Vibration platform for building cement prefabricated part pouring

By designing a vibration platform for cement precast parts and using vibration motors to discharge air bubbles in the cement, the problem of low cement pouring efficiency in the existing technology is solved. The detachable design simplifies equipment operation and improves cement pouring efficiency and equipment usage. Convenience.

CN221912455UActive Publication Date: 2024-10-29DAYE XINYU CONCRETE PRODUCTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323513376.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-29
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

In the existing technology, when making cement prefabricated parts, workers need to process them one by one to eliminate air bubbles in the mold. The process is cumbersome and leads to low efficiency.

Method used

A vibration platform for pouring building cement precast parts is designed, which includes a vibration platform body, a vibration motor and a detachable electric push rod structure. The bubbles are discharged through the vibration generated by the vibration motor, and the detachable design simplifies the equipment installation and disassembly process.

Benefits of technology

It effectively reduces the workload of the staff, improves the cement pouring efficiency, simplifies the installation and disassembly process of the equipment, and reduces the labor intensity of the staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221912455U_ABST
    Figure CN221912455U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building components, and particularly relates to a vibration platform for building cement prefabricated part pouring, which comprises a vibration platform body. Two pairs of mounting grooves are formed in the bottom of the vibration platform body; the mounting grooves are symmetrically arranged; an equipment groove is opened and closed in the bottom of the vibration platform body; a plurality of vibration motors are arranged on the inner side of the equipment groove; the vibration motor is fixedly connected to the inner side wall of the equipment groove; by means of the arranged vibration platform body, a worker carries out pouring on the top of the vibration platform body, after pouring is completed, a vibration motor is started, vibration generated by the vibration motor is transmitted into cement through the vibration platform body, then bubbles in the cement are discharged, and then the cement is poured into the cement through the vibration platform body. Therefore, the workload of workers is effectively reduced, meanwhile, all pouring cement on the top of the vibration platform body can be processed, and then the processing efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building components, in particular to a vibration platform for pouring building cement prefabricated parts. Background Art

[0002] With the development of technology, a large number of prefabricated parts will be used in infrastructure construction in order to reduce construction time.

[0003] In the current prior art, when making prefabricated cement products, cement needs to be poured into a mold, and then a vibrating device is inserted into the cement to expel the bubbles in the cement, and the cement is left to solidify to obtain the product.

[0004] During production, workers are required to process and remove bubbles one by one, which is rather cumbersome. Therefore, in view of the above problem, a vibration platform for pouring building cement prefabricated parts is proposed. Utility Model Content

[0005] In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background technology, the utility model proposes a vibration platform for pouring building cement prefabricated parts.

[0006] The technical solution adopted by the utility model to solve its technical problems is: the utility model describes a vibration platform for pouring building cement precast parts, comprising a vibration platform body; two pairs of mounting grooves are provided at the bottom of the vibration platform body; the mounting grooves are symmetrically arranged; an equipment groove is opened and closed at the bottom of the vibration platform body; a plurality of vibration motors are provided on the inner side of the equipment groove; the vibration motor is fixedly connected to the inner side wall of the equipment groove; and an electric push rod is provided on the inner side wall of the mounting groove.

[0007] Preferably, a sliding groove is provided on the inner side wall of the installation groove; a magnet is fixedly connected to the inner side wall of the sliding groove; a plurality of fixing blocks are provided on the inner side wall of the sliding groove; and a fixing groove is provided on the end of the electric push rod.

[0008] Preferably, a first support plate is fixedly connected to the middle of the electric push rod; and a second support plate is fixedly connected to the end of the electric push rod.

[0009] Preferably, a partition frame is provided on the inner side wall of the sliding groove; and the partition frame is fixedly connected to the inner side wall of the sliding groove.

[0010] Preferably, a groove is formed on the side wall of the partition frame; and a ball is rotatably connected to the inner side wall of the groove.

[0011] Preferably, a fixing pin is provided at the bottom of the second support plate; the fixing pin is fixedly connected to the bottom of the second support plate.

[0012] Preferably, two pairs of suspension rods are fixedly connected to the side walls of the vibration platform body; the suspension rods are symmetrically arranged.

[0013] Beneficial effects of the utility model:

[0014] 1. The utility model provides a vibration platform for pouring building cement prefabricated parts. Through the setting of the vibration platform body, the staff pours on the top of the vibration platform body. After the pouring is completed, the vibration motor is started, and the vibration generated by the vibration motor will be transmitted to the cement through the vibration platform body, and then the bubbles in the cement will be discharged, thereby effectively reducing the workload of the staff. At the same time, all the poured cement on the top of the vibration platform body can be processed, thereby effectively improving the processing efficiency.

[0015] 2. The utility model provides a vibration platform for pouring precast cement parts for construction. Through the detachable setting, it effectively simplifies the installation and disassembly of the equipment by the staff, thereby effectively facilitating the installation and disassembly of the equipment by the staff and reducing the workload of the staff during installation and disassembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0017] Figure 1 It is a three-dimensional diagram of the utility model;

[0018] Figure 2 It is a three-dimensional diagram of the vibration motor in the utility model;

[0019] Figure 3 It is a cross-sectional view of the installation groove in the utility model;

[0020] Figure 4 for Figure 3 Enlarged view of point A in the middle;

[0021] Figure 5 This is a positional relationship diagram of the electric push rod and the partition frame in the utility model;

[0022] Figure 6 It is a three-dimensional diagram of the ball in the utility model;

[0023] Figure 7 It is a three-dimensional diagram of the fixing groove in the utility model.

[0024] Legend:

[0025] 1. Vibration platform body; 11. Mounting slot; 12. Electric push rod; 13. Equipment slot; 14. Vibration motor; 2. Sliding slot; 21. Magnet; 22. Fixed block; 23. Fixed slot; 3. First support plate; 31. Second support plate; 4. Partition frame; 5. Groove; 51. Ball; 6. Fixed pin; 7. Suspension rod. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Specific examples are given below.

[0028] See also Figure 1 - Figure 7 The utility model provides a vibration platform for pouring building cement prefabricated parts, including a vibration platform body 1; two pairs of mounting grooves 11 are opened at the bottom of the vibration platform body 1; the mounting grooves 11 are symmetrically arranged; an equipment groove 13 is opened and closed at the bottom of the vibration platform body 1; a plurality of vibration motors 14 are arranged inside the equipment groove 13; the vibration motor 14 is fixedly connected to the inner side wall of the equipment groove 13; an electric push rod 12 is arranged on the inner side wall of the mounting groove 11. When working, when making prefabricated cement products, cement needs to be poured into a mold, and then the vibration equipment is inserted into the cement to discharge the bubbles in the cement. During this process, the staff needs to process and discharge the bubbles one by one. Through the vibration platform body 1, the staff casts on the top of the vibration platform body 1. After the casting is completed, the vibration motor 14 is started. The vibration generated by the vibration motor 14 will be transmitted to the cement through the vibration platform body 1, and then the bubbles in the cement will be discharged, thereby effectively reducing the workload of the staff. At the same time, all the casting cement on the top of the vibration platform body 1 can be processed, thereby effectively improving the processing efficiency.

[0029] Further, such as Figure 1 - Figure 7As shown, the inner wall of the installation groove 11 is provided with a sliding groove 2; the inner wall of the sliding groove 2 is fixedly connected with a magnet 21; the inner wall of the sliding groove 2 is provided with a plurality of fixing blocks 22; the end of the electric push rod 12 is provided with a fixing groove 23. When working, when installing and fixing the electric push rod 12, it is necessary to insert the electric push rod 12 into the installation groove 11. When the electric push rod 12 is inserted into the installation groove 11, the electric push rod 12 will squeeze the fixing block 22 into the sliding groove 2. Since the magnet 21 and the fixing block 22 are made of the same material, and there is a repulsive force between the fixing block 22 and the magnet 21, The fixing block 22 is squeezed out of the fixing groove 23 by the repulsive force when the electric push rod 12 is fully inserted into the installation groove 11, thereby fixing the electric push rod 12. The end of the fixing block 22 is arc-shaped. When removing the electric push rod 12, the staff pulls the electric push rod 12 to squeeze the fixing block 22 out of the fixing groove 23 to complete the removal of the electric push rod 12. The detachable setting effectively simplifies the installation and disassembly of the equipment by the staff, thereby effectively facilitating the installation and disassembly of the equipment by the staff and reducing the workload of the staff during installation and disassembly.

[0030] Further, such as Figure 1 - Figure 7 As shown, a first support plate 3 is fixedly connected to the middle of the electric push rod 12; a second support plate 31 is fixedly connected to the end of the electric push rod 12. During operation, when the electric push rod 12 is installed, the force-bearing area of ​​the electric push rod 12 is effectively increased by setting the first support plate 3, and the second support plate 31 can effectively increase the bearing area of ​​the electric push rod 12, thereby reducing the ground subsidence of the equipment and improving the equipment's use stability.

[0031] Further, such as Figure 1 - Figure 7 As shown, a partition frame 4 is provided on the inner wall of the sliding groove 2; the partition frame 4 is fixedly connected to the inner wall of the sliding groove 2. When working, the partition frame 4 is set so that the fixed block 22 is in the space in the middle of the partition frame 4, thereby effectively limiting the moving range of the fixed block 22, thereby reducing the movement of the fixed block 22, and further effectively increasing the fixing effect of the equipment.

[0032] Further, such as Figure 1 - Figure 7 As shown, a groove 5 is provided on the side wall of the partition frame 4; a ball 51 is rotatably connected to the inner wall of the groove 5. During operation, when the fixed block 22 moves, the ball 51 provided at the same time changes the sliding connection between the fixed block 22 and the partition frame 4 into a rolling connection, thereby effectively reducing the friction force when the fixed block 22 moves, while reducing the wear of the equipment and increasing the service life of the equipment.

[0033] Further, such as Figure 1 - Figure 7As shown, a fixing pin 6 is provided at the bottom of the second support plate 31; the fixing pin 6 is fixedly connected to the bottom of the second support plate 31. During operation, through the provided fixing pin 6, after the device is placed at a predetermined location, the fixing pin 6 will be inserted into the ground, thereby further increasing the stability of the device.

[0034] Further, such as Figure 1 - Figure 7 As shown, two pairs of suspension rods 7 are fixedly connected to the side walls of the vibration platform body 1; the suspension rods 7 are symmetrically arranged. When working, through the arranged suspension rods 7, when moving the equipment, the staff puts the steel wire on the suspension rods 7, and can use the lifting equipment to lift the equipment for moving. The arrangement of the suspension rods 7 effectively facilitates the staff to move the equipment.

[0035] Working principle: When making prefabricated cement products, cement needs to be poured into a mold, and then a vibration device is inserted into the cement to expel the bubbles in the cement. During this process, the staff needs to process and expel the bubbles one by one. Through the vibration platform body 1, the staff pours on the top of the vibration platform body 1. After pouring, the vibration motor 14 is started. The vibration generated by the vibration motor 14 will be transmitted to the cement through the vibration platform body 1, and then the bubbles in the cement will be expelled, thereby effectively reducing the workload of the staff. At the same time, all the poured cement on the top of the vibration platform body 1 can be processed, thereby effectively improving the processing efficiency. When the electric push rod 12 is inserted into the installation groove 11, the electric push rod 12 will squeeze the fixing block 22 into the sliding groove 2. Since the magnet 21 and the fixing block 22 are made of the same material and there is a repulsive force between the fixing block 22 and the magnet 21, when the electric push rod 12 is fully inserted into the installation groove 11, the repulsive force will squeeze the fixing block 22 into the fixing groove 23, thereby fixing the electric push rod 12. The end of the fixing block 22 is arc-shaped. When disassembling the electric push rod 12, the staff pulls the electric push rod 12 to squeeze the fixing block 22 out of the fixing groove 23 to complete the disassembly of the electric push rod 12. The setting effectively simplifies the installation and disassembly of the equipment by the staff, thereby effectively facilitating the installation and disassembly of the equipment by the staff, reducing the workload of the staff during installation and disassembly. When the electric push rod 12 is installed, the first support plate 3 is set to effectively increase the force-bearing area of ​​the electric push rod 12, and the second support plate 31 can effectively increase the bearing area of ​​the electric push rod 12, thereby reducing the ground subsidence of the equipment and improving the stability of the equipment. The partition frame 4 is set to make the fixed block 22 in the space in the middle of the partition frame 4, thereby effectively limiting the movement range of the fixed block 22, thereby reducing the movement of the fixed block 22, and effectively The fixing effect of the equipment is increased. When the fixing block 22 moves, the ball 51 is set so that the sliding connection between the fixing block 22 and the partition frame 4 is changed into a rolling connection, thereby effectively reducing the friction when the fixing block 22 moves, and at the same time reducing the wear of the equipment and increasing the service life of the equipment. Through the set fixing pin 6, after the equipment is placed at a predetermined location, the fixing pin 6 will be inserted into the ground, thereby further increasing the stability of the equipment. Through the set hanging rod 7, when moving the setting, the staff will put the steel wire on the hanging rod 7, and can use the lifting red equipment to lift the equipment for movement. The set hanging rod 7 effectively facilitates the staff to move the equipment.

[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A vibration platform for pouring building cement precast parts, comprising a vibration platform body (1); characterized in that: The bottom of the vibration platform body (1) is provided with two pairs of installation grooves (11); the installation grooves (11) are symmetrically arranged; the bottom of the vibration platform body (1) is provided with an equipment groove (13); a plurality of vibration motors (14) are arranged inside the equipment groove (13); the vibration motors (14) are fixedly connected to the inner side wall of the equipment groove (13); and an electric push rod (12) is arranged on the inner side wall of the installation groove (11).

2. A vibration platform for pouring building cement precast parts according to claim 1, characterized in that: The inner wall of the installation groove (11) is provided with a sliding groove (2); the inner wall of the sliding groove (2) is fixedly connected with a magnet (21); the inner wall of the sliding groove (2) is provided with a plurality of fixing blocks (22); and the end of the electric push rod (12) is provided with a fixing groove (23).

3. The vibration platform for pouring building cement precast parts according to claim 1, characterized in that: A first support plate (3) is fixedly connected to the middle of the electric push rod (12); and a second support plate (31) is fixedly connected to the end of the electric push rod (12).

4. A vibration platform for pouring building cement precast parts according to claim 2, characterized in that: The inner side wall of the sliding groove (2) is provided with a partition frame (4); the partition frame (4) is fixedly connected to the inner side wall of the sliding groove (2).

5. A vibration platform for pouring building cement precast parts according to claim 4, characterized in that: A groove (5) is provided on the side wall of the partition frame (4); a ball (51) is rotatably connected to the inner side wall of the groove (5).

6. A vibration platform for pouring building cement precast parts according to claim 3, characterized in that: A fixing pin (6) is provided at the bottom of the second supporting plate (31); the fixing pin (6) is fixedly connected to the bottom of the second supporting plate (31).

7. The vibration platform for pouring building cement precast parts according to claim 1, characterized in that: Two pairs of suspension rods (7) are fixedly connected to the side walls of the vibration platform body (1); the suspension rods (7) are symmetrically arranged.