Steel bar finished product storage tool

By designing the finished steel bar storage tooling, bucket-shaped steel frames and high and low lifting ring components are used to achieve efficient classified storage and lifting of steel bars, solving the problem of low storage and transfer efficiency of steel bars at the construction site, and improving construction efficiency and the service life of the tooling.

CN221915525UActive Publication Date: 2024-10-29CHINA STATE CONSTR HAILONG TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420188839.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-29
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

At the construction site, the storage and transfer of steel bars are disorganized, inefficient, and lack lifting functions to effectively maintain balance, resulting in low production and construction efficiency.

Method used

A finished steel bar storage tooling is designed, which includes a tooling chassis, a bucket-shaped steel frame, support beams, and high and low lifting ring components. Through the vertical arrangement of multiple bucket-shaped steel frames and the connection of the supporting beams, a shelf storage position is formed, and high and low lifting rings are used The components are lifted and balanced, and a forklift slot is provided on the tooling chassis to facilitate transfer.

Benefits of technology

It achieves classified storage and efficient lifting of various types of steel bars, improves the efficiency of steel bar supply and handling, and extends the service life of tooling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221915525U_ABST
    Figure CN221915525U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel bar finished product storage tool which comprises a tool chassis, a tool base arranged on the tool chassis and a bucket-shaped steel frame arranged on the tool base. A forklift groove is formed in the tool chassis; the steel frame comprises a plurality of bucket-shaped steel frame bodies, a supporting cross beam and high-low lifting ring assemblies. The multiple bucket-shaped steel frames are vertically arranged on one side of the tool base, and every two adjacent bucket-shaped steel frames are connected through a supporting cross beam and used for supporting pressure between the bucket-shaped steel frames during hoisting. And a plurality of extension rods of each bucket-shaped steel frame incline upwards and are sequentially lengthened from top to bottom to form shelf storage positions. The plurality of extension rods of the bucket-shaped steel frame are all inclined upwards and are sequentially lengthened from top to bottom to form shelf storage positions for storing various types of steel bar finished products, so that the effect of storing various types of steel bar finished products in multiple layers by a single tool is achieved, sorting and classified storage according to types of steel bars can be achieved, and manual secondary sorting is not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel bar storage, in particular to a storage tool for finished steel bar products. Background Art

[0002] At the construction site, a large number of different types and models of steel bars are usually needed. The construction site usually places the steel bars directly on the construction ground. Some of them randomly pile up the steel bars on the finished product stacking racks. The stacking site is messy and requires manual secondary sorting. There is also a secondary transportation process, which is also inconvenient. The production and construction efficiency is low, it does not have a lifting function, and cannot effectively maintain balance during lifting. Therefore, further improvement is needed. Utility Model Content

[0003] In view of the problems existing in the prior art, the utility model provides a finished steel bar storage tool.

[0004] In order to achieve the above purpose, the technical solution of the utility model is as follows:

[0005] The utility model provides a finished steel bar storage tool, comprising: a tool chassis, a tool base arranged on the tool chassis, and a bucket-shaped steel frame arranged on the tool base;

[0006] A forklift slot is provided on the tooling chassis;

[0007] The steel frame includes a plurality of bucket-shaped steel frames, supporting beams, and high and low hanging ring components;

[0008] The multiple bucket-shaped steel frames are vertically arranged on one side of the tooling base, and two adjacent bucket-shaped steel frames are connected by a supporting crossbeam to support the pressure between the bucket-shaped steel frames during lifting;

[0009] The multiple extension rods of each of the bucket-shaped steel frames are inclined upward and are lengthened from top to bottom to form a shelf storage position;

[0010] The high and low lifting ring assembly includes an upper lifting ring and a lower lifting ring corresponding to the upper lifting ring, wherein the lower lifting ring is arranged on the tooling base, and the upper lifting ring is arranged on a bucket-shaped steel frame, forming a high and low lifting ring assembly for lifting the tooling, and at the same time using long and short hooks mounted on the lower lifting ring and the upper lifting ring to ensure balance.

[0011] Preferably, each of the "dou"-shaped steel frames comprises a vertical column and a plurality of extending rods connected to the vertical column at one end; the vertical column is fixed on a tooling base.

[0012] Preferably, the number of the multiple "dou"-shaped steel frames is 3, and they are arranged as "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3; the "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3 are distributed at intervals on one side of the tooling base, wherein the "dou"-shaped steel frame 1 and "dou"-shaped steel frame 3 are placed at the two end corners of the tooling base, and the "dou"-shaped steel frame 2 is placed in the middle of the tooling base.

[0013] Preferably, the tops of the first and third dou-shaped steel frames are provided with upper lifting rings, and the two end corners on the other side of the tooling base are provided with lower lifting rings, so that the upper lifting rings and the lower lifting rings form high and low lifting ring components at four corners.

[0014] Preferably, the tooling chassis and the tooling base are connected by bolts.

[0015] Preferably, the tooling chassis is made of plastic.

[0016] Preferably, the tooling base is made of steel.

[0017] The technical solution of the utility model has the following beneficial effects:

[0018] The multiple protruding rods of the bucket-shaped steel frame of the utility model structure are all inclined upward and are lengthened successively from top to bottom to form a shelf storage position for storing various types of finished steel bars, thereby achieving the effect of storing various types of finished steel bars on multiple layers in a single tool. The steel bars can be sorted and stored according to their models without the need for manual secondary sorting, thereby improving the efficiency of steel bar supply.

[0019] The utility model forms a high and low lifting ring assembly for lifting tooling, and simultaneously utilizes the long and short lifting hooks mounted on the lifting ring to ensure balance, thereby improving the lifting efficiency.

[0020] The utility model connects two adjacent bucket-shaped steel frames through a supporting crossbeam, which is used for supporting the pressure between the bucket-shaped steel frames during lifting, thereby improving the service life of the tooling.

[0021] The utility model adopts a tooling chassis with a forklift slot, which is convenient for subsequent insertion of a forklift for transportation and improves the handling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the utility model. DETAILED DESCRIPTION

[0023] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0024] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0025] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0026] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0027] In the present invention, unless otherwise expressly specified or limited, a first feature is “on” or “below” a second feature.

[0028] “Under” may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, the first feature being “above”, “above”, and “above” the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being “under”, “below”, and “below” the second feature includes the first feature being directly below and obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0029] Reference Figure 1 The utility model provides a finished steel bar storage tool, comprising: a tool chassis 1, a tool base 2 arranged on the tool chassis 1, and a bucket-shaped steel frame 3 arranged on the tool base 2;

[0030] The tooling chassis 1 is provided with a forklift slot 101 to facilitate the subsequent insertion of a forklift for transportation;

[0031] The steel frame 3 includes a plurality of bucket-shaped steel frames 3, a supporting beam 5, and a high and low hanging ring assembly 4;

[0032] The plurality of bucket-shaped steel frames 3 are vertically arranged on one side of the tooling base 2, and two adjacent bucket-shaped steel frames 3 are connected by a supporting crossbeam 5, which is used to support the pressure between the bucket-shaped steel frames 3 during lifting and improve the service life, and two adjacent bucket-shaped steel frames 3 are connected by two supporting crossbeams 5;

[0033] The multiple protruding rods 301 of each of the "BU"-shaped steel frames 3 are inclined upward and are lengthened from top to bottom to form a shelf storage position for storing various types of finished steel bars; each of the "BU"-shaped steel frames 3 includes a vertical column and a plurality of protruding rods 301 connected to the vertical column at one end; the vertical column is fixed on the tooling base 2, and the number of the multiple protruding rods 301 is 3.

[0034] The high and low lifting ring assembly 4 includes an upper lifting ring 401 and a lower lifting ring 402 corresponding to the upper lifting ring, wherein the lower lifting ring 402 is arranged on the tooling base 2, and the upper lifting ring 401 is arranged on the bucket-shaped steel frame 3, forming a high and low lifting ring assembly 4 for lifting tooling, and at the same time, the long and short hooks hoisted on the lower lifting ring 402 and the upper lifting ring 401 are used to ensure balance and improve lifting efficiency.

[0035] Furthermore, the number of the multiple "dou"-shaped steel frames 3 is 3, and they are arranged as "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3; the "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3 are distributed at intervals on one side of the tooling base 2, wherein the "dou"-shaped steel frame 1 and "dou"-shaped steel frame 3 are placed at the two end corners of the tooling base 2, and the "dou"-shaped steel frame 2 is placed in the middle of the tooling base 2, and the tops of the "dou"-shaped steel frames 1 and 3 are provided with the upper hanging rings 401, and the two end corners on the other side of the tooling base 2 are provided with the lower hanging rings 402, so that the upper hanging rings 401 and the lower hanging rings 402 form high and low hanging ring components at four corners.

[0036] Furthermore, the tooling chassis 1 and the tooling base 2 are connected by bolts to facilitate disassembly and installation; the tooling chassis 1 is made of plastic to reduce weight and facilitate subsequent transportation; the tooling base 2 is made of steel, and the size of the tooling base 2 is consistent with that of the tooling chassis 1, which is the largest boundary of the entire tooling and serves as a stable base and the first storage space.

[0037] The above description is only a preferred embodiment of the utility model, and does not limit the patent scope of the utility model. All equivalent structural changes made by using the contents of the utility model specification and drawings under the utility model concept, or directly / indirectly used in other related technical fields are included in the patent protection scope of the utility model.

Claims

1. A finished steel bar storage tool, It is characterized in that include: A tool chassis (1), a tool base (2) arranged on the tool chassis (1), and a bucket-shaped steel frame (3) arranged on the tool base (2); The tooling chassis (1) is provided with a forklift slot (101); The steel frame (3) comprises a plurality of bucket-shaped steel frames (3), a supporting crossbeam (5), and a high and low hanging ring assembly (4); The plurality of bucket-shaped steel frames (3) are vertically arranged on one side of the tooling base (2), and two adjacent bucket-shaped steel frames (3) are connected by a supporting crossbeam (5) for supporting the pressure between the bucket-shaped steel frames (3) during lifting; The multiple extending rods (301) of each of the bucket-shaped steel frames (3) are inclined upwards and are sequentially lengthened from top to bottom to form a shelf storage position; The high-low lifting ring assembly (4) comprises an upper lifting ring (401) and a lower lifting ring (402) corresponding to the upper lifting ring, wherein the lower lifting ring (402) is arranged on a tooling base (2), and the upper lifting ring (401) is arranged on a bucket-shaped steel frame (3), so as to form a high-low lifting ring assembly (4) for lifting tooling, and at the same time, balance is ensured by using long and short hooks hoisted on the lower lifting ring (402) and the upper lifting ring (401).

2. The finished steel bar storage tooling according to claim 1, It is characterized in that Each of the "dou"-shaped steel frames (3) comprises a vertical column and a plurality of extending rods (301) connected to the vertical column at one end; the vertical column is fixed on the tooling base (2).

3. The finished steel bar storage tooling according to claim 2, It is characterized in that The number of the plurality of "dou"-shaped steel frames (3) is 3, and they are arranged as "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3; the "dou"-shaped steel frame 1, "dou"-shaped steel frame 2, and "dou"-shaped steel frame 3 are distributed at intervals on one side of the tooling base (2), wherein the "dou"-shaped steel frame 1 and "dou"-shaped steel frame 3 are arranged at the two end corners of the tooling base (2), and the "dou"-shaped steel frame 2 is arranged in the middle of the tooling base (2).

4. The finished steel bar storage tooling according to claim 3, It is characterized in that The tops of the first and third dou-shaped steel frames are provided with the upper lifting rings (401), and the two end corners of the other side of the tooling base (2) are provided with the lower lifting rings (402), so that the upper lifting rings (401) and the lower lifting rings (402) form high and low lifting ring components at four corners.

5. The finished steel bar storage tooling according to claim 2, It is characterized in that The tooling chassis (1) and the tooling base (2) are connected via bolts.

6. The finished steel bar storage tooling according to claim 5, It is characterized in that The tooling chassis (1) is made of plastic.

7. The finished steel bar storage tool according to claim 5, It is characterized in that The tooling base (2) is made of steel material.