Double-row pile supporting structure capable of actively controlling deformation
By adopting inter-pile mixing pile processing and enhanced portal frame design in the double-row pile support structure, combined with the arrangement of piles inside and outside the pit and water-stop curtain measures, the double-row pile support structure has solved the problem of foundation pit deformation prevention The problem of insufficient effect has significantly improved the stability and deformation control capabilities of the foundation pit.
Patent Information
- Application Number
- CN202420399476.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing double-row pile support structure has a weak anti-deformation effect on the foundation pit and insufficient ability to control the deformation of the foundation pit. It does not meet the needs of foundation pit deformation control, especially in soft soil areas with high water levels and close to buildings. , which can easily lead to excessive monitoring of foundation pits and dangerous situations.
A double-row pile support structure with active deformation control is adopted. Through inter-pile mixing pile treatment between the front row piles and the rear row piles, the soil properties between the piles are improved to form an enhanced portal frame, which combines the piles in the pit and the piles outside the pit. The layout enhances the elastic modulus and bending stiffness of the supporting structure, and reduces deformation during foundation pit excavation through measures such as water-stop curtains and reinforcing bars.
It improves the stability and deformation control ability of the foundation pit supporting structure, reduces deformation during foundation pit excavation, enhances the protection effect of the foundation pit, and avoids environmental settlement caused by building sinking and water level drop.
Smart Images

Figure CN221919445U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit engineering support, in particular to a double-row pile support structure with active deformation control. Background Art
[0002] Foundation pit support engineering generally refers to the engineering measures taken to ensure the stability of foundation pit enclosure, protect the main construction safety of underground engineering, and protect the surrounding environment from damage. It mainly depends on the excavation depth of the foundation pit, site conditions, surrounding environment, existing buildings, municipal roads, pipelines, site hydrogeological conditions and engineering construction period requirements, etc., and should be comprehensively analyzed and reasonably selected. The support forms of foundation pit support usually include slope excavation, soil nail wall, cement soil gravity retaining wall, steel cement soil mixing wall, pile row and ground wall.
[0003] Pile support includes double-row pile support. Double-row pile support is a retaining structure composed of a rigid frame and a crown beam connected by front and rear rows of supporting piles and beams arranged along the side walls of the foundation pit. It is a commonly used foundation pit engineering technology that can effectively support the soil, prevent foundation pit collapse and surrounding settlement, ensure the safety of foundation pit projects, and has the characteristics of greater rigidity, smaller displacement, and simple construction.
[0004] For foundation pits in high-water soft soil areas and adjacent to buildings, although prestressed anchor cables and water-stop curtains can be used, driving prestressed anchor cables into the foundations of surrounding buildings can easily cause the building to sink or even crack, endangering safety. In addition, the cement soil wall that serves as both a water stop and support is not strong enough and rigid enough, and the deformation control is not strict enough, which often leads to over-limit alarms or dangerous situations in foundation pit monitoring, which is not conducive to foundation pit excavation and foundation construction. The existing double-row pile support structure has a weak anti-deformation effect on the foundation pit, and the ability to control the deformation of the foundation pit is insufficient, which does not meet the needs of foundation pit deformation control. Utility Model Content
[0005] In order to solve the technical problems that the existing double-row pile support structure has weak anti-deformation effect on the foundation pit, insufficient ability to control the deformation of the foundation pit, and cannot meet the needs of foundation pit deformation control, the utility model provides a double-row pile support structure with active deformation control.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] A double-row pile support structure with active deformation control comprises a front row of piles and a rear row of piles, wherein the front row of piles is closer to the side wall of a foundation pit than the rear row of piles, a plurality of inter-pile mixing piles are arranged between the front row of piles and the rear row of piles, the front row of piles and the rear row of piles are respectively provided with a pile top crown beam, a connecting beam is connected between the tops of the front row of piles and the rear row of piles, dowel bars are inserted into the tops of the inter-pile mixing piles, the dowel bars penetrate through the connecting beam and are fixedly connected to the connecting beam; a plurality of in-pit piles are arranged on the side of the front row of piles close to the foundation pit, and a plurality of out-pit piles are arranged on the side of the rear row of piles away from the foundation pit.
[0008] This application uses inter-pile mixing piles to perform inter-pile treatment, improve the properties of inter-pile soil, and increase the elastic modulus and flexural rigidity of the support structure. Then, an enhanced portal frame is formed through the front row of piles, the rear row of piles, the inter-pile mixing piles, the pile top crown beam, the connecting beam and the inserted reinforcement as well as the inter-pile soil, so as to give full play to the anti-deformation ability of the inter-pile soil spring. The in-pit piles can increase the pressure of the passive soil in the positive corner of the foundation pit or in the mid-span area in the passive area of the pit, and the out-pit piles can reinforce the active area outside the pit and reduce the pressure of the active soil in the active area outside the pit. The in-pit piles and the out-pit piles can reduce the deformation of the support structure during the excavation of the foundation pit, and cooperate with the enhanced portal frame to jointly ensure the overall stability of the support structure and improve the ability to control deformation.
[0009] As a preferred implementation of a double-row pile support structure with active deformation control, the piles in the pit are jet-jet piles with high strength.
[0010] As a preferred implementation of a double-row pile support structure with active deformation control, the piles outside the pit are mixing piles, which can improve the foundation strength.
[0011] As a preferred implementation of a double-row pile support structure with active deformation control, a water-stop curtain is provided between the front-row piles, which can prevent the surrounding environment of the foundation pit from settling due to the drop in the water level outside the pit.
[0012] As a preferred implementation mode of a double-row pile support structure with active deformation control, the water-stop curtain includes jet grouting piles, which can form a ground-type water-stop curtain together with the front-row piles, playing the dual role of retaining soil and water.
[0013] As a preferred implementation method of a double-row pile support structure with active deformation control, reinforcing bars are anchored into the connecting beams to enhance the overall strength and improve stability.
[0014] As a preferred implementation method of a double-row pile support structure with active deformation control, the pile top crown beam and the connecting beam are cast in one piece to enhance the overall strength and improve stability.
[0015] As a preferred implementation method of a double-row pile support structure with active deformation control, the front row piles and the rear row piles have the same pile diameter, the pile spacing of the front row piles is 1.5-2.5 times the pile diameter, the pile spacing of the rear row piles is 1.5-2.5 times the pile diameter, the row spacing between the front row piles and the rear row piles is 2-5 times the pile diameter, and the pile length of the front row piles and the rear row piles is 1.5-2.5 times the depth of the foundation pit.
[0016] As a preferred implementation of a double-row pile support structure with active deformation control, the reinforcement height of the piles outside the pit is equal to the depth of the foundation pit, and the unconfined compressive strength of the piles outside the pit is not less than 1.0 MPa.
[0017] As a preferred implementation of a double-row pile support structure with active deformation control, the depth of the water-stop curtain is 0.5 m greater than the depth of the front row of piles.
[0018] The beneficial effects of the utility model include:
[0019] This application uses inter-pile mixing piles to perform inter-pile treatment, improve the properties of inter-pile soil, and increase the elastic modulus and flexural rigidity of the support structure. Then, an enhanced portal frame is formed through the front row of piles, the rear row of piles, the inter-pile mixing piles, the pile top crown beam, the connecting beam and the inserted reinforcement as well as the inter-pile soil, so as to give full play to the anti-deformation ability of the inter-pile soil spring. The in-pit piles can increase the pressure of the passive soil in the positive corner of the foundation pit or in the mid-span area in the passive area of the pit, and the out-pit piles can reinforce the active area outside the pit and reduce the pressure of the active soil in the active area outside the pit. The in-pit piles and the out-pit piles can reduce the deformation of the support structure during the excavation of the foundation pit, and cooperate with the enhanced portal frame to jointly ensure the overall stability of the support structure and improve the ability to control deformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solution of the utility model, the drawings required for use in the description will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a schematic side cross-sectional structure diagram of a double-row pile support structure with active deformation control in a specific implementation mode of the utility model;
[0022] Figure 2 It is a schematic diagram of a top view and cross-section structure of a double-row pile support structure with active control of deformation in a specific implementation mode of the utility model;
[0023] List of parts and reference numerals:
[0024] 1. Front row of piles; 2. Back row of piles; 3. Crown beam on top of piles; 4. Mixed piles between piles; 5. Inserted reinforcement; 6. Connecting beam; 7. Piles outside the pit; 8. Piles inside the pit; 9. Water-stop curtain. DETAILED DESCRIPTION
[0025] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical scheme of the utility model will be clearly and completely described below in combination with the drawings in the specific embodiment. Obviously, the embodiments described below are only part of the embodiments of the utility model, not all of them. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.
[0026] Reference Figure 1-2 The present embodiment proposes a double-row pile support structure with active deformation control, comprising a front row pile 1 and a rear row pile 2, the front row piles 1 and the rear row piles 2 are arranged along the side wall of the foundation pit, the front row piles 1 and the rear row piles 2 are parallel to each other, the front row piles 1 are closer to the side wall of the foundation pit than the rear row piles 2, the pile diameters of the front row piles 1 and the rear row piles 2 are the same and are within the range of 0.8-1.5m, the pile spacing of the front row piles 1 is 1.5-2.5 times the pile diameter, the pile spacing of the rear row piles 2 is 1.5-2.5 times the pile diameter, the row spacing between the front row piles 1 and the rear row piles 2 is 2-5 times the pile diameter, and the pile lengths of the front row piles 1 and the rear row piles 2 are 1.5-2.5 times the depth of the foundation pit. A water-stop curtain 9 is provided between the front row piles 1. The water-stop curtain 9 is composed of high-pressure rotary jet piles. The depth of the water-stop curtain 9 is 0.5m greater than the depth of the front row piles 1. The diameter of the high-pressure rotary jet piles in the water-stop curtain 9 is not less than the diameter of the front row piles 1. The overlap length between the water-stop curtain 9 and the front row piles 1 is not less than 0.2m. The water-stop curtain 9 is made of cement with a temperature not lower than P.O42.5, and the water-cement ratio is not lower than 1.0.
[0027] Several rows of inter-pile mixing piles 4 are arranged between the front row piles 1 and the rear row piles 2, and the soil between the front row piles 1 and the rear row piles 2 is reinforced by the inter-pile mixing piles 4. The plane arrangement of the inter-pile mixing piles 4 adopts a grid type, and the material of the inter-pile mixing piles 4 is P.O42.5 cement. The reinforcement height of the inter-pile mixing piles 4 is equal to the depth of the foundation pit, and the position of each inter-pile mixing pile 4 close to the front row piles 1 corresponds to the position between two adjacent front row piles 1, and the position of each inter-pile mixing pile 4 close to the rear row piles 2 corresponds to the position between the piles of the rear row piles 2. The pile diameter of the inter-pile mixing piles 4 is not less than 0.5m, and the lap length between adjacent inter-pile mixing piles 4 is not less than 0.1m. The 28d unconfined compressive strength of the cement soil of the inter-pile mixing piles 4 is not less than 1.0MPa, and the cement addition amount is determined by indoor mix ratio test.
[0028] The front row piles 1 and the rear row piles 2 are respectively provided with a pile top crown beam 3, and a connecting beam 6 is connected between the tops of the front row piles 1 and the rear row piles 2. The heights of the pile top crown beam 3 and the connecting beam 6 are not less than 0.8 times the pile diameter of the front row piles 1. The top elevations of the front row piles 1, the rear row piles 2, the pile top crown beam 3 and the connecting beam 6 are the same and the strength is not less than C30. The top of the inter-pile mixing piles 4 is inserted with a dowel bar 5, the length of the dowel bar 5 is 2-4m, the length of the dowel bar 5 anchored in the connecting beam 6 depends on the height of the connecting beam 6, the dowel bar 5 is anchored in the connecting beam 6, and the pile top crown beam 3 and the connecting beam 6 are cast in one piece.
[0029] Several rows of in-pit piles 8 are provided on the side of the front row of piles 1 close to the foundation pit. The in-pit piles 8 are located at the positive corner position or the mid-span area in the foundation pit. The in-pit piles 8 are high-pressure rotary jet piles. The in-pit piles 8 are made of cement with a P.O. of not less than 42.5, and the water-cement ratio is not less than 1.0. The plane layout of the in-pit piles 8 adopts a pier-type plane layout. The reinforcement width of the in-pit piles 8 is 2-4m, the reinforcement depth is 3-5m, the pile diameter is not less than 0.6m, and the overlap length between adjacent in-pit piles 8 is not less than 0.1m.
[0030] A plurality of rows of outside-pit piles 7 are provided on the side of the rear row of piles 2 away from the foundation pit. The outside-pit piles 7 are cement-soil mixing piles. The reinforcement height of the outside-pit piles 7 is equal to the depth of the foundation pit. The cement-soil 28d unconfined compressive strength of the outside-pit piles 7 is not less than 1.0Mpa. The pile diameter of the outside-pit piles 7 is not less than 0.5m, and the overlap length between adjacent outside-pit piles 7 is not less than 0.1m.
[0031] The working principle of the utility model is:
[0032] Before excavation of the foundation pit, the front row piles 1 and the rear row piles 2 are constructed first, then the water stop curtain 9 and the inter-pile mixing piles 4 are constructed, and finally the piles 7 outside the pit and the piles 8 inside the pit are constructed. Then the floating slurry on the top of the front row piles 1 and the rear row piles 2 is chiseled off, the steel bars of the pile top crown beam 3 are tied, the dowel bars 5 are inserted into the top of the inter-pile mixing piles 4, and then the steel bars of the connecting beam 6 are tied, the dowel bars 5 are anchored into the connecting beam 6, and the formwork is supported and the pile top crown beam 3 and the connecting beam 6 are integrally cast. Finally, the foundation pit can be excavated according to the design working conditions to achieve the deformation control requirements.
[0033] This embodiment uses the inter-pile mixing piles 4 to perform inter-pile treatment, improve the properties of the soil between the piles, and improve the elastic modulus and bending stiffness of the support structure. Then, the front row piles 1, the rear row piles 2, the inter-pile mixing piles 4, the pile top crown beam 3, the connecting beam 6 and the inserted bar 5 and the soil between the piles form an enhanced portal frame to give full play to the anti-deformation ability of the soil spring between the piles. The piles 8 in the pit can increase the pressure of the passive soil in the positive corner position of the foundation pit or the mid-span area in the passive area of the pit, the piles 7 outside the pit can reinforce the active area outside the pit and reduce the pressure of the active soil in the active area outside the pit. The piles 8 in the pit and the piles 7 outside the pit can reduce the deformation of the support structure during the excavation of the foundation pit, and cooperate with the enhanced portal frame to jointly ensure the stability of the support structure as a whole and improve the ability to control deformation.
[0034] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A double-row pile support structure with active deformation control, comprising a front row of piles (1) and a rear row of piles (2), wherein the front row of piles (1) is closer to the side wall of a foundation pit than the rear row of piles (2), and characterized in that: A plurality of inter-pile mixing piles (4) are arranged between the front row piles (1) and the rear row piles (2); the front row piles (1) and the rear row piles (2) are respectively provided with a pile top crown beam (3); a connecting beam (6) is connected between the tops of the front row piles (1) and the rear row piles (2); a dowel bar (5) is inserted into the top of the inter-pile mixing piles (4); the dowel bar (5) passes through the connecting beam (6) and is fixedly connected to the connecting beam (6); a plurality of in-pit piles (8) are arranged on a side of the front row piles (1) close to the foundation pit; a plurality of out-pit piles (7) are arranged on a side of the rear row piles (2) away from the foundation pit.
2. The double-row pile support structure with active deformation control according to claim 1 is characterized in that: The pile (8) in the pit is a jet grouting pile.
3. The double-row pile support structure with active deformation control according to claim 1 is characterized in that: The pile (7) outside the pit is a mixing pile.
4. The double-row pile support structure with active deformation control according to claim 1, characterized in that: A water-stop curtain (9) is provided between the piles of the front row (1).
5. The double-row pile support structure with active deformation control according to claim 4 is characterized in that: The water-stop curtain (9) comprises jet-jet piles.
6. The double-row pile support structure with active deformation control according to claim 1, characterized in that: The dowel bars (5) are anchored into the coupling beam (6).
7. The double-row pile support structure with active deformation control according to claim 1, characterized in that: The pile top cap beam (3) and the connecting beam (6) are integrally cast and formed.
8. The double-row pile support structure with active deformation control according to claim 1, characterized in that: The front row piles (1) and the rear row piles (2) have the same pile diameter, the pile spacing of the front row piles (1) is 1.5-2.5 times the pile diameter, the pile spacing of the rear row piles (2) is 1.5-2.5 times the pile diameter, the row spacing between the front row piles (1) and the rear row piles (2) is 2-5 times the pile diameter, and the pile length of the front row piles (1) and the rear row piles (2) is 1.5-2.5 times the depth of the foundation pit.
9. The double-row pile support structure with active deformation control according to claim 1, characterized in that: The reinforcement height of the piles outside the pit (7) is equal to the depth of the foundation pit, and the unconfined compressive strength of the piles outside the pit (7) is not less than 1.0 MPa.
10. The double-row pile support structure with active deformation control according to claim 4 or 5, characterized in that: The depth of the water-stop curtain (9) is 0.5 m greater than the depth of the front row of piles (1).
