Structure facilitating installation of SPE small column
By designing a structure that stably fixes the test tube in the solid-phase extraction device, and using the clamping block and slot mechanism to limit the clamping pressure, the problem of unstable SPE column position caused by the instability of the test tube is solved, and the safety and reliability of the experiment are improved. .
Patent Information
- Application Number
- CN202420107277.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-16
AI Technical Summary
The instability of the test tube in the existing solid-phase extraction device causes the position of the SPE cartridge to be unstable, affecting the adsorption and separation of the sample, increasing the risk of the experiment and the inaccuracy of the analysis results.
A structure including a base, connecting rod, placing plate, chute and moving rod is designed. The clamping block and slot mechanism are used to limit the pressure of the splint to prevent the test tube from breaking. The height of the placing plate is adjusted through the screw to ensure the stable fixation of the test tube. .
It effectively prevents the test tube from being broken, improves the installation stability of the SPE column, ensures the safety and reliability of the experiment, and reduces the risk of repeated experiments.
Smart Images

Figure CN221907226U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of solid phase extraction, in particular to a structure which is convenient for installing a SPE column. Background Art
[0002] A solid phase extraction device is a laboratory device used for sample pretreatment and separation, in which a solid phase material, such as a filler or adsorbent, is used to selectively adsorb, enrich or separate target analytes from a sample.
[0003] When using a solid phase extraction device, it is common to install the SPE column in a test tube. During the experiment, the instability of the test tube will have some impact on the solid phase extraction experiment. The instability of the test tube causes the position of the SPE column to be unstable, which may make it impossible to accurately extract the sample for solid phase extraction. For example: during the extraction process, the instability of the test tube may cause the SPE column to be easily squeezed out of the top of the test tube, and the sample cannot be fully adsorbed and separated. This may affect the analysis results and increase the risk of repeating the experiment. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a structure for facilitating the installation of SPE columns, so as to solve the problems in the prior art that the test tube rack structure is relatively simple, the test tubes placed therein are relatively unstable, and the installation of the SPE columns is affected.
[0005] A structure for facilitating installation of an SPE column comprises a base, the top of the base is fixedly connected to two symmetrically arranged connecting rods, the peripheral sides of the connecting rods are connected to a placement plate, the top of the placement plate is provided with two rows of symmetrically arranged placement holes, the side wall of the placement plate is provided with a slide groove, the slide groove is communicated with the placement holes, a moving rod is slidably connected in the slide groove, one end of the moving rod is fixedly connected to a handle, the other end is fixedly connected to a clamping plate, a first spring is installed on the peripheral side of the moving rod, and the first spring is close to the clamping plate.
[0006] Preferably, an installation groove is provided in the slide groove, a installation block is fixedly connected in the installation groove, a clamping groove is provided on the side wall of the installation block, a installation column is fixedly connected to the peripheral side of the connecting rod, a groove is provided on the side wall of the installation column, a second spring is sleeved in the groove, and a clamping block is sleeved on the end of the second spring away from the groove.
[0007] Preferably, the block is in the shape of a triangle.
[0008] Preferably, the position and size of the card block match those of the card slot.
[0009] Preferably, the side wall of the clamping plate is fixedly connected with a rubber pad.
[0010] Preferably, the connecting rod is a screw rod, and a threaded sleeve is threadedly connected to the side surface of the screw rod to adjust the height of the placement plate.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] 1. The utility model provides a clamping block and a clamping groove. When the test tube is placed in the placement hole and clamped, the clamping block will be stuck in the clamping groove to prevent the clamping plate from continuing to press the test tube inward, thereby preventing the test tube from being broken by excessive pressure. By limiting the further movement of the moving rod and the clamping plate, the pressure of the clamping plate can be effectively controlled, which can not only ensure the clamping effect of the test tube, but also protect the integrity of the test tube, thereby ensuring the safety and reliability of the experiment. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0014] Figure 2 For this utility model Figure 1 A magnified view of the local structure at center A;
[0015] Figure 3 For this utility model Figure 1 A front view structural diagram of
[0016] Figure 4 For this utility model Figure 3 Schematic diagram of the cross-section structure at AA in the middle;
[0017] Figure 5 For this utility model Figure 4 Enlarged view of the local structure at point B in the middle.
[0018] In the figure:
[0019] 1. Base; 2. Screw; 3. Placement plate; 31. Placement hole; 4. Moving rod; 41. Handle; 42. Clamp; 43. Rubber pad; 5. First spring; 6. Mounting column; 61. Groove; 62. Second spring; 63. Block; 7. Mounting groove; 8. Mounting block; 81. Slot; 9. Screw sleeve. DETAILED DESCRIPTION
[0020] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0021] Embodiment 1: As shown in the attached Figure 1 To Attachment Figure 5As shown: The utility model provides a structure that is convenient for installing SPE columns, including a base 1, two symmetrically arranged connecting rods are fixedly connected to the top of the base 1, a placement plate 3 is connected to the surrounding side of the connecting rod, two rows of symmetrically arranged placement holes 31 are opened on the top of the placement plate 3, a sliding groove is opened on the side wall of the placement plate 3, the sliding groove is connected to the placement hole 31, a moving rod 4 is slidably connected in the sliding groove, one end of the moving rod 4 is fixedly connected to a handle 41, and the other end is fixedly connected to a clamping plate 42, a first spring 5 is installed on the surrounding side of the moving rod 4, and the first spring 5 is close to the clamping plate 42.
[0022] As can be seen from the above, when in use, first pull the handle 41 outward to increase the distance between the placement plate 3 and the placement hole 31, and then the test tube can be placed in the placement hole 31. When the handle 41 is released, the first spring 5 will fix the clamp 42 tightly to the outside of the test tube due to its own elastic force, and finally the test tube can be fixed in the placement hole 31.
[0023] Embodiment 2: On the basis of embodiment 1, in order to prevent the elastic force of the first spring 5 from being too large, so that the splint 42 squeezes and breaks the test tube, the position of the splint 42 can be limited according to the size of the test tube to be placed, and a mounting groove 7 is provided in the connecting groove, and a mounting block 8 is fixedly connected to the mounting groove 7, and a clamping groove 81 is provided on the side wall of the mounting block 8, and a mounting column 6 is fixedly connected to the side surface of the connecting rod, and a groove 61 is provided on the side wall of the mounting column 6, and a second spring 62 is sleeved in the groove 61, and a clamping block 63 is sleeved on the end of the second spring 62 away from the groove 61, and the shape of the clamping block 63 is triangular, and the position and size of the clamping block 63 match the clamping groove 81.
[0024] As can be seen from the above, when the handle 41 is released, the first spring 5 will drive the block 63 to move inward. During the movement, the block 63 will first touch the side wall of the mounting block 8. Since the block 63 is triangular in shape, it can enter the slot 81 through the inclined surface. The block 63 will be stuck in the slot 81, thereby limiting the further movement of the moving rod 4, and ultimately preventing excessive pressure between the splint 42 and the test tube.
[0025] When the test tube needs to be taken out, the handle 41 can be pulled outwards. Since the shape of the clamping block 63 is triangular, it can leave the clamping slot 81 through the inclined surface, and finally the test tube can be taken out of the placement hole 31.
[0026] A rubber pad 43 is fixedly connected to the side wall of the clamping plate 42 .
[0027] The connecting rod is a screw rod 2 , and a screw sleeve 9 is threadedly connected to the side surface of the screw rod 2 for adjusting the height of the placement plate 3 .
[0028] As can be seen from the above, by providing the block 63 and the slot 81, when the test tube is placed in the placement hole 31 and clamped, the block 63 will be stuck in the slot 81 to prevent the splint 42 from continuing to press the test tube inward, thereby avoiding the test tube from being broken by excessive pressure. By limiting the further movement of the moving rod 4 and the splint 42, the pressure of the splint 42 can be effectively controlled, which can not only ensure the clamping effect of the test tube, but also protect the integrity of the test tube, thereby ensuring the safety and reliability of the experiment.
[0029] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, as well as parameter values (e.g., temperature, pressure, etc.), mounting arrangements, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure described herein that performs the function, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, improvements, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to numerous modifications still falling within the scope of the appended claims.
[0030] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0031] It should be understood that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but for those of ordinary skill having the benefit of this disclosure, without undue experimentation, the development effort will be a routine task of design, fabrication, and production.
[0032] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A structure for facilitating installation of an SPE column, characterized in that: The utility model comprises a base (1), wherein the top of the base (1) is fixedly connected with two symmetrically arranged connecting rods, the peripheral side surfaces of the connecting rods are connected with a placement plate (3), the top of the placement plate (3) is provided with two rows of symmetrically arranged placement holes (31), the side wall of the placement plate (3) is provided with a slide groove, the slide groove is connected with the placement holes (31), a moving rod (4) is slidably connected in the slide groove, one end of the moving rod (4) is fixedly connected with a handle (41), and the other end is fixedly connected with a clamping plate (42), and a first spring (5) is installed on the peripheral side surface of the moving rod (4), and the first spring (5) is close to the clamping plate (42).
2. A structure for facilitating installation of an SPE column as claimed in claim 1, characterized in that: A mounting groove (7) is provided in the slide groove, a mounting block (8) is fixedly connected in the mounting groove (7), a clamping groove (81) is provided on the side wall of the mounting block (8), a mounting column (6) is fixedly connected to the peripheral side surface of the connecting rod, a groove (61) is provided on the side wall of the mounting column (6), a second spring (62) is sleeved in the groove (61), and a clamping block (63) is sleeved on one end of the second spring (62) away from the groove (61).
3. A structure for facilitating installation of an SPE column as claimed in claim 2, characterized in that: The shape of the block (63) is a triangle.
4. A structure for facilitating installation of an SPE column as claimed in claim 2, characterized in that: The position and size of the card block (63) match those of the card slot (81).
5. A structure for facilitating installation of an SPE column as claimed in claim 1, characterized in that: The side wall of the clamping plate (42) is fixedly connected with a rubber pad (43).
6. A structure for facilitating installation of an SPE column as claimed in claim 1, characterized in that: The connecting rod is a screw rod (2), and a screw sleeve (9) is threadedly connected to the side surface of the screw rod (2) for adjusting the height of the placement plate (3).
