Partition plate installation front locking type energy storage nozzle
The front-locking structure installed through the partition solves the safety problem of fire caused by thermal runaway of the lithium battery in the energy storage box, improves the installation stability and sealing of the nozzle, and achieves a more compact and beautiful energy storage nozzle design.
Patent Information
- Application Number
- CN202323646085.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-29
AI Technical Summary
Thermal runaway of lithium batteries in existing energy storage boxes can lead to fires or explosions. The existing fire nozzle installation method requires additional brackets, takes up space and is unstable.
A front-locking energy storage nozzle with a partition installed is designed. It uses an alloy material nozzle body and a convex seat structure. The partition is clamped by nuts and convex seats to achieve fixed installation, ensuring the stability and tight connection of the nozzle.
This design improves the installation stability of the nozzle, saves bracket costs, and enhances sealing and aesthetics through sealing gaskets and threaded structures.
Smart Images

Figure CN221905542U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fire nozzles, in particular to a partition-mounted front-locking energy storage nozzle. Background Art
[0002] With the continuous development of new energy, energy storage equipment is changing with each passing day. The market share of energy storage box transformers that use batteries as energy storage carriers is increasing year by year. Because batteries are large energy carriers, they can still undergo chemical reactions in the absence of oxygen, releasing a large amount of heat, thereby causing fire or explosion.
[0003] Energy storage is an emerging industry that is developing very rapidly. From promoting the consumption of renewable energy to frequency and peak regulation, and then to new energy vehicle power batteries, energy storage is expanding its market share at a rapid pace. The trend of vigorously developing electrochemical energy storage is irreversible. The multiple values of energy storage have initially emerged and have broad market potential, but they still face challenges in terms of safety. Existing energy storage boxes are usually assembled from multiple lithium battery cells into a battery box (energy storage pack), and then multiple battery boxes are placed in the energy storage box. When the lithium battery cells in the energy storage box thermally run away and catch fire, if firefighting cannot be carried out in time, it will trigger thermal runaway of other lithium battery cells in the energy storage box, causing a major safety accident and affecting personal safety and property safety.
[0004] At present, the market mostly uses gas fire fighting, such as HFC-227ea, 1230 gas, etc., or high-pressure fine water mist fire fighting, such as a fire warning and fire fighting system for energy storage boxes and cabinets disclosed in the Chinese patent document with publication number CN220110297U, which involves the field of fire safety technology of new energy storage equipment, including energy storage boxes, cabinets, fire fighting systems, and alarm systems; the fire fighting system includes fire fighting pipes, sprinkler head connectors, and fire sprinkler heads; the alarm system includes sound and light alarms, gas detectors, and remote transmission modules; a fire warning and fire fighting system for energy storage boxes and cabinets is provided, which organically integrates fire fighting, alarms, and gas detection into one unit, which is convenient and practical; the coordinated use of the fire fighting system and the alarm system can quickly and automatically carry out fire fighting operations when an explosion or fire occurs in the energy storage box or cabinet, and the alarm system simultaneously sounds and lights alarms at the scene and the control center, and sends alarm information synchronously through the web page and APP for rapid processing, thereby reducing the user's property loss.
[0005] Another example is a fire-fighting device for an energy storage box disclosed in a Chinese patent document with publication number CN219579762U. It relates to the field of battery energy storage technology, and specifically includes a connection seat fixed on the outer side of the maintenance panel of the energy storage box, a puncture valve arranged on one side of the connection seat, a fire hose connected to the puncture valve, and a fire detection mechanism plugged into the maintenance panel; the maintenance panel is provided with a maintenance port that connects the internal space of the energy storage box with the outside, and the connection seat is provided with a cavity that is connected to the maintenance port, and the puncture valve is used to puncture the outer wall of the connection seat to connect the cavity with the fire hose. After the fire detection mechanism detects that the battery has thermal runaway, the puncture valve is controlled to quickly puncture the outer wall of the connection seat, so that the fire hose is connected to the cavity of the connection seat through the puncture valve, so that the water or gas in the fire hose can quickly enter the internal space of the energy storage box, cool down the battery in the energy storage box, and then quickly carry out fire fighting on the energy storage box.
[0006] The energy storage nozzle used for the energy storage pack needs to be installed in the box of the energy storage pack through an additional bracket in the prior art, which occupies more space in the box of the energy storage pack. In addition, the bracket is unstable, which affects the water spraying / mist direction of the nozzle. Summary of the invention
[0007] In view of the above technical problems existing in the prior art, the utility model provides a partition-mounted front-locking energy storage nozzle.
[0008] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0009] Provided is a partition-mounted front-locked energy storage nozzle, comprising a nozzle body in a columnar shape made of alloy material, the nozzle body having a liquid through hole axially extending therethrough, a nozzle being arranged at the front end of the liquid through hole, the liquid through hole including a first hole section and a second hole section from front to back, the inner diameter of the first hole section being larger than the inner diameter of the second hole section, the first hole section being provided with a valve core and a compression spring, the compression spring applying force to the valve core so that the valve core keeps elastically blocking the second hole section;
[0010] A convex seat is integrally formed on the outer side of the nozzle body around the circumference, and a first external thread is arranged at the front end of the nozzle body. The first external thread is matched with a first nut so that the first nut and the front end surface of the convex seat clamp the peripheral partition together.
[0011] Specifically, a sealing gasket is arranged between the first nut and the boss, and after the first nut is tightened, the end surface of the first nut is flush with the front end surface of the nozzle body.
[0012] Specifically, the nozzle body includes a connecting pipe section and an assembly section in sequence from the rear end to the front. The outer diameter of the connecting pipe section is smaller than the inner diameter of the assembly section. A second external thread is provided on the outer side of the assembly section. The second external thread is matched with a second nut. A pipe insertion groove is formed between the inner wall of the second nut and the outer wall of the connecting pipe section for inserting and locking the end of the water supply pipe.
[0013] Specifically, the outer wall of the pipe connecting section is provided with a pipe clamping protrusion, which includes, from back to front, a first tapered section with a gradually expanding diameter, a straight section with a constant diameter, and a second tapered section with a gradually shrinking diameter.
[0014] Specifically, the second nut includes a threaded section corresponding to the assembly section and a pressing tube section aligned with the pipe section, and the inner diameter of the pressing tube section is smaller than the outer diameter of the assembly section.
[0015] Specifically, the nozzle and the liquid through hole are threadedly connected to each other, one end of the compression spring abuts against the nozzle, and the other end of the compression spring abuts against the valve core, and a first sealing ring is provided between the nozzle and the liquid through hole.
[0016] Specifically, a nozzle core is arranged inside the nozzle, and a plurality of water guide grooves inclined relative to the axis are arranged around the nozzle core.
[0017] Specifically, the valve core includes a valve body, the outer side of the valve body is slidably fitted with the inner wall of the first hole section, and the valve body is provided with a plurality of long water holes; a positioning column is integrally formed at the front end of the valve body, and a telescopic spring is sleeved outside the positioning column.
[0018] Specifically, a tight section is integrally formed at the rear end of the valve body, a conical transition section is provided between the first hole section and the second hole section, and the tight section and the conical transition section cooperate with each other to achieve sealing.
[0019] Specifically, an annular groove is arranged on the outer side of the abutting section, and a second sealing ring is sleeved on the annular groove.
[0020] Beneficial effects of the utility model:
[0021] The utility model discloses a partition-mounted front-locked energy storage nozzle. When in use, the front end of the nozzle body is inserted inwardly from the hole reserved in the partition of the energy storage package box, and the convex seat and the rear part are left outside the energy storage package box. Then the first nut is screwed on from the inside of the partition, and the outer partition can be clamped together with the front end surface of the convex seat, so that the entire energy storage nozzle is fixedly installed. Compared with the existing installation method through an additional bracket, it is more stable and saves the cost of the bracket. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A cross-sectional view of a partition that matches a front-locking energy storage nozzle installed on a partition in an embodiment.
[0023] Figure 2 A three-dimensional diagram of a partition that matches a front-locking energy storage nozzle installed on a partition in an embodiment.
[0024] Figure 3 A stereoscopic view of a partition-mounted front-lock energy storage nozzle in an embodiment.
[0025] Figure 4 An exploded view of a partition-mounted front-lock energy storage nozzle in an embodiment.
[0026] Figure 5 Schematic diagram of the structure of the nozzle in the embodiment.
[0027] Reference numerals:
[0028] Nozzle body 1, liquid through hole 11, first hole section 111, second hole section 112, tapered transition section 113, boss 12, first external thread 13, pipe connecting section 14, pipe clamping protrusion 15, first cone section 151, straight section 152, second cone section 153, assembly section 16, second external thread 17;
[0029] Valve core 2, valve body 21, water hole 22, positioning column 23, abutting section 24, annular groove 25;
[0030] Compression spring 3, nozzle 4, nozzle core 41, water guide groove 411, first nut 5, second nut 6, threaded section 61, pipe pressing section 62, pipe insertion groove 7, sealing gasket 8, first sealing ring 9, second sealing ring 10, partition A. DETAILED DESCRIPTION
[0031] The following will be combined with the accompanying drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0032] A partition-mounted front-locking energy storage nozzle of this embodiment, such as Figures 1 to 5 As shown, the nozzle body 1 is made of alloy and is in a columnar shape. The nozzle body 1 is provided with a liquid hole 11 in the axial direction. A nozzle 4 is provided at the front end of the liquid hole 11. The liquid hole 11 includes a first hole section 111 and a second hole section 112 from front to back. The inner diameter of the first hole section 111 is larger than the inner diameter of the second hole section 112. The first hole section 111 is provided with a valve core 2 and a compression spring 3. The compression spring 3 applies force to the valve core 2 so that the valve core 2 keeps elastically blocking the second hole section 112. When working, the water flow overcomes the force of the compression spring 3 to push the valve core 2 to move, so that the first hole section 111 and the second hole section 112 are connected.
[0033] The outer side of the nozzle body 1 is integrally formed with a boss 12 around the circumference, and the front end of the nozzle body 1 is provided with a first external thread 13, and the first external thread 13 is matched with a first nut 5, so that the first nut 5 and the front end face of the boss 12 can clamp the peripheral partition A together. When in use, the front end of the nozzle body 1 is inserted inward from the hole reserved in the partition A of the energy storage package box, and the boss 12 and its rear part are left outside the energy storage package box. Then the first nut 5 is screwed on from the inside of the partition A, and the peripheral partition A can be clamped together with the front end face of the boss 12, so that the entire energy storage nozzle is fixedly installed, which is more stable than the existing installation method through an additional bracket, saving the cost of the bracket.
[0034] Specifically, a sealing gasket 8 is provided between the first nut 5 and the boss 12 to enhance the sealing of the opening of the partition A. After the first nut 5 is fixed and tightened to the partition A, its end face is flush with the front end face of the nozzle body 1, and the structure is more compact and beautiful.
[0035] Specifically, the nozzle body 1 includes a pipe connecting section 14 and an assembly section 16 from the rear end to the front. The outer diameter of the pipe connecting section 14 is smaller than the inner diameter of the assembly section 16. The outer side of the assembly section 16 is provided with a second external thread 17. The second external thread 17 is matched with a second nut 6. A pipe inserting groove 7 is formed between the inner wall of the second nut 6 and the outer wall of the pipe connecting section 14 for the end of the water supply pipe to be inserted and locked. When connecting the pipe, the end of the water supply pipe is inserted into the pipe inserting groove 7 after passing through the second nut 6, and then the second nut 6 is tightened. The cooperation between the second nut 6 and the pipe connecting section 14 can clamp and lock the water pipe, and the connection is convenient. Of course, in practice, the water supply pipe can also be directly threadedly matched with the second external thread 17 to achieve the connection, and a variety of connection methods are provided for selection.
[0036] Specifically, the outer wall of the pipe connecting section 14 is integrally formed with a pipe clamping protrusion 15, which includes, from back to front, a first tapered section 151 with a gradually expanding diameter, a straight section 152 with a constant diameter, and a second tapered section 153 with a gradually shrinking diameter, which plays a role of gradually expanding and tightening the soft water supply pipe port when it is inserted.
[0037] Specifically, the second nut 6 includes a threaded section 61 corresponding to the assembly section 16 and a pressing section 62 aligned with the pipe section 14, the inner diameter of the pressing section 62 being smaller than the outer diameter of the assembly section 16. When the second nut 6 is tightened, the pressing section 62 can press the pipe wall of the water supply pipe.
[0038] Specifically, the nozzle 4 and the liquid hole 11 are threadedly connected to each other, one end of the compression spring 3 abuts against the nozzle 4, and the other end of the compression spring 3 abuts against the valve core 2, and a first sealing ring 9 is provided between the nozzle 4 and the liquid hole 11.
[0039] Specifically, a nozzle core 41 is disposed inside the nozzle 4, and a plurality of water guide grooves 411 inclined relative to the axis are disposed around the nozzle core 41, which can accelerate the water flow entering the nozzle 4 and spray it out more evenly and stably.
[0040] Specifically, the valve core 2 includes a valve body 21, the outer side of the valve body 21 is slidably fitted with the inner wall of the first hole section 111, and the valve body 21 is provided with a plurality of long water holes 22; a positioning column 23 is integrally formed at the front end of the valve body 21, and a telescopic spring is sleeved outside the positioning column 23. Specifically, a tight section 24 is integrally formed at the rear end of the valve body 21, and a conical transition section 113 is provided between the first hole section 111 and the second hole section 112, and the tight section 24 and the conical transition section 113 cooperate with each other to achieve sealing. Specifically, an annular groove 25 is provided on the outer side of the tight section 24, and a second sealing ring 10 is sleeved on the annular groove 25.
[0041] In the description of the present invention, it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments. The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations.
[0042] Therefore, the above detailed description of the embodiments of the utility model provided in the accompanying drawings is not intended to limit the scope of the utility model claimed for protection, but merely represents selected embodiments of the utility model. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without making creative efforts are within the scope of protection of the utility model.
[0043] In the description of the present utility model, it should be noted that the terms "middle", "upper", "lower", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "disposed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be directly connected or indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
Claims
1. A bulkhead mounted front-lock type energy storage nozzle, characterized by: The nozzle body (1) is made of alloy and is in a columnar shape. The nozzle body (1) is provided with a liquid through hole (11) extending through the nozzle body (1) in the axial direction. A nozzle (4) is provided at the front end of the liquid through hole (11). The liquid through hole (11) includes a first hole section (111) and a second hole section (112) from front to back. The inner diameter of the first hole section (111) is larger than the inner diameter of the second hole section (112). The first hole section (111) is provided with a valve core (2) and a compression spring (3). The compression spring (3) applies force to the valve core (2) so that the valve core (2) keeps elastically blocking the second hole section (112). A convex seat (12) is integrally formed on the outer side of the nozzle body (1) in a circumferential direction, and a first external thread (13) is provided at the front end of the nozzle body (1). The first external thread (13) is matched with a first nut (5), so that the first nut (5) and the front end surface of the convex seat (12) can clamp the peripheral partition together.
2. The partition-mounted front-lock energy storage nozzle according to claim 1 is characterized in that: A sealing gasket (8) is provided between the first nut (5) and the convex seat (12), and after the first nut (5) is tightened, its end surface is flush with the front end surface of the nozzle body (1).
3. The partition-mounted front-lock energy storage nozzle according to claim 1 is characterized in that: The nozzle body (1) comprises a connecting pipe section (14) and an assembly section (16) in sequence from the rear end to the front, the outer diameter of the connecting pipe section (14) is smaller than the inner diameter of the assembly section (16), a second external thread (17) is provided on the outer side of the assembly section (16), the second external thread (17) is matched with a second nut (6), and a pipe insertion groove (7) is formed between the inner wall of the second nut (6) and the outer wall of the connecting pipe section (14) for inserting and locking the end of the water supply pipe.
4. A bulkhead mounted front-locked energy storage nozzle according to claim 3, characterized in that: The outer wall of the pipe section (14) is provided with a pipe holding protrusion (15), which comprises, from back to front, a first tapered section (151) with a gradually expanding diameter, a straight section (152) with a constant diameter, and a second tapered section (153) with a gradually shrinking diameter.
5. The partition-mounted front-locked energy storage nozzle according to claim 3 is characterized in that: The second nut (6) comprises a threaded section (61) corresponding to the assembly section (16) and a pressing tube section (62) aligned with the pipe section (14); the inner diameter of the pressing tube section (62) is smaller than the outer diameter of the assembly section (16).
6. The partition-mounted front-locking energy storage nozzle according to claim 1 is characterized in that: The nozzle (4) and the liquid passage hole (11) are threadedly connected to each other, one end of the compression spring (3) abuts against the nozzle (4), the other end of the compression spring (3) abuts against the valve core (2), and a first sealing ring (9) is provided between the nozzle (4) and the liquid passage hole (11).
7. A bulkhead mounted front-locked energy storage nozzle according to claim 6, characterized in that: A spray core (41) is arranged inside the spray head (4), and a plurality of water guide grooves (411) inclined relative to the axis are arranged on the peripheral side of the spray core (41).
8. The partition-mounted front-locked energy storage nozzle according to claim 1 is characterized in that: The valve core (2) comprises a valve body (21), the outer side of the valve body (21) is slidably fitted with the inner wall of the first hole section (111), and the valve body (21) is provided with a plurality of long strip-shaped water holes (22); a positioning column (23) is integrally formed at the front end of the valve body (21), and a telescopic spring is sleeved outside the positioning column (23).
9. The partition-mounted front-locking energy storage nozzle according to claim 8 is characterized in that: A tight section (24) is integrally formed at the rear end of the valve body (21), a conical transition section (113) is provided between the first hole section (111) and the second hole section (112), and the tight section (24) and the conical transition section (113) cooperate with each other to achieve sealing.
10. A bulkhead mounted front-locked energy storage nozzle according to claim 9, characterized in that: An annular groove (25) is arranged on the outer side of the abutting section (24), and a second sealing ring (10) is sleeved on the annular groove (25).