Water conservancy project building foundation pile
By designing movable plates and driving components in the foundation piles of water conservancy projects, the reinforcing rods are lowered within the pile body and inserted into the soil layer, which solves the problem of fixed side plates hindering installation, improves installation efficiency and stability, and reduces the cost of the driving mechanism setup costs.
Patent Information
- Application Number
- CN202420519111.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-18
AI Technical Summary
During the installation process of existing water conservancy project building foundation piles, the fixed side plates hinder the insertion of the base into the soil layer, resulting in low installation efficiency.
Design a foundation pile for a water conservancy project building. A reinforcing rod and a movable plate are installed inside the pile body. The driving assembly drives the movable plate down, driving the reinforcing rod to penetrate through the through hole and insert into the soil layer to enhance the stability of the foundation pile, and facilitate the movement of the foundation pile through upper and lower screws. Installation and disassembly of the drive mechanism reduces setup costs.
The reinforcement rod is positioned within the pile body before the foundation pile is driven into the ground, avoiding obstruction when inserted into the soil layer, improving installation efficiency and stability, and saving the installation cost of the driving mechanism.
Smart Images

Figure CN221919372U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building foundation piles, in particular to a water conservancy engineering building foundation pile. Background Art
[0002] A pile foundation is a deep foundation that connects the tops of several piles into a whole through a cap to jointly bear dynamic and static loads. A pile is a vertical or inclined foundation component set in the soil. Its function is to penetrate soft, highly compressible soil layers or water and transfer the load borne by the pile to a harder, denser or less compressible bearing layer of the foundation. We usually call the piles in the pile foundation foundation piles. The foundation piles of water conservancy project buildings are an example of the application of pile foundations in the field of water conservancy projects.
[0003] A Chinese utility model patent with publication number CN219261084U discloses a foundation pile for a water conservancy project, comprising a base plate, a mounting groove being provided at the bottom of the base plate, a connecting groove being provided inside the mounting groove, a compression spring being provided inside the connecting groove, a cover plate being provided at one end of the compression spring, an upper base being provided at the bottom of the cover plate, an anti-corrosion layer being provided on the surface of the upper base, connecting holes being provided on both sides of one end of the upper base close to the bottom, a first lower base being provided at the bottom of the upper base, a second lower base being provided on one side of the first lower base, a fixed shaft being provided at the top of the first lower base, a fixed plate being provided on the outer side of the fixed shaft, positioning blocks being provided at both ends of the fixed shaft, and fixed side plates being provided on both sides of the first lower base and the second lower base.
[0004] In the above technology, fixed side plates are fixedly installed on both sides of the base, which increases the contact area between the base and the soil and improves the stability of the foundation piles. However, the fixed side plates are arranged on both sides of the base, and the fixed side plates hinder the process of the base being inserted into the soil layer, which is not conducive to the staff to quickly install the foundation piles of the water conservancy project. Utility Model Content
[0005] In order to solve the above problems, the utility model provides a foundation pile for a water conservancy project building.
[0006] The above-mentioned technical purpose of the utility model is achieved through the following technical solutions: a foundation pile of a water conservancy project, comprising a pile body, a reinforcement rod is arranged in the pile body, a through hole for the reinforcement rod to pass through is penetrated on the side wall of the pile body, one end of the reinforcement rod is located in the through hole, a movable plate slidingly matched with the inner wall of the pile body is arranged in the pile body, a driving mechanism for driving the reinforcement rod to pass through the through hole is arranged on the movable plate, the driving mechanism comprises an ejection assembly and a driving assembly for driving the movable plate to rise and fall, the ejection assembly comprises a connecting rod fixed to the bottom of the movable plate, a trapezoidal block fixed to the side wall of the connecting rod near its lower end, and an abutment block fixed to the top of the reinforcement rod, and a surface on one side of the abutment block cooperates with the inclined surface of the trapezoidal block.
[0007] By adopting the above technical solution, before the building foundation piles are driven into the ground, the reinforcement rod is located inside the pile body, thereby avoiding the situation where the reinforcement rod hinders the process of the pile body being driven into the soil layer. When the building foundation piles are driven into the ground, the staff only needs to drive the movable plate down through the driving assembly, and the movable plate moves downward and drives the trapezoidal block to move synchronously through the connecting rod. When the inclined surface of the trapezoidal block abuts the inclined surface of the abutting block, as the movable plate continues to descend, the reinforcement rod gradually penetrates the through hole and is inserted into the soil layer. The reinforcement rod has a good reinforcement effect on the pile body, thereby enhancing the stability of the building foundation piles during use.
[0008] The cam is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs, each of which is provided with a plurality of springs,
[0009] By adopting the above technical solution, in the process of driving the pile body into the ground, the upper spring supports the slider on the side wall of the movable plate, ensuring the stability of the movable plate, the connecting rod, the trapezoidal block and the reinforcement rod in this process. In the process of using the driving assembly to drive the movable plate to descend, the staff only needs to rotate the active gear through the crank, and the active gear drives the driven gear and the threaded rod to rotate. Since the threaded rod is threadedly connected to the mounting block, the guide rod and the mounting block slide together, so that the mounting block and the movable plate fixed to the mounting block are lowered. In this process, the upper spring is gradually compressed, and the movable plate drives the trapezoidal block to descend through the connecting rod. The inclined surface of the trapezoidal block acts on the inclined surface of the abutment block, so that the reinforcement rod is gradually moved out of the through hole and inserted into the soil layer, thereby playing a good reinforcement role on the soil layer.
[0010] Furthermore, an L-shaped block is fixed to the side wall of the mounting plate, an upper screw is provided through the vertical portion of the L-shaped block and is gap-matched with the L-shaped block, the upper screw is threadedly connected to the inner wall of the pile body, and a lower screw is provided through the mounting block and is gap-matched with the mounting block, and the lower screw is threadedly connected to the top of the movable plate.
[0011] By adopting the above technical solution, the setting of the upper screws makes it easy for the staff to install and disassemble the mounting plate, and the setting of the lower screws makes it easy for the staff to install and disassemble the mounting block, thereby making it easy for the staff to disassemble the driving mechanism from the pile body, so that after the staff completes driving the reinforcement rod on one of the pile bodies into the soil layer, the driving mechanism can be disassembled and applied to another pile body, saving the setting cost of the driving mechanism.
[0012] Furthermore, the outer wall of the pile body is provided with a mounting groove connected to the through hole, the inner wall of the mounting groove is rotatably mounted with a side cover for covering the through hole, a rotating shaft is fixed to the side wall of the side cover near its top, the side wall of the pile body is provided with a mounting hole connected to the mounting groove, a torsion spring sleeved on the outside of the rotating shaft is fixed in the mounting hole, the end of the torsion spring is fixed to the side wall of the side cover and is used to keep the side cover in the mounting groove.
[0013] By adopting the above technical solution, the torsion force provided by the torsion spring ensures that the side cover is always in the installation groove during the process of the pile body being driven into the ground. The side cover shields the small amount of stones in the soil, avoiding the situation where the opening of the through hole is exposed and blocked by stones, which is conducive to the smooth insertion of the reinforcement rod into the soil layer through the through hole at a later stage.
[0014] Furthermore, the lower end of the pile body is provided with a cone that is plugged into the opening of the lower end of the pile body, the side wall of the pile body is penetrated by a hexagonal countersunk bolt that matches the gap of the pile body, the end of the hexagonal countersunk bolt is threadedly connected to the cone, and the outer wall of the pile body is provided with a receiving hole for accommodating the head of the hexagonal countersunk bolt.
[0015] By adopting the above technical solution, the cone can be detachably installed at the lower end of the pile body, so that the staff can install the reinforcement rod provided with the abutment block, and the head of the hexagon socket countersunk bolt is located in the accommodating hole, thereby avoiding the probability of the hexagon socket countersunk bolt obstructing the process of the pile body being driven into the ground.
[0016] Furthermore, a top cover is provided on the upper end of the pile body, an upper bolt which is loosely matched with the top cover is penetrated through the top cover, and a threaded sleeve which is threadedly connected with the upper bolt is embedded on the top of the pile body.
[0017] By adopting the above technical solution, the upper bolts are preset in the pile body, which is convenient for the staff to use the upper bolts to install and remove the top cover. In the process of driving the pile body into the ground, the staff can directly use the striking tool to hit the top cover. When inserting the reinforcement rod into the soil layer for reinforcement, the staff needs to unscrew the upper bolts and remove the top cover, and then drive the movable plate down through the driving assembly until the reinforcement rod is inserted into the soil layer for reinforcement.
[0018] Furthermore, a lower spring is fixed to a side of the abutment block away from the inclined surface thereof, and one end of the lower spring away from the abutment block is fixed to the inner wall of the pile body.
[0019] By adopting the above technical solution, the lower spring plays a certain connecting role on the abutment block, thereby enhancing the stability of the reinforcement rod during the process of the pile body being driven into the ground, and reducing the probability of the reinforcement rod falling from the through hole into the interior of the pile body due to vibration.
[0020] Furthermore, a triangular block is fixed on the bottom surface of the reinforcing rod away from one side of the through hole, an elastic block is fixed on the inner wall of the pile body near the bottom of the through hole, and an inclined surface matching the inclined surface of the triangular block is provided on the side of the elastic block close to the triangular block.
[0021] By adopting the above technical solution, the reinforcement rod is gradually moved out of the through hole during the descending process of the movable plate, the inclined surface of the triangular block abuts against the inclined surface of the elastic block and causes the elastic block to undergo a certain deformation. As the movable plate continues to descend, the reinforcement rod continues to move out of the through hole, and then the right-angled side of the triangular block is buckled with the elastic block, which enhances the stability of the reinforcement rod after being inserted into the ground, and is beneficial for the reinforcement rod to maintain the reinforcement effect on the pile body.
[0022] Furthermore, the reinforcement rods are provided with two and staggered arrangement, the two through holes on the pile body are distributed on both sides of the pile body, and the ejection assembly is provided with two groups and respectively drives the two reinforcement rods to move out from the through holes on both sides.
[0023] By adopting the above technical solution, during the downward movement of the movable plate, the two sets of ejection assemblies respectively eject the reinforcement rods on both sides to both sides of the pile body, and the reinforcement rods on both sides cooperate and fully enhance the effect of reinforcing the pile body.
[0024] In summary, the utility model has the following beneficial effects:
[0025] 1. In the present application, before the building foundation pile is driven into the ground, the reinforcing rod is located inside the pile body, which avoids the situation that the reinforcing rod hinders the process of the pile body being driven into the soil layer, and is conducive to the rapid installation of the building foundation pile by the staff. When the building foundation pile is driven into the ground, the staff only needs to drive the movable plate to descend through the driving assembly, and the movable plate moves downward and drives the trapezoidal block to move synchronously through the connecting rod. When the inclined surface of the trapezoidal block abuts the inclined surface of the abutting block, as the movable plate continues to descend, the reinforcing rod gradually penetrates from the through hole and is inserted into the soil layer. The reinforcing rod plays a good reinforcing role on the pile body, and enhances the stability of the building foundation pile during use;
[0026] 2. In the present application, the upper screw is provided to facilitate the installation and removal of the mounting plate by the staff, and the lower screw is provided to facilitate the installation and removal of the mounting block by the staff, thereby facilitating the staff to remove the driving mechanism from the pile body, so that after the staff completes driving the reinforcement rod on one of the pile bodies into the soil layer, the driving mechanism can be removed and applied to another pile body, thereby saving the installation cost of the driving mechanism;
[0027] 3. In the present application, the reinforcing rod is gradually moved out from the through hole during the descending process of the movable plate, the inclined surface of the triangular block abuts against the inclined surface of the elastic block and causes the elastic block to undergo a certain deformation. As the movable plate continues to descend, the reinforcing rod continues to move out of the through hole, and then the right-angled side of the triangular block is buckled with the elastic block, which enhances the stability of the reinforcing rod after being inserted into the ground, and is beneficial for the reinforcing rod to maintain the reinforcing effect on the pile body. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of Embodiment 1 of the present utility model;
[0029] Figure 2 yes Figure 1 A cross-sectional view that highlights the ejector assembly;
[0030] Figure 3 yes Figure 2 The enlarged schematic diagram of point A in the middle;
[0031] Figure 4 This is a schematic diagram of the structure of the utility model embodiment 1 for highlighting the rectangular through slot;
[0032] Figure 5 It is a schematic diagram of the planar structure of Embodiment 2 of the present utility model. Figure 5 One set of ejector components was deleted;
[0033] Figure 6 yes Figure 2 The enlarged schematic diagram of point B in the middle;
[0034] Figure 7 yes Figure 5 Enlarged schematic diagram of point C in the middle.
[0035] In the figure: 1, pile body; 11, cone; 12, hexagon socket countersunk bolt; 13, receiving hole; 14, top cover; 141, upper bolt; 15, threaded sleeve; 16, through hole; 17, slide groove; 171, upper spring; 18, mounting groove; 19, mounting hole; 2, reinforcement rod; 21, triangular block; 3, movable plate; 31, slider; 32, rectangular through groove; 4, driving mechanism; 41, ejector assembly; 411, connecting rod; 412 , trapezoidal block; 413, abutment block; 42, drive assembly; 421, mounting plate; 4211, L-shaped block; 42111, upper screw; 422, mounting block; 4221, lower screw; 423, guide rod; 424, threaded rod; 425, driven gear; 426, active rod; 427, active gear; 428, crank; 5, lower spring; 6, elastic block; 7, side cover; 71, rotating shaft; 711, torsion spring. DETAILED DESCRIPTION
[0036] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0037] Example 1
[0038] like Figure 1-4 As shown, the embodiment of the present application discloses a foundation pile for a water conservancy project, comprising a pile body 1, a reinforcing rod 2, a movable plate 3 and a driving mechanism 4. The pile body 1 is a circular tubular structure, and a cone 11 is provided at the lower end of the pile body 1 to be plugged into the opening at the lower end of the pile body 1, and a hexagon socket countersunk bolt 12 is provided through the side wall of the pile body 1 to be gap-matched with the pile body 1, and the end of the hexagon socket countersunk bolt 12 is threadedly connected with the cone 11, and a receiving hole 13 for accommodating the head of the hexagon socket countersunk bolt 12 is provided on the outer wall of the pile body 1. In this embodiment, a top cover 14 is provided at the upper end of the pile body 1, and an upper bolt 141 is provided through the top cover 14 to be gap-matched with the top cover 14, and a threaded sleeve 15 threadedly connected with the upper bolt 141 is embedded at the top of the pile body 1.
[0039] The reinforcing rod 2 is horizontally arranged in the pile body 1. A through hole 16 for the reinforcing rod 2 to pass through is penetrated on the side wall of the pile body 1, and one end of the reinforcing rod 2 is located in the through hole 16. Two reinforcing rods 2 are provided and staggered. The two through holes 16 on the pile body 1 are distributed on both sides of the pile body 1.
[0040] The movable plate 3 is a circular plate-shaped structure horizontally arranged in the pile body 1. The axis of the movable plate 3 coincides with the axis of the pile body 1. Slide blocks 31 are integrally formed on both sides of the movable plate 3. The inner wall of the pile body 1 is provided with a slide groove 17 for sliding cooperation of the slide block 31. In this embodiment, an upper spring 171 is fixed to the inner bottom wall of the slide groove 17, and the upper end of the upper spring 171 abuts against the bottom surface of the slide block 31.
[0041] The driving mechanism 4 is arranged on the movable plate 3, and is used to drive the reinforcement rod 2 to pass through the through hole 16. The driving mechanism 4 includes an ejection assembly 41 and a driving assembly 42 for driving the movable plate 3 to move up and down. The ejection assembly 41 is provided with two groups and drives the two reinforcement rods 2 to move out from the through holes 16 on both sides respectively. Each group of ejection assemblies 41 includes a connecting rod 411, a trapezoidal block 412 and an abutment block 413. The connecting rod 411 is vertically arranged at a position close to the inner wall of the pile body 1, and the upper end of the connecting rod 411 is fixed to the bottom of the movable plate 3. The trapezoidal block 412 is a block structure with a right-angle trapezoidal cross section. The side wall of one side of the trapezoidal block 412 is fixed to the position of the side wall of the connecting rod 411 close to its lower end. The bottom of the trapezoidal block 412 is an inclined surface, and the distance between the bottom surface of the trapezoidal block 412 and the connecting rod 411 increases from the connecting rod 411 to the side away from the connecting rod 411. The cross section of the abutment block 413 is a right-angled trapezoid. The bottom surface of the abutment block 413 is fixed to the top of the reinforcement rod 2 . The abutment block 413 is located close to the connecting rod 411 , and the inclined surface of the abutment block 413 matches the inclined surface of the trapezoidal block 412 .
[0042] The driving assembly 42 includes a mounting plate 421, a mounting block 422, a guide rod 423, a threaded rod 424, a driven gear 425, an active rod 426, an active gear 427 and a crank 428. The mounting plate 421 is a horizontally arranged circular plate-shaped structure, which is located above the movable plate 3. L-shaped blocks 4211 are fixed on both sides of the mounting plate 421. An upper screw 42111 that is clearance-matched with the L-shaped block 4211 is provided through the vertical portion of the L-shaped block 4211, and the upper screw 42111 is threadedly connected to the inner wall of the pile body 1. The mounting block 422 is a rectangular block-shaped structure, and its bottom surface is in contact with the upper surface of the movable plate 3. A lower screw 4221 that is clearance-matched with the mounting block 422 is provided through the mounting block 422, and the lower screw 4221 is threadedly connected to the top of the movable plate 3. The guide rod 423 is a round rod structure, the upper end of which is fixed to the bottom of the mounting plate 421. The guide rod 423 is set on the mounting block 422 and slides with the mounting block 422. The upper end of the threaded rod 424 penetrates the mounting plate 421 and is rotatably connected to the mounting plate 421. The lower end of the threaded rod 424 penetrates the mounting block 422 and is threadedly connected to the mounting block 422. A rectangular through groove 32 is penetrated and opened at a position of the movable plate 3 close to the mounting block 422 for the guide rod 423 and the threaded rod 424 to pass through. The axis of the driven gear 425 coincides with the axis of the threaded rod 424, and its bottom surface is fixed to the upper end of the threaded rod 424. The active rod 426 is rotatably mounted on the top of the mounting plate 421, the axis of the active gear 427 coincides with the axis of rotation of the active rod 426, the bottom surface of the active gear 427 is fixed to the upper end of the active rod 426, and the active gear 427 is meshed with the driven gear 425, and the crank 428 is fixed to the top of the active gear 427 near the edge of the active gear 427.
[0043] The use principle of a water conservancy engineering construction pile in this embodiment is as follows: before the construction pile is driven into the ground, the reinforcement rod 2 is located in the pile body 1, so as to avoid the situation that the reinforcement rod 2 hinders the process of the pile body 1 being driven into the soil layer, and the movable plate 3 is kept suspended under the elastic force of the upper spring 171, so that the trapezoidal block 412 does not exert force on the abutment block 413, and the reinforcement rod 2 remains stable. When the construction pile is driven into the ground, the staff only needs to directly use a knocking tool to knock the top cover 14 to make the pile body 1 inserted into the soil layer. After the pile body 1 is inserted into the soil layer, in order to enhance the stability of the pile body 1, the staff only needs to unscrew the upper bolt 141 and open the top cover 14, and then rotate the driving gear 427 through the crank 428, and the driving gear 427 drives the driven gear 425 and the threaded rod 424 to rotate. Since the threaded rod 424 is threadedly connected with the mounting block 422, the guide rod 423 slides with the mounting block 422, so that the mounting block 422 and the movable plate 3 fixed with the mounting block 422 are lowered. During this process, the upper spring 171 is gradually compressed, and the movable plate 3 drives the trapezoidal block 412 to descend through the connecting rod 411. The inclined surface of the trapezoidal block 412 acts on the inclined surface of the abutment block 413, so that the reinforcement rod 2 is gradually moved out of the through hole 16 and inserted into the soil layer, thereby playing a good reinforcement effect on the soil layer. The setting of the upper screw 42111 makes it easy for the staff to install and disassemble the mounting plate 421, and the setting of the lower screw 4221 makes it easy for the staff to install and disassemble the mounting block 422, thereby making it easy for the staff to disassemble the driving mechanism 4 from the pile body 1, so that after the staff completes driving the reinforcement rod 2 on one of the pile bodies 1 into the soil layer, the driving mechanism 4 can be disassembled and applied to another pile body 1, saving the setting cost of the driving mechanism 4.
[0044] Example 2
[0045] like Figure 5-7 As shown, the difference between this embodiment and embodiment 1 is that: in order to enhance the stability of the reinforcement rod 2 during the process of the pile body 1 being driven into the ground, a lower spring 5 is fixed to the side of the abutment block 413 away from its inclined surface, and one end of the lower spring 5 away from the abutment block 413 is fixed to the inner wall of the pile body 1. The lower spring 5 plays a certain connecting role on the abutment block 413, thereby enhancing the stability of the reinforcement rod 2 during the process of the pile body 1 being driven into the ground, and reducing the probability of the reinforcement rod 2 falling from the through hole 16 into the inside of the pile body 1 due to vibration.
[0046] In order to enhance the stability of the reinforcing rod 2 after it is inserted into the soil layer, a triangular block 21 is fixed to the bottom surface of the reinforcing rod 2 at a position away from one side of the through hole 16, and an elastic block 6 is fixed to the inner wall of the pile body 1 at a position close to the bottom of the through hole 16. The side of the elastic block 6 close to the triangular block 21 is provided with an inclined surface that matches the inclined surface of the triangular block 21. The reinforcing rod 2 gradually moves out of the through hole 16 during the descent of the movable plate 3, and the inclined surface of the triangular block 21 abuts against the inclined surface of the elastic block 6 and causes a certain deformation of the elastic block 6. As the movable plate 3 continues to descend, the reinforcing rod 2 continues to move out of the through hole 16, and then the right-angled side of the triangular block 21 is buckled with the elastic block 6, which enhances the stability of the reinforcing rod 2 after it is inserted into the ground, which is beneficial for the reinforcing rod 2 to maintain the reinforcing effect on the pile body 1.
[0047] In order to reduce the probability that the pile body 1 is driven into the soil layer and that stones and other debris enter the through hole 16 and affect the insertion of the reinforcement rod 2 into the soil layer, a mounting groove 18 connected to the through hole 16 is provided on the outer wall of the pile body 1, and a side cover 7 for blocking the through hole 16 is rotatably installed on the inner wall of the mounting groove 18. A rotating shaft 71 is fixed to the side wall of the side cover 7 near its top. A mounting hole 19 connected to the mounting groove 18 is provided on the side wall of the pile body 1, and a torsion spring 711 sleeved on the outside of the rotating shaft 71 is fixed in the mounting hole 19. The end of the torsion spring 711 is fixed to the side wall of the side cover 7 and is used to keep the side cover 7 in the mounting groove 18. The side cover 7 has a shielding effect on a small amount of stones in the soil, thereby avoiding the situation where the opening of the through hole 16 is exposed and blocked by stones, which is conducive to the smooth insertion of the reinforcement rod 2 from the through hole 16 into the soil layer at a later stage.
[0048] The above is only a preferred embodiment of the present invention. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A foundation pile for a water conservancy project, characterized in that: The invention comprises a pile body (1), wherein a reinforcing rod (2) is arranged in the pile body (1), a through hole (16) for the reinforcing rod (2) to pass through is penetrated on the side wall of the pile body (1), one end of the reinforcing rod (2) is located in the through hole (16), a movable plate (3) is arranged in the pile body (1) and is slidably matched with the inner wall of the pile body (1), and a driving mechanism (4) is arranged on the movable plate (3) for driving the reinforcing rod (2) to pass through the through hole (16), and the driving mechanism (4) is used to drive the reinforcing rod (2) to pass through the through hole (16). The mechanism (4) comprises an ejection assembly (41) and a driving assembly (42) for driving the movable plate (3) to rise and fall, the ejection assembly (41) comprising a connecting rod (411) fixed to the bottom of the movable plate (3), a trapezoidal block (412) fixed to a position of a side wall of the connecting rod (411) close to its lower end, and an abutment block (413) fixed to the top of the reinforcing rod (2), a surface on one side of the abutment block (413) being matched with an inclined surface of the trapezoidal block (412).
2. A foundation pile for a hydraulic engineering building according to claim 1, characterized in that: Slide blocks (31) are integrally formed on both sides of the movable plate (3); a slide groove (17) for slidingly cooperating with the slide block (31) is provided on the inner wall of the pile body (1); an upper spring (171) is fixed to the inner bottom wall of the slide groove (17); the upper end of the upper spring (171) abuts against the bottom surface of the slide block (31); the driving assembly (42) comprises a mounting plate (421) detachably mounted on the pile body (1); a mounting block (422) detachably mounted on the movable plate (3); a guide rod (423) penetrating the mounting block (422) and slidingly cooperating with the mounting block (422); and a threaded rod (424) penetrating the mounting block (422) and threadedly connected to the mounting block (422). ), a driven gear (425) fixed to the upper end of the threaded rod (424), an active rod (426) rotatably mounted on the top of the mounting plate (421), a driving gear (427) fixed to the upper end of the active rod (426) and meshing with the driven gear (425), and a crank (428) fixed to the top of the driving gear (427); the upper end of the guide rod (423) is fixed to the bottom of the mounting plate (421); the threaded rod (424) penetrates the mounting plate (421) and is rotatably connected to the mounting plate (421); a rectangular through slot (32) is penetrated through the movable plate (3) at a position close to the mounting block (422) for the guide rod (423) and the threaded rod (424) to pass through.
3. A foundation pile for a hydraulic engineering building according to claim 2, characterized in that: An L-shaped block (4211) is fixed to the side wall of the mounting plate (421), an upper screw (42111) is provided through the vertical portion of the L-shaped block (4211) and is loosely matched with the L-shaped block (4211), the upper screw (42111) is threadedly connected to the inner wall of the pile body (1), and a lower screw (4221) is provided through the mounting block (422) and is loosely matched with the mounting block (422), the lower screw (4221) is threadedly connected to the top of the movable plate (3).
4. A foundation pile for a hydraulic engineering building according to claim 3, characterized in that: The pile body (1) has an outer wall provided with a mounting groove (18) connected to the through hole (16); a side cover (7) for shielding the through hole (16) is rotatably mounted on the inner wall of the mounting groove (18); a rotating shaft (71) is fixed at a position near the top of the side wall of the side cover (7); a mounting hole (19) connected to the mounting groove (18) is provided on the side wall of the pile body (1); a torsion spring (711) sleeved on the outside of the rotating shaft (71) is fixed in the mounting hole (19); an end of the torsion spring (711) is fixed to the side wall of the side cover (7) and is used to keep the side cover (7) in the mounting groove (18).
5. A foundation pile for a hydraulic engineering building according to claim 4, characterized in that: The lower end of the pile body (1) is provided with a cone (11) which is plugged into the opening of the lower end of the pile body (1); a hexagon socket countersunk bolt (12) which is loosely matched with the pile body (1) is penetrated through the side wall of the pile body (1); the end of the hexagon socket countersunk bolt (12) is threadedly connected to the cone (11); and the outer wall of the pile body (1) is provided with a receiving hole (13) for receiving the head of the hexagon socket countersunk bolt (12).
6. A foundation pile for a hydraulic engineering building according to claim 5, characterized in that: A top cover (14) is arranged at the upper end of the pile body (1), an upper bolt (141) which is loosely matched with the top cover (14) is penetrated through the top cover (14), and a threaded sleeve (15) which is threadedly connected with the upper bolt (141) is embedded at the top of the pile body (1).
7. A foundation pile for a hydraulic engineering building according to claim 5, characterized in that: A lower spring (5) is fixed to the side of the abutment block (413) away from the inclined surface thereof, and one end of the lower spring (5) away from the abutment block (413) is fixed to the inner wall of the pile body (1).
8. A foundation pile for a hydraulic engineering building according to claim 7, characterized in that: A triangular block (21) is fixed to a position on the bottom surface of the reinforcing rod (2) away from the through hole (16), and an elastic clamping block (6) is fixed to a position on the inner wall of the pile body (1) close to the bottom of the through hole (16). The elastic clamping block (6) is provided with an inclined surface that matches the inclined surface of the triangular block (21) on a side close to the triangular block (21).
9. A foundation pile for a hydraulic engineering building according to claim 6, characterized in that: The reinforcement rods (2) are provided with two and are staggered, the two through holes (16) on the pile body (1) are distributed on both sides of the pile body (1), and the ejection assembly (41) is provided with two groups and respectively drives the two reinforcement rods (2) to be moved out from the through holes (16) on both sides.