Temporary pipe pier for process pipeline prefabrication site

By designing temporary pipe piers for process pipeline prefabrication, using lifting components and universal wheels to support heavier pipelines, and realizing flexible rotation and angle adjustment of the pipelines through hydraulic cylinders and runners, the problem of pipeline support and angle adjustment in the existing technology is solved. The problem of inconvenient rotation improves construction efficiency and safety.

CN221917213UActive Publication Date: 2024-10-29SINOPEC OILFIELD SERVICE CORPORATION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420596834.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-10-29
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

During the prefabrication process of process pipelines, it is inconvenient to support and rotate heavy pipelines, resulting in high labor intensity for construction workers, potential safety hazards, and low welding efficiency. The existing lifting-type combined slide table is easily damaged when the pipeline weight is heavy and is not suitable for pipeline rotation. .

Method used

A temporary pipe pier is designed, including a bottom plate, a lifting assembly and a top plate. The top plate is equipped with an insulation layer and a runner. The four corners of the bottom plate are equipped with grooves and rotating plates. It is equipped with universal wheels and hydraulic cylinders. The top plate is controlled by the hydraulic cylinder. Lifting and lowering, the universal wheel flips to support the heavy weight pipe, and the flexible rotation and angle adjustment of the pipe are realized through the runner.

Benefits of technology

It reduces the labor intensity of construction personnel, extends the service life of the universal wheel, improves the quality and efficiency of pipeline assembly, avoids electrochemical corrosion, simplifies welding operations, and improves safety and reuse rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221917213U_ABST
    Figure CN221917213U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of process pipeline prefabrication, in particular to a temporary pipe pier for a process pipeline prefabrication site. Comprising a bottom plate, a lifting assembly is arranged on the bottom plate, an arc-shaped top plate is fixed to the upper end of the lifting assembly, a plurality of groove holes are formed in the two sides of the top plate, rotating wheels are rotationally connected into the groove holes, grooves are formed in the four corners of the bottom plate, rotating plates are arranged in the grooves, the rotating plates are rotationally connected with the bottom plate, and universal wheels are fixedly installed at the lower ends of the rotating plates. The bottom plate is in threaded connection with a bolt corresponding to the groove, the bolt is rotationally connected with a baffle, and the baffle makes contact with the upper end of the rotating plate and stops rotation of the rotating plate. And by arranging the universal wheels, the temporary pipe pier is convenient to move, small components can be carried, and manpower is saved. And when the heavy pipe fitting needs to be supported, the universal wheels can be turned over, and the bottom plate is in contact with the ground, so that the service life of the universal wheels can be prolonged, and the stability of the heavy pipe fitting during supporting can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of process pipeline prefabrication, in particular to a temporary pipe pier used in a process pipeline prefabrication site. Background Art

[0002] With the promotion and application of modularization and skid-mounted process equipment, most of the construction work of process pipelines is completed by prefabrication and assembly in the factory. However, when prefabricating in the factory, a whole pipe of 8-12 meters in length is cut according to the size of the drawing, and the lengths are different. When prefabricating, the workers squat on the prefabrication platform and use a small crowbar to pry the pipe or pipe fittings to complete the assembly work. After the welds are assembled, the welders simply put a sleeper or steel under the pipe to squat and weld, or manually carry the cut materials. The labor intensity is high, the work is complicated, and safety hazards are prone to occur during prefabrication. In summary, the operators squat for a long time during construction, and they often feel dizzy when they stand up. Therefore, there is an urgent need for a suitable operating tooling to reduce the labor intensity as much as possible, facilitate material handling, facilitate pipeline prefabrication, and facilitate welders to weld, so as to improve the quality of process pipeline prefabrication.

[0003] The patent document with application number CN202123074463.7 and titled "Lifting combined slide for installation of large-diameter pipelines" discloses a lifting combined slide that can adapt to pipelines of different diameters, so that the equipment can meet the actual use requirements and is convenient for adjusting the placement position of the pipeline. When in use, according to the diameter of the pipeline, adjust the position of the sliding block in the limit slide groove. After the position is adjusted, the sliding block is clamped and fixed by the locking screw, and the electric push rod drives the diagonal support plate to rotate downward, so that the diagonal support plate stably supports one side of the base, increases the force area of ​​the base, and ensures the stability of the equipment. Then, the pipeline is placed between the sliding block and the fixed block, and then the servo motor is started. The servo motor drives the screw to rotate, so that the sliding seat can move upward along the support column, and then the pipeline can move upward with the crossbar and the sliding seat. However, when the pipeline group is welded, in order to ensure the angle of the upper branch pipe of the pipeline, the pipeline needs to be rotated, but the lifting combined slide is not convenient for the pipeline to rotate. A universal wheel is arranged at the lower end of the base to facilitate the movement of the lifting combination slide. However, when the weight of the pipeline is large, the universal wheel is easily damaged, thereby causing the lifting combination slide to tilt. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a temporary pipe pier for a process pipeline prefabrication site, which is convenient for supporting heavy pipelines, convenient for rotating the supported pipelines during the pipeline group welding process, and capable of improving the efficiency of pipeline group welding.

[0005] In order to achieve the above purpose, the technical solution provided by the utility model is:

[0006] A temporary pipe pier used in a process pipeline prefabrication site comprises a base plate, a lifting assembly is arranged on the base plate, an arc-shaped top plate is fixed on the upper end of the lifting assembly, a plurality of slots are provided on both sides of the top plate, a rotating wheel is rotatably connected in the slots, grooves are provided at the four corners of the base plate, a rotating plate is arranged in the grooves, the rotating plate is rotatably connected to the base plate, a universal wheel is fixedly installed at the lower end of the rotating plate, bolts corresponding to the grooves are threadedly connected to the base plate, a baffle is rotatably connected to the bolts, the baffle contacts the upper end of the rotating plate and stops the rotating plate from rotating.

[0007] Specifically, a fixing sleeve is fixed to one side of the rotating plate away from the bottom of the groove, a pin is rotatably connected inside the fixing sleeve, and the pin is fixedly connected to the bottom plate.

[0008] Specifically, a gap is provided between the rotating plate and the groove wall of the groove to allow the rotating plate and the universal wheel to rotate around the pin shaft.

[0009] Specifically, an insulating layer is fixed to the inner edge of the top plate, and the slots penetrate the insulating layer.

[0010] Specifically, the lifting assembly includes a plurality of vertical sleeves fixed on the base plate, an inner tube is concentrically slidably connected inside the sleeve, the upper end of the inner tube is fixedly connected to the top plate, the plurality of sleeves are fixedly connected through a bracket, the bracket is fixedly connected to the base plate, a vertical hydraulic cylinder is fixed to the upper end of the bracket, and the telescopic end of the hydraulic cylinder is fixedly connected to the top plate.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. The utility model fixes the insulating layer on the inner edge of the top plate, thereby avoiding electrochemical corrosion caused by contact between the prefabricated stainless steel and alloy steel and the carbon steel.

[0013] 2. By setting universal wheels, the temporary pipe pier is easy to move and can also carry small components, saving manpower. When it is necessary to support heavy pipes, the universal wheels can be turned over and the bottom plate can be in contact with the ground, which can extend the service life of the universal wheels and ensure stability when supporting heavy pipes.

[0014] 3. The temporary pipe pier can adjust the top plate height, which can avoid the construction workers from bending down to operate, improve the operating conditions, reduce labor intensity, and reduce quality fluctuations during the assembly process.

[0015] 4. The temporary pipe pier can adjust the height of the prefabricated parts and improve the assembly quality and efficiency of the process pipeline components.

[0016] 5. By setting a rotating wheel on the top plate, the welder can rotate the welder during welding, and the elbow can be slightly adjusted when the elbow weld is assembled without changing the axis. It is convenient to adjust the angle of the branch pipe on the pipeline.

[0017] 6. The lifting assembly and the base plate form a stable temporary pipe pier. The hydraulic cylinder controls the vertical lifting, which has a high safety factor and is not easy to roll over.

[0018] 7. This temporary pipe pier has a simple structure, is easy to make, has a high reuse rate, and can be placed in a prefabrication plant for long-term use in pipeline prefabrication work. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the utility model.

[0020] Figure 2 It is a top view of the utility model.

[0021] Figure 3 It is a bottom view of the utility model.

[0022] Figure 4 It is a front view of the utility model.

[0023] The names of the parts in the attached drawings are:

[0024] 1 Bottom plate

[0025] 2 Casing

[0026] 3 Inner tube

[0027] 4 Bracket

[0028] 5 Hydraulic cylinder

[0029] 6 Top Plate

[0030] 7 slots

[0031] 8 Wheels

[0032] 9 Insulation layer

[0033] 10 Grooves

[0034] 11 Transfer

[0035] 12 Pin

[0036] 13 Fixed sleeve

[0037] 14 Universal wheels

[0038] 15 Baffle 16 Bolt. DETAILED DESCRIPTION

[0039] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0040] Embodiment 1:

[0041] Reference Figure 1-Figure 4 As shown, a temporary pipe pier used in a process pipeline prefabrication site includes a bottom plate 1, on which a lifting assembly is arranged. An arc-shaped top plate 6 is fixed to the upper end of the lifting assembly. A plurality of slots 7 are provided on both sides of the top plate 6, an insulating layer 9 is fixed to the inner edge of the top plate 6, and the slots 7 penetrate the insulating layer 9. A rotating wheel 8 is rotatably connected in the slot 7.

[0042] By fixing the insulating layer 9 on the inner edge of the top plate 6, electrochemical corrosion caused by contact between the stainless steel and alloy steel and the carbon steel during prefabrication is avoided.

[0043] In this embodiment, there are four slots 7 , which are arranged in a rectangular array on the top plate 6 , and the axis of the rotating wheel 8 is parallel to the axis of the top plate 6 .

[0044] The lifting assembly includes a plurality of vertical sleeves 2 fixed on a bottom plate 1, an inner tube 3 is concentrically slidably connected inside the sleeve 2, and the upper end of the inner tube 3 is fixedly connected to a top plate 6. The plurality of sleeves 2 are fixedly connected through a bracket 4, and the bracket 4 is fixedly connected to the bottom plate 1. A vertical hydraulic cylinder 5 is fixed to the upper end of the bracket 4, and the telescopic end of the hydraulic cylinder 5 is fixedly connected to the top plate 6.

[0045] By controlling the hydraulic cylinder 5, the top plate 6 can be lifted and lowered vertically. After the pipeline is located in the top plate 6, the height of the pipeline can be changed during the lifting and lowering process of the top plate 6. This can avoid the construction workers from bending down to operate, improve the operating conditions, reduce labor intensity, and reduce quality fluctuations during the assembly process. Improve the assembly quality and assembly efficiency of process pipeline components.

[0046] The lifting assembly and the bottom plate 1 form a stable temporary pipe pier, and the hydraulic cylinder 5 controls the vertical lifting, which has a high safety factor and is not easy to tip over. The temporary pipe pier has a simple structure, is easy to make, has a high reuse rate, and can be placed in a prefabrication plant for long-term pipeline prefabrication work.

[0047] By arranging the rotating wheel 8 on the top plate 6, the welder can meet the rotation welding during welding, and the elbow can be slightly adjusted when the elbow weld is assembled while keeping the axis unchanged. It is convenient to adjust the angle of the branch pipe on the pipeline.

[0048] Embodiment 2:

[0049] Based on Example 1, refer to Figure 1-Figure 4As shown, grooves 10 are provided at the four corners of the bottom plate 1, and rotating plates 11 are provided in the grooves 10. The rotating plates 11 are rotatably connected to the bottom plate 1, and a gap is provided between the rotating plates 11 and the groove wall of the groove 10 to allow the rotating plates 11 and the universal wheels 14 to rotate around the pins 12. Specifically, a fixing sleeve 13 is fixed to the side of the rotating plate 11 away from the bottom of the groove 10, and the pins 12 are rotatably connected in the fixing sleeve 13, and the pins 12 are fixedly connected to the bottom plate 1.

[0050] A universal wheel 14 is fixedly mounted on the lower end of the rotating plate 11, and a bolt 16 corresponding to the groove 10 is threadedly connected to the bottom plate 1, and the bolt 16 is threadedly connected to the bottom plate 1 inside the groove 10, and the upper end of the rotating plate 11 is flush with the upper end of the bottom plate 1. A baffle 15 is rotatably connected to the bolt 16, and the baffle 15 contacts the upper end of the rotating plate 11 and stops the rotating plate 11 from rotating.

[0051] After the arc-shaped top plate 6 supports the pipeline, the temporary pipe pier and the pipeline can be moved by the universal wheel 14. The temporary pipe pier is easy to move, and small components can also be carried, saving manpower.

[0052] When it is necessary to support a heavy pipe, the bolt 16 is loosened and the baffle 15 is rotated so that the baffle 15 is misaligned with the rotating plate 11. After the baffle 15 is misaligned with the rotating plate 11, the baffle 15 loses the anti-rotation effect on the rotating plate 11. At the same time, a gap is provided between the rotating plate 11 and the groove wall of the groove 10 to allow the rotating plate 11 and the universal wheel 14 to rotate around the pin 12. Therefore, after the baffle 15 is misaligned with the rotating plate 11, the rotating plate 11 can drive the universal wheel 14 to rotate upward around the pin 12. When the bottom plate 1 is in contact with the ground, a heavy pipe can be supported.

[0053] When heavy pipes need to be supported, the universal wheels 14 can be turned over and the bottom plate 1 can be brought into contact with the ground, which can extend the service life of the universal wheels 14 and ensure stability when supporting heavy pipes.

[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A temporary pipe pier used in a process pipeline prefabrication site, comprising a base plate (1), on which a lifting assembly is arranged. It is characterized in that An arc-shaped top plate (6) is fixed at the upper end of the lifting assembly. A plurality of slots (7) are provided on both sides of the top plate (6). Rotating wheels (8) are rotatably connected in the slots (7). Grooves (10) are provided at four corners of the bottom plate (1). Rotating plates (11) are provided in the grooves (10). The rotating plates (11) are rotatably connected to the bottom plate (1). A universal wheel (14) is fixedly installed at the lower end of the rotating plate (11). Bolts (16) corresponding to the grooves (10) are threadedly connected to the bottom plate (1). A baffle (15) is rotatably connected to the bolts (16). The baffle (15) contacts the upper end of the rotating plate (11) and stops the rotating plate (11) from rotating.

2. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that A fixing sleeve (13) is fixed to the side of the rotating plate (11) away from the bottom of the groove (10), a pin shaft (12) is rotatably connected inside the fixing sleeve (13), and the pin shaft (12) is fixedly connected to the bottom plate (1).

3. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that The bolt (16) is threadedly connected to the bottom plate (1) inside the groove (10), and the upper end of the rotating plate (11) is flush with the upper end of the bottom plate (1).

4. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that A gap is provided between the rotating plate (11) and the groove wall of the groove (10) to allow the rotating plate (11) and the universal wheel (14) to rotate around the pin shaft (12).

5. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that An insulating layer (9) is fixed to the inner edge of the top plate (6), and the slot (7) penetrates the insulating layer (9).

6. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that The lifting assembly comprises a plurality of vertical sleeves (2) fixed on a base plate (1), an inner tube (3) being coaxially slidably connected inside the sleeve (2), the upper end of the inner tube (3) being fixedly connected to a top plate (6), the plurality of sleeves (2) being fixedly connected via a bracket (4), the bracket (4) being fixedly connected to the base plate (1), a vertical hydraulic cylinder (5) being fixedly connected to the upper end of the bracket (4), and the telescopic end of the hydraulic cylinder (5) being fixedly connected to the top plate (6).

7. The temporary pipe pier for process pipeline prefabrication site according to claim 1, It is characterized in that The number of the slot holes (7) is four, and the four slot holes (7) are arranged in a rectangular array on the top plate (6), and the axis of the rotating wheel (8) is parallel to the axis of the top plate (6).