Permeable sidewalk and blind sidewalk integrated concrete road
By using a permeable concrete layer and water storage system in the blind sidewalk, the problem of insufficient water permeability of traditional roads is solved, efficient drainage and water resource utilization are achieved, the stability and safety of the road are enhanced, and the urban heat island effect is alleviated.
Patent Information
- Application Number
- CN202420110228.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-17
AI Technical Summary
Traditional roads lack water permeability, causing drainage to rely on drainage ditches on both sides of the road, destroying the ecological environment and failing to effectively utilize rainfall. In addition, the base layer of blind sidewalks is unstable when saturated with water, and drainage performance is reduced, resulting in lifting and falling off.
An integrated concrete road with permeable sidewalks and blind paths is designed, including a permeable surface layer, a permeable concrete layer, a cement concrete base layer, a graded gravel layer and a water storage system. The permeable concrete layer is composed of concrete and inorganic permeable nano water storage concrete reinforcement. , the water collection pipe collects excess water and stores it in the water storage tank, the heating cable is heated to accelerate drying, and the positioning installation plate is maintained flat.
It achieves high water permeability of the road, prevents flexible collapse and pavement shrinkage and cracking, improves drainage efficiency, facilitates water utilization, increases friction on blind roads, avoids slipping, and alleviates the urban heat island effect.
Smart Images

Figure CN221918842U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of roads, in particular to a permeable sidewalk and blind path integrated concrete road. Background Art
[0002] In the construction of sponge cities, the construction of road surfaces is an important link. However, most traditional roads are not permeable, and their drainage mainly relies on the drainage ditches on both sides of the road surface, and then the drainage is collected and treated as wastewater. In this way, the original natural ground permeability properties are changed, the ecological environment is greatly damaged, and the original rainfall water cannot be well utilized, resulting in waste.
[0003] The organic permeable bricks on the market are a special concrete product. In the existing sidewalk blind paths, after the infiltrated water in the surface layer and the base layer reaches a saturated state, the roadbed soil is in a state of immersion for a long time, which will cause the base soil to be unstable and the drainage performance to be reduced, causing the blind path to warp and fall off, and moss will appear on the surface. In order to solve the above problems, a permeable sidewalk blind path integrated concrete road with good permeability is provided. Utility Model Content
[0004] Based on this, it is necessary to provide a permeable sidewalk integrated concrete road for the traditional sidewalk blind path to meet the permeability and drying requirements.
[0005] The utility model provides a permeable sidewalk and blind path integrated concrete road, comprising a sidewalk area and a blind path block area, wherein the blind path block area is composed of a plurality of blind path blocks connected in sequence, each blind path block is provided with a blind guide protrusion, and a positioning installation plate is provided between two connected blind path blocks;
[0006] The pedestrian area is provided with a basic permeable surface layer, a permeable concrete layer, a cement concrete base layer, a graded crushed stone layer and a plain soil compaction layer in sequence from top to bottom, wherein the concrete layer is composed of a mixture of concrete and an inorganic permeable nano-water-storage concrete enhancer;
[0007] It also includes a water storage system, which includes a water collection pipe and a water storage system. The water collection pipe includes a water collection pipe and a drainage pipe. The water collection pipe is located between the permeable concrete layer and the cement concrete base layer.
[0008] Preferably, each blind paving block comprises a basic permeable surface layer and a permeable concrete layer from top to bottom.
[0009] Preferably, the basic permeable surface layer is made of permeable concrete, which is composed of a skeleton void structure formed by single-size crushed stone and gel.
[0010] Preferably, the water collecting pipes are provided in plurality, and one end of each water collecting pipe is connected to the corresponding drainage pipe.
[0011] Preferably, the lowest point of the pipe body of the drainage pipe is lower than the lowest point of the pipe body of the water collection pipe.
[0012] Preferably, the water storage system is a water tank arranged at the water outlet of the drainage pipe, and an overflow pipe is also provided on the side wall of the water tank.
[0013] Preferably, a heating device is provided in the blind paving block.
[0014] Preferably, the heating device is a heating cable, and the heating cable is arranged in an S shape in the blind path block.
[0015] Preferably, a mounting groove is provided between each blind paving block, the positioning mounting plate is located in the mounting groove, and the positioning mounting plate and the mounting groove are connected by bolts.
[0016] Preferably, the crushed stone used in the permeable concrete layer has a particle size ranging from 2.4 mm to 13.2 mm.
[0017] Technical advantages of this utility model:
[0018] 1. A permeable surface layer and a permeable concrete layer are set up to drain water downwards. The permeable concrete layer is composed of concrete and an inorganic permeable nano-water-storage concrete reinforcing agent to prevent the road from absorbing water excessively and reducing the flexibility of the entire road, thereby causing collapse. More specifically, an inorganic permeable nano-water-storage concrete reinforcing agent is set in the cement. The anions in the reinforcing agent maximize the dispersion of cement particles, enhance the stability of the entire structure, and reduce the shrinkage and cracking of the road surface.
[0019] 2. A water storage system is set up. The water collection pipe can collect excess water in the permeable concrete layer and concentrate it in the water storage tank on the side. This can not only speed up the drainage efficiency, but also facilitate the extraction of water from the water storage tank during dry time;
[0020] 3. A heating cable is installed in the blind paving blocks, which can heat the blind paving blocks when the rain stops or the snow stops in winter, accelerate the drying of the surface of the blind paving, increase friction and avoid slipping. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The drawings and descriptions of the exemplary embodiments of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0022] Figure 1 This is a cross-sectional view of the integrated concrete road of the permeable sidewalk and blind path provided by the utility model.
[0023] Figure 2 This is a schematic diagram of the overall structure of the permeable sidewalk and blind path integrated concrete road provided by the utility model.
[0024] Figure 3 This is a structural schematic diagram of a base plate and a first cover plate in a permeable sidewalk and blind paving integrated concrete road provided by the utility model.
[0025] Figure 4 A structural schematic diagram of a base plate and a first cover plate in a permeable sidewalk and blind-path integrated concrete road is provided for another embodiment of the utility model.
[0026] Figure 5 A schematic diagram of a base plate and a bottom plate in a permeable sidewalk and blind integrated concrete road is provided for another embodiment of the utility model.
[0027] Figure numerals: pedestrian walkway area 11; blind paving block area 12; blind paving block 121; guide protrusion 13; positioning mounting plate 7; foundation permeable surface layer 1; permeable concrete layer 2; cement concrete base layer 3; graded gravel layer 4; rammed earth layer 41; water storage system 5; water collection pipe 51; water collection pipe 511; drainage pipe 512; water storage tank 52; heating device 6; positioning mounting plate 7; mounting groove 70. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0030] In addition, in the present invention, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0031] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] The utility model provides a permeable sidewalk and blind path integrated concrete road.
[0033] like Figures 1 to 5 As shown, in one embodiment of the utility model, a permeable sidewalk and blind paving integrated concrete road includes a sidewalk area 11 and a blind paving block area 12. The blind paving block area 12 is composed of a plurality of sequentially connected blind paving blocks 121, and each blind paving block 121 is provided with a blind guide protrusion 13.
[0034] like Figure 1-3 As shown: In one embodiment of the utility model, a water storage system 5 is also included, the water storage system 5 includes a water collection pipe 51 and a water storage system, the water collection pipe 51 includes a water collection pipe 511 and a drainage pipe 512. The water collection pipe 51 is located between the permeable concrete layer 2 and the cement concrete base layer 3. The drainage pipe 512 collects excess rainwater on the road surface, and flows into the water storage tank 52 through the water collection pipe 511 for storage. The water storage tank 52 collects rainwater discharged from the water collection pipe 511, and then purifies and reuses it.
[0035] The water collecting pipes 511 are provided in a plurality, and one end of each water collecting pipe 511 is connected to the corresponding drainage pipe 512. The lowest point of the pipe body of the drainage pipe 512 is lower than the lowest point of the pipe body of the water collecting pipe 511.
[0036] The water storage system is a water tank 52 disposed at the outlet of the drain pipe 512 . An overflow pipe 521 is also disposed on the side wall of the water tank 52 . When the water tank 52 is overfull, the water is discharged into the ground through the overflow pipe 521 .
[0037] A water storage system 5 is provided, and the water collection pipe can collect the excess water in the permeable concrete layer and concentrate it in the water storage tank on the side, which can not only accelerate the drainage efficiency, but also facilitate the extraction of water in the water storage tank for use during dry time.
[0038] like Figure 2As shown: In one embodiment of the utility model, the sidewalk area 11 is sequentially provided with a basic permeable surface layer 1, a permeable concrete layer 2, a cement concrete base layer 3, a graded crushed stone layer 4 and a plain soil rammed layer 41 from top to bottom, and the concrete layer 2 is composed of a mixture of concrete and an inorganic permeable nano-water-storage concrete enhancer; each blind paving block 121 includes a basic permeable surface layer 1 and a permeable concrete layer 2 from top to bottom.
[0039] A rammed earth layer 41 is laid on the roadbed. In some embodiments, as a common laying method, the graded gravel layer 4 is laid on the rammed earth layer 41. The ramming coefficient of the rammed earth layer 41 is preferably above 90%. An impermeable geotextile is placed on the rammed earth layer 41, and a 50 blind pipe is placed in the graded gravel layer 4 to drain and connect to the drainage ditch.
[0040] The permeable layer composed of the base permeable surface layer 1 and the permeable concrete layer 2 has high overall permeability, and the permeability coefficient reaches 2.38mm / S. The permeable roads on the market rely on voids and hair gaps for water permeability, while our permeable roads rely mainly on capillary permeability, supplemented by voids and hair gaps. In the early cement hydration process, the water-cement ratio is strictly controlled so that the cement molecules wrap the water molecules. In the later maintenance process, the water molecules evaporate to form a capillary pore structure. The capillaries have the function of breaking the surface tension of water molecules, thereby effectively improving the permeability.
[0041] The crushed stone used in the permeable concrete layer has a particle size ranging from 2.4 mm to 13.2 mm. The crushed stone used in the permeable concrete must be hard, durable and clean.
[0042] Inorganic permeable nano-water storage concrete enhancer contains metal ions and anions. The anions in the enhancer maximize the dispersion of cement particles and accelerate the hydration reaction of cement. Usually, 40% of cement does not participate in hydration during the cement hydration process. Inorganic enhancers can make the cement hydration degree reach 99.6%. During the hydration process of cement, the cations in the enhancer undergo a replacement reaction with tricalcium silicate and dicalcium silicate, polymerizing the cement hydrolysis product calcium hydroxide to form a network of crystals that merge with the stone material, achieving the purpose of cement molecules encapsulating water molecules, so that the road will not freeze at temperatures above minus 20 degrees.
[0043] Reduce pavement shrinkage and cracking. When the hydration heat is too high, it is not suitable for large-scale paving. First, inorganic enhancers are added during the cement moisture process, and the release of cement hydration heat is greatly reduced. Secondly, calcium hydroxide reacts to decompose calcium carbonate and water, and this part of water is absorbed and utilized, further reducing the hydration heat. Finally, during the maintenance process, the water molecules wrapped by the cement molecules evaporate slowly and steadily, and the dicalcium silicate increases in large quantities, which minimizes the shrinkage and cracking of the pavement.
[0044] The basic permeable surface layer 1 is made of permeable concrete, which is composed of a skeleton void structure formed by single-size crushed stone and gel.
[0045] Water retention function, alleviates the urban heat island effect. It realizes the function of "sponge", no drainage in light rain, slight drainage in moderate rain, and slow drainage in heavy rain. In case of severe weather such as heavy rain, it will first absorb and lock 44% of the water, and then discharge the excess rainwater, effectively alleviating the discharge pressure of the municipal pipe network. Based on the water retention function of the road, it can alleviate the urban heat island effect. Water absorbs heat from the surroundings during evaporation, which will reduce the temperature.
[0046] like Figure 3-4 As shown; the heating device 6 is provided in the blind paving block 121, and the heating device 6 is a heating cable, which is arranged in an S shape in the blind paving block 121. The heating cable 6 is provided in the blind paving block 12, which can heat the blind paving block 12 when the rain stops or the snow stops in winter, accelerate the drying of the surface of the blind paving, increase friction, and avoid slipping.
[0047] like Figure 5 As shown: a positioning mounting plate 7 is provided between two connected blind paving blocks 121, and a mounting groove 70 is further provided between each blind paving block 121, the positioning mounting plate 7 is in the mounting groove 70, and the positioning mounting plate 7 and the mounting groove 70 are connected by bolts. The positioning mounting plate 7 can connect two adjacent blind paving blocks 121 to prevent the road surface from shrinking and expanding, causing a single blind paving to fall off and warp, and can also ensure that the two blind pavings are kept on the same plane to improve the flatness.
[0048] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0049] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model shall be based on the attached claims.
Claims
1. A permeable sidewalk and blind path integrated concrete road, It is characterized in that It comprises a pedestrian area (11) and a blind paving block area (12), wherein the blind paving block area (12) is composed of a plurality of blind paving blocks (121) connected in sequence, each blind paving block (121) is provided with a blind guide protrusion (13), and a positioning installation plate (7) is provided between two connected blind paving blocks (121); The pedestrian area (11) is provided with a basic permeable surface layer (1), a permeable concrete layer (2), a cement concrete base layer (3), a graded crushed stone layer (4) and a plain soil compaction layer (41) in order from top to bottom, wherein the permeable concrete layer (2) is composed of a mixture of concrete and an inorganic permeable nano-water storage concrete reinforcing agent; It also includes a water storage system (5), the water storage system (5) includes a water collection pipe (51) and a water storage system, the water collection pipe (51) includes a water collection pipe (511) and a drainage pipe (512), and the water collection pipe (51) is located between the permeable concrete layer (2) and the cement concrete base layer (3).
2. The permeable sidewalk and blind path integrated concrete road according to claim 1, It is characterized in that Each blind paving block (121) comprises, from top to bottom, a basic permeable surface layer (1) and a permeable concrete layer (2).
3. The permeable sidewalk and blind path integrated concrete road according to claim 1 or 2, It is characterized in that The base permeable surface layer (1) is made of permeable concrete, which is composed of a skeleton void structure formed by crushed stones of a single particle size and gel.
4. The permeable sidewalk and blind path integrated concrete road according to claim 1, It is characterized in that The water collecting pipes (511) are provided in a plurality, and one end of each water collecting pipe (511) is connected to a corresponding drainage pipe (512).
5. The permeable sidewalk and blind path integrated concrete road according to claim 1, It is characterized in that The lowest point of the pipe body of the drainage pipe (512) is lower than the lowest point of the pipe body of the water collecting pipe (511).
6. The permeable sidewalk and blind path integrated concrete road according to claim 5, It is characterized in that The water storage system is a water storage tank (52) arranged at the water outlet of the drainage pipe (512), and an overflow pipe (521) is also arranged on the side wall of the water storage tank (52).
7. The permeable sidewalk and blind path integrated concrete road according to claim 2, It is characterized in that A heating device (6) is provided in the blind path block (121).
8. The permeable sidewalk and blind path integrated concrete road according to claim 7, It is characterized in that The heating device (6) is a heating cable, and the heating cable is arranged in an S-shape in the blind path block (121).
9. The permeable sidewalk and blind path integrated concrete road according to claim 1, It is characterized in that A mounting groove (70) is also provided between each blind path block (121), the positioning mounting plate (7) is located in the mounting groove (70), and the positioning mounting plate (7) and the mounting groove (70) are connected by bolts.
10. The permeable sidewalk and blind path integrated concrete road according to claim 1, It is characterized in that The crushed stone material used in the permeable concrete layer (2) has a particle size ranging from 2.4 mm to 13.2 mm.