Constructional engineering surveying pay-off device

By designing a construction engineering wire storage box with a pay-off wheel, a tension control frame and a cleaning frame, the problem of easy damage to the device and contamination of the wire body during construction is solved, the safe storage and cleaning of the wire body is realized, and the accuracy of measurement is improved. Practicality.

CN221894375UActive Publication Date: 2024-10-25CHONGQING QISAN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420110682.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-25
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

The construction engineering measurement and setting-out device is easily damaged due to falling during construction, and the wire body is prone to adhere to dust and soil, affecting the use effect.

Method used

A device including a construction engineering wire storage box is designed. The wire storage box is equipped with a pay-off wheel, a tension control frame, a cleaning frame and an electric cylinder. It is locked through a guide wheel set, a clamping roller frame, a spring telescopic rod and a magnetic suction. Components to realize the storage, tension adjustment and cleaning of the thread body.

Benefits of technology

It effectively protects the measuring and setting-out device from damage, ensures that the line body is clean, facilitates construction operations, and improves the practicality of setting-out measurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221894375U_ABST
    Figure CN221894375U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering surveying, in particular to a constructional engineering surveying pay-off device which comprises a constructional engineering wire storage box, the top of the constructional engineering wire storage box is rotationally connected with a pulling door through a pin shaft, and the bottom of the inner wall of the constructional engineering wire storage box is fixedly connected with a stabilizing frame. A pay-off wheel with a driving end is fixedly installed on the surface of the stabilizing frame, a first electric air cylinder is fixedly installed on the top of the inner wall of the constructional engineering wire storage box, a tension control frame is fixedly connected to the output end of the first electric air cylinder, and a pay-off frame is fixedly connected to the right side of the constructional engineering wire storage box; according to the structure, the constructional engineering wire storage box with the protection function is arranged to protect the internal structure, the situation of damage caused by falling and collision in constructional engineering construction is avoided, the cleaning frame is additionally arranged, the surface of a recycled wire body can be wiped and cleaned, and the paying-off measurement practicability in constructional engineering is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a construction engineering measurement and setting-out device, belonging to the technical field of construction engineering measurement. Background Art

[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's production, living, learning, and public activities. Laying out lines is to facilitate the work of workers, that is, to copy the dimensions of the design drawings to the ground according to the dimensions shown in the drawings. Whether the dimensions of the entire project are constructed in accordance with the dimensions of the design drawings, according to the types of projects served by engineering surveying, can also be divided into construction engineering surveying, line surveying, bridge and tunnel surveying, mining surveying, urban surveying, and water conservancy engineering surveying, etc.;

[0003] For example, a construction engineering measurement and setting-out device with patent publication number CN202021942319.3 includes a mounting frame, threaded holes are provided on both sides of the mounting frame, fixing bolts are connected to the inner threads of the threaded holes, a fixing frame is fixedly connected to the top of the mounting frame, a forward and reverse motor is fixedly connected to the inner part of the fixing frame, a transmission shaft is movably connected to the output end of the forward and reverse motor, and a rotating rod is movably connected to one end of the transmission shaft;

[0004] Since the above-mentioned measuring and laying-out device is used in an exposed state during construction projects, it is easy for it to accidentally fall and collide with the measuring and laying-out device during construction, causing damage to the wire body on the measuring and laying-out device. However, in practical construction engineering measurement projects, dust and dirt will adhere to the wire body, which brings certain adverse effects to actual use, and therefore needs to be improved. Utility Model Content

[0005] The purpose of the utility model is to provide a construction engineering measurement and layout device. The utility model protects the internal structure by arranging a construction engineering wire storage box with a protective function to avoid damage caused by falling and impact during construction of the construction project. A cleaning frame is added to wipe and clean the surface of the recovered wire body, thereby ensuring the practicability of the layout measurement in the construction project, so as to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A construction engineering measuring and laying-out device comprises a construction engineering wire storage box, the top of the construction engineering wire storage box is rotatably connected with a pulling door through a pin shaft, the bottom of the inner wall of the construction engineering wire storage box is fixedly connected with a stabilizing frame, a wire-laying wheel with a driving end is fixedly installed on the surface of the stabilizing frame, an electric cylinder 1 is fixedly installed on the top of the inner wall of the construction engineering wire storage box, the output end of the electric cylinder 1 is fixedly connected with a tension control frame, the right side of the construction engineering wire storage box is fixedly connected with a wire-laying frame, a spring telescopic rod is fixedly installed on the left side of the wire-laying frame near its inner wall through a bracket, the output end of the spring telescopic rod is fixedly connected with a clamping roller frame, a cleaning frame is fixedly installed on the middle part of the wire-laying frame near its inner wall, an electric cylinder 2 is fixedly installed on the top of the cleaning frame, the output end of the electric cylinder 2 penetrates into the interior of the cleaning frame and is fixedly connected with an upward moving plate, the bottom of the inner wall of the cleaning frame and the bottom of the upward moving plate are both connected with a locking assembly, the locking assembly is connected to a cleaning plate with a wet wiping cloth, and the right side of the cleaning frame is rotatably connected with a sealing door through a hinge.

[0008] Furthermore, a lower leg is fixedly connected to the bottom of the construction engineering wire storage box, a wear-resistant pad is fixedly connected to the bottom of the lower leg, and the lower surface of the wear-resistant pad is provided with an anti-skid textured surface.

[0009] Furthermore, the main body of the tension control frame is an open frame, and the interior of the open frame is rotatably connected to a guide wheel group through a driving end, and the number of the guide wheel groups is two, and the two guide wheel groups are connected in left and right positions.

[0010] Furthermore, the surface of the roller rod on the clamping roller frame and the surface of the roller on the guide wheel group are both fixedly connected with rubber ring pads, and the surface of the rubber ring pads is opened as a smooth surface.

[0011] Furthermore, a guide plate is fixedly connected to the surface of the clamping roller frame, a guide groove is provided on the surface of the inner wall of the wire-releasing frame, and the inner wall of the guide groove is slidably connected to the surface of the guide plate.

[0012] Furthermore, the locking assembly includes a magnetic locking plate and a magnetic locking groove, the magnetic locking plate is fixedly connected to the surface of the cleaning plate, the magnetic locking groove is opened on the bottom of the inner wall of the cleaning frame and the bottom of the upper plate, and the inner wall of the magnetic locking groove and the surface of the magnetic locking plate are magnetically engaged and adapted.

[0013] The beneficial effects of the utility model are:

[0014] The utility model discloses a wire storage box for construction projects, in which the wire body can be stored and stored for subsequent wire-releasing and wire-winding operations, and the wire head in the wire-releasing wheel can be guided to move out of the wire-releasing frame, and the wire body can be guided by the guide wheel group in the tension control frame and the roller rod on the clamping roller frame in turn. If the wire body after being moved out is loose and the tension is insufficient, the electric cylinder can be driven to operate to drive the tension control frame to be raised and lowered, and the wire body inside it can be pulled for tension control. In the process of wire-releasing or wire-winding, the wire body will be subjected to telescopic tension, which will cause the clamping roller frame to be pulled in the left and right directions. Under the elastic action of the spring telescopic rod, the impact force and pulling force caused by the clamping roller frame can be offset and buffered, and the smooth movement of the clamping roller frame during the movement is guaranteed by the arrangement of the guide plate and the guide groove, thereby completing the free retraction and release of the wire body inside the wire storage box for construction projects.

[0015] In the utility model, since dust and mud may adhere to the wire body during the construction engineering measurement practical project, during the process of recovering the wire body, the electric cylinder can be operated to drive the upper plate to move downward, and the cleaning plate on it can be controlled to be close to the cleaning plate below the cleaning frame. The wet wiping cloth on the two cleaning plates close to each other can wrap and wipe the wire body, and after subsequent use, the cleaning plate can be taken out from the inside of the cleaning frame for decontamination and cleaning by unlocking the magnetic locking plate and the magnetic locking groove, thereby ensuring the cleanliness of the wire body after recovery. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the specific embodiments of the present invention and do not constitute a limitation to the present invention.

[0017] Figure 1 It is a schematic diagram of the overall structure of a construction engineering measurement and setting-out device of the utility model;

[0018] Figure 2 It is a front cross-sectional view of a construction engineering measurement and setting-out device of the utility model;

[0019] Figure 3 This is an enlarged view of point A of a construction engineering measurement and setting-out device of the utility model;

[0020] Figure 4 This is an enlarged view of position B of a construction engineering measurement and setting-out device of the utility model;

[0021] Numbers in the figure: 1. Construction engineering wire storage box; 2. Pull door; 3. Stabilizing frame; 4. Pay-off wheel; 5. Electric cylinder one; 6. Tension control frame; 7. Pay-off frame; 8. Spring telescopic rod; 9. Clamping roller frame; 10. Cleaning frame; 11. Electric cylinder two; 12. Upper plate; 13. Cleaning plate; 14. Sealing door; 15. Lower leg; 16. Wear-resistant pad; 17. Guide wheel group; 18. Rubber ring pad; 19. Guide plate; 20. Guide groove; 21. Magnetic locking plate; 22. Magnetic locking groove. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Example 1 Please refer to Figure 1-Figure 4 , the utility model provides a technical solution:

[0024] A construction engineering measurement and release device, comprising a construction engineering wire storage box 1, the top of the construction engineering wire storage box 1 is rotatably connected to a pulling door 2 through a pin shaft, the bottom of the inner wall of the construction engineering wire storage box 1 is fixedly connected to a stabilizing frame 3, a release wheel 4 with a driving end is fixedly installed on the surface of the stabilizing frame 3, an electric cylinder 5 is fixedly installed on the top of the inner wall of the construction engineering wire storage box 1, the output end of the electric cylinder 5 is fixedly connected to a tension control frame 6, the right side of the construction engineering wire storage box 1 is fixedly connected to a release frame 7, and the left side of the release frame 7 close to its inner wall is fixedly connected by a bracket. A spring telescopic rod 8 is fixedly installed, and the output end of the spring telescopic rod 8 is fixedly connected to a clamping roller frame 9. A cleaning frame 10 is fixedly installed on the wire-releasing frame 7 near the middle of its inner wall. An electric cylinder 11 is fixedly installed on the top of the cleaning frame 10. The output end of the electric cylinder 11 passes through the interior of the cleaning frame 10 and is fixedly connected to an upward plate 12. The bottom of the inner wall of the cleaning frame 10 and the bottom of the upward plate 12 are both connected with a locking assembly, and the locking assembly is connected to a cleaning plate 13 with a wet wiping cloth. The right side of the cleaning frame 10 is rotatably connected to a sealing door 14 through a hinge.

[0025] Specifically, Figure 1-Figure 4 As shown, the bottom of the construction engineering wire storage box 1 is fixedly connected with a lower support leg 15, and the bottom of the lower support leg 15 is fixedly connected with a wear-resistant pad 16, and the lower surface of the wear-resistant pad 16 is provided with an anti-skid surface. Under the action of the wear-resistant pad 16 under the lower support leg 15, the entire construction engineering wire storage box 1 can be supported by a wear-resistant and anti-skid effect.

[0026] Furthermore, a guide plate 19 is fixedly connected to the surface of the clamping roller frame 9, and a guide groove 20 is provided on the surface of the inner wall of the wire-releasing frame 7. The inner wall of the guide groove 20 and the surface of the guide plate 19 are slidably connected. The setting of the guide plate 19 and the guide groove 20 ensures smooth movement of the clamping roller frame 9 during the movement process.

[0027] Specifically, Figure 1-Figure 4 As shown, the locking assembly includes a magnetic locking plate 21 and a magnetic locking groove 22, the magnetic locking plate 21 is fixedly connected to the surface of the cleaning plate 13, the magnetic locking groove 22 is opened on the bottom of the inner wall of the cleaning frame 10 and the bottom of the upper plate 12, the inner wall of the magnetic locking groove 22 and the surface of the magnetic locking plate 21 are magnetically engaged and adapted, and the cleaning plate 13 is taken out from the interior of the cleaning frame 10 for decontamination and cleaning by unlocking the magnetic locking plate 21 and the magnetic locking groove 22.

[0028] Example 2 Please refer to Figure 1-Figure 4 The difference between this embodiment and embodiment 1 is that the main body of the tension control frame 6 is an open frame, and the interior of the open frame is connected to a guide wheel group 17 through a driving end rotation. The number of the guide wheel groups 17 is two, and the two guide wheel groups 17 are connected in left and right positions. The surface of the roller rod on the clamping roller frame 9 and the surface of the roller on the guide wheel group 17 are fixedly connected with a rubber ring pad 18. The surface of the rubber ring pad 18 is opened as a smooth surface, which can drive the electric cylinder 15 to drive the tension control frame 6 to move up and down. The guide wheel group 17 pulls the wire body inside it to adjust the tension, and the wire body will be stretched and retracted during the process of releasing or retrieving the wire. Under the action of the rubber ring pad 18, the degree of wear on the wire body is reduced.

[0029] Working principle of the utility model: when in use, the staff can move the entire construction project wire storage box 1 to the construction project measurement site, and when the construction project's wire laying and measurement work is to be carried out, the wire body and the wire head in the wire laying wheel 4 can be guided to move out of the wire laying frame 7, and the wire body can be guided successively by the guide wheel group 17 in the tension control frame 6 and the roller rod on the clamping roller frame 9. If the wire body is loose after being moved out and the tension is insufficient, the electric cylinder 15 can be driven to drive the tension control frame 6 to be raised and lowered, and the wire body inside it can be pulled to adjust the tension. In the process of laying off or taking up the wire, the wire body will be stretched and retracted, which will cause the clamping roller frame 9 to be pulled in the left and right directions. Under the elastic action of the spring telescopic rod 8, the impact force and the pulling force caused by the clamping roller frame 9 can be offset and buffered, and the guide plate 19 and The setting of the guide groove 20 ensures the smooth movement of the clamping roller frame 9 during the movement, thereby completing the free retraction and release of the center line body inside the construction project line storage box 1. However, in the practical engineering of construction project measurement, dust and dirt will adhere to the line body. In the process of recovering the line body, the electric cylinder 11 can be operated to drive the upper plate 12 to move downward, and the cleaning plate 13 on it can be controlled to be close to the cleaning plate 13 in the lower part of the cleaning frame 10. The wet wiping cloth on the two cleaning plates 13 close to each other can be used to wrap and wipe the line body. After subsequent use, the cleaning plate 13 can be taken out from the inside of the cleaning frame 10 for decontamination and cleaning by unlocking the magnetic locking plate 21 and the magnetic locking groove 22, thereby ensuring the cleanliness of the line body after recovery and the practicality of line measurement in construction projects.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering measurement and setting-out device, comprising a construction engineering wire storage box (1), characterized in that: The top of the construction engineering wire storage box (1) is rotatably connected to a sliding door (2) via a pin shaft; the bottom of the inner wall of the construction engineering wire storage box (1) is fixedly connected to a stabilizing frame (3); a wire-releasing wheel (4) with a driving end is fixedly installed on the surface of the stabilizing frame (3); an electric cylinder (5) is fixedly installed on the top of the inner wall of the construction engineering wire storage box (1); the output end of the electric cylinder (5) is fixedly connected to a tension control frame (6); the right side of the construction engineering wire storage box (1) is fixedly connected to a wire-releasing frame (7); a spring telescopic rod (8) is fixedly installed on the left side of the wire-releasing frame (7) near the inner wall thereof via a bracket; The output end of the spring telescopic rod (8) is fixedly connected to a clamping roller frame (9); a cleaning frame (10) is fixedly installed on the middle part of the inner wall of the wire-releasing frame (7); an electric cylinder 2 (11) is fixedly installed on the top of the cleaning frame (10); the output end of the electric cylinder 2 (11) penetrates into the interior of the cleaning frame (10) and is fixedly connected to an upward moving plate (12); the bottom of the inner wall of the cleaning frame (10) and the bottom of the upward moving plate (12) are both connected to a locking assembly; the locking assembly is connected to a cleaning plate (13) with a wet wiping cloth; the right side of the cleaning frame (10) is rotatably connected to a sealing door (14) via a hinge.

2. A construction engineering surveying and setting-out device according to claim 1, characterized in that: The bottom of the construction engineering wire storage box (1) is fixedly connected to a lower leg (15), the bottom of the lower leg (15) is fixedly connected to a wear-resistant pad (16), and the lower surface of the wear-resistant pad (16) is provided with an anti-slip textured surface.

3. A construction engineering surveying and setting-out device according to claim 1, characterized in that: The main body of the tension control frame (6) is an open frame, and the interior of the open frame is rotatably connected to a guide wheel group (17) via a driving end, and the number of the guide wheel groups (17) is two, and the two guide wheel groups (17) are connected in left and right positions.

4. A construction engineering surveying and setting-out device according to claim 3, characterized in that: The surface of the roller rod on the clamping roller frame (9) and the surface of the roller on the guide wheel group (17) are both fixedly connected with a rubber ring pad (18), and the surface of the rubber ring pad (18) is formed into a smooth surface.

5. A construction engineering surveying and setting-out device according to claim 1, characterized in that: A guide plate (19) is fixedly connected to the surface of the clamping roller frame (9), a guide groove (20) is provided on the surface of the inner wall of the wire-releasing frame (7), and the inner wall of the guide groove (20) is slidably connected to the surface of the guide plate (19).

6. A construction engineering surveying and setting-out device according to claim 1, characterized in that: The locking assembly comprises a magnetic locking plate (21) and a magnetic locking groove (22); the magnetic locking plate (21) is fixedly connected to the surface of the cleaning plate (13); the magnetic locking groove (22) is formed at the bottom of the inner wall of the cleaning frame (10) and the bottom of the upward moving plate (12); the inner wall of the magnetic locking groove (22) and the surface of the magnetic locking plate (21) are magnetically engaged and adapted.