastening bolts, and the side of the fastening bolts away from the inner wall of the movable groove is abutted against the outer wall of the adjacent reinforcement plate, and the fastening bolts are movably inserted into the inner side of the adjacent traction spring.
[0015] Preferably, the first plate frame and the second plate frame have the same height, and the first plate frame and the second plate frame have the same thickness.
[0016] In the above technical solution, the technical effects and advantages provided by the utility model are:
[0017] 1. The first plate frame and the second plate frame can be conveniently spliced by connecting the plug-in plate and the connecting groove. At the same time, the connecting plate can connect two adjacent movable shafts, and the blocking plate can block the movable shaft to prevent the movable shaft from being separated from the movable groove. At the same time, the reinforcing plate can fix the movable shaft by rotating the fastening bolts, so that the movable shaft can remain stable in the movable groove, thereby making the splicing and disassembly of the first plate frame and the second plate frame more convenient, avoiding the deviation of the template body during the splicing process, and thus ensuring the stable progress of the concrete pouring work;
[0018] 2. By setting the mounting groove, the blocking plate and the movable shaft can be easily detached from the inner wall of the connecting plate, and then the connecting plate can be easily detached from the outer walls of the first plate frame and the second plate frame, which can facilitate the staff to replace the connecting mechanism. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0021] Figure 2 It is a top cross-sectional view of the utility model.
[0022] Figure 3 For this utility model Figure 2 Enlarged view of part A.
[0023] Figure 4 It is an exploded view of the three-dimensional structure of the template body of the utility model.
[0024] Figure 5 It is an exploded view of the three-dimensional structure of the connecting mechanism of the utility model.
[0025] Description of reference numerals:
[0026] 1. Template body; 101. First plate frame; 102. Connection groove; 103. Second plate frame; 104. Plug-in board; 105. Active shaft; 106. Blocking plate;
[0027] 2. Connecting mechanism; 201. Connecting plate; 202. Movable slot; 203. Mounting slot; 204. Traction spring; 205. Reinforcement plate; 206. Fastening bolts. DETAILED DESCRIPTION
[0028] The utility model provides Figure 1 A steel bar template positioning construction structure shown includes a template body 1, and also includes:
[0029] There are two connecting mechanisms 2 , which are respectively arranged on the inner walls at both ends of the connecting position of the template body 1 , and are used to reinforce the connection of the template body 1 .
[0030] In order to conveniently pour concrete components, Figure 2 and Figure 4As shown, the formwork body 1 includes a first plate frame 101 and a second plate frame 103, and movable shafts 105 are fixedly installed on the outer walls of both ends of the opposite sides of the first plate frame 101 and the second plate frame 103, and a blocking plate 106 is fixedly installed on the outer wall of one end of the movable shaft 105. The formwork body 1 is composed of the first plate frame 101 and the second plate frame 103, so that concrete components can be cast in the space formed by the first plate frame 101 and the second plate frame 103.
[0031] In order to facilitate the first plate frame 101 and the second plate frame 103 to be tightly connected and disassembled, as shown in FIG. Figure 2-3 and Figure 5 As shown, the connecting mechanism 2 includes a connecting plate 201, and movable grooves 202 are provided on the inner walls on both sides of the connecting plate 201. The inner walls of the two movable grooves 202 are movably connected to the outer walls of the two movable shafts 105 at the same end respectively, and the inner walls on the opposite sides of the two movable grooves 202 are fixedly installed with traction springs 204. A reinforcement plate 205 is fixedly installed on the side of the traction spring 204 away from the inner wall of the movable groove 202. The reinforcement plate 205 is movably connected to the outer wall of the adjacent movable shaft 105. A fastening bolt 206 is arranged between the reinforcement plate 205 and the inner wall of the adjacent movable groove 202. The movable shaft 105 is inserted into the movable groove 202. The reinforcing plate 205 can reinforce the movable shaft 105 by rotating the fastening bolt 206, so that the first plate frame 101 and the second plate frame 103 can be conveniently connected and disassembled.
[0032] In order to ensure that the first plate frame 101 and the second plate frame 103 can be stably spliced, as shown in FIG. Figure 2 and Figure 4 As shown, the template body 1 includes a connecting groove 102, and there are four connecting grooves 102. The four connecting grooves 102 are respectively opened on the inner walls at both ends of the opening side of the first plate frame 101, and two plug-in boards 104 are fixedly installed on both ends of the side of the second plate frame 103 close to the first plate frame 101. The outer wall of the plug-in board 104 is movably connected to the inner wall of the adjacent connecting groove 102. The connection between the connecting groove 102 and the plug-in board 104 makes it possible to conveniently connect the first plate frame 101 and the second plate frame 103, thereby avoiding the first plate frame 101 and the second plate frame 103 from being offset during the splicing process.
[0033] In order to make the connecting plate 201 convenient to connect the first plate frame 101 and the second plate frame 103, as shown in FIG. Figure 2-3 and Figure 5As shown, the connecting mechanism 2 includes an installation groove 203, and two installation grooves 203 are provided. The two installation grooves 203 are respectively opened on the inner wall of the opposite side of the two movable grooves 202. The height dimension of the movable groove 202 is the same as the diameter dimension of the movable shaft 105. The diameter dimension of the installation groove 203 is the same as the diameter dimension of the blocking plate 106. The blocking plate 106 passes through the installation groove 203 so that the movable shaft 105 can be movably inserted into the movable groove 202. The movable shaft 105 can be blocked and limited by the blocking plate 106 to prevent the movable shaft 105 from detaching from the inside of the movable groove 202.
[0034] In order to keep the movable shaft 105 stable inside the movable groove 202, as shown in FIG. Figure 2-3 As shown, the inner walls of the two movable grooves 202 on the opposite sides are respectively threadedly connected with two fastening bolts 206, and the side of the fastening bolts 206 away from the inner wall of the movable groove 202 is in contact with the outer wall of the adjacent reinforcement plate 205. The fastening bolts 206 are movably inserted into the inner side of the adjacent traction spring 204. By rotating the fastening bolts 206, the reinforcement plate 205 can be pushed to reinforce the movable shaft 105, so that the movable shaft 105 remains stable inside the movable groove 202, so that the connecting plate 201 can stably connect the first plate frame 101 and the second plate frame 103.
[0035] In order to make the formwork body 1 stable for concrete pouring, Figure 2 and Figure 4 As shown, the first plate frame 101 and the second plate frame 103 have the same height dimensions, and the first plate frame 101 and the second plate frame 103 have the same thickness dimensions. The first plate frame 101 and the second plate frame 103 can be stably connected so that concrete can be stably poured in the space inside them.
[0036] The specific implementation method is as follows: when pouring concrete, the installation grooves 203 on one side of the two connecting plates 201 are respectively sleeved to the outside of the blocking plates 106 on the outer walls of the two ends of the first plate frame 101, and then the two connecting plates 201 are moved toward the first plate frame 101, so that the blocking plates 106 can pass through the installation grooves 203, and then the two installation grooves 203 on the other side of the two connecting plates 201 are respectively sleeved to the outside of the blocking plates 106 on the outer walls of the two ends of the second plate frame 103, and then the blocking plates 106 at the two ends of the second plate frame 103 pass through the adjacent installation grooves 203, and then the first plate frame 101 and the second plate frame 103 are moved relative to each other, so that the four plug-in plates 104 can be plugged into the four connecting grooves 102, so that the first plate frame 101 and the second plate frame 103 can be spliced together, and at the same time, when the first plate frame 101 and the second plate frame 103 are spliced, the two movable shafts 105 at both ends can move relative to each other along the adjacent movable grooves 202. After the first and second plate frames 101 and 103 are spliced, the movable shaft 105 can be moved to the side of the inner wall of the adjacent movable groove 202 away from the reinforcement plate 205, so that the blocking plate 106 can block the movable shaft 105, and then the reinforcement plate 205 can be pushed to move toward the adjacent movable shaft 105 by rotating the fastening bolt 206, so that the traction spring 204 extends, so that the reinforcement plate 205 and the inner wall of the movable groove 202 can reinforce the movable shaft 105, so that the first plate frame 101 and the second plate frame 103 can be tightly connected, so that the assembly and disassembly of the formwork body 1 are more convenient, and the first plate frame 101 and the second plate frame 103 can be avoided from being offset during the splicing process, and the stability of the splicing of the formwork body 1 can be ensured, so that the formwork body 1 can be stably used for concrete pouring. This embodiment specifically solves the problem in the prior art that the steel bar formwork is prone to offset during the installation process, which affects the concrete pouring work.
[0037] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A steel bar template positioning construction structure, comprising a template body (1), characterized in that: Also includes: Two connecting mechanisms (2) are provided, which are respectively arranged on the inner walls at both ends of the connection position of the template body (1) and are used to reinforce the connection of the template body (1); The template body (1) comprises a first plate frame (101) and a second plate frame (103); movable shafts (105) are fixedly mounted on the outer walls of both ends of the opposite sides of the first plate frame (101) and the second plate frame (103); and a blocking plate (106) is fixedly mounted on the outer wall of one end of the movable shaft (105); The connecting mechanism (2) comprises a connecting plate (201), and movable grooves (202) are provided on the inner walls on both sides of the connecting plate (201). The inner walls of the two movable grooves (202) are respectively movably connected to the outer walls of two movable shafts (105) at the same end. A traction spring (204) is fixedly installed on the inner walls on the opposite sides of the two movable grooves (202). A reinforcing plate (205) is fixedly installed on the side of the traction spring (204) away from the inner wall of the movable groove (202). The reinforcing plate (205) is movably connected to the outer wall of the adjacent movable shaft (105), and a fastening bolt (206) is provided between the reinforcing plate (205) and the inner wall of the adjacent movable groove (202).
2. A steel bar template positioning construction structure according to claim 1, characterized in that: The template body (1) comprises a connection groove (102), and four connection grooves (102) are provided. The four connection grooves (102) are respectively opened on the inner walls at both ends of the opening side of the first plate frame (101).
3. A steel bar template positioning construction structure according to claim 2, characterized in that: Two plug-in boards (104) are fixedly mounted on both ends of one side of the second plate frame (103) close to the first plate frame (101), and the outer walls of the plug-in boards (104) are movably connected to the inner walls of adjacent connection grooves (102).
4. A steel bar template positioning construction structure according to claim 1, characterized in that: The connection mechanism (2) comprises a mounting groove (203), two mounting grooves (203) are provided, and the two mounting grooves (203) are respectively opened on the inner wall of the opposite side of the two movable grooves (202).
5. A steel bar template positioning construction structure according to claim 4, characterized in that: The height dimension of the movable groove (202) is the same as the diameter dimension of the movable shaft (105), and the diameter dimension of the installation groove (203) is the same as the diameter dimension of the blocking plate (106).
6. A steel bar template positioning construction structure according to claim 1, characterized in that: The inner walls of the two movable grooves (202) on the opposite sides are respectively threadedly connected to two fastening bolts (206); the side of the fastening bolts (206) away from the inner wall of the movable groove (202) is in contact with the outer wall of the adjacent reinforcing plate (205); and the fastening bolts (206) are movably inserted into the inner side of the adjacent traction spring (204).
7. A steel bar template positioning construction structure according to claim 1, characterized in that: The first plate frame (101) and the second plate frame (103) have the same height dimension, and the first plate frame (101) and the second plate frame (103) have the same thickness dimension.