Industrial waste gas detection sampling device
By designing multiple gas storage tanks and a flexible gas circulation system, the problem of low exhaust gas sampling efficiency in the existing technology is solved and multi-point efficient exhaust gas sampling is achieved.
Patent Information
- Application Number
- CN202322750632.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-10-13
AI Technical Summary
The existing industrial waste gas sampling device can only extract waste gas from one location. If the waste gas needs to be sampled from other locations, the gas storage tank and air pump need to be replaced, resulting in low sampling efficiency.
An industrial waste gas detection and sampling device including multiple gas storage tanks, air pumps, air inlet pipes and air outlet pipes is designed. Multi-point sampling is achieved through one-way relief valves and elastic expansion joints. The holding box is equipped with rollers and inclined push rods. It is easy to move and install the gas storage tank, and the gate valve controls the gas flow.
It achieves efficient operation of multi-point sampling, reduces the time for replacing gas storage tanks and air pumps, and improves exhaust gas sampling efficiency.
Smart Images

Figure CN221883202U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste gas sampling equipment, and more specifically, particularly relates to an industrial waste gas detection sampling device. Background Art
[0002] Industrial waste gas refers to the general term for various pollutant gases discharged into the air during the combustion of fuel and production processes within the factory area of an enterprise. These waste gases include: carbon dioxide, carbon disulfide, hydrogen sulfide, fluoride, nitrogen oxides, chlorine, hydrogen chloride, carbon monoxide, sulfuric acid (mist), lead and mercury, beryllium, smoke and industrial dust. When discharged into the atmosphere, they will pollute the air. These substances enter the human body through the respiratory tract through different pathways. Some of them cause direct harm, while others have an accumulation effect, which will more seriously endanger human health.
[0003] At present, when sampling industrial waste gas, an air pump is usually used to extract the waste gas at the corresponding sampling location, and then it is stored in a gas tank. The existing gas sampling device can only extract waste gas from one location. If it is necessary to sample waste gas from other locations, a new gas tank must be reconnected to the air pump. This process is time-consuming and cannot improve the sampling efficiency. Utility Model Content
[0004] The utility model aims to provide an industrial waste gas detection sampling device which is simple to operate and improves sampling efficiency.
[0005] The vent pipe is connected with the air inlet pipe of the air inlet pipe, and the ...
[0006] Preferably, rollers are rotatably mounted at the four corners of the bottom of the storage box, and an inclined push rod is fixedly mounted at one end of the storage box.
[0007] Preferably, the elastic telescopic joint includes a sleeve and a plug, the sleeve is fixedly installed at the lower part of the air inlet pipe, the sleeve is connected to the air inlet pipe, the plug is inserted in the sleeve, a limiting ring is fixedly sleeved on the outer side of the upper end of the plug, a spring is fixedly installed on the upper part of the limiting ring, the upper end of the spring is fixedly connected to the top of the sleeve, and the lower end of the plug is inserted in the air inlet of the first one-way air relief valve.
[0008] Preferably, a threaded joint is installed at the lower end of the second one-way air release valve, and the threaded joint is cooperatively connected with a corresponding threaded convex pipe.
[0009] Preferably, a gate valve is installed on the air inlet pipe between adjacent air storage tanks.
[0010] Preferably, the gate valve is a manual gate valve.
[0011] Compared with the prior art, the advantages of the utility model are:
[0012] The utility model is provided with a plurality of gas storage tanks for gas sampling, and gas sampling can be performed at different positions. By turning on the air pump, the air pump can fill the external gas into the air inlet pipe, and the air pressure in the air inlet pipe increases. When the air pressure reaches the air inlet pressure value of the first one-way air relief valve, the gas can enter the gas storage tank through the first one-way air relief valve. When the air pressure in the gas storage tank is greater than the air outlet pressure value of the second one-way air relief valve, the gas can overflow, and the overflowed gas is discharged through the air outlet pipe;
[0013] When sampling of the first gas storage tank near the vacuum pump is completed, the holding box is moved to other locations where sampling is required, and the gate valve behind it is opened. The above operation is repeated at this time to fill the subsequent gas storage tanks with gas from the sampling site, thereby improving the sampling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a structural diagram of an industrial waste gas detection and sampling device of the utility model;
[0016] Figure 2 It is a cross-sectional view of the storage box of the utility model;
[0017] Figure 3 It is a cross-sectional view of the gas storage bottle of the utility model;
[0018] Figure 4 yes Figure 3 A schematic diagram of the enlarged structure in the middle.
[0019] In the figure: 1 a containing box, 11 a box door, 12 a roller, 13 an air outlet, 2 an air storage tank, 21 a first one-way air release valve, 22 a second one-way air release valve, 221 a threaded joint, 3 an air outlet pipe, 31 a threaded convex pipe, 4 an air inlet pipe, 41 a gate valve, 5 an air pump, 6 an elastic expansion joint, 61 a sleeve, 62 a cannula, 63 a limiting ring, 64 a spring, and 7 an oblique push rod. DETAILED DESCRIPTION
[0020] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0021] See also Figure 1-Figure 4 As shown, the utility model provides an industrial waste gas detection sampling device, including a containing box 1, and also including an air pump 5, an air outlet pipe 3, an air inlet pipe 4 and a plurality of air storage tanks 2, the upper and lower ends of the air storage tanks 2 are connected and installed with a first one-way air release valve 21 and a second one-way air release valve 22, the air inlet pipe 4 and the air outlet pipe 3 are respectively fixedly installed at the upper and lower ends of the containing box 1, the air pump 5 is fixedly installed at the upper end of one side of the containing box 1, the exhaust end of the air pump 5 is connected to one end of the air inlet pipe 4, and the lower end of the other side of the containing box 1 is provided with an air outlet connected to the air outlet pipe 3. 13. A plurality of threaded convex tubes 31 are evenly and fixedly installed on the upper part of the air outlet pipe 3. The lower ends of the plurality of gas storage tanks 2 are matched and connected with the corresponding threaded convex tubes 31 through the second one-way air release valve 22. A plurality of elastic expansion joints 6 are evenly and fixedly installed on the lower part of the air inlet pipe 4. The upper ends of the plurality of gas storage tanks 2 are connected with the corresponding elastic expansion joints 6 through the first one-way air release valve 21. An opening is provided on the front side of the containing box 1. A box door 11 is installed in the opening through a hinge. By opening the box door 11, the staff can install or disassemble the gas storage tank 2, thereby improving the efficiency of gas sampling.
[0022] Furthermore, in order to facilitate the staff to transfer the storage box 1, in this embodiment, rollers 12 are rotatably installed at the four corners of the bottom of the storage box 1, and an inclined push rod 7 is fixedly installed at one end of the storage box 1.
[0023] In this embodiment, the elastic expansion joint 6 includes a sleeve 61 and a plug 62. The sleeve 61 is fixedly installed at the lower part of the air inlet pipe 4. The sleeve 61 is connected to the air inlet pipe 4. The plug 62 is inserted in the sleeve 61. A limiting ring 63 is fixedly sleeved on the outer side of the upper end of the plug 62. A spring 64 is fixedly installed on the upper part of the limiting ring 63. The upper end of the spring 64 is fixedly connected to the top of the sleeve 61. The lower end of the plug 62 is inserted in the air inlet of the first one-way air relief valve 21. The plug 62 can move up and down in the sleeve 61, so as to facilitate the installation of the gas storage tank 2.
[0024] Furthermore, in order to ensure that the gas storage tank 2 can be stably installed on the gas outlet pipe 3 , in this embodiment, a threaded joint 221 is installed at the lower end of the second one-way air release valve 22 , and the threaded joint 221 is matched with the corresponding threaded convex pipe 31 for connection.
[0025] In this embodiment, a gate valve 41 is installed on the air inlet pipe 4 between adjacent air storage tanks 2 .
[0026] In this embodiment, the gate valve 41 is a manual gate valve.
[0027] The specific operation steps are as follows: push the containing box 1 to the position where gas sampling is required through the inclined push rod 7, open the gate valve 41 near the air pump 5, and by turning on the air pump 5, the air pump 5 can fill the external gas into the air inlet pipe 4, and the air pressure in the air inlet pipe 4 increases. When the air pressure reaches the air inlet pressure value of the first one-way air release valve 21, the gas can enter the gas storage tank 2 through the first one-way air release valve 21. When the air pressure in the gas storage tank 2 is greater than the air outlet pressure value of the second one-way air release valve 21, the gas can overflow, and the overflowed gas is discharged through the air outlet pipe 3;
[0028] When the sampling of the first gas storage tank 2 near the vacuum pump 5 is completed, the containing box 1 is transferred to other locations where sampling is required, and the gate valve 41 at the rear thereof is opened. At this time, the above operation is repeated to fill the subsequent gas storage tanks 2 with the gas at the sampling location.
[0029] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, the patent owner may make various variations or modifications within the scope of the appended claims. As long as they do not exceed the protection scope described in the claims of the present invention, they should be within the protection scope of the present invention.
Claims
1. An industrial waste gas detection sampling device, comprising a containing box, Features: The vent pipe is connected with the air inlet pipe of the air inlet pipe, and the vent pipe is connected with the air inlet pipe of the air inlet pipe, and the vent pipe is connected with the air inlet pipe of the air inlet pipe.
2. An industrial waste gas detection sampling device according to claim 1, Features: The elastic expansion joint includes a sleeve and a plug. The sleeve is fixedly installed at the lower part of the air inlet pipe. The sleeve is connected to the air inlet pipe. The plug is inserted in the sleeve. A limiting ring is fixedly sleeved on the outer side of the upper end of the plug. A spring is fixedly installed on the upper part of the limiting ring. The upper end of the spring is fixedly connected to the top of the sleeve. The lower end of the plug is inserted in the air inlet of the first one-way air relief valve.
3. An industrial waste gas detection sampling device according to claim 1, Features: The lower end of the second one-way air release valve is connected to a threaded joint, which is matched and connected with a corresponding threaded convex pipe.
4. An industrial waste gas detection sampling device according to claim 1, Features: The air inlet pipe is provided with a gate valve between adjacent air storage tanks.
5. An industrial waste gas detection sampling device according to claim 4, Features: The gate valve is a manual gate valve.