High-rise building foundation and structure integral lifting, inclination rectifying and stroke changing device
By using the combined design of the reaction force lifting mechanism and the jack in the overall lifting and tilting device for the foundation and structure of high-rise buildings, the deformation of the filling piles during the change of strokes is avoided, and the problems of structural cracking and safety hazards caused by conventional methods are solved. , achieving a more stable correction process.
Patent Information
- Application Number
- CN202420365106.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-27
AI Technical Summary
In the process of overall upgrading and tilting of high-rise building foundations and structures, the conventional method of changing paths leads to large penetration deformation of supplementary piles, resulting in differential settlement, causing structural cracks and potential safety hazards.
A device including filling piles, transverse support beams, reaction beams and two sets of jacks is used. The load is transferred from the first jack to the second jack during the stroke change through the reaction lifting mechanism and steel pads. Avoid passing directly to the fill pile.
It effectively avoids the deformation of the added piles, reduces the safety hazards of the structure, and ensures the stability and safety of the tilt correction process.
Smart Images

Figure CN221919568U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole. Background Art
[0002] The working mechanism of overall lifting and tilt correction of the foundation and structure of high-rise buildings is to reinforce the foundation by controlling the sinking of the piles, and then use the piles as support points, use the lifting frame and the self-locking hydraulic jack group, and adopt a computer control system to implement overall synchronous lifting and tilt correction of the foundation and structure. While correcting the tilt, the base is grouting to fill the lifting gap. After the correction is completed, the prestressed loading and pile sealing are carried out. However, when the lifting height of the tilt correction exceeds the working stroke of the jack, it is necessary to change the stroke. The conventional change method is to directly retract the cylinder of the jack to be changed, and after retracting into place, install a temporary steel pad under the jack, and the change is completed. This method is to transfer the unloading force of the jack to the adjacent piles through the stiffness of the structure itself, which leads to a large deformation of the piles, differential settlement, structural cracking, and structural safety hazards. Utility Model Content
[0003] The purpose of the utility model is to provide a high-rise building foundation and structure integral lifting tilt correction switching device to solve the problems raised in the above background technology.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole, comprising:
[0006] A supplementary pile, wherein the supplementary pile is inserted into the foundation of the high-rise building, and the upper end thereof protrudes from the foundation of the high-rise building;
[0007] A transverse support beam, wherein the transverse support beam is arranged at the upper end of the supplementary pile;
[0008] A reaction beam, the reaction beam is located at the upper end of the transverse support beam, and both sides of the reaction beam are connected to the foundation of the high-rise building through reaction force lifting mechanisms;
[0009] A first jack, which is disposed between the transverse support beam and the reaction beam and is used to lift the reaction beam; and
[0010] Two groups of second jacks are also arranged between the transverse support beam and the reaction beam, and are arranged on both sides of the first jack. The second jacks are used to support the reaction beam.
[0011] Furthermore, the first jack is a hydraulic jack.
[0012] Furthermore, the second jack is a manual jack.
[0013] Furthermore, two groups of the second jacks are symmetrically arranged on both sides of the first jack.
[0014] Furthermore, the transverse support beam is a shoulder pole beam.
[0015] Furthermore, the reaction force lifting mechanism is a reaction force anchor rod.
[0016] Furthermore, a first cushion block is arranged between the first jack and the transverse support beam.
[0017] Furthermore, a second cushion block is arranged between the second jack and the transverse support beam.
[0018] Compared with the prior art, the utility model has the following beneficial effects: the utility model utilizes the second jack to replace the first jack for support during the shifting process, and the load of the second jack will not be transmitted to the supplementary piles, which can effectively prevent the supplementary piles from being deformed, thereby avoiding safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is one of the schematic diagrams of the structure of the utility model.
[0020] Figure 2 This is the second schematic diagram of the structure of the utility model.
[0021] In the figure: additional piles 1, transverse support beams 2, reaction beams 3, first jacks 4, second jacks 5, reaction-force lifting mechanisms 6, first cushion blocks 7, second cushion blocks 8, and high-rise building foundations 9. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 and Figure 2A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole, comprising a supplementary pile 1, a transverse support beam 2, a reaction beam 3, a first jack 4 and two second jacks 5. The supplementary pile 1 is inserted into a high-rise building foundation 9, and its upper end extends out of the high-rise building foundation 9. The transverse support beam 2 is arranged at the upper end of the supplementary pile 1. The reaction beam 3 is located at the upper end of the transverse support beam, and its left and right sides are respectively connected to the high-rise building foundation 9 through a reaction force lifting mechanism 6. The first jack 4 is arranged between the transverse support beam 2 and the reaction beam 3 to lift the reaction beam 3. The two second jacks 5 are also arranged between the transverse support beam 2 and the reaction beam 3, and are symmetrically arranged on the left and right sides of the first jack 4. The second jack 5 is used to support the reaction beam 3.
[0024] Continue reading Figure 1 and Figure 2 In one embodiment of the utility model, the first jack 4 is a self-locking hydraulic jack, the second jack 5 is a manual jack, the transverse support beam 2 is a shoulder beam, and the reaction force lifting mechanism 6 is a reaction force anchor rod.
[0025] Further reading Figure 1 and Figure 2 A first cushion block 7 is arranged between the first jack 4 and the transverse support beam 2, and a second cushion block 8 is arranged between the second jack 5 and the transverse support beam 2. Both the first cushion block 7 and the second cushion block 8 are steel cushion blocks.
[0026] The specific implementation process of the utility model is as follows:
[0027] Step 1: a temporary shoulder beam is arranged on the top of the supplementary pile 1 and fixed to the supplementary pile 1 by bolts or welding;
[0028] Step 2: When the first jack 4 cylinder reaches the working stroke, tighten the self-locking nut immediately to lock the hydraulic cylinder;
[0029] Step 3: temporary second pads 8 are arranged on the left and right sides of the first jack 4 and the reaction beam 3 is tightened with the second jack 5;
[0030] Step 4: After the oil cylinder of the first jack 4 is retracted into place, a temporary first cushion block 7 is installed under the first jack, the changeover is completed, and then the next round of lifting is continued until the tilt correction requirements are met.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole. It is characterized in that include: A supplementary pile (1), wherein the supplementary pile (1) is inserted into the high-rise building foundation (9), and the upper end of the supplementary pile (1) protrudes from the high-rise building foundation (9); A transverse support beam (2), wherein the transverse support beam (2) is arranged at the upper end of the supplementary pile (1); A reaction beam (3), wherein the reaction beam (3) is located at the upper end of the transverse support beam (2), and both sides of the reaction beam (3) are connected to the high-rise building foundation (9) via reaction lifting mechanisms (6); a first jack (4), the first jack (4) being arranged between the transverse support beam (2) and the reaction beam (3) and being used for lifting the reaction beam (3); and Two groups of second jacks (5) are also arranged between the transverse support beam (2) and the reaction beam (3), and are arranged on both sides of the first jack (4). The second jacks (5) are used to support the reaction beam (3).
2. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that The first jack (4) is a hydraulic jack.
3. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that The second jack (5) is a manual jack.
4. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that The two groups of the second jacks (5) are symmetrically arranged on both sides of the first jack (4).
5. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that The transverse support beam (2) is a shoulder pole beam.
6. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that The reaction force lifting mechanism (6) is a reaction force anchor rod.
7. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that A first cushion block (7) is arranged between the first jack (4) and the transverse support beam (2).
8. A device for lifting and correcting the tilt of a high-rise building foundation and structure as a whole according to claim 1, It is characterized in that A second cushion block (8) is provided between the second jack (5) and the transverse support beam (2).