High-altitude operation construction trolley for bridge

By designing a bridge construction trolley for high-altitude operations, and using vertical load-bearing columns, pulley blocks and fixed structures, the problems of low construction efficiency and high safety risks of simple hanging baskets were solved, and efficient and safe construction platform movement and bridge main girder wings were achieved. Decoration of slabs and installation of centralized drainage facilities.

CN221895592UActive Publication Date: 2024-10-25CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420874494.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-10-25
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

During the bridge construction process, when simple hanging baskets are used for high-altitude operations, construction personnel have low traffic efficiency, high safety risks, low construction efficiency, high costs, and poor stability, making it difficult to ensure vertical and horizontal stability.

Method used

A construction trolley for high-altitude bridge work is designed, including spaced vertical load-bearing columns, ladders, fixed structures, pulley blocks, scissor braces, transverse connecting columns, diagonal braces and guardrails. The pulley block enables rapid movement and movement of the trolley. stability to ensure the safety and efficiency of the construction platform.

Benefits of technology

It improves construction efficiency, reduces construction costs, enhances the overall strength and safety of the construction trolley, and can quickly move to the location to be constructed without the need to frequently adjust the position, ensuring the stability and safety of the construction platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895592U_ABST
    Figure CN221895592U_ABST
Patent Text Reader

Abstract

The high-altitude operation construction trolley for the bridge comprises two vertical stress columns which are arranged in a spaced mode, crawling ladders are arranged on the vertical stress columns, a construction platform is arranged below the vertical stress columns, and a fixing structure is arranged above the vertical stress columns. The fixing structure comprises a bending piece arranged at the top end of the vertical stress column and a pulley block arranged on the bending piece, the construction platform comprises a first construction platform arranged in the middle of the vertical stress column and a second construction platform arranged at the lower end of the vertical stress column, and the crawling ladder penetrates through the first construction platform and is connected to the second construction platform; the construction trolley is fixed to a bridge floor through the fixing structure, safety of workers during high-altitude operation is guaranteed, the construction trolley is driven by the pulley block to rapidly move on a bridge and can directly move to a to-be-constructed position, and stability of a construction platform can be guaranteed in the moving process; and the first construction platform and the second construction platform are arranged on the construction trolley, so that the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to high-altitude bridge operations, in particular to a high-altitude bridge construction trolley. Background Art

[0002] During the bridge construction process, a large amount of work requires high-altitude operations, such as the collection of rainwater and sewage on the bridge deck. In order to ensure the safety and normal use of the bridge, centralized drainage facilities are usually installed on the cable-stayed bridge. The centralized drainage facilities include bridge deck gutters, longitudinal drainage pipes and positioning rods under the bridge deck main beams. Except for the gutters, all of them involve high-altitude operations; as well as the modification of the edges of the bridge main beam wing plates. Due to the small working area of ​​the bridge main beam wing plates and the large amount of work at high altitude edges, most of the main beam wing plates have uneven edges and serious color differences. Therefore, high-altitude operations are required to modify the bridge main beam wing plates.

[0003] On bridges that are ready for traffic, bridge inspection vehicles are generally chosen as construction platforms for the installation of centralized drainage facilities and the decoration of bridge main beam wing plates. However, most bridge construction sites are not ready for traffic, and most use simple hanging baskets for high-altitude operations.

[0004] However, when using a simple hanging basket for high-altitude operations, the passage of construction workers and the efficiency of construction cannot be guaranteed. In addition, the safety risk of simple hanging basket construction is high. The simple hanging basket does not have a dedicated passage for personnel to go up and down. People are mostly lifted up and down by cranes, and construction workers have no safety guarantee; the operation process is cumbersome. Since the simple hanging basket has no walking device, the hanging basket can only be moved by a crane to adjust the construction position. The position needs to be adjusted frequently during the construction process. During the hoisting process, it is easy to cause the hanging basket to flip and fall; the construction efficiency is low, the longitudinal drainage pipe needs to be installed in sections, and the longitudinal spacing of the hanging basket is short. The position can only be adjusted frequently or the longitudinal drainage pipe can be cut off to increase the joint, resulting in extremely low comprehensive construction efficiency; the construction cost is uncontrollable, and conventional simple hanging baskets must be equipped with cranes for auxiliary construction, and the construction cost is high; the stability is poor, and the hanging basket is difficult to ensure vertical verticality. Most of them are offset to the inside of the center line of the bridge. The stress state is unclear, the construction platform cannot be guaranteed to be horizontal, and the overall stability is poor, which increases the difficulty of construction. Utility Model Content

[0005] The utility model aims to provide a high-altitude construction trolley for bridges, which can solve the problem of low construction efficiency caused by the construction inconvenience caused by the need to frequently change the construction positions of construction workers during high-altitude bridge operations.

[0006] To this end, the technical solution adopted by the utility model is: a high-altitude construction trolley for bridges, comprising two vertical load-bearing columns arranged at intervals, each of the vertical load-bearing columns being equipped with a ladder, a construction platform for high-altitude operations being arranged below the vertical load-bearing columns, a fixed structure for fixing on the bridge deck being arranged above the vertical load-bearing columns, the fixed structure comprising a bending member arranged at the top end of the vertical load-bearing columns and a pulley group arranged on the bending member for walking on the bridge deck, the bending portion of the bending member being bent downward and parallel to the vertical load-bearing columns, the construction platform comprising a first construction platform arranged in the middle position of the vertical load-bearing columns and a second construction platform arranged at the lower end of the vertical load-bearing columns, the ladder passing through the first construction platform and connected to the second construction platform.

[0007] More preferably, the pulley block includes an inner walking pulley arranged at the bent portion, a top walking pulley arranged at the horizontal portion, and an outer walking pulley arranged on the vertical force-bearing column. By arranging the pulley block on the construction trolley, the construction trolley can be moved, which makes construction more convenient and improves construction efficiency.

[0008] Further preferably, the outer walking pulley is bolted to the vertical load-bearing column, and the height of the outer walking pulley is adjusted according to the size of the bridge.

[0009] More preferably, the vertical load-bearing columns are provided with scissor braces for increasing the strength of the vertical load-bearing columns. The scissor braces are provided to increase the strength between the vertical load-bearing columns, thereby preventing the vertical load-bearing columns from deforming during use and affecting the safety of construction workers.

[0010] More preferably, the bending member is provided with a plurality of transverse connecting columns, and the bending member is provided with diagonal braces. The transverse connecting columns and diagonal braces can improve the overall strength of the construction trolley and ensure safety during construction.

[0011] It is further preferred that both the first construction platform and the second construction platform are provided with guardrails, which can ensure the safety of workers during construction.

[0012] The beneficial effects of the utility model include: fixing the construction trolley on the bridge deck by arranging a fixed structure at the top of the vertical load-bearing column, thereby ensuring the safety of the workers when working at high altitudes; a pulley block is provided for the construction trolley to slide on the bridge, which can drive the construction trolley to move quickly on the bridge and can be directly moved to the construction position without frequent disassembly and assembly of the construction trolley, and the stability of the construction platform can be ensured during the movement; a first construction platform and a second construction platform are provided on the construction trolley, and the decoration of the bridge main beam wing plate and the installation of the bridge centralized drainage facilities can be carried out simultaneously, thereby improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the utility model. DETAILED DESCRIPTION

[0014] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0015] like Figure 1 As shown, a high-altitude construction trolley for bridges includes two vertical load-bearing columns 1 arranged at intervals, each of which is equipped with a ladder 2, a construction platform for high-altitude operations is arranged below the vertical load-bearing column 1, and a fixed structure for fixing on the bridge deck is arranged above the vertical load-bearing column 1. The fixed structure includes a bending member 3 arranged at the top of the vertical load-bearing column 1 and a pulley block arranged on the bending member 3 for walking on the bridge deck, and a plurality of transverse connecting columns 10 are arranged on the bending member 3, and the bending member 3 is provided with a diagonal brace 11. By arranging the transverse connecting columns 10 and the diagonal brace 11, the overall strength of the construction trolley can be improved to ensure safety during construction.

[0016] The pulley block includes an inner walking pulley 6 arranged at the bent portion, a top walking pulley 7 arranged at the horizontal portion, and an outer walking pulley 8 arranged on the vertical force-bearing column 1. By arranging the pulley block on the construction trolley, the construction trolley can be moved, which is more convenient during construction and can improve construction efficiency.

[0017] The outer traveling pulley 8 is bolted to the vertical load-bearing column 1, and the height of the outer traveling pulley 8 is adjusted according to the size of the bridge.

[0018] The bending part of the bending member 3 is bent downward and parallel to the vertical load-bearing column 1. The vertical load-bearing column 1 is provided with a scissor brace 9 for increasing the strength of the vertical load-bearing column 1. The scissor brace 9 is provided to increase the strength between the vertical load-bearing columns 1, and prevent the vertical load-bearing columns 1 from deforming during use, which affects the safety of construction workers.

[0019] The construction platform includes a first construction platform 4 arranged in the middle of the vertical load-bearing column 1 and a second construction platform 5 arranged at the lower end of the vertical load-bearing column 1, and the ladder 2 passes through the first construction platform 4 and is connected to the second construction platform 5. A connecting plate (not shown in the figure) fixed to the vertical load-bearing column 1 is arranged below the first construction platform 4 for fixing the first construction platform 4.

[0020] The first construction platform 4 and the second construction platform 5 are both provided with guardrails 12. The guardrails 12 can ensure the safety of the workers during construction. The materials of the construction trolleys are all angle steels, and are all welded.

[0021] The construction trolley is fixed on the bridge deck by setting a fixed structure at the top of the vertical load-bearing column 1 to ensure the safety of workers when working at high altitudes. A pulley block is provided for the construction trolley to slide on the bridge, which can drive the construction trolley to move quickly on the bridge and can be directly moved to the construction position without frequent disassembly and assembly of the construction trolley. The stability of the construction platform can be ensured during the movement. The construction trolley is provided with a first construction platform 4 and a second construction platform 5. The decoration of the bridge main beam wing plate and the installation of the bridge centralized drainage facilities can be carried out simultaneously, thereby improving the construction efficiency.

[0022] During the construction process, the trolley is attached to the completed steel guardrail or concrete guardrail, the inner walking pulley 6 is in contact with the side wall, the top walking pulley 7 is in contact with the upper surface, and the outer walking pulley 8 is in direct contact with the edge of the concrete main beam. A winch is anchored on the bridge deck, and the steel wire rope on the winch is connected to the construction trolley. The winch drives the trolley to move longitudinally on the side wall of the bridge. When the trolley is moved, the staff leaves the trolley through the ladder 2. During the process, the staff's safety belts are hung on the fall arrester of the completed steel guardrail or concrete guardrail.

[0023] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A high-altitude construction trolley for bridges, characterized by: The invention comprises two vertical load-bearing columns (1) arranged at intervals, each of the vertical load-bearing columns (1) being equipped with a ladder (2), a construction platform for aerial work being arranged below the vertical load-bearing columns (1), a fixing structure for fixing on a bridge deck being arranged above the vertical load-bearing columns (1), the fixing structure comprising a bending member (3) arranged at the top of the vertical load-bearing columns (1) and a pulley block arranged on the bending member (3) for walking on the bridge deck, the bending portion of the bending member (3) being bent downwardly and parallel to the vertical load-bearing columns (1), the construction platform comprising a first construction platform (4) arranged at the middle position of the vertical load-bearing columns (1) and a second construction platform (5) arranged at the lower end of the vertical load-bearing columns (1), the ladder (2) passing through the first construction platform (4) and connected to the second construction platform (5).

2. The aerial work construction trolley for bridges according to claim 1 is characterized in that: The pulley block comprises an inner walking pulley (6) arranged on the bent portion, a top walking pulley (7) arranged on the horizontal portion, and an outer walking pulley (8) arranged on the vertical force-bearing column (1).

3. The aerial work construction trolley for bridges according to claim 2 is characterized in that: The outer walking pulley (8) is bolted to the vertical load-bearing column (1), and the height of the outer walking pulley (8) is adjusted according to the size of the bridge.

4. The aerial work construction trolley for bridges according to claim 1 is characterized in that: The vertical load-bearing column (1) is provided with a scissor brace (9) for increasing the strength of the vertical load-bearing column (1).

5. The aerial construction trolley for bridges according to claim 1 is characterized in that: A plurality of transverse connecting columns (10) are arranged on the bending piece (3), and a diagonal brace (11) is arranged on the bending piece (3).

6. The aerial construction trolley for bridges according to claim 1, characterized in that: Guardrails (12) are provided on both the first construction platform (4) and the second construction platform (5).