Concentrated dust removal equipment for construction waste

By using a combined structure of a spray frame and a filter plate in the construction waste centralized dust removal equipment, efficient dust removal is achieved and water resources are reduced, solving the problems of water resource waste and contaminated water treatment problems in the existing technology.

CN221906283UActive Publication Date: 2024-10-29SUZHOU PANFENG RECYCLING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323530843.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-29
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

Existing construction waste centralized dust removal equipment requires the use of a large amount of water, resulting in the generation of polluted water, resulting in a waste of resources and increasing the difficulty of subsequent processing.

Method used

A centralized dust removal equipment for construction waste is designed. It adopts a combined structure of a spray frame and a filter plate. Water is sprayed evenly through the sprinkler head and the air inlet and exhaust fans are used for dust removal. The water collection seat is used to uniformly handle the splashed water. Reduce water usage and generation of contaminated water.

Benefits of technology

It effectively reduces dust during construction waste transportation, solves the problem of water waste and contaminated water treatment, and improves dust removal efficiency and resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221906283U_ABST
    Figure CN221906283U_ABST
Patent Text Reader

Abstract

The utility model discloses centralized dust removal equipment for construction waste, relates to the technical field of centralized dust removal of construction waste, and aims to solve the problems that the centralized dust removal equipment for construction waste in the prior art needs a large amount of water, and a large amount of polluted water is generated in the dust removal process; and meanwhile, time and labor are wasted in subsequent treatment of the polluted water. A water storage barrel is arranged at the top of the dust collecting bin, a water inlet is formed in the end face of one side of the water storage barrel, a water collecting seat is arranged at the bottom of the dust collecting bin, and a water outlet is formed in the end face of one side of the water collecting seat; the spraying frame is arranged at the top end of the interior of the dust collecting bin, a plurality of spraying heads are installed at the bottom of the spraying frame, and a connecting water pipe is arranged at the top of the spraying frame; and the filter plates are arranged in the dust removal bin, the number of the filter plates is four, and limiting blocks are arranged at the upper ends and the lower ends of the end faces of the two sides of the four filter plates correspondingly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of centralized dust removal of construction waste, in particular to centralized dust removal equipment for construction waste. Background Art

[0002] Construction waste refers to the slag, abandoned soil, abandoned materials, silt and other waste generated during the construction, laying, demolition and repair of various buildings, structures, pipe networks, etc. by construction units or individuals. Concrete blocks and rubble contain a large number of fine particles and dust, which are easily blown by the wind and pollute the atmosphere.

[0003] For example, the Chinese authorized patent with announcement number CN212442305U (a dust removal device for construction waste): includes a material mechanism and a water pool, a lifting mechanism is arranged above the material mechanism, the lifting mechanism is movably installed on a bracket, a moving mechanism is arranged on the top of the bracket, under the coordinated action of the moving mechanism and the lifting mechanism, the material mechanism can be lowered into the water pool, and after it is fully in contact with the water, it is lifted up and then slid away from the water pool, the lifting mechanism is a slide and a hydraulic rod, one end of the hydraulic rod is fixed on the slide and the other end is fixed on the material mechanism, an intermediate beam is installed in the top center of the bracket, the slide is slidably connected to the intermediate beam, the material mechanism is raised or lowered by the extension and contraction of the hydraulic rod, and water is used to fully contact the gravel pile, so as to completely wash away the dust, small particles, etc. in the gravel pile, with high and thorough dust removal efficiency, avoiding dust in subsequent transportation and processing.

[0004] However, the centralized dust removal equipment for construction waste in the above-mentioned prior art requires the use of a large amount of water, and a large amount of polluted water will be generated during the dust removal process, which not only causes waste of resources but also makes the subsequent treatment of the polluted water time-consuming and labor-intensive. Therefore, it does not meet the existing needs. We have proposed a centralized dust removal equipment for construction waste. Utility Model Content

[0005] The purpose of the utility model is to provide a centralized dust removal device for construction waste, so as to solve the problem that the centralized dust removal device for construction waste in the prior art proposed in the above background technology needs to use a large amount of water, and a large amount of polluted water will be generated in the dust removal process, which causes waste of resources and the subsequent treatment of the polluted water will also be time-consuming and laborious.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a centralized dust removal device for construction waste, comprising a dust collecting bin and a dust removal bin, a water storage bucket is arranged on the top of the dust collecting bin, a water inlet is arranged on one end face of the water storage bucket, a water collecting seat is arranged on the bottom of the dust collecting bin, a water drain is arranged on one end face of the water collecting seat;

[0007] Also includes:

[0008] A spray rack is arranged at the top of the dust collecting bin, a spray head is installed at the bottom of the spray rack, and a plurality of spray heads are arranged, and a connecting water pipe is arranged at the top of the spray rack;

[0009] A filter plate is arranged inside the dust removal bin, and four filter plates are installed. Limit blocks are arranged at the upper and lower ends of the end surfaces on both sides of the four filter plates, and the filter plates are plugged and connected between the limit blocks.

[0010] Preferably, rolling shutters are installed on the front and rear end faces of the dust collecting bin, a driver is installed on one side of the rolling shutter, auxiliary plates are provided on the front and rear end faces of the water collecting seat, and a water leakage plate is provided on the upper surface of the water collecting seat.

[0011] Preferably, a connecting pipe is installed on one end surface of the dust collecting bin, and an air inlet fan is provided on one side of the connecting pipe.

[0012] Preferably, one side of the air inlet fan is fixedly connected to one end surface of the dust removal bin.

[0013] Preferably, a processing port is installed on the front end surface of the dust removal bin, and sealing strips are installed around the processing port.

[0014] Preferably, an exhaust fan is provided on the other side of the dust removal bin.

[0015] Preferably, an exhaust duct is installed on the top of the exhaust fan, and a sealing cover is installed on the top of the exhaust duct.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] 1. The utility model arranges a spray rack at the top of the interior of the dust collecting bin, and the spray rack is connected with the bottom of the water storage barrel through the connecting water pipe on the top of the spray rack, so that the construction waste is placed in the dust collecting bin through the transportation equipment, and then the rolling shutter door is closed, and the water storage barrel transports water to several spray heads at the bottom of the spray rack through the connecting water pipe through the water pump inside the water storage barrel, and the water is evenly sprinkled on the construction waste by the spray heads. At the same time, the dust generated in the dust collecting bin is input into the interior of the dust removal bin through the connecting pipe by the air inlet fan, and the dust is filtered through the filter plate inside the dust collection bin, and the dust-removed gas is discharged by the exhaust fan and the exhaust pipe. While achieving the collective dust removal effect, the sprayed water can also ensure the reduction of dust during the transportation of construction waste, which solves the problem that the centralized dust removal equipment for construction waste in the prior art needs to use a large amount of water, and a large amount of polluted water will be generated in the dust removal process, which causes waste of resources and the subsequent treatment of the polluted water will also be time-consuming and laborious.

[0018] 2. A water collecting seat is arranged at the bottom of the dust collecting bin, and a leaking plate is arranged on the upper surface of the water collecting seat. The water splashed by the spray enters the water collecting seat through the leaking plate, which is convenient for unified treatment through the drain port. At the same time, a limit block is arranged inside the dust collecting bin, and the filter plate is plugged and connected between the limit blocks, which is convenient for disassembly, assembly and replacement of the filter plate through the treatment port. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the overall structure of the centralized dust removal equipment for construction waste of the utility model;

[0020] Figure 2 It is an enlarged schematic diagram of the local structure of the dust collecting bin of the centralized dust removal equipment for construction waste of the utility model;

[0021] Figure 3 It is an enlarged schematic diagram of the spray frame structure inside the dust collection bin of the utility model;

[0022] Figure 4 This is an enlarged view of the internal structure of the dust removal bin of the utility model;

[0023] In the figure: 1. Dust collecting bin; 2. Water storage barrel; 3. Water inlet; 4. Connecting pipe; 5. Dust removal bin; 6. Inlet fan; 7. Exhaust fan; 8. Exhaust duct; 9. Processing port; 10. Water collecting seat; 11. Drain port; 12. Auxiliary plate; 13. Rolling shutter; 14. Leakage plate; 15. Spray rack; 16. Spray head; 17. Connecting water pipe; 18. Filter plate; 19. Limit block. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0025] See also Figure 1-4 The utility model provides an embodiment: a centralized dust removal device for construction waste, comprising a dust collecting bin 1 and a dust removal bin 5, a water storage bucket 2 is arranged on the top of the dust collecting bin 1, a water inlet 3 is arranged on one side end surface of the water storage bucket 2, a water collecting seat 10 is arranged on the bottom of the dust collecting bin 1, and a drainage port 11 is arranged on one side end surface of the water collecting seat 10;

[0026] Also includes:

[0027] A spray rack 15 is arranged at the top of the dust collecting bin 1, a spray head 16 is installed at the bottom of the spray rack 15, and a plurality of spray heads 16 are arranged, and a connecting water pipe 17 is arranged at the top of the spray rack 15;

[0028] The filter plate 18 is arranged inside the dust collecting bin 5, and four filter plates 18 are installed. The upper and lower ends of the end faces of both sides of the four filter plates 18 are provided with limit blocks 19, and the filter plates 18 are plugged and connected between the limit blocks 19. When in use, the spray rack 15 is connected with the bottom of the water storage barrel 2 through the connecting water pipe 17 at its top, and the construction waste is placed inside the dust collecting bin 1 through the transportation equipment. Then the rolling shutter door 13 is closed, and the water storage barrel 2 uses the water pump inside the water storage barrel 2 to transport water to several spray heads 16 at the bottom of the spray rack 15 through the connecting water pipe 17. The water is evenly sprinkled on the construction waste by the spray heads 16. At the same time, the dust generated in the dust collecting bin 1 is input into the interior of the dust collecting bin 5 through the connecting pipe 4 by the air inlet fan 6, and is filtered through the filter plate 18 inside it and then used The exhaust fan 7 and the exhaust pipe 8 can discharge the gas after dust removal, which can achieve the collective dust removal effect. At the same time, the spraying water can also ensure the reduction of dust during the transportation of construction waste, which solves the problem that the centralized dust removal equipment of construction waste in the prior art needs to use a large amount of water, and a large amount of polluted water will be generated during the dust removal process, which causes waste of resources and the subsequent treatment of the polluted water will also be time-consuming and labor-intensive. In addition, a water collecting seat 10 is provided at the bottom of the dust collecting bin 1, and a water leakage plate 14 is provided on the upper surface of the water collecting seat 10. The water splashed by the spraying enters the water collecting seat 10 through the water leakage plate 14, which is convenient for unified treatment through the drain port 11. At the same time, a limit block 19 is provided inside the dust removal bin 5, and the filter plate 18 is plugged and connected between the limit blocks 19, which is convenient for disassembly, assembly and replacement of the filter plate 18 through the processing port 9.

[0029] See also Figure 1 and Figure 2 The front and rear end faces of the dust collecting bin 1 are both equipped with rolling shutters 13, a driver is installed on one side of the rolling shutter 13, the front and rear end faces of the water collecting seat 10 are both equipped with auxiliary plates 12, and the upper surface of the water collecting seat 10 is equipped with a leaking plate 14. The water splashed by the spray enters the water collecting seat 10 through the leaking plate 14, which is convenient for unified treatment through the drain port 11.

[0030] See also Figure 1 and Figure 4 A connecting pipe 4 is installed on one end surface of the dust collecting bin 1 , and an air inlet fan 6 is arranged on one side of the connecting pipe 4 .

[0031] See also Figure 1 and Figure 4 One side of the air inlet fan 6 is fixedly connected to one end surface of the dust removal bin 5 .

[0032] See also Figure 1 and Figure 4 A processing port 9 is installed on the front end surface of the dust removal bin 5, and sealing strips are installed around the processing port 9. The filter plate 18 is plugged and connected between the limit blocks 19, which is convenient for disassembly, assembly and replacement of the filter plate 18 through the processing port 9.

[0033] See also Figure 1 and Figure 4 An exhaust fan 7 is provided on the other side of the dust removal bin 5.

[0034] See also Figure 1 and Figure 4 An exhaust pipe 8 is installed on the top of the exhaust fan 7, and a sealing cover is installed on the top of the exhaust pipe 8.

[0035] Working principle: When in use, the spray rack 15 is connected to the bottom of the water storage barrel 2 through the connecting water pipe 17 at the top thereof, and the construction waste is placed in the dust collection bin 1 through the transportation equipment, and then the shutter door 13 is closed. The water storage barrel 2 uses the water pump inside it to transport water to the several spray heads 16 at the bottom of the spray rack 15 through the connecting water pipe 17, and the water is evenly sprinkled on the construction waste by the spray heads 16. At the same time, the dust generated in the dust collection bin 1 is input into the dust removal bin 5 through the connecting pipe 4 by the air inlet fan 6, and is filtered through the filter plate 18 inside it, and then the dust-removed gas is discharged by the exhaust fan 7 and the exhaust pipe 8, so that the collective dust removal effect is achieved while the spray The water spraying can also ensure the reduction of dust during the transportation of construction waste, which solves the problem that the centralized dust removal equipment for construction waste in the prior art needs to use a large amount of water, and a large amount of polluted water will be generated during the dust removal process, which causes waste of resources and the subsequent treatment of the polluted water will also be time-consuming and labor-intensive. In addition, a water collecting seat 10 is provided at the bottom of the dust collecting bin 1, and a water leakage plate 14 is provided on the upper surface of the water collecting seat 10. The water splashed by the spraying enters the water collecting seat 10 through the water leakage plate 14, which is convenient for unified treatment through the drain port 11. At the same time, a limit block 19 is provided inside the dust removal bin 5, and the filter plate 18 is plugged and connected between the limit blocks 19, which is convenient for disassembly, assembly and replacement of the filter plate 18 through the processing port 9.

[0036] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A centralized dust removal device for construction waste, comprising a dust collecting bin (1) and a dust removal bin (5), wherein a water storage bucket (2) is arranged on the top of the dust collecting bin (1), a water inlet (3) is arranged on one end surface of the water storage bucket (2), a water collecting seat (10) is arranged on the bottom of the dust collecting bin (1), and a water outlet (11) is arranged on one end surface of the water collecting seat (10); Features: Also includes: A spray rack (15) is arranged at the top of the dust collecting bin (1), a spray head (16) is installed at the bottom of the spray rack (15), and a plurality of spray heads (16) are arranged, and a connecting water pipe (17) is arranged at the top of the spray rack (15); A filter plate (18) is arranged inside the dust removal bin (5), and four filter plates (18) are installed. Limit blocks (19) are arranged at the upper and lower ends of the end surfaces on both sides of the four filter plates (18), and the filter plates (18) are plug-connected between the limit blocks (19).

2. The centralized dust removal equipment for construction waste according to claim 1 is characterized in that: The front and rear end surfaces of the dust collecting bin (1) are both provided with rolling shutter doors (13), a driver is installed on one side of the rolling shutter door (13), the front and rear end surfaces of the water collecting seat (10) are both provided with auxiliary plates (12), and the upper surface of the water collecting seat (10) is provided with a water leakage plate (14).

3. The centralized dust removal equipment for construction waste according to claim 1 is characterized in that: A connecting pipe (4) is installed on one end surface of the dust collecting bin (1), and an air inlet fan (6) is arranged on one side of the connecting pipe (4).

4. The centralized dust removal equipment for construction waste according to claim 3 is characterized in that: One side of the air inlet fan (6) is fixedly connected to one end surface of the dust removal bin (5).

5. The centralized dust removal equipment for construction waste according to claim 1 is characterized in that: The front end surface of the dust removal bin (5) is provided with a processing port (9), and sealing strips are provided around the processing port (9).

6. The centralized dust removal equipment for construction waste according to claim 1 is characterized by: An exhaust fan (7) is arranged on the other side of the dust removal bin (5).

7. The centralized dust removal equipment for construction waste according to claim 6 is characterized by: An exhaust pipe (8) is installed on the top of the exhaust fan (7), and a sealing cover is installed on the top of the exhaust pipe (8).