Binding structure of building material decorative plate

Through the structure of the hydraulic push rod and the transmission motor, the building material boards are stacked neatly and bundled, which solves the problem of uneven building material decorative boards after bundling, and simplifies the transportation process of the boards, achieving efficient bundling and transportation. .

CN221914835UInactive Publication Date: 2024-10-29SHANGHAI CETANG IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420167397.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing building material decorative board bundling device is prone to uneven board surfaces when bundling, and the bundled boards are inconvenient to transport.

Method used

A structure including the first base plate, the first baffle, the first support column, a hydraulic push rod, a push plate, a slide block, a binding frame, a telescopic spring and a transmission motor is designed. Through the cooperation of the hydraulic push rod and the transmission motor, The building material boards are stacked neatly and bundled. At the same time, the bundling frame and transmission motor are used to drive the bundling ropes for knotting, which facilitates transportation.

Benefits of technology

It solves the problem of uneven building material decorative panels after being bundled, simplifies the handling process of the panels, and improves bundling efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221914835U_ABST
    Figure CN221914835U_ABST
Patent Text Reader

Abstract

The utility model discloses a binding structure of a building material decorative plate, which relates to the technical field of binding equipment and comprises a first bottom plate, a first baffle is fixedly mounted at the top of the first bottom plate, a first support column is fixed at the top of the first bottom plate on one side of the first baffle, and a first hydraulic push rod is fixedly mounted on one side, close to the first baffle, of the first support column. An operator uses a forklift to place a building material decorative plate on a second bottom plate from a forklift groove formed in the second bottom plate, a second hydraulic push rod is started, the building material decorative plate is pushed to a conveying belt through cooperation of the second hydraulic push rod and a push plate, a first transmission motor is started, and the building material decorative plate is pushed to the conveying belt. The building material decorating plates are moved into the first baffle from the conveying belt by rotating the conveying belt, an operator starts a first hydraulic push rod, the building material decorating plates are stacked in order through cooperation of the first hydraulic push rod and a first push plate, and a binding frame is started to bind the building material decorating plates stacked in order. The problem that the building material decorative plates are uneven after being bound is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of binding equipment, in particular to a binding structure of building material decorative panels. Background Art

[0002] Decorative board is a kind of man-made board. It is a thermosetting laminated plastic made of a variety of special papers after chemical treatment and high temperature and high pressure adhesive. The board surface has various wood grains or patterns, bright and smooth, bright and beautiful colors, and has good physical properties such as high wear resistance, heat resistance, cold resistance, and fire resistance. Many high-end houses use this new type of decorative board for the walls and roofs, well-made cabinets, cupboards, tables, beds, workbenches of precision instruments, laboratory benches, TV sets, radios, and other radio and telecommunications equipment shells.

[0003] The existing patent (announcement number: CN207773568U) is a bundling device for building material decorative panels. The utility model is a bundling device for building material decorative panels, which is connected by fastening a support to the surface of a bundling platform, and then the motor is energized through the wire groove on the right side of the support and the electric control box, so that the transmission roller drives the conveyor belt to transmit each other. In this way, the building material board can be directly placed on the transmission belt, and the building materials can be bundled and packaged by mutual transmission and cooperation equipment, which can ensure the trapezoidal integrity of the building material board and avoid injuries to workers.

[0004] The bundling device of the above-mentioned building material decorative panels drives the conveyor belt to transmit to each other through the transmission roller. The building material panels can be directly placed on the transmission belt and transmitted to each other by themselves and cooperate with the equipment to bundle and pack the building materials. However, the building material decorative panels will be uneven during bundling, and the bundled building material decorative panels are not convenient to carry. Therefore, we propose a bundling structure of building material decorative panels to solve the above problems. Utility Model Content

[0005] The utility model provides a bundling structure for building material decorative boards, which solves the technical problem that the building material decorative boards are uneven after being bundled and the bundled building material decorative boards are convenient to carry.

[0006] In order to solve the above technical problems, the utility model provides a bundling structure of building material decorative panels, comprising a first bottom plate, a first baffle plate is fixedly installed on the top of the first bottom plate, a first support column is fixedly installed on the top of the first bottom plate on one side of the first baffle plate, a first hydraulic push rod is fixedly installed on the side of the first support column close to the first baffle plate, a first push plate is fixedly installed on the other end of the first hydraulic push rod, a slider is fixedly installed on the bottom of the first push plate, a slide groove is opened on the side of the first bottom plate close to the first baffle plate, and the slider is slidably connected in the slide groove;

[0007] A binding frame is fixedly installed on one side of the first base plate close to the first baffle, a telescopic spring is fixedly connected to the inner side of the binding frame, the other end of the telescopic spring is fixedly connected to a first hook, a second transmission motor is fixed to the bottom of the binding frame close to the hole, and a second hook is fixed to the other end of the second transmission motor.

[0008] The above technical solution is adopted: the operator uses a forklift to place the building material decorative board on the second bottom plate from the forklift slot opened on the second bottom plate, turns on the second hydraulic push rod, and pushes the building material decorative board onto the conveyor belt through the cooperation of the second hydraulic push rod and the second push plate, turns on the first transmission motor, so that the building material decorative board moves from the conveyor belt to the first baffle, the operator turns on the first hydraulic push rod, and through the cooperation of the first hydraulic push rod and the first push plate, the building material decorative boards are stacked neatly, the bundling frame is turned on, and the neatly stacked building material decorative boards are bundled, thereby solving the problem that the building material decorative boards are uneven after bundling;

[0009] The operator first pre-hangs the binding rope on the first hook and the second hook. When the building materials decorative panels are stacked neatly, the second transmission motor drives the second hook fixed on the top to rotate through the cooperation of the binding frame, the second transmission motor, the telescopic spring, the first hook and the second hook arranged on the outside of the building materials decorative panels. The second hook drives the binding rope to rotate. The first hook connected to the telescopic spring is driven by the second transmission motor to drive the second hook to rotate. Under the action of the binding rope passing through the force, the binding rope hung on the first hook falls off, so that the building materials decorative panels are bundled and knotted.

[0010] Preferably, a fixing plate is fixed on the top of the first bottom plate on one side of the bundling frame, a rotating column is rotatably connected between the fixing plates, a wire drum is fixed on the rotating column, and a hole is opened on one side of the bundling frame close to the fixing plate.

[0011] The above technical solution is adopted: through the cooperation of the fixed plate, the rotating column, the wire drum and the hole, the binding rope is placed in the wire drum, and the binding rope passes through the hole and is set in the binding frame, so that the binding rope is pre-hung on the first hook and the second hook.

[0012] Preferably, a second baffle is fixedly mounted on one side of the first bottom plate close to the binding frame.

[0013] By adopting the above technical solution, the second baffle is provided to play a limiting role when the building material decorative plate moves on the conveyor belt.

[0014] Preferably, a support is provided between the second baffles, a conveyor belt is rotatably provided on the outer side of the support, a rotating roller is rotatably provided on the support, a first transmission motor is fixedly installed on the side of the first base plate away from the bundling frame, the first transmission motor is rotatably connected to a rotating shaft on the side close to the conveyor belt, and the other end of the rotating shaft is fixedly connected to the rotating roller.

[0015] The above-mentioned technical scheme is adopted: through the cooperation of the support, conveyor belt, rotating roller, rotating shaft and the first transmission motor, when the building material decorative board is pushed onto the conveyor belt, the first transmission motor drives the rotating shaft to rotate, and the rotating shaft drives the rotating roller to rotate, so that the rotating roller drives the conveyor belt to rotate, and finally the conveyor belt drives the building material decorative board to move, so that the conveyor belt moves the building material decorative board to the first baffle, or turns on the first transmission motor to rotate in the opposite direction to move the bundled building material decorative board to the second bottom plate, thereby facilitating the transportation of the building material decorative board.

[0016] Preferably, a second bottom plate is fixedly mounted on a side of the first bottom plate away from the first baffle, and a forklift groove is provided on the second bottom plate.

[0017] By adopting the above technical solution: through the setting of the second bottom plate and the forklift slot opened on the second bottom plate, the operator drives the forklift through the forklift slot to place the building material decorative panels to be bundled on the second bottom plate or transport the bundled building material decorative panels away, which facilitates the placement or transportation of the building material decorative panels and solves the difficulty of placing and transporting the building material decorative panels.

[0018] Preferably, a third bottom plate is fixedly installed on the side of the second bottom plate away from the first baffle plate, a second support column is fixedly installed on the top of the third bottom plate away from the first baffle plate, a second hydraulic push rod is fixedly installed on the side of the second support column close to the first baffle plate, and a second push plate is fixedly installed on the other side of the second hydraulic push rod.

[0019] The above technical solution is adopted: through the cooperation of the third bottom plate, the second support column, the second hydraulic push rod and the second push plate, the building material decorative plate placed on the second bottom plate is pushed onto the conveyor belt.

[0020] Compared with the related art, the utility model has the following beneficial effects:

[0021] 1. The operator uses a forklift to place the building material decorative board on the second bottom plate from the forklift slot opened on the second bottom plate, turns on the second hydraulic push rod, and pushes the building material decorative board onto the conveyor belt through the cooperation of the second hydraulic push rod and the push plate, turns on the first transmission motor, and moves the building material decorative board from the conveyor belt to the first baffle, and the operator turns on the first hydraulic push rod, and through the cooperation of the first hydraulic push rod and the first push plate, the building material decorative boards are stacked neatly, and the bundling frame is turned on to bundle the neatly stacked building material decorative boards, thereby solving the problem of uneven building material decorative boards after bundling.

[0022] 2. By setting up the second bottom plate and the forklift slot opened on the second bottom plate, the operator drives the forklift through the forklift slot to place the building material decorative panels that need to be bundled on the second bottom plate or move the bundled building material decorative panels away, which facilitates the placement or transportation of the building material decorative panels and solves the difficulty of placing and transporting the building material decorative panels. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of a bundling structure of a building material decorative board;

[0024] Figure 2 A schematic diagram of a bundling frame assembly structure of a bundling structure of a building material decorative panel;

[0025] Figure 3 A schematic diagram of the extrusion assembly structure of a bundling structure of a building material decorative panel;

[0026] Figure 4 A schematic diagram of the extrusion assembly structure of a bundling structure of a building material decorative panel;

[0027] Figure 5 The present invention is a schematic diagram of the structure of a conveyor belt assembly of a bundling structure for building material decorative panels.

[0028] Numbers in the figure: 1. first base plate; 2. first baffle; 3. first support column; 4. first hydraulic push rod; 5. first push plate; 6. slide groove; 7. slider; 8. bundling frame; 9. second baffle; 10. support; 11. conveyor belt; 12. rotating roller; 13. first transmission motor; 14. rotating shaft; 15. second base plate; 16. forklift groove; 17. third base plate; 18. second support column; 19. second hydraulic push rod; 20. second push plate; 21. fixed plate; 22. rotating column; 23. wire drum; 24. hole; 25. telescopic spring; 26. first hook; 27. second transmission motor; 28. second hook. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Embodiment 1

[0031] like Figure 1-5 As shown, a bundling structure of building material decorative panels comprises a first bottom plate 1, a first baffle plate 2 is fixedly mounted on the top of the first bottom plate 1, a first support column 3 is fixedly mounted on the top of the first bottom plate 1 on one side of the first baffle plate 2, a first hydraulic push rod 4 is fixedly mounted on the side of the first support column 3 close to the first baffle plate 2, a first push plate 5 is fixedly mounted on the other end of the first hydraulic push rod 4, a slider 7 is fixedly mounted on the bottom of the first push plate 5, a slide groove 6 is provided on the side of the first bottom plate 1 close to the first baffle plate 2, and the slider 7 is slidably connected in the slide groove 6;

[0032] A binding frame 8 is fixedly installed on one side of the first base plate 1 close to the first baffle 2, a telescopic spring 25 is fixedly connected to the inner side of the binding frame 8, and a first hook 26 is fixedly connected to the other end of the telescopic spring 25. A second transmission motor 27 is fixed to one side of the bottom of the binding frame 8 close to the hole 24, and a second hook 28 is fixed to the other end of the second transmission motor 27.

[0033] The operator uses a forklift to place the building material decorative board on the second bottom plate 15 from the forklift slot 16 opened in the second bottom plate 15, turns on the second hydraulic push rod 19, and pushes the building material decorative board onto the conveyor belt 11 through the cooperation of the second hydraulic push rod 19 and the second push plate 20, turns on the first transmission motor 13, so that the building material decorative board moves from the conveyor belt 11 to the first baffle 2, and the operator turns on the first hydraulic push rod 4, and through the cooperation of the first hydraulic push rod 4 and the first push plate 5, the building material decorative boards are stacked neatly, and the bundling frame 8 is turned on to bundle the neatly stacked building material decorative boards, thereby solving the problem that the building material decorative boards are uneven after bundling;

[0034] The operator first pre-hangs the binding rope on the first hook 26 and the second hook 28. When the building material decorative panels are neatly stacked, the second transmission motor 27 drives the second hook 28 fixed on the top to rotate through the cooperation of the binding frame 8, the second transmission motor 27, the telescopic spring 25, the first hook 26 and the second hook 28 arranged on the outside of the building material decorative panels. The second transmission motor 27 drives the second hook 28 fixed on the top to rotate, and the second hook 28 drives the binding rope to rotate. The first hook 26 connected by the telescopic spring 25 is driven by the second transmission motor 27 to drive the second hook 28 to rotate. Under the action of the binding rope passing force, the binding rope hung on the first hook 26 falls off, so that the building material decorative panels are bundled and knotted.

[0035] Embodiment 2

[0036] like Figure 1-5As shown, a fixed plate 21 is fixed on the top of the first bottom plate 1 on one side of the bundling frame 8, a rotating column 22 is rotatably connected between the fixed plates 21, a wire drum 23 is fixed on the rotating column 22, and a hole 24 is opened on the side of the bundling frame 8 close to the fixed plate 21. Through the cooperation of the fixed plate 21, the rotating column 22, the wire drum 23 and the hole 24, the bundling rope is placed in the wire drum 23, and the bundling rope passes through the hole 24 and is arranged in the bundling frame 8, so that the bundling rope is pre-hung on the first hook 26 and the second hook 28. A second baffle 9 is fixedly installed on the side of the first bottom plate 1 close to the bundling frame 8. Through the second baffle 9, when the building material decorative board moves on the conveyor belt 11 The supporting frame 10 plays a limiting role. A supporting frame 10 is arranged between the second baffle plates 9. A conveyor belt 11 is rotatably arranged on the outer side of the supporting frame 10. A rotating drum 12 is rotatably arranged on the supporting frame 10. A first transmission motor 13 is fixedly installed on the side of the first bottom plate 1 away from the bundling frame 8. The first transmission motor 13 is rotatably connected with a rotating shaft 14 on the side close to the conveyor belt 11. The other end of the rotating shaft 14 is fixedly connected to the rotating drum 12. Through the cooperation of the supporting frame 10, the conveyor belt 11, the rotating drum 12, the rotating shaft 14 and the first transmission motor 13, when the building material decorative board is pushed onto the conveyor belt 11, the first transmission motor 13 drives the rotating shaft 14 to rotate, and the rotating shaft 14 drives the rotating drum 12 to rotate, thereby rotating. The movable roller 12 drives the conveyor belt 11 to rotate, and finally the conveyor belt 11 drives the building material decorative board to move, so that the conveyor belt 11 moves the building material decorative board to the first baffle plate 2, or turns on the first transmission motor 13 to rotate in the opposite direction to move the bundled building material decorative board to the second bottom plate 15, which facilitates the transportation of the building material decorative board. The second bottom plate 15 is fixedly installed on the side of the first bottom plate 1 away from the first baffle plate 2, and the second bottom plate 15 is provided with a forklift slot 16. Through the second bottom plate 15 and the forklift slot 16 provided on the second bottom plate 15, the operator starts the forklift through the forklift slot 16 to place the building material decorative board to be bundled on the second bottom plate 15 or the bundled The decorative building material boards are carried away, which facilitates the placement or transportation of the decorative building material boards and solves the difficulty in placing and transporting the decorative building material boards. The third bottom plate 15 is fixedly installed on the side away from the first baffle plate 2, and the second support column 18 is fixedly installed on the top of the third bottom plate 17 away from the first baffle plate 2. The second support column 18 is fixedly installed on the side close to the first baffle plate 2, and the second hydraulic push rod 19 is fixedly installed on the other side of the second hydraulic push rod 19. Through the cooperation of the third bottom plate 17, the second support column 18, the second hydraulic push rod 19 and the second push plate 20, the decorative building material boards placed on the second bottom plate 15 are pushed onto the conveyor belt 11.

[0037] Working principle: Figure 1-5As shown, first, the operator pre-hangs the binding rope on the first hook 26 and the second hook 28, and uses a forklift to place the building material decorative board on the second bottom plate 15 from the forklift slot 16 opened on the second bottom plate 15, and turns on the second hydraulic push rod 19. Through the cooperation of the second hydraulic push rod 19 and the second push plate 20, the building material decorative board is pushed onto the conveyor belt 11, and the first transmission motor 13 is turned on. Through the cooperation of the support 10, the conveyor belt 11, the rotating roller 12, the rotating shaft 14 and the first transmission motor 13, the first transmission motor 13 drives the rotating shaft 14 to rotate, and the rotating shaft 14 drives the rotating roller 12 to rotate, so that the rotating roller 12 drives the conveyor belt 11 to rotate, and finally the conveyor belt 11 drives the building material decorative board to move, so that the conveyor belt 11 moves the building material decorative board into the first baffle 2, and the operator turns on the first hydraulic push rod 4. Through the cooperation of the first hydraulic push rod 4 and the first push plate 5, the building material decorative board The decorative building materials are neatly stacked between the bundling frames 8. Through the cooperation of the bundling frame 8, the second transmission motor 27, the telescopic spring 25, the first hook 26 and the second hook 28 arranged on the outer side of the decorative building materials board, the second transmission motor 27 drives the second hook 28 fixed on the top to rotate, and the second hook 28 drives the bundling rope to rotate. The first hook 26 connected by the telescopic spring 25 is driven by the second transmission motor 27 to drive the second hook 28 to rotate. Under the action of the force of the bundling rope, the bundling rope hung on the first hook 26 falls off, so that the decorative building materials boards are bundled and knotted, which solves the problem that the decorative building materials boards are uneven after bundling. After the decorative building materials boards are bundled, the first transmission motor 13 is turned on to rotate in the opposite direction to move the bundled decorative building materials boards to the second bottom plate 15. The operator starts the forklift to move the bundled decorative building materials boards placed on the second bottom plate 15 from the forklift slot 16 opened in the second bottom plate 15, thereby realizing convenient transportation of the decorative building materials boards.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A bundling structure of building material decorative panels, characterized in that: The invention comprises a first bottom plate (1), a first baffle (2) is fixedly mounted on the top of the first bottom plate (1), a first support column (3) is fixedly mounted on the top of the first bottom plate (1) on one side of the first baffle (2), a first hydraulic push rod (4) is fixedly mounted on the side of the first support column (3) close to the first baffle (2), a first push plate (5) is fixedly mounted on the other end of the first hydraulic push rod (4), a slider (7) is fixedly mounted on the bottom of the first push plate (5), a slide groove (6) is provided on the side of the first bottom plate (1) close to the first baffle (2), and the slider (7) is slidably connected in the slide groove (6); A binding frame (8) is fixedly mounted on one side of the first bottom plate (1) close to the first baffle plate (2); a telescopic spring (25) is fixedly connected to the inner side of the binding frame (8); the other end of the telescopic spring (25) is fixedly connected to a first hook (26); a second transmission motor (27) is fixed to the inner bottom of the binding frame (8) close to the hole (24); and a second hook (28) is fixed to the other end of the second transmission motor (27).

2. The binding structure of building material decorative panels according to claim 1 is characterized in that: A fixing plate (21) is fixed on the top of the first bottom plate (1) on one side of the bundling frame (8), a rotating column (22) is rotatably connected between the fixing plates (21), a wire drum (23) is fixed on the rotating column (22), and a hole (24) is provided on one side of the bundling frame (8) close to the fixing plate (21).

3. The bundling structure of building material decorative panels according to claim 1 is characterized in that: A second baffle (9) is fixedly mounted on a side of the first bottom plate (1) close to the binding frame (8).

4. The binding structure of building material decorative panels according to claim 3 is characterized in that: A support (10) is arranged between the second baffles (9), a conveyor belt (11) is rotatably arranged outside the support (10), a rotating roller (12) is rotatably arranged on the support (10), a first transmission motor (13) is fixedly installed on the side of the first bottom plate (1) away from the bundling frame (8), a rotating shaft (14) is rotatably connected to the side of the first transmission motor (13) close to the conveyor belt (11), and the other end of the rotating shaft (14) is fixedly connected to the rotating roller (12).

5. The binding structure of building material decorative panels according to claim 1 is characterized in that: A second bottom plate (15) is fixedly mounted on a side of the first bottom plate (1) away from the first baffle plate (2), and a forklift slot (16) is provided on the second bottom plate (15).

6. The binding structure of building material decorative panels according to claim 5, characterized in that: A third bottom plate (17) is fixedly mounted on the side of the second bottom plate (15) away from the first baffle plate (2); a second support column (18) is fixedly mounted on the top of the third bottom plate (17) away from the first baffle plate (2); a second hydraulic push rod (19) is fixedly mounted on the side of the second support column (18) close to the first baffle plate (2); and a second push plate (20) is fixedly mounted on the other side of the second hydraulic push rod (19).