Dry coil pipe mounting structure of clean room

Through prefabricated panels and pole structures on the ceiling and rotating threaded rod technology, holeless installation and height adjustment of dry coils are achieved, which solves the problem of dust pollution caused by drilling holes in the existing technology and improves cleanliness and installation efficiency.

CN221919960UActive Publication Date: 2024-10-29BEIJING TAIWEI METAL STRUCTURE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323610886.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-10-29
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

Existing dry coil installation technology requires drilling holes in the ceiling, resulting in dust contamination and reduced cleanroom cleanliness.

Method used

Prefabricated panels and prefabricated vertical poles are prefabricated on the ceiling. The height adjustment and installation of the dry coil is performed by rotating the first threaded rod, avoiding drilling holes. Reinforcement components are used to improve support stability and enable lateral movement.

Benefits of technology

No need to drill holes for installation, which improves cleanliness, saves installation time and materials, has a wide range of applications, and is suitable for clean room environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919960U_ABST
    Figure CN221919960U_ABST
Patent Text Reader

Abstract

The utility model discloses a dry coil pipe installation structure of a clean room, and relates to the technical field of dry coil pipe installation, the dry coil pipe installation structure comprises a ceiling and a dry coil pipe arranged at the bottom of the ceiling, the bottom of the ceiling is rotatably provided with a plurality of prefabricated plates which are uniformly distributed, the bottom of each prefabricated plate is fixedly provided with a prefabricated vertical rod, and a transverse plate is slidably arranged in each prefabricated vertical rod. A reinforcing assembly is arranged between one end of the transverse plate and the bottom end of the prefabricated vertical rod, a first threaded rod is arranged in one end of the transverse plate in a threaded mode, and a supporting plate is fixedly arranged at the bottom end of the first threaded rod. The prefabricated plates and the prefabricated vertical rods are prefabricated on the ceiling, so that punching is not needed when the dry coil pipe is installed, power consumption and dust pollution caused by punching when expansion bolts are installed are avoided, and the dry coil pipe installation structure is efficient, energy-saving and environment-friendly, facilitates formation of a clean room and maintenance of cleanliness, and is suitable for popularization and application. People only need to screw the first threaded rod into the lifting lug and the transverse plate, so that the dry coil pipe can be mounted conveniently and quickly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dry coil installation, in particular to a clean room dry coil installation structure. Background Art

[0002] A clean room is a well-sealed space where parameters such as air cleanliness, temperature, humidity, pressure and noise are controlled as required. The prefabricated DCC (dry coil) construction process refers to the installation of dry coils on the clean room ceiling, which is usually used in the clean room ceiling where it is inconvenient to set up a return air duct, such as a dressing room, clean corridor, etc.

[0003] Dry coil is a device used to provide cooling or heating to indoor return air. In order to achieve the purpose of "dryness", the temperature of the chilled water used in the dry coil is higher than that of the ordinary coil, and generally no condensation occurs, so it is called a dry coil.

[0004] When installing the existing dry coil, the hanger is usually fixed to the ceiling with expansion bolts first, and then the hanger and the dry coil are connected with tools such as threaded rods. However, the installation of the expansion bolts requires drilling holes in the ceiling, which will generate a lot of dust, which is not conducive to the formation of the clean room and the maintenance of cleanliness. Utility Model Content

[0005] The utility model aims at the deficiencies of the prior art and provides a clean room dry coil installation structure. The specific technical scheme is as follows:

[0006] A clean room dry coil installation structure includes a ceiling and a dry coil arranged at the bottom of the ceiling, wherein the bottom of the ceiling is rotatably provided with a plurality of evenly distributed prefabricated panels, the bottom of the prefabricated panels is fixedly provided with prefabricated vertical rods, a cross plate is slidably provided inside the prefabricated vertical rods, a reinforcement component is provided between one end of the cross plate and the bottom end of the prefabricated vertical rods, one end of the cross plate is provided with a first threaded rod with an internal thread, the bottom end of the first threaded rod is fixedly provided with a support plate, the outer wall of the bottom end of the first threaded rod is rotatably provided with a lifting ear that cooperates and abuts against the top of the support plate, and the dry coil is fixedly provided between the plurality of lifting ears.

[0007] By adopting the above technical solution, by prefabricating the prefabricated panels and prefabricated vertical poles on the ceiling, it is possible to install the dry coil without drilling holes. By rotating the first threaded rod, the height of the dry coil can be changed, making it convenient for people to adjust the installation height of the dry coil.

[0008] Optionally, a limiting hole is provided in the prefabricated vertical pole, and the horizontal plate is slidably connected in the corresponding limiting hole.

[0009] By adopting the above technical solution, the prefabricated vertical poles can support and limit the cross plate through the limiting holes, so as to facilitate the horizontal movement of the cross plate.

[0010] Optionally, the reinforcement assembly includes a fixed sleeve rod, a swivel seat and a second threaded rod, the fixed sleeve rod being rotatably connected to the bottom of one end of the cross plate, the swivel seat being rotatably connected to the outer wall of the bottom end of the prefabricated vertical rod, a swivel block being rotatably provided in the swivel seat, the bottom end of the second threaded rod being fixed at the center of one side of the swivel block, a threaded hole being provided at the bottom of the fixed sleeve rod, the top end of the second threaded rod being threadedly connected to the threaded hole, a second gripping rod being fixedly provided on the outer wall of the second threaded rod, and the second gripping rod being located between the fixed sleeve rod and the swivel seat.

[0011] By adopting the above technical solution, the cross plate and the prefabricated vertical poles can be reinforced through the reinforcement assembly, thereby improving the stability of the cross plate supporting the first threaded rod, and rotating the second threaded rod in the reinforcement assembly can drive the cross plate and the dry coil to move horizontally.

[0012] Optionally, the reinforcing assembly and the first threaded rod are staggered, the first threaded rod is located directly below the ceiling, a first gripping rod is fixedly provided on an outer wall of the first threaded rod, and the first gripping rod is located between the reinforcing assembly and the hanging ear.

[0013] By adopting the above technical solution, the staggered first threaded rods will not affect the rotation of the second gripping rod in the reinforcement assembly.

[0014] In summary, the present invention has at least one of the following beneficial effects:

[0015] 1. By prefabricating the prefabricated panels and prefabricated vertical poles on the ceiling, it is possible to install the dry coil without drilling holes, thus avoiding the power consumption and dust pollution caused by drilling holes when installing expansion bolts. This is highly efficient, energy-saving and environmentally friendly, and is conducive to the formation of a clean room and the maintenance of cleanliness. People only need to screw the first threaded rod into the lifting lug and the horizontal plate to complete the installation of the dry coil, which is convenient and quick.

[0016] 2. By rotating the first threaded rod, the height of the dry coil can be changed, which makes it convenient for people to adjust the installation height of the dry coil. The reinforcement component can be used to reinforce the cross plate and the prefabricated vertical pole to improve the stability of the cross plate supporting the first threaded rod. By rotating the second threaded rod in the reinforcement component, the cross plate and the dry coil can be driven to move horizontally, which makes it convenient for people to horizontally adjust the installation position of the dry coil. It has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is the internal connection diagram of the local structure of the utility model;

[0019] Figure 3 This is the internal connection diagram of the fixed sleeve rod and the rotating seat of the utility model;

[0020] Figure 4 This is a top view of the connection between the first threaded rod, the lifting lug and the dry coil of the utility model.

[0021] Explanation of the reference numerals: 1. ceiling; 2. prefabricated panel; 21. prefabricated vertical pole; 22. limit hole; 23. horizontal plate; 24. first threaded rod; 25. first gripping rod; 26. support plate; 3. dry coil; 31. lifting ear; 4. fixing sleeve rod; 41. swivel seat; 42. second threaded rod; 43. swivel block; 44. threaded hole; 45. second gripping rod. DETAILED DESCRIPTION

[0022] The following is combined with Figure 1-4 The utility model is described in further detail.

[0023] The utility model embodiment discloses a clean room dry coil installation structure, referring to Figure 1 , including a ceiling 1 and a dry coil 3 arranged at the bottom of the ceiling 1. The ceiling 1 is the ceiling of the existing clean room and can be a suspended ceiling panel or a prefabricated floor panel.

[0024] Reference Figure 1-2 A plurality of evenly distributed prefabricated panels 2 are rotatably provided at the bottom of the ceiling 1, and a prefabricated vertical rod 21 is fixedly provided at the bottom of the prefabricated panel 2. The prefabricated panel 2 can support the prefabricated vertical rod 21. The top ends of the prefabricated panel 2 and the prefabricated vertical rod 21 can be embedded in the bottom of the ceiling 1 when the ceiling 1 is manufactured, thereby realizing the prefabrication of the prefabricated panel 2 and the prefabricated vertical rod 21. The prefabricated panel 2 and the prefabricated vertical rod 21 can be used not only as support members for the dry coil 3, but also as support members for other pipelines, such as support members for ventilation pipes.

[0025] Reference Figure 1-2 A horizontal plate 23 is slidably provided in the prefabricated vertical rod 21, and a limiting hole 22 is provided in the prefabricated vertical rod 21. The horizontal plate 23 is slidably connected in the corresponding limiting hole 22. The prefabricated vertical rod 21 can support and limit the horizontal plate 23 through the limiting hole 22, so as to facilitate the horizontal movement of the horizontal plate 23.

[0026] Reference Figure 1-3 A reinforcing component is provided between one end of the horizontal plate 23 and the bottom end of the prefabricated vertical pole 21. The reinforcing component can reinforce the horizontal plate 23 and the prefabricated vertical pole 21 to improve the stability and reliability between the horizontal plate 23. The reinforcing component includes a fixed sleeve rod 4, a swivel seat 41 and a second threaded rod 42.

[0027] Reference Figure 1-3 The fixed sleeve rod 4 is rotatably connected to the bottom of one end of the horizontal plate 23, and the rotating seat 41 is rotatably connected to the outer wall of the bottom end of the prefabricated vertical pole 21. The horizontal plate 23 can support and limit the fixed sleeve rod 4, and the prefabricated vertical pole 21 can support and limit the rotating seat 41.

[0028] Reference Figure 1-3 A rotating block 43 is rotatably provided in the rotating seat 41, and the bottom end of the second threaded rod 42 is fixedly arranged at the center of one side of the rotating block 43. The rotating block 43 can connect the second threaded rod 42 and the rotating seat 41 so that the second threaded rod 42 will not be separated from the rotating seat 41 when rotating.

[0029] Reference Figure 1-3 A threaded hole 44 is provided at the bottom of the fixed sleeve rod 4, and the top end of the second threaded rod 42 is threadedly connected to the threaded hole 44. After the second threaded rod 42 rotates, one end will move in the threaded hole 44, and cooperate with the connection of the rotating block 43, so that the fixed sleeve rod 4 and the rotating seat 41 will move closer to or away from each other, thereby realizing the horizontal push of the cross plate 23.

[0030] Reference Figure 1-3 A second gripping rod 45 is fixedly disposed on the outer wall of the second threaded rod 42 . The second gripping rod 45 is located between the fixed sleeve rod 4 and the rotating seat 41 . People can drive the second threaded rod 42 to rotate between the fixed sleeve rod 4 and the rotating seat 41 through the second gripping rod 45 .

[0031] Reference Figure 1 , Figure 2 and Figure 4 A first threaded rod 24 is provided with an internal thread at one end of the cross plate 23. The cross plate 23 can support and limit the first threaded rod 24 through the thread. A support plate 26 is fixedly provided at the bottom end of the first threaded rod 24. A lifting ear 31 that cooperates and abuts against the top of the support plate 26 is rotatably provided on the outer wall of the bottom end of the first threaded rod 24. The first threaded rod 24 can lift and support the lifting ear 31 through the support plate 26. The dry coil 3 is fixedly arranged between multiple lifting ears 31. Multiple lifting ears 31 can support and fix the dry coil 3.

[0032] Reference Figure 1-2 The first threaded rod 24 is located directly below the ceiling 1, which facilitates the lifting and lowering of the first threaded rod 24 directly below the ceiling 1. A first gripping rod 25 is fixedly disposed on the outer wall of the first threaded rod 24, and the first gripping rod 25 is located between the reinforcing assembly and the hanging ear 31. People can drive the first threaded rod 24 to rotate by rotating the first gripping rod 25, and the first threaded rod 24 is threadedly connected to the first threaded rod 24 by the cross plate 23, so that the first threaded rod 24 and the support plate 26 can be lifted and lowered. The reinforcing assembly and the first threaded rod 24 are staggered, and the staggered first threaded rod 24 will not affect the rotation of the second gripping rod 45 in the reinforcing assembly.

[0033] The implementation principle of the clean room dry coil installation structure of the utility model embodiment is:

[0034] During installation, people can pass the top end of the first threaded rod 24 through the ear 31 so that the bottom support plate 26 can abut against the top ear 31, and then rotate the first threaded rod 24 so that the first threaded rod 24 can be screwed into the cross plate 23. At this time, the prefabricated plate 2 and prefabricated vertical rod 21 prefabricated at the bottom of the ceiling 1 can cooperate with the first threaded rod 24 and other components to support the dry coil 3 between the multiple ears 31, thereby completing the installation process of the dry coil 3.

[0035] When the installation position of the dry coil 3 needs to be moved upward, people can first use tools to lift the heavier dry coil 3 and push the dry coil 3 to the installation height, so that the ear 31 on the outside of the dry coil 3 moves up and separates from the support plate 26, and then the first threaded rod 24 is driven to rotate by rotating the first gripping rod 25, and the first threaded rod 24 is threadedly connected to the cross plate 23, so that the first threaded rod 24 and the support plate 26 can be raised and lowered, and the raised support plate 26 can support the support plate 26 and the lifted dry coil 3.

[0036] When the installation position of the dry coil 3 needs to be moved downward, the first threaded rod 24 can be directly rotated to drive the support plate 26 and the dry coil 3 to move downward, thereby adjusting the installation height of the dry coil 3.

[0037] People can also use the second grip rod 45 to drive the second threaded rod 42 to rotate. After the second threaded rod 42 rotates, one end will move in the threaded hole 44, and cooperate with the connection of the rotating block 43, so that the fixed sleeve rod 4 and the rotating seat 41 will move closer to or away from each other, thereby realizing the horizontal push of the cross plate 23. After the horizontal movement of the cross plate 23, it will drive the dry coil 3 to move horizontally, thereby realizing the horizontal adjustment of the installation position of the dry coil 3.

[0038] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A clean room dry coil installation structure, comprising a ceiling (1) and a dry coil (3) arranged at the bottom of the ceiling (1), characterized in that: A plurality of evenly distributed prefabricated panels (2) are rotatably provided at the bottom of the ceiling (1); a prefabricated vertical rod (21) is fixedly provided at the bottom of the prefabricated panel (2); a horizontal plate (23) is slidably provided inside the prefabricated vertical rod (21); a reinforcing component is provided between one end of the horizontal plate (23) and the bottom end of the prefabricated vertical rod (21); a first threaded rod (24) is internally threaded at one end of the horizontal plate (23); a supporting plate (26) is fixedly provided at the bottom end of the first threaded rod (24); a lifting ear (31) that cooperates and abuts against the top of the supporting plate (26) is rotatably provided on the outer wall of the bottom end of the first threaded rod (24); and the dry coil (3) is fixedly provided between the plurality of lifting ears (31).

2. The clean room dry coil installation structure according to claim 1, characterized in that: A limiting hole (22) is provided in the prefabricated vertical pole (21), and the horizontal plate (23) is slidably connected in the matching limiting hole (22).

3. The clean room dry coil installation structure according to claim 1, characterized in that: The reinforcement assembly comprises a fixed sleeve rod (4), a swivel seat (41) and a second threaded rod (42); the fixed sleeve rod (4) is rotatably connected to the bottom of one end of the horizontal plate (23); and the swivel seat (41) is rotatably connected to the outer wall of the bottom end of the prefabricated vertical rod (21).

4. The clean room dry coil installation structure according to claim 3, characterized in that: A rotating block (43) is rotatably disposed in the rotating seat (41), and the bottom end of the second threaded rod (42) is fixedly disposed at the center of one side of the rotating block (43).

5. The clean room dry coil installation structure according to claim 4, characterized in that: A threaded hole (44) is provided at the bottom of the fixed sleeve rod (4), and the top end of the second threaded rod (42) is threadedly connected in the threaded hole (44).

6. The clean room dry coil installation structure according to claim 5, characterized in that: A second gripping rod (45) is fixedly provided on the outer wall of the second threaded rod (42), and the second gripping rod (45) is located between the fixed sleeve rod (4) and the rotating seat (41).

7. The clean room dry coil installation structure according to claim 1, characterized in that: The reinforcing assembly and the first threaded rod (24) are staggered, and the first threaded rod (24) is located directly below the ceiling (1).

8. The clean room dry coil installation structure according to claim 1, characterized in that: A first gripping rod (25) is fixedly provided on the outer wall of the first threaded rod (24), and the first gripping rod (25) is located between the reinforcing assembly and the lifting ear (31).