Water conservancy project maintenance slope protection building structure
By introducing buffering, drainage and stabilizing components into the slope protection construction structure of water conservancy projects, the problems of river water impact and rainwater erosion are solved, impact buffering, timely drainage and vegetation protection are achieved, and the safety and stability of the building structure are improved.
Patent Information
- Application Number
- CN202420306669.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The existing slope protection structures for maintenance of water conservancy projects are not convenient for buffering and counteracting the impact of river water, and are not convenient for timely drainage and protection of vegetation, causing the slope to be eroded by rainwater and soil and water loss.
A structure is designed that includes a protective embankment, a buffer component, a drainage component and a stabilization component. The buffer component slows down the impact force through telescopic tubes and buffer springs. The drainage component achieves timely drainage through water collection tanks and drainage pipes. The stabilization component uses upright columns and reinforced columns. The cover increases the stability of the slope and prevents vegetation from being washed away.
It can effectively buffer the impact of river water, extend the life of protective embankments, drain water in time to prevent slope erosion, improve the safety and stability of building structures, and prevent soil erosion and vegetation from being washed away.
Smart Images

Figure CN221919225U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy project maintenance and slope protection construction structure, in particular to a water conservancy project maintenance and slope protection construction structure. Background Art
[0002] Water conservancy projects are a general term for various engineering constructions built to control, utilize and protect surface and underground water resources and the environment. Slope protection refers to the general term for various paving and planting on the slope surface to prevent the slope from being eroded. In the river section where the bridge is located, the concave bank of the river bank is eroded by the water flow year by year, which will cause the river bank to collapse continuously. In order to protect the safety of bridges and embankments, protective buildings must be built on the concave bank. In addition, when the river flow direction changes due to the construction of bridges, the river bank is eroded and endangers farmland and villages, protective buildings must also be built on the river bank. In water conservancy projects, maintenance, slope protection and construction of structures are important aspects to ensure the long-term and stable operation of the project. Therefore, a water conservancy project maintenance and slope protection construction structure is needed to facilitate buffering and offsetting some impacts, timely drainage, and protection of vegetation.
[0003] A water conservancy project maintenance slope protection construction structure disclosed in the publication number CN218204313U includes a slope protection body and a first protective plate. The slope of the slope protection body is provided with a first protective plate, and a second protective plate is provided between the two first protective plates, and a docking mechanism is provided between the second protective plate and the first protective plate. In the water conservancy project maintenance slope protection construction structure, the first protective plate is limited to the bottom of the slope of the slope protection body, and a docking screw is used to penetrate the first protective plate and the second protective plate to be limited to one side of the slope protection body, so that after the slope protection body is installed with the water conservancy project maintenance slope protection construction structure, the river bank can be prevented from being eroded by water flow, the collapse of the river bank can be prevented or reduced, and casualties can be prevented. The first limiting plate is installed with the second protective plate at the top of the slope of the slope protection body, and the second limiting plate is installed with the first protective plate at the bottom of the slope of the slope protection body, so that the water conservancy project maintenance slope protection construction structure can protect the river bank more stably.
[0004] However, the slope protection construction structure of the water conservancy project has the following disadvantages: when the river water hits the embankment, it is not convenient to buffer and offset part of the impact to prevent the river water from hitting the embankment and causing erosion damage; at the same time, it is not convenient to drain water in time and protect vegetation to prevent the slope from being eroded by rainwater and causing soil erosion. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] The technical problem solved by the utility model is to provide a water conservancy project maintenance and slope protection construction structure which is highly practical, can be simply operated, and has a relatively simple structure, thereby solving the problems raised in the above background technology of being inconvenient to buffer and offset some impacts, drain water in time, and protect vegetation.
[0007] (II) Technical solution
[0008] To achieve the above objectives, the utility model is implemented through the following technical solutions: a water conservancy project maintenance and slope protection construction structure, including a slope body, the interior of the slope body is fixedly connected to a protective embankment, the top surface of the protective embankment is fixedly connected to a plurality of stabilizing components, one side of the protective embankment is fixedly connected to a plurality of buffer components, the surface of the slope body is fixedly connected to a reinforcement layer, the top of the slope body is fixedly connected to a drainage component, and the surface of the reinforcement layer is fixedly connected to a plurality of supporting layer sleeves.
[0009] As a further solution of the utility model, the stabilizing assembly includes a column fixedly connected to the top surface of the protective embankment, and a reinforcing column sleeve is fixedly connected to the surface of the column, which is convenient for increasing the stability of the column.
[0010] As a further solution of the utility model, the buffer assembly includes a fixed tube fixedly connected to one side of the protective embankment, a telescopic tube is slidably connected inside the fixed tube, and a buffer spring is sleeved on the surface of the telescopic tube to mitigate impact force.
[0011] As a further solution of the utility model, the drainage assembly includes a water collecting trough fixedly connected to the top of the slope, a plurality of drainage pipes are fixedly connected to the bottom of the water collecting trough, and an extension pipe is connected through the bottom of the drainage pipe to facilitate drainage.
[0012] As a further solution of the utility model, a protective baffle is threadedly connected to one end of the telescopic tube, a curing plate is fixedly connected to the bottom of the supporting layer sleeve, a plurality of threaded holes are provided on the back of the protective baffle and one end of the telescopic tube, threaded bolts penetrate the interior of the threaded holes, and the curing plate is convenient for preventing vegetation from being washed away.
[0013] As a further solution of the utility model, a stone ladder is fixedly connected to one side of the surface of the reinforcement layer, and a plurality of drainage grooves are opened on the surface of the reinforcement layer, which facilitate the accelerated discharge of surface rainwater.
[0014] As a further solution of the utility model, a guardrail is fixedly connected to the top surface of the protective embankment, and a suspension hole is opened on the surface of the protective baffle, and the suspension hole is convenient for replacing and suspending the guardrail.
[0015] As a further solution of the utility model, a plurality of drainage holes are provided inside the water collecting tank.
[0016] (III) Beneficial effects
[0017] The utility model provides a water conservancy project maintenance and slope protection construction structure, which has the following beneficial effects:
[0018] 1. The water conservancy project slope protection construction structure is provided with a buffer component. When the river water hits the protective embankment, the impact force is transmitted to the telescopic tube through the protective baffle, causing the telescopic tube to shrink in the fixed tube, and then the pressure is transmitted to the buffer spring, so that the buffer spring is deformed by force to produce a reverse elastic force, which generates a thrust on the protective baffle, thereby offsetting the impact and achieving a buffering effect, preventing the river water from hitting the protective embankment and causing erosion damage, thereby extending the service life of the protective embankment.
[0019] 2. The water conservancy project slope protection construction structure is constructed by setting drainage components and supporting layer sleeves. When there is a lot of rain, rainwater is collected through the sump, along the drainage pipe to the extension pipe, and then reaches the fixed pipe, and is directly discharged into the river from the telescopic pipe, thereby achieving the effect of timely drainage, avoiding the slope from being eroded by rainwater and causing soil and water loss. At the same time, the supporting layer sleeve and the curing plate can effectively block soil and water loss, prevent vegetation from being washed away by rainwater, causing slope collapse, and improve the safety of the construction structure.
[0020] 3. The water conservancy project repairs and builds a slope protection structure. Through the installation of stabilizing components, when the protective embankment is eroded by river water, the columns are fixed inside the slope to increase the support of the slope to the protective embankment. At the same time, the protective embankment protects the slope to prevent the river bank from being eroded by water flow, thereby achieving the effect of stabilizing the slope. The reinforced column sleeves on the surface of the columns can increase the stability of the columns when they are subjected to force. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0022] Figure 2 This is a schematic diagram of the split structure of the utility model;
[0023] Figure 3 This is a schematic diagram of the structure of the buffer component of the utility model;
[0024] Figure 4 This is a schematic diagram of the structure of the drainage component of the utility model.
[0025] In the figure: 1. Slope; 2. Protective embankment; 3. Stabilizing component; 301. Column; 302. Reinforced column sleeve; 4. Buffer component; 401. Fixed pipe; 402. Telescopic pipe; 403. Buffer spring; 5. Reinforcement layer; 6. Drainage component; 601. Sump; 602. Drain pipe; 603. Extension pipe; 7. Support layer sleeve; 8. Protective baffle; 9. Curing plate; 10. Stone ladder; 11. Guardrail; 12. Threaded bolt. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] See also Figures 1 to 4 The utility model provides a technical solution: a water conservancy project maintenance slope protection construction structure, including a slope body 1, a protective embankment 2 is fixedly connected inside the slope body 1, and a plurality of stabilizing components 3 are fixedly connected to the top surface of the protective embankment 2. The stabilizing component 3 is set to stabilize the slope body 1. The reinforcing column sleeve 302 on the surface of the column 301 can increase the stability of the column 301 when it is subjected to force. A plurality of buffer components 4 are fixedly connected to one side of the protective embankment 2. The buffering effect is achieved through the setting of the buffer component 4 to prevent river water from hitting the protective embankment 2 and causing erosion damage, thereby extending the service life of the protective embankment 2. A reinforcement layer 5 is fixedly connected to the surface of the slope body 1, and a drainage component 6 is fixedly connected to the top of the slope body 1. Through the setting of the drainage component 6 and the supporting layer sleeve 7, the effect of timely drainage is achieved to prevent the slope body 1 from being eroded by rainwater and causing soil and water loss, and at the same time prevent vegetation from being washed away by rainwater, causing the collapse of the slope body 1, thereby improving the safety of the construction structure. The surface of the reinforcement layer 5 is fixedly connected to a plurality of supporting layer sleeves 7.
[0028] The stabilizing assembly 3 includes a column 301 fixedly connected to the top surface of the protective embankment 2, and a reinforcing column sleeve 302 is fixedly connected to the surface of the column 301. The arrangement of the reinforcing column sleeve 302 increases the stability of the column 301.
[0029] The buffer assembly 4 includes a fixed pipe 401 fixedly connected to one side of the protective embankment 2, a telescopic pipe 402 is slidably connected inside the fixed pipe 401, and a buffer spring 403 is sleeved on the surface of the telescopic pipe 402. The buffer spring 403 is provided to facilitate the mitigation of impact force.
[0030] The drainage assembly 6 includes a water collecting trough 601 fixedly connected to the top of the slope 1, and a plurality of drainage pipes 602 are fixedly connected to the bottom of the water collecting trough 601. The bottom of the drainage pipe 602 is connected through an extension pipe 603. The extension pipe 603 is provided to facilitate drainage.
[0031] One end of the telescopic tube 402 is threadedly connected to a protective baffle 8, and the bottom of the supporting layer sleeve 7 is fixedly connected to a curing plate 9. The back of the protective baffle 8 and one end of the telescopic tube 402 are both provided with a plurality of threaded holes, and threaded bolts 12 are passed through the threaded holes. The setting of the curing plate 9 plays a role in preventing vegetation from being washed away;
[0032] A stone ladder 10 is fixedly connected to one side of the surface of the reinforcement layer 5. A plurality of drainage grooves are provided on the surface of the reinforcement layer 5. The arrangement of the drainage grooves can accelerate the discharge of surface rainwater.
[0033] The top surface of the protective embankment 2 is fixedly connected with a guardrail 11, and the surface of the protective baffle 8 is provided with a hanging hole, through the setting of the hanging hole, it is convenient to hang and replace the protective baffle 8;
[0034] A plurality of drainage holes are provided inside the water collecting tank 601 .
[0035] In the utility model, the working steps of the device are as follows:
[0036] Step 1: When the river water hits the protective embankment 2, the impact force is transmitted to the telescopic tube 402 through the protective baffle 8, causing the telescopic tube 402 to contract in the fixed tube 401, and then the pressure is transmitted to the buffer spring 403, causing the buffer spring 403 to deform under force and generate reverse elastic force, thereby generating thrust on the protective baffle 8, thereby offsetting the impact;
[0037] Step 2: When there is a lot of rain, the rainwater is collected through the water collection tank 601, along the drainage pipe 602 to the extension pipe 603, and then reaches the fixed pipe 401, and is directly discharged into the river from the telescopic pipe 402. At the same time, the support layer sleeve 7 and the curing plate 9 can effectively prevent soil erosion;
[0038] Step 3: When the protective bank 2 is eroded by the river water, the support of the slope 1 to the protective bank 2 is increased by fixing the columns 301 inside the slope 1. At the same time, the protective bank 2 protects the slope 1 to prevent the river bank from being eroded by the water flow.
[0039] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;
[0040] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.
[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A water conservancy project maintenance and slope protection construction structure, comprising a slope body (1), characterized in that: The interior of the slope body (1) is fixedly connected to a protective bank (2), the top surface of the protective bank (2) is fixedly connected to a plurality of stabilizing components (3), one side of the protective bank (2) is fixedly connected to a plurality of buffer components (4), the surface of the slope body (1) is fixedly connected to a reinforcement layer (5), the top of the slope body (1) is fixedly connected to a drainage component (6), and the surface of the reinforcement layer (5) is fixedly connected to a plurality of supporting layer sleeves (7).
2. A water conservancy project maintenance and slope protection construction structure according to claim 1, characterized in that: The stabilizing assembly (3) comprises a column (301) fixedly connected to the top surface of the protective embankment (2), and a reinforcing column sleeve (302) is fixedly connected to the surface of the column (301).
3. A water conservancy project maintenance and slope protection construction structure according to claim 1, characterized in that: The buffer assembly (4) comprises a fixed pipe (401) fixedly connected to one side of the protective embankment (2), a telescopic pipe (402) being slidably connected inside the fixed pipe (401), and a buffer spring (403) being sleeved on the surface of the telescopic pipe (402).
4. A water conservancy project maintenance and slope protection construction structure according to claim 1, characterized in that: The drainage assembly (6) comprises a water collecting trough (601) fixedly connected to the top of the slope (1), a plurality of drainage pipes (602) are fixedly connected to the bottom of the water collecting trough (601), and an extension pipe (603) is connected through the bottom of the drainage pipe (602).
5. A water conservancy project maintenance and slope protection construction structure according to claim 3, characterized in that: One end of the telescopic tube (402) is threadedly connected to a protective baffle (8), the bottom of the support layer sleeve (7) is fixedly connected to a curing plate (9), and the back of the protective baffle (8) and one end of the telescopic tube (402) are both provided with a plurality of threaded holes, and threaded bolts (12) penetrate the interior of the threaded holes.
6. A water conservancy project maintenance and slope protection construction structure according to claim 1, characterized in that: A stone ladder (10) is fixedly connected to one side of the surface of the reinforcement layer (5), and a plurality of drainage grooves are provided on the surface of the reinforcement layer (5).
7. A water conservancy project maintenance and slope protection construction structure according to claim 5, characterized in that: A guardrail (11) is fixedly connected to the top surface of the protective embankment (2), and a hanging hole is provided on the surface of the protective baffle (8).
8. A water conservancy project maintenance and slope protection construction structure according to claim 4, characterized in that: A plurality of drainage holes are provided inside the water collecting tank (601).