Precast beam steam curing system

Through the design of the precast beam steam curing system, steam spray and cold water spray devices combined with temperature and humidity sensors and PID control methods are used to solve the problem of difficulty in controlling the temperature and humidity of precast beams in the existing technology, and realize the control of the surface of precast beams. Precise control and energy saving improve the strength and environmentally friendly production of prefabricated beams.

CN221912526UActive Publication Date: 2024-10-29陕西路桥集团有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420415921.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-29
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

The existing steam curing method for precast beams is difficult to effectively control the temperature and humidity inside the tarpaulin, resulting in waste of energy and changes in temperature and humidity on the surface of the precast beams, affecting the strength.

Method used

A prefabricated beam steam curing system is designed, including a steam curing chamber, a movable pedestal, a spray device and a data collection device. It uses steam spray and cold water spray devices, combined with temperature and humidity sensors and PID control method, to realize automatic control of steam curing. Indoor temperature and humidity, prefabricated beams are quickly transported through rails, and circulating filter pumps save water resources.

Benefits of technology

It achieves precise control of the temperature and humidity on the surface of precast beams, reduces energy waste, improves the strength of precast beams, and ensures environmentally friendly production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221912526U_ABST
    Figure CN221912526U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of precast beam processing equipment, and discloses a precast beam steam curing system. The system comprises a steam curing chamber, a movable pedestal, a spraying device and a data acquisition device, spraying devices are arranged in the steam-curing chamber box body and comprise a steam spraying device and a cold water spraying device, the first steam spraying device is arranged on the top of the inner side of the steam-curing chamber box body, and the top of the steam-curing chamber box body is further connected with a first temperature and humidity sensor. Cold water spraying devices are arranged on the inner side wall and the top of the inner side of the steam curing chamber box body; a movable pedestal is arranged in the center of the bottom of the steam curing chamber box body, and second steam spraying devices are arranged on the two sides of the movable pedestal; drainage ditches are arranged on the lowermost portions of the two sides of the steam curing chamber box body. A circulating filter pump and a steam generator are arranged outside the steam curing chamber box body; the control unit is arranged, and automatic steam curing is achieved by monitoring and adjusting the temperature and humidity in the steam curing chamber box body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated beam processing equipment, in particular to a prefabricated beam steam curing system. Background Art

[0002] Precast beams are concrete beam components that are molded, mixed, and poured at a concrete component factory or construction site. When the strength reaches the design requirements, they are transported to the installation location for installation. There are many factors that affect the quality of precast beams, among which temperature and humidity are the biggest problems. In order to overcome this problem, construction teams usually use steam to cure the concrete.

[0003] In the prior art, steam curing construction generally uses tarpaulins to wrap the precast concrete parts that need to be cured, and then connects the boiler to pass steam into the tarpaulin. Due to the poor thermal insulation effect of the tarpaulin, it is often necessary to continuously pass steam into the tarpaulin. This steam curing method is difficult to control the temperature and humidity inside the tarpaulin, and the uninterrupted operation of the boiler will also increase energy waste. In addition, since industrial boilers produce harmful gases during combustion, the steam curing area is generally set in the corner of the precast beam construction site. During the transportation of the precast beam to the steam curing area, heat will be lost or the surface temperature and humidity of the precast beam will be greatly changed, thereby affecting the strength of the precast beam. Utility Model Content

[0004] The utility model aims to provide a prefabricated beam steam curing system to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A prefabricated beam steam curing system comprises a curing chamber, a movable platform, a spraying device and a data acquisition device, wherein the curing chamber comprises a curing chamber box, and a heat preservation layer is arranged on the outside of the curing chamber box; a spraying device is arranged inside the curing chamber box, and the spraying device comprises a steam spraying device and a cold water spraying device, and the steam spraying device comprises a first steam spraying device and a second steam spraying device, and the first steam spraying device is arranged at the top of the inner side of the curing chamber box, and the top of the curing chamber box is also connected to a first temperature and humidity sensor; a movable platform is arranged at the bottom center of the curing chamber box, and a second temperature and humidity sensor is arranged on the movable platform, and second steam spraying devices are arranged on both sides of the movable platform; a circulating filtration pump and a steam generator are arranged outside the curing chamber box.

[0007] Further preferably, the first steam spray device is connected to the inner side of the top of the curing chamber box through a support frame, and the first steam spray device includes a steam main pipe, a movable steam branch pipe, a steam branch pipe and a steam spray head. The steam main pipe is arranged at the inner top of the curing chamber box, and steam branch pipes are connected to both sides of the steam main pipe, respectively. The other end of the steam branch pipe is connected to a movable steam branch pipe, and a plurality of steam spray heads are also movably connected to the movable steam branch pipe and the steam branch pipe. The steam branch pipe changes its angle according to the shape of the concrete beam to be cured, so that the steam is directly sprayed on the surface of the concrete beam, so that the surface temperature and humidity of the concrete beam change rapidly as required.

[0008] Further preferably, the second steam spray device includes a steam main pipe, a movable bracket, a steam branch pipe and a steam spray head, the steam main pipe is arranged on both sides of the movable base, the two sides of the steam main pipe are connected with steam branch pipes, a plurality of steam spray heads are arranged on the steam branch pipes, the other end of the lower steam branch pipe is movably connected to the movable bracket through a connecting rotating shaft, the movable bracket is connected to the steam branch pipe through a rotating shaft, and a pulley is arranged at the bottom of the movable bracket.

[0009] Further preferably, a track is provided under the mobile pedestal, the track passes through the steam curing chamber and is connected to the previous link and the next link of the steam curing section. The provision of the track makes it more convenient and faster to transport the concrete beam between each process, and prevents the concrete beam from experiencing a long transportation time after demoulding, which causes a large change in the temperature and humidity on the surface of the concrete beam, thereby affecting the strength of the precast concrete beam.

[0010] Further preferably, the first temperature and humidity sensor and the second temperature and humidity sensor are electrically connected to the control unit respectively, and the control unit adopts PID control method, after converting the temperature signal collected by the temperature and humidity sensor into an electrical signal, through automatic calculation of the set value and the target value, controls the opening and closing of the electric control valve and the circulating filter pump to achieve the effect of automatically controlling the temperature and humidity inside the steaming chamber. The control unit is set as a terminal device such as a computer or a tablet, and transmits data by wire or wireless means.

[0011] Further preferably, the first temperature and humidity sensor is arranged on the top of the inner side of the steaming chamber box, the second temperature and humidity sensor is arranged on the mobile pedestal, and the first temperature and humidity sensor and the second temperature and humidity sensor are connected with a support rod. The second temperature and humidity sensor can be arranged on the mobile pedestal. When the concrete beam to be steamed and cured is a box beam, the second temperature and humidity sensor can also be arranged in the hollow part inside the box beam, so as to measure the temperature and humidity inside the box beam, making the steaming and curing of the concrete beam more accurate and controllable. When placing the first temperature and humidity sensor, adjust the length of the telescopic rod so that the first temperature and humidity sensor is closer to the concrete beam, and the measured data is more accurate.

[0012] Further preferably, the cold water spray device is arranged on the inner side wall and the inner top of the steam curing chamber box body, and the cold water spray device includes a cold water main pipe, a cold water branch pipe and a cold water nozzle, the cold water main pipe is fixed to the inner top of the steam curing chamber box body, the cold water branch pipe is fixed to the upper part of the two inner side walls of the steam curing chamber box body, the cold water branch pipe is connected to the cold water main pipe, and a plurality of cold water nozzles are distributed on the cold water branch pipe and the cold water main pipe, and the water inlet of the cold water main pipe is connected to the water outlet of the circulation filter pump. In the process of spraying and cooling, the excess water will be collected by the drainage ditch and finally flow into the circulation filter pump. The recycled water will be filtered and then transported to each cold water branch pipe by the circulation filter pump, and the water will be sprayed out according to the steam curing needs. The design of circulation filtration can save water resources in production and achieve the purpose of environmentally friendly production.

[0013] Further preferably, the first steam spray device and the second steam spray device are both connected to an electric control valve at one end close to the steam generator, and the PID control method is used to determine whether the range in which the steam flow should be reduced is reached. If the temperature exceeds the range, the control unit will transmit a signal to the electric control valve, and the size of the steam is controlled by adjusting the electric control valve to achieve the effect of changing the temperature. The other side of the electric control valve is connected to the steam generator, and the electric control valve is electrically connected to the control unit.

[0014] Further preferably, the floor of the steaming chamber box is set as a slope with a high middle and low surroundings, and drainage ditches are set at the bottom of the boxes on both sides of the steaming chamber box, and the drainage ditches are connected to the water inlet of the circulating filtration pump.

[0015] Compared with the prior art, the beneficial effects of the utility model are:

[0016] 1. The utility model can monitor the temperature and humidity in the steaming room in real time through the temperature and humidity sensor, and automatically adjust the temperature and humidity in the steaming room according to different steaming stages through the control unit. The setting of the control unit can better use the influence of external factors such as season and environment on the steaming environment.

[0017] 2. The steam spray branch pipe can be adaptively adjusted according to different concrete beams, and the effect of making the steam cover the surface of the concrete beam as much as possible can be achieved by changing the spray angle and height.

[0018] 3. The steaming and curing room of the utility model is provided with tracks on the floor and a movable platform is adopted, so that the concrete beam can be transported into the steaming and curing room more quickly through the track after demoulding, thereby avoiding the change of the strength of the concrete beam due to the large change of temperature and humidity on the surface of the concrete beam caused by the long transportation time after demoulding.

[0019] 4. A circulating filter pump is provided to make the water in the steaming process circulate and fully utilize to avoid the waste of water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall structure when the prefabricated beam of the utility model is a box beam;

[0021] Figure 2 The purpose of the steam spray device of the utility model is;

[0022] Figure 3 This is a schematic diagram of the steam spray pipeline of the utility model;

[0023] Figure 4 This is a schematic diagram of the cold water pipeline of the utility model;

[0024] Figure 5 This is a schematic diagram of the overall structure when the prefabricated beam of the utility model is a T-beam.

[0025] In the figure: 1. Steaming chamber box; 2. Insulation layer; 3. Cold water nozzle; 4. First steam spray device; 5. Second steam spray device; 6. First temperature and humidity sensor; 7. Second temperature and humidity sensor; 8. Box beam; 9. Moving pedestal; 10. Track; 11. Drainage ditch; 12. Circulating filter pump; 13. Support frame; 14. Rotating shaft; 15. Steam main pipeline; 16. Steam branch pipeline; 17. Steam spray head; 18. Moving bracket; 19. Steam generator; 20. Cold water branch pipeline; 21. Cold water main pipeline; 22. Electric control valve; 23. T-beam; 24. Movable steam branch pipe. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-5 , the utility model provides a technical solution:

[0028] A prefabricated beam steam curing system comprises a steam curing chamber, a movable platform 9, a spraying device and a data acquisition device, wherein the steam curing chamber comprises a steam curing chamber box 1, and an insulation layer 2 is arranged on the outer side of the steam curing chamber box 1; a spraying device is arranged inside the steam curing chamber box 1, and the spraying device comprises a steam spraying device and a cold water spraying device, and the steam spraying device comprises a first steam spraying device 4 and a second steam spraying device 5, the first steam spraying device 4 is arranged at the inner top of the steam curing chamber box 1, and a first temperature and humidity sensor 6 is also connected to the top of the steam curing chamber box 1, and a cold water spraying device is arranged on the inner side wall and the inner top of the steam curing chamber box 1; a movable platform 9 is arranged at the bottom center of the steam curing chamber box 1, a second temperature and humidity sensor 7 is arranged on the movable platform 9, and second steam spraying devices 5 are arranged on both sides of the movable platform 9; drainage ditches 11 are arranged at the bottom of the boxes on both sides of the steam curing chamber box 1; a circulating filter pump 12 and a steam generator 19 are arranged outside the steam curing chamber box 1;

[0029] In the utility model, the first steam spray device 4 is connected to the inner side of the top of the curing chamber box body 1 through the support frame 13. The first steam spray device 4 includes a steam main pipe 15, a movable steam branch pipe 24, a steam branch pipe 16 and a steam spray head 17. The steam main pipe 15 is arranged at the inner top of the curing chamber box body 1. The two sides of the steam main pipe 15 are respectively connected to the steam branch pipes 16. The other end of the steam branch pipe 16 is connected to the movable steam branch pipe 24. The movable steam branch pipe 24 and the steam branch pipe 16 are also movably connected to a plurality of steam spray heads 17. The steam branch pipe 16 changes its angle according to the shape of the concrete beam to be cured, so that the steam is directly sprayed on the surface of the concrete beam, so that the surface temperature and humidity of the concrete beam change rapidly as required.

[0030] In the utility model, the second steam spray device 5 includes a steam main pipe 15, a movable bracket 18, a steam branch pipe 16 and a steam spray head 17. The steam main pipe 15 is arranged on both sides of the movable base 9. The two sides of the steam main pipe 15 are connected with steam branch pipes 16. A plurality of steam spray heads 17 are arranged on the steam branch pipes 16. The other end of the lower steam branch pipe 16 is movably connected to the movable bracket 18 through a rotating shaft 14, and a pulley is arranged at the bottom of the movable bracket 18.

[0031] In the utility model, a track 10 is arranged below the mobile pedestal 9, and the track 10 penetrates the steam curing chamber box 1 and is connected to the construction sites of the previous link and the next link of the steam curing. The arrangement of the track 10 makes it more convenient and faster to transport the concrete beam between each process, and prevents the concrete beam from experiencing a long transportation time after demoulding, which causes a large change in the temperature and humidity on the surface of the concrete beam, thereby affecting the strength of the concrete precast beam.

[0032] In the utility model, the first temperature and humidity sensor 6 and the second temperature and humidity sensor 7 are electrically connected to the control unit respectively. The control unit adopts the PID control method. After the temperature signal collected by the temperature and humidity sensor is converted into an electrical signal, the opening and closing of the electric control valve 22 and the circulating filter pump 12 are controlled through automatic calculation of the set value and the target value to achieve the effect of automatically controlling the temperature and humidity inside the steaming chamber box 1. The control unit is set as a terminal device such as a computer or a tablet, and transmits data by wire or wireless means.

[0033] In the utility model, the first temperature and humidity sensor 6 is arranged on the top of the inner side of the steam curing chamber box 1, and the second temperature and humidity sensor 7 is arranged on the mobile pedestal 9. The first temperature and humidity sensor 6 and the second temperature and humidity sensor 7 are connected with a support rod. The second temperature and humidity sensor 7 can be arranged on the mobile pedestal 9. When the concrete beam to be steam-cured is a box beam 8, the second temperature and humidity sensor 7 can also be arranged in the hollow part inside the box beam 8, so as to measure the temperature and humidity inside the box beam 8, so that the steam curing of the concrete beam is more accurate and controllable. When the first temperature and humidity sensor 6 is placed, the length of the telescopic rod is adjusted so that the first temperature and humidity sensor 6 is closer to the concrete beam, and the measured data is more accurate.

[0034] In the utility model, the cold water spray device is arranged on the inner side wall and the inner top of the steam curing chamber box body 1, and the cold water spray device includes a cold water main pipe 20, a cold water branch pipe 21 and a cold water nozzle 3. The cold water main pipe 21 is fixed to the inner top of the steam curing chamber box body 1, and the cold water branch pipe 20 is fixed to the upper part of the two inner side walls of the steam curing chamber box body 1. The cold water branch pipe 20 is connected with the cold water main pipe 21. A plurality of cold water nozzles 3 are distributed on the cold water branch pipe 20 and the cold water main pipe 21. The water inlet of the cold water main pipe 21 is connected with the water outlet of the circulating filter pump 12. In the process of spraying and cooling, the excess water will be collected by the drainage ditch 11 and finally flow into the circulating filter pump 12. The recycled water will be filtered and then transported to each cold water branch pipe 20 by the circulating filter pump 12. The water is sprayed out according to the steam curing needs. The design of circulating filtration can save water resources in production and achieve the purpose of environmentally friendly production.

[0035] In the utility model, the first steam spray device 4 and the second steam spray device 5 are connected to an electric control valve 22 at one end close to the steam generator 19. The PID control method is used to determine whether the range in which the steam flow rate should be reduced is reached. If the temperature exceeds the range, the control unit will transmit a signal to the electric control valve 22, and the size of the steam is controlled by adjusting the electric control valve 22 to achieve the effect of changing the temperature. The other side of the electric control valve 22 is connected to the steam generator 19, and the electric control valve 22 is electrically connected to the control unit.

[0036] In the utility model, the floor of the steaming and curing chamber box 1 is set as a slope with a high middle and low surroundings. Drainage ditches 11 are set at the bottom of the boxes on both sides of the steaming and curing chamber box 1. The drainage ditches 11 are connected to the water inlet of the circulating filter pump 12.

[0037] Embodiment 1,

[0038] After the concrete box beam 8 is demoulded, the box beam 8 is moved into the steam curing chamber box 1 through the movable pedestal 9 along the track 10, and the doors at both ends of the steam curing chamber box 1 are closed to make the steam curing chamber box 1 in a closed state. The angles of the movable bracket 18 and the steam branch pipe 16 are adjusted so that the steam spraying range of the steam spray head 17 covers the surface of the box beam 8 as much as possible; the length of the telescopic rod of the first temperature and humidity sensor 6 is adjusted; the second temperature and humidity sensor 7 is placed inside the box beam 8 so that the second temperature and humidity sensor 7 measures the temperature and humidity inside the box beam 8 in real time.

[0039] The steam generator 19 and the control unit are started, and the first temperature and humidity sensor 6 and the second temperature and humidity sensor 7 transmit the real-time temperature and humidity information in the steaming chamber box 1 to the control unit in the form of an electrical signal. The PID controller determines whether the pressure should be reduced. If the pressure exceeds the range, the signal will be transmitted to the electric control valve 22, and the valve opening angle will be changed according to the pressure adjustment to achieve the purpose of automatically controlling the steam opening signal, the steam closing signal, and the steam adjustment signal, so as to achieve the purpose of automatically controlling the temperature in the steaming chamber box 1. The control unit automatically manages the humidity in the steaming chamber box 1, transmits the spray signal, the spray duration, and the spray stop signal to the circulation filter pump 12, and the circulation filter pump 12 delivers cold water to the cold water nozzle 3. The control unit recognizes the received temperature and humidity information in real time and regulates the electric control valve 22 and the circulation filter pump 12.

[0040] Excess cold water is collected by the drainage ditch 11 and flows into the circulating filter pump 12. The recovered water is filtered and then sprayed by the cold water nozzle 3 as needed by the circulating filter pump 12.

[0041] Embodiment 2,

[0042] Depend on Figure 5 As shown, when the concrete beam to be steam-cured is a T-beam 23, the length of the telescopic rod of the first temperature and humidity sensor 6 is adjusted to make it as close as possible to the surface of the T-beam 23. The angle position of the movable bracket 18 and the steam branch pipe 16 is adjusted so that the steam spraying range of the steam spray head 17 covers the surface of the T-beam 23 as much as possible.

[0043] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.

[0044] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A precast beam steam curing system, comprising a steam curing chamber, a movable stand (9), a spraying device and a data acquisition device, characterized in that: The steam curing chamber comprises a steam curing chamber box (1), the outer side of which is provided with a heat-insulating layer (2); a spray device is provided inside the steam curing chamber box (1), the spray device comprises a steam spray device and a cold water spray device, the steam spray device comprises a first steam spray device (4) and a second steam spray device (5), the first steam spray device (4) is provided at the top of the inner side of the steam curing chamber box (1), the top of the steam curing chamber box (1) is also connected with a first temperature and humidity sensor (6), a movable base (9) is provided at the center of the bottom of the steam curing chamber box (1), a second temperature and humidity sensor (7) is provided on the movable base (9), and second steam spray devices (5) are provided on both sides of the movable base (9); a circulating filtration pump (12) and a steam generator (19) are provided outside the steam curing chamber box (1).

2. The precast beam steam curing system according to claim 1, characterized in that: The first steam spray device (4) is connected to the inner side of the top of the steam curing chamber box (1) through a support frame (13). The first steam spray device (4) comprises a steam main pipe (15), a movable steam branch pipe (24), a steam branch pipe (16) and a steam spray head (17). The steam main pipe (15) is arranged at the inner top of the steam curing chamber box (1). The two sides of the steam main pipe (15) are respectively connected to the steam branch pipes (16). The other end of the steam branch pipe (16) is connected to the movable steam branch pipe (24). A plurality of steam spray heads (17) are also movably connected to the movable steam branch pipe (24) and the steam branch pipe (16).

3. The precast beam steam curing system according to claim 1, characterized in that: The second steam spray device (5) comprises a steam main pipe (15), a movable bracket (18), a steam branch pipe (16) and a steam spray head (17); the steam main pipe (15) is arranged on both sides of the movable platform (9); the two sides of the steam main pipe (15) are connected with steam branch pipes (16); a plurality of steam spray heads (17) are arranged on the steam branch pipes (16); the other end of the steam branch pipe (16) at the lower side is movably connected to the movable bracket (18) through a rotating shaft (14); and a pulley is arranged at the bottom of the movable bracket (18).

4. The precast beam steam curing system according to claim 1, characterized in that: A track (10) is arranged below the movable platform (9), and the track (10) passes through the steaming chamber box (1).

5. The precast beam steam curing system according to claim 1, characterized in that: The first temperature and humidity sensor (6) and the second temperature and humidity sensor (7) are electrically connected to the control unit respectively.

6. A precast beam steam curing system according to claim 5, characterized in that: The first temperature and humidity sensor (6) is arranged on the top of the inner side of the steaming chamber box (1), and the second temperature and humidity sensor (7) is arranged on the movable platform (9). The first temperature and humidity sensor (6) and the second temperature and humidity sensor (7) are connected to support rods.

7. The precast beam steam curing system according to claim 1, characterized in that: The cold water spray device is arranged on the inner side wall and the inner top of the steam curing chamber box body (1), and comprises a cold water main pipe (21), a cold water branch pipe (20) and a cold water nozzle (3). The cold water main pipe (21) is fixed to the inner top of the steam curing chamber box body (1), and the cold water branch pipe (20) is fixed to the upper parts of the two inner side walls of the steam curing chamber box body (1). The cold water branch pipe (20) is connected to the cold water main pipe (21), and a plurality of cold water nozzles (3) are distributed on the cold water branch pipe (20) and the cold water main pipe (21). The water inlet of the cold water main pipe (21) is connected to the water outlet of the circulating filter pump (12).

8. The precast beam steam curing system according to claim 1, characterized in that: One end of the first steam spray device (4) and the second steam spray device (5) close to the steam generator (19) is connected to an electric control valve (22), the other side of the electric control valve (22) is connected to the steam generator (19), and the electric control valve (22) is electrically connected to the control unit.

9. The precast beam steam curing system according to claim 1, characterized in that: The floor of the steaming chamber box (1) is arranged as a slope with a high middle and low sides. Drainage ditches (11) are arranged at the bottom of the boxes on both sides of the steaming chamber box (1). The drainage ditches (11) are connected to the water inlet of the circulating filtration pump (12).

Citation Information

Cited By

  • Automatic spraying maintenance system for prefabricated box girder

    CN119159670A