Arch frame trolley for tunnel maintenance
By designing the supporting mechanism and fixing mechanism of the hydraulic cylinder and the cylinder, the problem that the arch lift truck for tunnel maintenance needs to be assembled internally during use is solved, the arch frame is firmly fixed and quickly deployed, and the transportation cost and time are reduced. Improved efficiency and safety of tunnel maintenance work.
Patent Information
- Application Number
- CN202420661898.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The arch lift truck for tunnel maintenance requires internal assembly during use, resulting in high transportation costs, time-consuming and labor-intensive transportation, and it cannot automatically shrink and expand.
An arch trolley including a base plate, a support frame and a moving trough is designed. It adopts a support mechanism and a fixing mechanism. Through the cooperation of hydraulic cylinders and air cylinders, the arch frame can be firmly fixed, balancedly supported and quickly deployed, which improves the convenience of operation. and efficiency.
It achieves stable fixation and rapid deployment of the arch, reduces transportation costs and time, and improves the efficiency and safety of tunnel maintenance work.
Smart Images

Figure CN221879425U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to tunnel maintenance, in particular to an arch frame trolley for tunnel maintenance. Background Art
[0002] Tunnel maintenance is the regular inspection, maintenance and repair of the completed tunnel structure and its ancillary facilities. It aims to ensure the normal operation of the tunnel, guarantee driving safety and extend its service life. The maintenance content covers structural safety inspection, drainage system cleaning, ventilation facility maintenance, lighting system inspection, traffic sign and marking update and other aspects. Through regular inspections and timely disposal, tunnel maintenance work can timely discover potential safety hazards, prevent structural damage, and ensure smooth traffic and comfortable driving. In addition, tunnel maintenance also involves rapid response to emergency events, such as handling sudden water leakage, fire and other accidents, to ensure the safety of people in the tunnel. Life safety, in summary, tunnel maintenance is not only an important part of tunnel management, but also an important guarantee to ensure the long-term stable operation and safe passage of the tunnel. The arch frame trolley is used in tunnel maintenance, mainly to ensure construction safety. The arch frame can provide stable support and effectively prevent the collapse of the tunnel top or falling stones from causing damage to vehicles and personnel. At the same time, the trolley operation can prevent vehicles from directly passing through the maintenance area and reduce the impact of construction on traffic. This method not only protects the structural safety of the tunnel, but also ensures the safety of passing vehicles. It is a commonly used and efficient technical means in tunnel maintenance. Therefore, there is a special need for an arch frame trolley for tunnel maintenance.
[0003] However, when the arch frame lifting vehicle for tunnel maintenance is used, it needs to be assembled inside. Otherwise, the cost of transporting it inside is very high, and it is very time-consuming and labor-intensive. Moreover, the entire device cannot automatically retract and unfold. Utility Model Content
[0004] The purpose of the utility model is to provide a tunnel maintenance arch trolley to solve the problem proposed in the above-mentioned background technology that the tunnel maintenance arch trolley needs to be assembled inside when in use, otherwise the cost of transporting it inside is very high, it is very time-consuming and labor-intensive, and the entire device cannot be automatically retracted and unfolded.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an arch frame trolley for tunnel maintenance, comprising a bottom plate, a support frame and a movable groove, the lower surface of the bottom plate is fixedly mounted with the support frame, the lower surface of the support frame is fixedly connected with the movable groove, the upper surface of the bottom plate is provided with a support mechanism, and one side surface of the support frame is provided with a fixing mechanism;
[0006] The supporting mechanism includes a base, a lifting arm, a first supporting shell, a lifting hydraulic cylinder, a second supporting shell, a pushing hydraulic cylinder, a placement groove, a third supporting shell, a retracting cylinder, a supporting plate, a pulling hydraulic cylinder and a rotating ball. The upper surface of the bottom plate is fixedly connected to the base, the upper surface of the base is equipped with a lifting arm, the upper surface of the lifting arm is fixedly connected to the first supporting shell, the upper surface of the base is fixedly connected to the lifting hydraulic cylinder, the inner surface of the first supporting shell is rotatably connected to the second supporting shell, the inner surface of the second supporting shell is fixedly connected to the pushing hydraulic cylinder, the inner surface of the second supporting shell is provided with a placement groove, the inner surface of the placement groove is connected to the third supporting shell, the lower surface of the third supporting shell is welded with a retracting cylinder, the upper surface of the retracting cylinder is welded with a supporting plate, the lower surface of the second supporting shell is fixedly connected to the pulling hydraulic cylinder, and one side surface of the pulling hydraulic cylinder is connected to a rotating ball.
[0007] Preferably, the number of the support frames is two.
[0008] Preferably, a rotating ball is connected to the lower surface of the support plate.
[0009] Preferably, the fixing mechanism includes a placement box, a cylinder, a connecting ring, and a fixing vertebra; the placement box is fixedly mounted on one side surface of the support frame, the cylinder is mounted on the inner surface of the placement box, the connecting ring is threadedly connected to the lower surface of the cylinder, and the fixing vertebra is threadedly connected to the lower surface of the connecting ring.
[0010] Preferably, the cylinders are provided in two groups.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows: the tunnel maintenance arch trolley, first, by pushing the moving groove to the specified position, the activation of the internal cylinder enables the fixed vertebra to reasonably utilize the terrain, firmly fix the entire device on the ground, and ensure the firmness and stability of the bracket. Subsequently, the lifting hydraulic cylinder is activated to easily lift the second support shell, while driving the first support shell to rise and fall, and then the internal lifting arm performs swing support. This series of actions enables the device to maintain balance during work and the operation is smoother. When the lifting hydraulic cylinder is raised to the appropriate position, the lifting arm stops swinging, further supporting the first support shell. The support shell improves the overall stability. Subsequently, the hydraulic cylinder is pushed to drive the third support shell in the placement slot to be pushed out, and then the support plate is unfolded and spread out by pulling the hydraulic cylinder. This process is quick and effective, which greatly improves the working efficiency. In order to ensure the stability of the support plate, the second support shell is also specially equipped with a retraction cylinder to further strengthen the support. After the unfolding is completed, if the height needs to be further adjusted, it only needs to be adjusted by lifting the hydraulic cylinder. The operation is simple and convenient. In summary, the arch frame lifting car for tunnel maintenance is cleverly designed, easy to operate, and powerful in function, which brings great convenience and efficiency improvement to tunnel maintenance work. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a front view structural diagram of the utility model;
[0013] Figure 2 This is a schematic diagram of the support mechanism structure of the utility model;
[0014] Figure 3 This is a schematic diagram of the internal parts structure of the support mechanism of the utility model;
[0015] Figure 4 This is a schematic diagram of the rotational use structure of the support mechanism of the utility model;
[0016] Figure 5 It is a schematic diagram of the fixing mechanism structure of the utility model.
[0017] In the figure: 1, bottom plate; 2, support frame; 3, moving groove; 4, supporting mechanism; 401, base; 402, lifting arm; 403, first supporting shell; 404, lifting hydraulic cylinder; 405, second supporting shell; 406, pushing hydraulic cylinder; 407, placing groove; 408, third supporting shell; 409, retracting cylinder; 410, supporting plate; 411, pulling hydraulic cylinder; 412, rotating ball; 5, fixing mechanism; 501, placing box; 502, cylinder; 503, connecting ring; 504, fixing vertebra. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-5 The utility model provides a technical solution: an arch trolley for tunnel maintenance, comprising a bottom plate 1, a support frame 2 and a moving groove 3, the support frame 2 is fixedly installed on the lower surface of the bottom plate 1, the moving groove 3 is fixedly connected to the lower surface of the support frame 2, a supporting mechanism 4 is arranged on the upper surface of the bottom plate 1, and a fixing mechanism 5 is arranged on one side surface of the support frame 2;
[0020] The supporting mechanism 4 includes a base 401, a lifting arm 402, a first supporting shell 403, a lifting hydraulic cylinder 404, a second supporting shell 405, a pushing hydraulic cylinder 406, a placement slot 407, a third supporting shell 408, a retracting cylinder 409, a supporting plate 410, a pulling hydraulic cylinder 411 and a rotating ball 412. The upper surface of the bottom plate 1 is fixedly connected to the base 401, the upper surface of the base 401 is mounted with a lifting arm 402, the upper surface of the lifting arm 402 is rotatably connected with the first supporting shell 403, the upper surface of the base 401 is fixedly connected to the lifting hydraulic cylinder 404, the inner side surface of the first supporting shell 403 is rotatably connected to the second supporting shell 405, the inner side surface of the second supporting shell 405 is fixedly connected to the pushing hydraulic cylinder 406, and the second A placement groove 407 is provided on the inner surface of the support shell 405, and a third support shell 408 is connected to the inner surface of the placement groove 407. A retracting cylinder 409 is welded to the lower surface of the third support shell 408, and a support plate 410 is telescopically connected to the upper surface of the retracting cylinder 409. A pulling hydraulic cylinder 411 is fixedly connected to the lower surface of the second support shell 405, and a rotating ball 412 is connected to one side surface of the pulling hydraulic cylinder 411. Through the arrangement of the base 401, the lifting arm 402, the first support shell 403, the lifting hydraulic cylinder 404, the second support shell 405, the pushing hydraulic cylinder 406, the placement groove 407, the third support shell 408, the retracting cylinder 409, the support plate 410, the pulling hydraulic cylinder 411 and the rotating ball 412, the retracting The folding and use of the lifting device is more convenient and stable. First, when the bottom plate 1 is pulled to the specified position through the moving groove 3, the lifting hydraulic cylinder 404 is started to lift the second supporting shell 405, and then the second supporting shell 405 will drive the first supporting shell 403 to rise and fall at the same time, and then the first supporting shell 403 will drive the internal lifting arm 402 to swing and support. When the lifting hydraulic cylinder 404 is lifted to a suitable position, the lifting arm 402 will also stop swinging to support the first supporting shell 403. When the second supporting shell 405 reaches a suitable position, the pushing hydraulic cylinder 406 will drive the third supporting shell 408 in the placement groove 407 to be pushed out. When the third supporting shell 408 reaches a suitable position, the pulling hydraulic cylinder 406 is started. The pressure cylinder 411 is pulled, and the hydraulic cylinder 411 drives the support plate 410, and the support plate 410 is pushed out and spread out by the rotating ball 412. In order to keep the support plate 410 stable, a retracting cylinder 409 is added to the second support shell 405 for further stability. After the unfolding is completed, if the height needs to be adjusted, it can be further adjusted by lifting the hydraulic cylinder 404. When the support plate 410 is pushed and pulled by the hydraulic cylinder 406, the rotating ball 412 will rotate. At the same time, in order to keep the support plate 410 stable, the retracting cylinder 409 drives the support plate 410 to be stable. The third support shell 408 is a stable rotating and retracting platform kicked by the retracting cylinder 409, and the third support shell 408 is rotatably connected with the support plate 410.The connector placed under the support plate 410 wraps around the rotating ball 412 to rotate.
[0021] Furthermore, the number of the support frames 2 is two, and the setting of the support frames 2 can achieve a better supporting effect.
[0022] Furthermore, a rotating ball 412 is connected to the lower surface of the support plate 410 . The provision of the rotating ball 412 makes the support plate 410 more stable when in use.
[0023] Furthermore, the fixing mechanism 5 includes a placement box 501, a cylinder 502, a connecting ring 503, and a fixing vertebra 504. The placement box 501 is fixedly installed on one side surface of the support frame 2, and the cylinder 502 is installed on the inner surface of the placement box 501. The lower surface of the cylinder 502 is threadedly connected with the connecting ring 503, and the lower surface of the connecting ring 503 is threadedly connected with the fixing vertebra 504. Through the arrangement of the placement box 501, the cylinder 502, the connecting ring 503, and the fixing vertebra 504, the device is more stable when in use. When the moving groove 3 is pushed to the specified position inside the tunnel, the placement box 501 can be opened to start the internal cylinder 502. The cylinder 502 will use a more suitable fixing vertebra 504 according to the terrain, and then push the fixing vertebra 504 to fix the entire device to maintain the stability of the bracket. If special geology is encountered, the fixing vertebra 504 can be replaced through the connecting ring 503.
[0024] Furthermore, two groups of air cylinders 502 are provided, and through the provision of the air cylinders 502, the fixing vertebra 504 can be more stably driven into the ground.
[0025] Working principle: First, when the mobile slot 3 is pushed to the designated position inside the tunnel, the placement box 501 can be opened to start the internal cylinder 502. The cylinder 502 will use the appropriate fixing vertebra 504 according to the terrain, and then push the fixing vertebra 504 to fix the entire device to maintain the stability of the bracket. After fixing, the lifting hydraulic cylinder 404 is started to lift the second support shell 405, and then the second support shell 405 will drive the first support shell 403 to rise and fall at the same time, and then the first support shell 403 will drive the internal lifting arm 402 to swing support. When the lifting hydraulic cylinder 404 is lifted to the appropriate position, the lifting arm 402 will also Stop swinging to support the first support shell 403. When the second support shell 405 reaches a suitable position, the hydraulic cylinder 406 is pushed to push out the third support shell 408 in the placement slot 407. When the third support shell 408 reaches a suitable position, the hydraulic cylinder 411 is then started to pull and drive the support plate 410. The support plate 410 is pushed out and spread out by rotating the ball 412. In order to keep the support plate 410 stable, a retracting cylinder 409 is added to the second support shell 405 for further stability. After the unfolding is completed, if the height needs to be adjusted, further adjustment can be made by lifting the hydraulic cylinder 404.
[0026] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel maintenance arch trolley, comprising a base plate (1), a support frame (2) and a moving trough (3), Features: A support frame (2) is fixedly mounted on the lower surface of the base plate (1), a movable groove (3) is fixedly connected to the lower surface of the support frame (2), a support mechanism (4) is arranged on the upper surface of the base plate (1), and a fixing mechanism (5) is arranged on one side surface of the support frame (2); The support mechanism (4) comprises a base (401), a lifting arm (402), a first support shell (403), a lifting hydraulic cylinder (404), a second support shell (405), a pushing hydraulic cylinder (406), a placement slot (407), a third support shell (408), a retracting cylinder (409), a support plate (410), a pulling hydraulic cylinder (411) and a rotating ball (412); the upper surface of the bottom plate (1) is fixedly connected to the base (401); the upper surface of the base (401) is equipped with a lifting arm (402); the upper surface of the lifting arm (402) is fixedly connected to the first support shell (403); the upper surface of the base (401) is fixedly connected to the lifting hydraulic cylinder (404); The inner surface of the first supporting shell (403) is rotatably connected to the second supporting shell (405), the inner surface of the second supporting shell (405) is fixedly connected to a pushing hydraulic cylinder (406), the inner surface of the second supporting shell (405) is provided with a placement groove (407), the inner surface of the placement groove (407) is connected to a third supporting shell (408), the lower surface of the third supporting shell (408) is welded with a contraction cylinder (409), the upper surface of the contraction cylinder (409) is welded with a support plate (410), the lower surface of the second supporting shell (405) is fixedly connected to a pulling hydraulic cylinder (411), and one side surface of the pulling hydraulic cylinder (411) is connected to a rotating ball (412).
2. A tunnel maintenance arch trolley according to claim 1, Features: The number of the support frames (2) is two.
3. The tunnel maintenance arch trolley according to claim 1, Features: A rotating ball (412) is connected to the lower surface of the support plate (410).
4. The tunnel maintenance arch trolley according to claim 1, Features: The fixing mechanism (5) comprises a placement box (501), a cylinder (502), a connecting ring (503), and a fixing vertebra (504); the placement box (501) is fixedly mounted on one side surface of the support frame (2); the cylinder (502) is mounted on the inner side surface of the placement box (501); the connecting ring (503) is threadedly connected to the lower surface of the cylinder (502); and the fixing vertebra (504) is threadedly connected to the lower surface of the connecting ring (503).
5. The tunnel maintenance arch trolley according to claim 4, Features: The cylinders (502) are provided in two groups.
