Pipeline parallel clamping device
By designing a pipeline parallel clamping device and using linkage components and height adjustment components, the problems of rocking and alignment difficulties during pipeline installation are solved, stable clamping and height adjustment of the pipeline are achieved, and installation efficiency is improved.
Patent Information
- Application Number
- CN202323655405.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-31
AI Technical Summary
When installing existing pipelines, it is easy to make alignment difficult due to shaking, which is inefficient and requires frequent position adjustments.
A pipeline parallel clamping device is designed, including linkage components, installation boxes, installation frames, rotating shafts, threaded rods, sliding sleeves, hinged rods, connecting plates and clamping plates. The worm and worm gear drive are driven by the handwheel to rotate the threaded rod. and a sliding sleeve, driving the slider and the connecting plate close to the clamped pipe, and combined with the height adjustment component and the electric push rod to achieve stable clamping and height adjustment of the pipe.
It achieves stable clamping of the pipe, avoids shaking, simplifies the installation process, and improves the efficiency and convenience of alignment installation.
Smart Images

Figure CN221911877U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to pipeline clamping and installation, in particular to a pipeline parallel clamping device. Background Art
[0002] A pipeline is a device connected by pipes, pipe connectors and valves for transporting gas, liquid or fluid with solid particles. It is mainly used in water supply, drainage, heating, gas supply, long-distance transportation of oil and natural gas, agricultural irrigation, hydraulic engineering and various industrial installations.
[0003] In the existing pipeline installation, most of the pipelines to be installed are hoisted by mechanical equipment or manually lifted, and then the pipeline to be installed and the already positioned pipeline or equipment are aligned and installed by manual adjustment. However, the disadvantage is that the pipeline is prone to shaking when it is hoisted or manually lifted and aligned, which is not convenient for alignment. The position of the pipeline needs to be constantly adjusted, and the installation and docking efficiency is low. Utility Model Content
[0004] In order to solve the defects in the prior art, the utility model provides a pipeline parallel clamping device.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0006] The utility model discloses a pipeline parallel clamping device, comprises a base plate, the base plate is provided with a height adjustment component and a mounting box is installed through the height adjustment component, mounting frames are fixedly installed on both sides of the upper surface of the mounting box, two rotating shafts are rotatably installed on the mounting box, a linkage component is provided between the two rotating shafts and is transmission connected through the linkage component, a threaded rod is fixedly installed on the top of the rotating shaft, the top of the threaded rod is fixedly connected to the mounting frame on the same side, two sliding grooves are provided in the mounting frame and sliders are slidably installed in the two sliding grooves, connecting plates are fixedly installed on the upper surfaces of the two sliders, clamping plates are fixedly installed on the opposite surfaces of the two connecting plates, a sliding sleeve is threadedly installed on the outer surface of the threaded rod, and two hinged rods are symmetrically hinged on the outer surface of the sliding sleeve, and one end of the hinged rod away from the sliding sleeve on the same side is hinged to the slider on the same side.
[0007] As a preferred technical solution of the utility model, the linkage assembly includes a connecting shaft rotatably installed in an installation box, both ends of the connecting shaft are fixedly installed with a first bevel gear, the bottom end of the rotating shaft extends into the installation box and is fixedly installed with a second bevel gear, the second bevel gear is meshed with the first bevel gear on the same side, a worm is rotatably installed in the installation box, a worm wheel meshing with the worm is fixedly installed on the connecting shaft, and one end of the worm extends outside the installation box and is fixedly installed with a handwheel.
[0008] As a preferred technical solution of the utility model, the height adjustment assembly includes an electric push rod fixedly mounted on the base plate, and the output end of the electric push rod is fixedly connected to the installation box.
[0009] As a preferred technical solution of the utility model, telescopic rods are fixedly installed at the four corners of the upper surface of the base plate, and the tops of the four telescopic rods are fixedly connected to the installation box.
[0010] As a preferred technical solution of the utility model, a slide bar is fixedly installed in the slide groove, and the sliding block slides on the outer surface of the slide bar on the same side.
[0011] As a preferred technical solution of the utility model, a non-slip pad is fitted on one side of the clamping plate away from the connecting plate on the same side.
[0012] As a preferred technical solution of the utility model, foot brake universal wheels are fixedly installed at the four corners of the lower surface of the base plate.
[0013] The beneficial effects of the utility model are:
[0014] 1. The parallel clamping device for pipes is provided with a linkage assembly, a mounting box, a mounting frame, a rotating shaft, a threaded rod, a sliding sleeve, a hinged rod, a sliding rod, a connecting plate and a clamping plate. The hand wheel is turned to drive the worm to rotate. The rotation of the worm drives the connecting shaft to rotate through the worm wheel. The rotation of the connecting shaft drives the two rotating shafts to rotate under the transmission of the first bevel gear and the second bevel gear at both ends. The rotation of the rotating shaft drives the threaded rod to follow the rotation. The movement of the threaded rod drives the sliding sleeve to move. The movement of the sliding sleeve cooperates with the sliding rod to drive the sliders on both sides to approach each other through the hinged rods on both sides. The sliders on both sides approach each other and then drive the connecting plates and the clamping plates on both sides to approach each other to clamp and fix the pipes placed on the mounting frame, thereby ensuring the stability of the pipes and avoiding shaking of the pipes during the centering installation process. The operation is simple and the installation is convenient.
[0015] 2. This type of parallel pipe clamping device, by setting a height adjustment component, drives the installation box and the installation frame to move through the electric push rod, and then drives the pipe clamped and fixed by the clamping plate on the installation frame to move, so that the height of the pipe can be adjusted, which is convenient for the alignment and installation of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0017] Figure 1 This is a schematic diagram of the overall structure of a parallel pipe clamping device of the utility model;
[0018] Figure 2 It is a schematic diagram of the cross-sectional structure of an installation box of a parallel pipe clamping device of the utility model;
[0019] Figure 3 This is a schematic diagram of the electric push rod structure of a parallel pipe clamping device of the utility model;
[0020] Figure 4 This is a schematic diagram of the threaded rod structure of a parallel pipe clamping device of the utility model;
[0021] Figure 5 The utility model is a schematic diagram of a sliding rod structure of a parallel pipe clamping device.
[0022] In the figure: 1, base plate; 2, installation box; 3, installation frame; 4, rotating shaft; 5, threaded rod; 6, slider; 7, connecting plate; 8, clamping plate; 9, sliding sleeve; 10, hinged rod; 11, connecting shaft; 12, first bevel gear; 13, second bevel gear; 14, worm; 15, worm wheel; 16, foot brake universal wheel; 17, electric push rod; 18, telescopic rod; 19, sliding rod; 20, anti-slip pad. Implementation
[0023] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0024] Example: Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the utility model is a parallel clamping device for pipes, comprising a bottom plate 1, a height adjustment component is arranged on the bottom plate 1 and a mounting box 2 is installed through the height adjustment component, mounting frames 3 are fixedly installed on both sides of the upper surface of the mounting box 2, two rotating shafts 4 are rotatably installed on the mounting box 2, a linkage component is arranged between the two rotating shafts 4 and the two rotating shafts 4 are transmission-connected through the linkage component, a threaded rod 5 is fixedly installed on the top of the rotating shaft 4, the top of the threaded rod 5 is fixedly connected to the mounting frame 3 on the same side, two sliding grooves are provided in the mounting frame 3 and sliders 6 are fitted and slidably installed in the two sliding grooves, connecting plates 7 are fixedly installed on the upper surfaces of the two sliders 6, and clamping plates 8 are fixedly installed on the opposite surfaces of the two connecting plates 7. A sleeve 9 is threadedly installed on the outer surface of the threaded rod 5. Two hinged rods 10 are symmetrically hinged on the outer surface of the sleeve 9. The end of the hinged rod 10 away from the sleeve 9 on the same side is hinged to the slider 6 on the same side, and the two rotating shafts 4 are driven to rotate through the linkage. The rotation of the rotating shaft 4 drives the threaded rod 5 to rotate accordingly. The movement of the threaded rod 5 drives the sleeve 9 to move. The sleeve 9 moves and cooperates with the slide rod 19 to drive the sliders 6 on both sides to approach each other through the hinged rods 10 on both sides. The sliders 6 on both sides approach each other and then drive the connecting plates 7 and the clamping plates 8 on both sides to approach each other to clamp and fix the pipes placed on the mounting frame 3, thereby ensuring the stability of the pipes and avoiding shaking of the pipes during the centering installation process. The operation is simple and the installation is convenient.
[0025] Among them, the linkage assembly includes a connecting shaft 11 rotatably installed in the installation box 2, and the first bevel gears 12 are fixedly installed at both ends of the connecting shaft 11. The bottom end of the rotating shaft 4 extends into the installation box 2 and is fixedly installed with a second bevel gear 13. The second bevel gear 13 is meshed with the first bevel gear 12 on the same side. A worm 14 is rotatably installed in the installation box 2, and a worm wheel 15 meshing with the worm 14 is fixedly installed on the connecting shaft 11. One end of the worm 14 extends to the outside of the installation box 2 and is fixedly installed with a handwheel. Turning the handwheel drives the worm 14 to rotate, and the rotation of the worm 14 drives the connecting shaft 11 to rotate through the worm wheel 15. The rotation of the connecting shaft 11 drives the two rotating shafts 4 to rotate under the transmission of the first bevel gears 12 and the second bevel gears 13 at both ends, so that the movements of the two rotating shafts 4 can be linked together, saving trouble and effort.
[0026] Among them, the height adjustment component includes an electric push rod 17 fixedly installed on the base plate 1, and the output end of the electric push rod 17 is fixedly connected to the installation box 2. The electric push rod 17 pushes the installation box 2 and the installation frame 3 to move, thereby driving the pipe clamped and fixed by the clamping plate 8 on the installation frame 3 to move, so that the height of the pipe can be adjusted, which is convenient for aligning the pipe for installation.
[0027] Among them, telescopic rods 18 are fixedly installed at the four corners of the upper surface of the base plate 1, and the tops of the four telescopic rods 18 are fixedly connected to the installation box 2. The telescopic rods 18 can guide and limit the installation box 2 when the electric push rod 17 adjusts the height of the installation box 2, thereby ensuring the stability of the installation box 2 during movement.
[0028] Among them, a slide rod 19 is fixedly installed in the slide groove, and the slider 6 slides on the outer surface of the slide rod 19 on the same side. The slide rod 19 can guide and support the movement of the slider 6 to ensure the stability of the slider 6 in the slide groove.
[0029] Among them, an anti-skid pad 20 is installed on the side of the clamping plate 8 away from the same-side connecting plate 7. The anti-skid pad 20 can increase the friction between the clamping plate 8 and the pipeline, and improve the stability of the clamping plate 8 clamping the pipeline.
[0030] Among them, foot brake universal wheels 16 are fixedly installed at the four corners of the lower surface of the base plate 1 to facilitate the movement of the device.
[0031] During operation, the pipes to be installed are placed on the two mounting frames 3, and the hand wheel is turned to drive the worm 14 to rotate. The rotation of the worm 14 drives the connecting shaft 11 to rotate through the worm gear 15. The rotation of the connecting shaft 11 drives the two rotating shafts 4 to rotate under the transmission of the first bevel gear 12 and the second bevel gear 13 at both ends. The rotation of the rotating shaft 4 drives the threaded rod 5 to follow the rotation. The movement of the threaded rod 5 drives the sliding sleeve 9 to move. The sliding sleeve 9 moves and cooperates with the sliding rod 19 to drive the sliders 6 on both sides to approach each other through the hinged rods 10 on both sides. The sliders 6 on both sides approach each other and then drive the connecting plates 7 and the clamping plates 8 on both sides to approach each other to clamp and fix the pipes placed on the mounting frame 3, so as to ensure the stability of the pipe and avoid the pipe from shaking during the centering installation process. Then, the pipe is moved to the already positioned pipe or equipment through the foot brake universal wheel 16, and the height of the pipe is adjusted by cooperating with the extension and retraction of the electric push rod 17, so as to facilitate the alignment and installation of the pipe. The operation is simple and easy to use.
[0032] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A parallel pipe clamping device, comprising a bottom plate (1), characterized in that: The bottom plate (1) is provided with a height adjustment component and a mounting box (2) is installed via the height adjustment component. Both sides of the upper surface of the mounting box (2) are fixedly installed with mounting frames (3). Two rotating shafts (4) are rotatably installed on the mounting box (2). A linkage component is provided between the two rotating shafts (4) and the two rotating shafts (4) are transmission-connected via the linkage component. A threaded rod (5) is fixedly installed at the top of the rotating shaft (4). The top of the threaded rod (5) is fixedly connected to the mounting frame (3) on the same side. Two sliding grooves are provided in the mounting frame (3) and sliders (6) are slidably installed in the two sliding grooves. A connecting plate (7) is fixedly installed on the upper surface of the two sliders (6). A clamping plate (8) is fixedly installed on the opposite surface of the two connecting plates (7). A sliding sleeve (9) is threadedly installed on the outer surface of the threaded rod (5). Two hinged rods (10) are symmetrically hinged on the outer surface of the sliding sleeve (9). One end of the hinged rod (10) away from the sliding sleeve (9) on the same side is hinged to the slider (6) on the same side.
2. A parallel pipe clamping device according to claim 1, characterized in that: The linkage assembly comprises a connecting shaft (11) rotatably mounted in the mounting box (2), first bevel gears (12) being fixedly mounted at both ends of the connecting shaft (11), the bottom end of the rotating shaft (4) extending into the mounting box (2) and fixedly mounted with a second bevel gear (13), the second bevel gear (13) meshing with the first bevel gear (12) on the same side, a worm (14) rotatably mounted in the mounting box (2), a worm wheel (15) meshing with the worm (14) being fixedly mounted on the connecting shaft (11), and one end of the worm (14) extending outside the mounting box (2) and fixedly mounted with a hand wheel.
3. A parallel pipe clamping device according to claim 1, characterized in that: The height adjustment assembly comprises an electric push rod (17) fixedly mounted on the base plate (1), and an output end of the electric push rod (17) is fixedly connected to the mounting box (2).
4. A parallel pipe clamping device according to claim 3, characterized in that: Telescopic rods (18) are fixedly mounted at the four corners of the upper surface of the base plate (1), and the tops of the four telescopic rods (18) are fixedly connected to the mounting box (2).
5. The parallel pipe clamping device according to claim 1, characterized in that: A slide bar (19) is fixedly installed in the slide groove, and the slide block (6) slides on the outer surface of the slide bar (19) on the same side.
6. A parallel pipe clamping device according to claim 1, characterized in that: An anti-slip pad (20) is fitted on one side of the clamping plate (8) away from the connecting plate (7) on the same side.
7. The parallel pipe clamping device according to claim 1, characterized in that: Foot brake universal wheels (16) are fixedly mounted at the four corners of the lower surface of the base plate (1).