Multifunctional automatic wall building machine
By designing a multi-functional automatic wall-laying machine, using components such as traveling, lifting, feeding and brick-laying mechanisms, the problem of low mechanization of existing wall-laying machines has been solved, and efficient and automated wall-laying and plastering operations have been achieved, improving construction quality and progress.
Patent Information
- Application Number
- CN202323433120.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-16
AI Technical Summary
The existing wall-laying machines have a low degree of mechanization, limited wall-laying efficiency and quality, and are unable to achieve high automation, resulting in construction progress and quality problems.
A multi-functional automatic wall-laying machine is designed, including a traveling mechanism, a lifting mechanism, a feeding mechanism, a brick-laying mechanism and a power mechanism. It is installed on the ground through a detachable structure, using a traveling transmission wheel, a brick-laying sprocket, and a pushing mechanism. and plastering devices realize the automatic and orderly supply of bricks and rapid wall construction, improving the degree of automation.
It realizes the automated operation of wall building, improves construction efficiency and quality, saves labor, and can quickly and accurately complete brick wall building and plastering work.
Smart Images

Figure CN221920366U_ABST
Abstract
Description
Technical Field
[0001] The utility model discloses a multifunctional automatic wall-building machine, which belongs to the technical field of residential construction, and in particular relates to an automatic brick wall-building device for small and medium-sized buildings. Background Art
[0002] Bricklaying is an indispensable process in the construction of small and medium-sized buildings. At present, bricklaying is mainly done manually. Manual bricklaying is not only inefficient, but also of low quality. Therefore, manual bricklaying not only affects the progress of construction, but also affects the quality of the project. Chinese patent ZL201520994122.7 discloses an electric bricklaying machine. Compared with manual bricklaying, the bricklaying efficiency and quality of this electric bricklaying machine have been improved to a certain extent, but the degree of mechanization is too low, and workers are still required to use brick clamps to clamp bricks and stack them one by one, which leads to the fact that the improvement of its bricklaying efficiency and quality is still severely limited, and it is impossible to achieve high automation of bricklaying. Based on this, it is necessary to invent a bricklaying machine with a higher degree of automation to liberate the labor of bricklaying work. Utility Model Content
[0003] In order to solve one of the above technical defects, the utility model provides a multifunctional automatic bricklaying machine, which realizes the automatic operation of bricklaying walls, is convenient and efficient to use, and saves labor.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a multifunctional automatic wall-building machine, including a traveling mechanism, a lifting mechanism, a feeding mechanism, a bricklaying mechanism and a power mechanism;
[0005] The travel mechanism includes rails, a box-type frame, a wheel set and a standard rod. The two rails are arranged in parallel and fixedly installed on the ground through a detachable structure. The two wheel sets are respectively rotatably assembled on the lower left and lower right parts of the box-type frame, and the two wheel sets are both rollingly supported on the two rails. A travel transmission wheel is installed on the connecting shaft of one of the wheel sets. Four standard rods are installed on the box-type frame. The top and bottom ends of the four standard rods are connected to each other through a plurality of cross beams to form a stable frame.
[0006] A workbench is installed between the four standard rods, and the workbench is connected to the standard rods through a lifting mechanism to achieve step-by-step lifting at a fixed height;
[0007] The feeding mechanism comprises a bottom plate, a roller group, a barrier and a pushing mechanism. The bottom plate is fixed on the workbench, and a roller group is installed on the bottom plate. The upper plane of the roller group forms a slope with the front part downward. A barrier is provided above both sides of the roller group to prevent bricks from falling off. The pushing mechanism is installed on the workbench, and a pushing stroke of the pushing mechanism is the length of a brick.
[0008] The bricklaying mechanism comprises a wall side rod, a partition, an upper support rod, a vertical support rod, a sprocket group, a bricklaying chain, a brick partition rod, a bricklaying sprocket and a one-way flip plastering bucket, two wall side rods are arranged in parallel at the front lower part of the workbench, a partition is installed between the two wall side rods, and a wall side rod close to the workbench is fixedly connected to the workbench, an upper support rod is arranged in parallel above the two wall side rods, and the two upper support rods are connected to the corresponding wall side rods below through a plurality of vertical support rods, and the two ends of the two upper support rods are fixedly connected through a cross rod, and the wall side rods and the upper support rods parallel to each other form a support rod group, and each support rod group is installed with a Sprocket set, each sprocket set includes four sprockets respectively installed at the four corners of the support rod set, the shafts of the two sprockets at the corresponding corners of the two support rod sets are fixedly connected by round rods, and one of the round rods is fixedly connected to a bricklaying sprocket, and the round rods at the two corners of the lower part of the support rod set are movably sleeved with roller sleeves, and the plane distance between the bottom edge of the roller sleeve and the partition is the thickness of a brick, each sprocket set is sleeved with a bricklaying chain, and the two bricklaying chains are connected by a plurality of brick-spacer rods, and the distance between every two adjacent brick-spacer rods is the width of a brick, and a one-way flip plastering bucket is installed at both ends of the wall side rod;
[0009] The power mechanism includes at least one motor, which drives the travel transmission wheel and the bricklaying sprocket to rotate;
[0010] Proximity switches are installed at both ends of the rail through a detachable mechanism, and the proximity switches control the forward and reverse rotation of the motor of the power mechanism.
[0011] The power mechanism includes a main motor, a reduction gear box, a main chain, a main sprocket, a top sprocket and a pressure sprocket. The main motor is fixedly installed in a box-type frame. The output shaft of the main motor is connected to the input shaft of the reduction gear box. The main sprocket is installed on the output shaft of the reduction gear box. The top sprocket is installed on the crossbeam. The main chain is sleeved between the main sprocket and the top sprocket. The travel transmission wheel and the bricklaying sprocket are both sleeved on the inner side of the main chain. At least one pressure sprocket is sleeved on the outer side of the main chain.
[0012] The box-shaped frame is provided with a height-increasing assembly, the height-increasing assembly comprising a guide column, a lifting rod, a cross bar, a lifting rope and a lifting motor, at least one guide column is fixed on the box-shaped frame, a lifting rod is slidably installed in the guide column, a fixing locking device is installed between the lifting rod and the guide column, a cross bar is fixedly installed on the upper end of the lifting rod, at least one second fixed pulley is installed on the cross bar, the lifting motor is fixedly installed on the box-shaped frame and a winding wheel is installed on its output shaft, one end of the lifting rope is fixedly connected to the top cross beam of the standard rod, the other end of the lifting rope passes around the second fixed pulley and is wound and connected to the winding wheel, the standard rod is a cavity rod body and a guide inner rod is slidably sleeved inside it, the bottom end of the guide inner rod is fixed on the box-shaped frame, and a fixing locking device is arranged between the standard rod and the guide inner rod;
[0013] The power mechanism includes a travel motor for controlling the rotation of the travel transmission wheel and a bricklaying motor for controlling the rotation of the bricklaying sprocket wheel;
[0014] The output shaft of the travel motor is connected to the travel transmission wheel through the transmission mechanism to achieve power connection and control its uniform rotation;
[0015] The output shaft of the bricklaying motor is connected to the bricklaying sprocket through a transmission mechanism to achieve power connection and control its uniform rotation.
[0016] The pushing mechanism comprises a pushing frame, a pushing travel rail, a supporting rod, a crankshaft rotating rod, a connecting rod, a pushing sprocket and a one-way pushing plate;
[0017] The cam is connected with the support frame by the support rod, and the cam is connected with the support frame by the support rod, and the cam is connected with the support frame by the support rod.
[0018] A brick horizontal staggered mechanism is installed above the descending chain of the bricklaying chain;
[0019] The brick parallel walking staggered mechanism comprises a staggered frame, a staggered rod, a tilting rod, a first top block, a pull rope, an elastic reset rope, a supporting rotating rod, a rotating rod, a brick supporting plate and a second top block;
[0020] Two rectangular offset frames are placed above the two bricklaying chain lower chains and are located at the left and right parts respectively. A plurality of offset rods are arranged in the offset frames. The spacing between two adjacent offset rods is greater than the length of a brick. The four corners of the offset frames are hinged to the corresponding outer wall side rods through short rods.
[0021] An extension rod is fixed at the front end of the workbench, a thin rod is vertically arranged on the extension rod, the middle part of the tilting rod is hinged at the top end of the thin rod, one end of the tilting rod close to the pushing frame is fixedly connected to one end of the pull rope, the other end of the pull rope is fixedly connected to the dislocation frame after passing around the extension rod, the two dislocation frames are connected by an elastic reset rope, and a first top block is fixed at the front end of the pushing frame;
[0022] When the elastic reset rope is in a relaxed state, the two offset frames are partially stacked up and down so that the spacing between adjacent offset rods is less than the length of a brick, and the end of the tilting rod away from the pushing frame is located on the travel path of the first top block;
[0023] The supporting rotating rod is fixed on the pushing frame and is located at its front end. The middle part of the rotating rod is rotatably installed on the supporting rotating rod. The brick supporting plate is fixed on the lower end of the rotating rod and faces the pushing frame. After the brick is pushed out by the self-feeding mechanism, the front end of the brick is stuck on the brick supporting plate. The second top block is fixed on the upper support rod at the front end and corresponds to the upper end of the rotating rod. Top brick plates for limiting the forward movement of bricks are arranged on both sides below the second top block. The top brick plates are fixed on the wall side rods at the front end.
[0024] The lifting mechanism includes a lifting cable, a winding rod, a reduction stepping motor, an inverted right-angled triangular prism boss and a buckle ring. The reduction stepping motor is fixedly mounted on the crossbeam at the bottom end of the standard rod. The winding rod is rotatably mounted on the crossbeam at the bottom end of the standard rod through a bearing. The four corners of the workbench are respectively fixedly connected to one end of a lifting cable. Four first fixed pulleys are respectively provided on the crossbeam at the top end of the standard rod corresponding to the four lifting cables. The other ends of the lifting cables are fixedly connected to the winding rod after passing through the corresponding first fixed pulleys. The output shaft of the reduction stepping motor is fixedly connected to the end of the winding rod and drives it to rotate. Each standard rod is provided with multiple inverted A right-angled triangular prism-shaped boss, the right-angled surface of the inverted right-angled triangular prism-shaped boss is fixed on the side of the standard rod with its inclined surface facing downward, a vertical pole is arranged on the side of the standard rod facing away from the inverted right-angled triangular prism-shaped boss, and the vertical pole is fixed on the workbench, the buckle is a U-shaped buckle, the opening of the U-shaped buckle is hinged at the bottom end of the vertical pole, the U-shaped buckle is looped on the standard rod, the buckle is clamped in the groove formed by two adjacent inverted right-angled triangular prism-shaped bosses to achieve the positioning of the workbench, the closed end of the buckle is connected to the top of the vertical pole by an elastic rope, and the height difference between the upper and lower adjacent inverted right-angled triangular prism-shaped bosses is the sum of the thickness of a brick plus the mortar joint.
[0025] An infrared laser vertical detection device for detecting the verticality of the wall is installed above the box-shaped frame.
[0026] A pulp bucket is fixedly installed above the box-type frame, an anti-condensation stirring device is installed in the pulp bucket, a pulp outlet is provided on the pulp bucket and a solenoid valve switch is provided at the pulp outlet, a telescopic hose is connected to the pulp outlet, and the outlet end of the telescopic hose is correspondingly arranged directly above the one-way flip plastering bucket.
[0027] A wall side plasterer and a brick rolling shaft are fixedly installed on both sides of the bottom ends of the two wall side rods;
[0028] The wall side plasterer comprises a V-plate, a connecting rib plate, a fixing plate and a mortar receiving plate. The V-plate is a vertical V-shaped plate, and the outer side of the pointed end of the V-plate corresponds to the masonry wall surface below the partition. The vertical height of the V-plate is greater than the thickness of two bricks. The inner side surface of the open end of the V-plate is fixedly connected to the fixing plate through a plurality of connecting rib plates. The fixing plate is located at the upper end of the V-plate and is fixedly connected to the wall side rod. A mortar receiving plate is fixed to the middle of the two outer side surfaces of the V-plate, and the outer end angle of the mortar receiving plate is an arc angle.
[0029] The brick-rolling shaft comprises an inner rod and an outer shaft cylinder, the upper end of the inner rod is fixed to the bottom end of the wall side rod, the outer shaft cylinder is rotatably installed on the inner rod, the barrel surface of the outer shaft cylinder fits the wall surface to be built, and the length of the outer shaft cylinder does not exceed the thickness of a brick, and the axial distance between the brick-rolling shafts at the same end on the two wall side rods is the length of a brick.
[0030] A brick rolling and running switching mechanism and a brick seam adjustment mechanism are arranged between the bricklaying chains;
[0031] The brick rolling and running switching mechanism comprises a long brick partition rod, a short brick partition rod, a bottom stop head, a tail stop head and a short rod return spring. The middle parts of the inner sides of the two bricklaying chains are connected by a plurality of long brick partition rods, the spacing between two adjacent long brick partition rods is the length of a brick, and the middle part of the short brick partition rod is hinged on the outer ring surface of the bricklaying chain between the two adjacent long brick partition rods. The tail stop head is fixedly installed on the outer sides of the chains of the two bricklaying chains, and the tail stop head is located on the rotation trajectory of the outer ends of the corresponding short brick partition rods. A short rod return spring is arranged between the tail stop head and the outer ends of the corresponding short brick partition rods. A bottom stop head is fixedly arranged on the partition plate located on the inner side of the bricklaying chain, and the lower end of the bottom stop head is fixed on the partition plate and its top end is a beveled surface. When the short brick partition rod is in the initial state and is located between the bottom stop head and the tail stop head, the beveled surface of the bottom stop head faces back to the short brick partition rod, and the upper end of the bottom stop head is located on the walking route of the short brick partition rod and the top end of the bottom stop head does not exceed the lowest end of the long brick partition rod.
[0032] The brick seam adjustment mechanism comprises a running brick center brick seam cone angle and a running brick center brick seam cutting disk. The running brick center brick seam cone angle is arranged on the partition. The running brick center brick seam cone angle is located at the center of one end of the partition facing the bevel surface of the bottom stop head. A running brick center brick seam cutting disk is arranged at the center above the running brick center brick seam cone angle. The running brick center brick seam cutting disk is rotatably mounted on a round rod and both ends of the round rod are fixed on the partition.
[0033] By adopting the multifunctional automatic wall-building machine provided by the utility model, it is only necessary to arrange the bricks on the roller group in sequence to realize orderly feeding and rapid wall building and plastering, with a high degree of automation, convenient and efficient use. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The utility model is further described in detail below in conjunction with the accompanying drawings;
[0035] Figure 1This is a schematic diagram of the structure of the first embodiment of the utility model;
[0036] Figure 2 It is a structural schematic diagram of the feeding mechanism in the utility model;
[0037] Figure 3 It is a structural schematic diagram of the bricklaying mechanism in the utility model;
[0038] Figure 4 It is a side view structural diagram of the feeding mechanism and bricklaying mechanism in the utility model;
[0039] Figure 5 It is a schematic diagram of the structure in which the workbench in the utility model is connected to the standard rod through the inverted right-angled triangular prism-shaped boss and the buckle ring;
[0040] Figure 6 This is a schematic diagram of the structure of the power mechanism of Embodiment 1 of the present utility model;
[0041] Figure 7 This is a structural diagram of the brick horizontal staggered mechanism in the utility model;
[0042] Figure 8 It is a side view of the working state of the brick horizontal staggered mechanism in the utility model;
[0043] Fig. 9 This is a schematic diagram of the structure of the second embodiment of the present utility model;
[0044] Fig.10 This is a structural schematic diagram of the brick rolling and brick running switching mechanism in the utility model;
[0045] Fig.11 It is a top view structural diagram of the rolling brick running brick switching mechanism in the utility model;
[0046] Fig.12 for Fig.10 The A part in the figure is enlarged to show the structure diagram of bricklaying operation;
[0047] Fig.13 for Fig.10 The A part in the figure is an enlarged structural diagram showing the operation of rolling bricks to build a wall;
[0048] Fig.14 It is a structural schematic diagram of the wall side plasterer in the utility model;
[0049] Fig.15 Schematic diagram of the existing rolling brick and running brick laying methods. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solutions and advantages of the embodiments of the utility model clearer, the technical solutions of the utility model will be clearly and completely described below in combination with the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model. Example
[0051] Referring to Figures 1-8, the utility model is a multifunctional automatic wall-building machine, which includes a traveling mechanism, a lifting mechanism, a feeding mechanism, a bricklaying mechanism and a power mechanism.
[0052] like Figure 1 As shown, the travel mechanism includes a track 1, a box-type frame 2, a wheel pair 3 and a standard rod 4. Two track rails 1 are arranged in parallel and fixed on the ground through a detachable structure. One wheel pair 3 includes two traveling wheels arranged on an axis. The two wheel pairs 3 are rotatably assembled on the lower left and lower right parts of the box-type frame 2, and the two wheel pairs 3 are rollingly supported on the two track rails 1. A traveling transmission wheel 31 is installed on the connecting shaft of one of the wheel pairs 3. Four standard rods 4 are installed on the box-type frame 2. The top and bottom ends of the four standard rods 4 are interconnected by multiple cross beams 5 to form a stable frame.
[0053] A workbench 6 is installed in the middle of the four standard rods 4. The workbench 6 is connected to the standard rods 4 through a lifting mechanism and realizes step-by-step lifting of a fixed height. Each time a fixed height is lifted, the brick laying operation of the height can be realized; Figure 1 As shown, the lifting mechanism includes a lifting cable 7, a winding rod, a reduction stepping motor, an inverted right-angled triangular prism boss 10 and a buckle 11. The reduction stepping motor is fixedly mounted on the crossbeam 5 at the bottom end of the standard rod. The winding rod is rotatably mounted on the crossbeam at the bottom end of the standard rod 4 through a bearing. The four corners of the workbench 6 are respectively fixedly connected to one end of a lifting cable 7. Four first fixed pulleys 8 are respectively provided on the crossbeam 5 at the top end of the standard rod 4 corresponding to the four lifting cables 7. The other ends of the lifting cables 7 are fixedly connected to the winding rod after passing through the corresponding first fixed pulleys 8. The output shaft of the reduction stepping motor is fixedly connected to the end of the winding rod and drives it to rotate. The winding rod then winds around the four lifting cables 7 to drive the workbench 6 to rise. A plurality of inverted right-angled triangular prism bosses 10 are provided on each standard rod 4. Figure 5As shown, the right-angled surface of the inverted right-angled triangular prism-shaped boss 10 is fixed on the side of the standard rod 4 with its inclined surface facing downward, and the standard rod 4 is provided with a vertical rod 9 on the side facing away from the inverted right-angled triangular prism-shaped boss 10, and the vertical rod 9 is fixed on the workbench 6, and the buckle 11 is a U-shaped buckle, the opening of the U-shaped buckle is hinged at the bottom end of the vertical rod 9, and the U-shaped buckle is looped on the standard rod 4. The buckle 11 is clamped in the groove formed by two adjacent inverted right-angled triangular prism-shaped bosses 10 to achieve the positioning of the workbench 6, and the closed end of the buckle 11 is connected to the top of the vertical rod 9 through an elastic rope, and the height difference between the upper and lower adjacent inverted right-angled triangular prism-shaped bosses 10 is the sum of the thickness of a brick plus the mortar joint. During the rising process of the workbench 6, the buckle ring 11 slides up from the inclined surface of the adjacent inverted right-angled triangular prism-shaped boss 10 with which it contacts, and after entering the groove formed by the two adjacent inverted right-angled triangular prism-shaped bosses 10, the lifting rope 7 drives the workbench 6 to rise to a fixed height and then the deceleration stepper motor stops operating. Then, under the action of the elastic rope, the buckle ring 11 is tightly buckled toward the standard rod 4 and is stuck in the groove formed by the two adjacent inverted right-angled triangular prism-shaped bosses 10 to be fixed.
[0054] like Figure 2 , Figure 4 As shown, the feeding mechanism includes a base plate 12, a roller group 13, a guard bar 14 and a pushing mechanism. The base plate 12 is fixed on the workbench 6, and the roller group 13 is installed on the base plate 12. The upper plane of the roller group 13 forms a downward inclined surface at the front, so that the bricks placed on the roller group 13 can slide forward slowly. A guard bar 14 is provided above both sides of the roller group 13 to prevent the bricks from falling off. The pushing mechanism is installed on the workbench 6, and the pushing stroke of the pushing mechanism is the length of a brick.
[0055] The pushing mechanism includes a pushing frame 15, a pushing travel rail 16, a support rod 17, a crankshaft rotating rod 18, a connecting rod 20, a pushing sprocket 21 and a one-way pushing plate 22;
[0056] Two push travel rails 16 are fixedly installed on the workbench 6. The two push travel rails 16 are arranged in parallel and are respectively located on both sides of the bottom plate 12. The push frame 15 is a rectangular parallelepiped frame and is located directly above the roller group 13. The four corners of the push frame 15 are provided with support rods and the bottom of the support rods is movably installed on the push travel rails 16 and does not separate from them. The bottom of the support rod of the push frame 15 and the push travel rails 16 are installed through a sliding rod sleeve, or installed by pressing down the roller rail groove with a counterweight block. Figure 2 The figure shows that it is achieved by pressing down the roller track groove with the counterweight block. Figure 2The counterweight block arranged on the pushing frame 15 is omitted; two support rods 17 are fixedly installed on the workbench 6, and the two support rods 17 are respectively located on both sides of the bottom plate 12, and the two ends of the crankshaft rotating rod 18 are rotatably installed on the top of the two support rods 17, and the middle part of the crankshaft rotating rod 18 is a crankshaft U rod 19, and a sleeve is movably sleeved on the protruding part of the cross bar of the crankshaft U rod 19, and one end of the connecting rod 20 is connected to the sleeve, and the other end of the connecting rod 20 is hinged to the top of the front end of the pushing frame 15. In actual design and use, the length of the connecting rod 20 is greater than the stroke length of the crankshaft U rod 19, so that the connecting rod 20 can be used as a connecting rod. The connection point between the rod 20 and the pushing frame 15 is always located in front of the crankshaft rotating rod 18. A one-way pushing plate 22 is hinged at the rear of the pushing frame 15. A cross bar is arranged behind the one-way pushing plate 22 to prevent it from tipping over, that is, the flipping direction of the one-way pushing plate 22 is limited, so that when the pushing frame 15 moves backward, the one-way pushing plate 22 does not flip up and does not work. When the pushing frame 15 moves forward, the one-way pushing plate 22 cannot flip over and applies force to the bricks to push them forward. The cross bar is fixedly arranged on the pushing frame 15, and a pushing sprocket 21 is fixedly installed at one end of the crankshaft rotating rod 18.
[0057] like Figure 3 , Figure 4 As shown, the bricklaying mechanism includes a wall side rod 23, a partition 61, an upper support rod 24, a vertical support rod 25, a sprocket group 26, a bricklaying chain 27, a brick partition rod 28, a bricklaying sprocket 29 and a one-way flip plastering bucket 30. Two wall side rods 23 are arranged in parallel at the front and lower part of the workbench 6. A partition 61 is installed between the two wall side rods 23, and a wall side rod 23 close to the workbench 6 is fixedly connected to the workbench 6. An upper support rod 24 is arranged in parallel above the two wall side rods 23, and the two upper support rods 24 are connected to the corresponding wall side rods 23 below through multiple vertical support rods 25. The two ends of the two upper support rods 24 are fixedly connected through cross bars. The above structure enables the bricklaying mechanism to move with the workbench 6 and the box-type frame 2, with the wall side rods 23 and the upper support rods 24 parallel to each other. It is a group of support rod groups, each of which is equipped with a sprocket group 26, each sprocket group 26 includes four sprockets respectively installed at the four corners of the support rod group, the shafts of the two sprockets at the corresponding corners of the two support rod groups are fixedly connected by round rods, and one of the round rods is fixedly connected with a bricklaying sprocket 29, and the round rods located at the two corners of the lower part of the support rod group are movably mounted with roller sleeves, and the plane distance between the bottom edge of the roller sleeve and the partition 61 is the thickness of a brick, each sprocket group 26 is equipped with a bricklaying chain 27, and the two bricklaying chains 27 are connected by a plurality of brick partition rods 28, and the spacing between every two adjacent brick partition rods 28 is the width of a brick, and a one-way flip plastering bucket 30 is installed at both ends of the wall side rod 23 for pouring mortar on the laid bricks.
[0058] The power mechanism includes at least one motor, and the power mechanism drives the travel transmission wheel 31 and the bricklaying sprocket 29 to rotate.
[0059] In this embodiment, the travel transmission wheel 31 and the bricklaying sprocket 29 can be placed in the same transmission system, and the structure is as follows: Figure 6 As shown, the power mechanism includes a main motor, a reduction box 32, a main chain 33, a main sprocket 34, a top sprocket 35 and a pressing sprocket 36. The main motor is fixedly installed in the box frame 2, the output shaft of the main motor is connected to the input shaft of the reduction box 32, the main sprocket 34 is installed on the output shaft of the reduction box 32, the top sprocket 35 is installed on the crossbeam 5, the main chain 33 is sleeved between the main sprocket 34 and the top sprocket 35, the travel transmission wheel 31 and the bricklaying sprocket 29 are sleeved on the inner side of the main chain 33, and at least one pressing sprocket 36 is sleeved on the outer side of the main chain 33. The shaft body of the push sprocket 21 of the push mechanism is connected to the shaft body of the intermediate wheel through the reversing gear set, and the bricklaying sprocket 29 is connected to the intermediate wheel through the transmission mechanism and drives it to rotate at a uniform speed, so that the bricklaying and brick feeding of bricks can achieve a certain degree of synchronization.
[0060] Proximity switches are installed at both ends of the track 1 through a detachable mechanism, and the proximity switches control the forward and reverse rotation of the motor of the power mechanism. The actual design is performed by setting parameters according to actual needs.
[0061] like Figure 7 , 8 As shown, a brick horizontal staggered mechanism is installed above the descending chain of the bricklaying chain 27, and the brick horizontal staggered mechanism includes a staggered frame 38, a staggered rod 39, a tilting rod 40, a first top block 41, a pull rope 42, an elastic reset rope 51, a supporting rotating rod 52, a rotating rod 53, a brick supporting plate 54 and a second top block 55;
[0062] Two rectangular offset frames 38 are placed above the two lower chains of the bricklaying chains 27 and are located at the left and right parts respectively. Even if the lower chains of the two bricklaying chains 27 form a rectangular space, the two offset frames 38 are placed side by side in the space. A plurality of offset rods 39 are arranged in the offset frame 38. The spacing between two adjacent offset rods 39 is greater than the length of a brick. The four corners of the offset frame 38 are hinged to the corresponding outer wall side rods 23 through short rods 45, so that the two offset frames 38 can have a certain left and right movement stroke.
[0063] An extension rod 43 is fixed at the front end of the workbench 6, and a thin rod 44 is vertically arranged on the extension rod 43. The middle part of the tilting rod 40 is hinged at the top end of the thin rod 44. One end of the tilting rod 40 close to the pushing frame 15 is fixedly connected to one end of the pull rope 42. The other end of the pull rope 42 is fixedly connected to the dislocation frame 38 after passing through the extension rod 43. The two dislocation frames 38 are connected by an elastic reset rope. A first top block 41 is fixed at the front end of the pushing frame 15.
[0064] When the elastic reset rope is in a relaxed state, the two offset frames 38 are partially stacked up and down so that the spacing between adjacent offset rods 39 is less than the length of a brick. The adjacent offset rods 39 refer to two adjacent offset rods 39 of all the offset rods 39 of the two offset frames 38, and the end of the tilting rod 40 away from the pushing frame 15 is located on the travel path of the first top block 41; when the pushing frame 15 reaches the front end, the first top block 41 hits the front end of the tilting rod 40 to make its rear end tilt, thereby pulling the two offset frames 38 outward so that they no longer overlap, and then making the space between the two offset rods 39 available for bricks to fall;
[0065] The supporting rotating rod 52 is fixed on the pushing frame 15 and is located at its front end. The middle part of the rotating rod 53 is rotatably installed on the supporting rotating rod 52. The brick supporting plate 54 is fixed on the lower end of the rotating rod 53 and faces the pushing frame 15. After the brick is pushed out by the self-feeding mechanism, the front end of the brick is stuck on the brick supporting plate 54 to prevent the front end of the brick from tipping down prematurely. The second top block 55 is fixed on the upper support rod 24 at the front end and corresponds to the upper end of the rotating rod 53. Top brick plates 60 are provided on both sides below the second top block 55 to limit the forward movement of the brick. The top brick plates 60 are fixed on the wall side rods 23 at the front end. When the rotating rod 53 moves to the front end with the pushing frame 15, the top brick plate 60 supports the front end of the brick. At the same time, the second top block 55 supports the upper end of the rotating rod 53 to make the brick supporting plate 54 at the lower end of the rotating rod 53 flip and release the front end of the brick.
[0066] A slurry bucket 56 is fixedly installed above the box-type frame 2, and an anti-condensation stirring device is installed in the slurry bucket 56. The anti-condensation stirring device is a prior art equipment for preventing the lime slurry from condensing during use, and is not described in detail here. A slurry outlet is provided on the slurry bucket 56, and the slurry outlet is provided with a solenoid valve switch. The slurry outlet is connected to a telescopic hose, and the outlet end of the telescopic hose is correspondingly arranged directly above the one-way flip plastering bucket 30. During use, the solenoid valve switch is designed and controlled according to actual conditions, and the slurry bucket 56 provides slurry to the one-way flip plastering bucket 30 through the telescopic hose.
[0067] like Fig.14 As shown, a wall side plasterer 37 is fixedly installed on both sides of the bottom ends of the two wall side rods 23. Fig.14As shown, the wall side plasterer 37 includes a V-plate 371, a connecting rib plate 372, a fixing plate 373 and a mortar receiving plate 374. The V-plate 371 is a vertical V-shaped plate, and the outer side of the pointed end of the V-plate 371 corresponds to the masonry surface below the partition 61, and the mortar on the wall surface is scraped flat during the masonry process. The vertical height of the V-plate 371 is greater than the thickness of two bricks. The inner side surface of the open end of the V-plate 371 is fixedly connected to the fixing plate 373 through a plurality of connecting rib plates 372. The fixing plate 373 is located at the upper end of the V-plate 371 and is fixedly connected to the wall side rod 23. A mortar receiving plate 374 is fixed in the middle of the two outer side surfaces of the V-plate 371, and the outer end angle of the mortar receiving plate 374 is an arc angle. During the working process, according to the design, the slurry dropped on the brick surface by the slurry bucket 56 will be squeezed out of the brick joints, and the sharp end of the V-plate 371 of the wall side plasterer 37 will scrape the overflowed slurry onto the wall surface. If there is any dripping slurry, it will fall on the slurry receiving plate 374 to prevent it from sticking to the built wall below and causing an uneven wall surface.
[0068] A brick-rolling shaft 59 is installed on both sides of the bottom ends of the two wall side rods 23. The brick-rolling shaft 59 includes an inner rod and an outer shaft cylinder. The upper end of the inner rod is fixed to the bottom end of the wall side rod 23, and the outer shaft cylinder is rotatably installed on the inner rod. The outer shaft cylinder surface fits the wall surface to be built. The axial distance between the brick-rolling shafts at the same end of the two wall side rods 23 is the length of a brick. During the working process, the two corresponding brick-rolling shafts 59 can adjust the position of the fallen bricks to ensure the flatness and verticality of the brick surface. The length of the outer shaft cylinder should not exceed the thickness of a brick to avoid the shaft surface being contaminated with mortar after solidification, which affects its adjustment accuracy.
[0069] The working process of this embodiment:
[0070] The workbench 6 is lifted to a certain height by the lifting mechanism, and the main motor is started, and the main motor drives the travel transmission wheel 31, the push sprocket 21, and the bricklaying sprocket 29 to operate together;
[0071] The bricks are placed on the roller group 13 in sequence. Since the upper surface of the roller group 13 has a certain slope, the roller group 13 drives the bricks to move slowly forward, and the push sprocket 21 drives the crankshaft rotating rod 18 to rotate, and the crankshaft U rod 19 drives the push frame 15 to reciprocate on the push travel rail 16 through the connecting rod 20. When it moves backward, the one-way push plate 22 flips forward under the obstruction of the rear bricks. When it moves forward, a cross bar is set behind the one-way push plate 22 to prevent it from flipping backward. The one-way push plate 22 is inserted into the gap at the rear end of the bricks and pushes all the bricks in front to move forward. When the bricks reach When the workbench 6 is at the front end, it first falls on the brick supporting plate 54 and the dislocation rod 39 of the dislocation frame 38 and continues to move forward until the first top block 41 is pushed to the front end, the tilting rod 40 is overturned by force and drives the dislocation frame 38 to move through the pull rope 42, the dislocation rod 39 no longer supports the brick, the top brick plate 60 supports the brick so that it no longer moves forward, and the second top block 55 supports the top of the rotating rod 53 so that the lower end of the brick supporting plate 54 is turned outward to release the brick, and the brick falls on the partition 61. During operation, multiple bricks are separated by a brick partition rod 28. As the walking transmission wheel 31 and the bricklaying sprocket 29 run slowly and evenly, the present invention The new type of continuous walking is used, and the bricklaying chain 27 rotates to make the brick partition rod 28 push the brick down the partition 61 and separate from the brick joint with the bricklaying sprocket 29 at the corner, so that the brick falls on the lower brick and forms a brick joint of a certain width. In actual design, the thickness of the brick partition rod 28 can be selected according to the width requirement of the brick joint. Since the round rods at the two corners of the lower part of the support rod group are movably sleeved with roller sleeves, and the plane distance between the bottom edge of the roller sleeve and the partition 61 is the thickness of a brick, after the brick is pushed down the partition 61 by the brick partition rod and falls on the mortar of the next brick layer, it moves to the round rod and is pressed down by the round rod, and The rotation of the rolling sleeve in contact with the top of the brick will not affect the normal pushing of the brick during the downward pressing of the round rod. At this point, the plane height of the top surface of the brick and the width of the brick seam have been determined. During the walking process, the brick rolling shaft 59 rolls on both sides of the wall to adjust the newly placed bricks to a precise position to avoid the brick offset causing an uneven wall surface. Finally, the mortar in the one-way flip plastering bucket 30 falls on the brick surface and is smoothed by the bottom end. During the walking process, the wall side plasterer 37 at the bottom end of the wall side rod 23 scrapes the mortar overflowing from the wall side. The utility model can realize the uninterrupted and orderly supply of bricks and the automatic operation of brick walls and plastering. Example
[0072] This embodiment is similar in structure to the first embodiment, except that: Fig. 9As shown, a height-increasing component is installed on the box-type frame 2, and the height-increasing component includes a guide column 46, a lifting rod 47, a cross bar 48, a lifting rope 50 and a lifting motor. At least one guide column is fixed on the box-type frame 2, and a lifting rod 47 is slidably installed in the guide column 46. A fixed locking device is installed between the lifting rod 47 and the guide column 46. A cross bar 48 is fixedly installed on the upper end of the lifting rod 47, and at least one second fixed pulley 49 is installed on the cross bar 48. The lifting motor is fixedly installed on the box-type frame 2 and a winding wheel is installed on its output shaft. One end of the lifting rope 50 is fixedly connected to the top crossbeam 5 of the standard rod 4, and the other end of the lifting rope 50 passes around the second fixed pulley 49 and is wound around the winding wheel. The standard rod 4 is a hollow rod body and a guide inner rod is slidably sleeved inside it. The bottom end of the guide inner rod is fixed on the box-type frame 2, and a fixed locking device is arranged between the standard rod 4 and the guide inner rod.
[0073] The lifting rope 50 and the lifting motor in the present invention can also directly adopt a winch, or other arbitrary structures that can realize the overall lifting of the four standard rods 4.
[0074] In order to facilitate raising the standard rod 4 and its internal structure under the action of the height-raising assembly without affecting the bricklaying operation, the power mechanism includes a travel motor for controlling the rotation of the travel transmission wheel 31 and a bricklaying motor for controlling the rotation of the bricklaying sprocket 29;
[0075] The output shaft of the travel motor is connected to the travel transmission wheel 31 through a transmission mechanism to achieve power connection and control its uniform rotation;
[0076] The output shaft of the bricklaying motor is connected to the bricklaying sprocket 29 through a transmission mechanism to control its uniform rotation.
[0077] Each component is driven by a different motor, and it is only necessary to set the speed ratio of each component so that they can work together.
[0078] In this embodiment, the top height of the lifting rod 47 is raised to raise the crossbar 48 and then locked, and then the lifting motor pulls the entire frame of the standard rod 4 up through the lifting rope 50, and then the standard rod 4 is locked with the guide inner rod inside it, so that the workbench that has reached the highest masonry point can be adjusted down and continue to operate the wall upward. In this embodiment, the paddle bucket 56 can be fixed on the upper end crossbar of the standard rod 4 according to actual needs, so that it can be raised together with the adjustment of the height-increasing component, and the telescopic hose can be adjusted to adapt to the height adjustment operation of the paddle bucket 56.
[0079] When the utility model is installing the track 1, it is installed on the ground through a detachable structure, such as bolt connection and fixing. When the track 1 is installed, it is necessary to use infrared laser detection to adjust the connecting bolts at any time to ensure the horizontality of the track 1, and then ensure the verticality of the subsequent wall construction work. An infrared laser vertical detection device for detecting the verticality of the wall is also installed above the box-type frame 2, so that it can monitor the verticality of the built wall in real time in the working state. When a wall that does not meet the standards is detected, an alarm is issued to adjust the equipment in time.
[0080] Since there are two methods of wall bricklaying: running bricks and rolling bricks, such as Fig.15 The rolling bricks shown are all bricks laid vertically and neatly, and the running bricks are two bricks combined and laid horizontally. Therefore, in order to make the utility model applicable to different bricklaying work, a rolling brick running brick switching mechanism and a brick seam adjustment mechanism are provided between the bricklaying chains 27;
[0081] The brick rolling and running switching mechanism includes a long brick partition rod 281, a short brick partition rod 282, a bottom stopper 283, a tail stopper 284 and a short rod return spring. The middle parts of the inner sides of the two bricklaying chains 27 are connected by a plurality of long brick partition rods 281. The spacing between two adjacent long brick partition rods 281 is the length of a brick. The middle part of the short brick partition rod 282 is hinged to the outer ring surface of the bricklaying chain 27 between the two adjacent long brick partition rods 281. The tail stopper 284 is fixedly installed on the outer side of the two bricklaying chains 27. The tail stopper 284 is located at the outer end of the corresponding short brick partition rod 282. On the rotation trajectory, a short rod return spring is arranged between the tail stop head 284 and the outer end of the corresponding partition brick short rod 282, and a bottom stop head 283 is fixedly arranged on the partition plate 61 located on the inner side of the bricklaying chain 27. The lower end of the bottom stop head 283 is fixed on the partition plate 61 and its top end is a beveled surface. When the partition brick short rod 282 is in the initial state and is located between the bottom stop head 283 and the tail stop head 284, the bevel of the bottom stop head 283 faces away from the partition brick short rod 282, and the upper end of the bottom stop head 283 is located on the walking route of the partition brick short rod 282 and the top end of the bottom stop head 283 does not exceed the lowest end of the partition brick long rod 281.
[0082] The brick seam adjustment mechanism includes a running brick center brick seam cone angle 57 and a running brick center brick seam cutting disk 58. The running brick center brick seam cone angle 57 is provided on the partition 61. The running brick center brick seam cone angle 57 is located at the center of one end of the partition 61 facing the oblique surface of the bottom stop head 283. A running brick center brick seam cutting disk 58 is provided at the center above the running brick center brick seam cone angle 57. The running brick center brick seam cutting disk 58 is rotatably installed on the round rod and the two ends of the round rod are fixed on the partition 61.
[0083] like Figure 10-13 As shown, the working principle of the rolling brick running brick switching mechanism is:
[0084] When laying a brick layer, the bricklaying chain 27 moves downward to the right. Fig.12As shown, when the short brick partition rod 282 reaches the bottom stop 283, it collides with its upper end. Since the short brick partition rod 282 presses against the vertical surface of the bottom stop 283 and cannot slide smoothly, resistance is applied to the short brick partition rod 282 to rotate it to be parallel to the bricklaying chain 27, and no longer hinder the falling of the running bricks. At the same time, when the long brick partition rod 281 pushes the brick to the right end of the partition 61, the two running brick lower seams are separated by the running brick center brick seam cone angle 57 to form a uniform brick seam for mortar to penetrate, and the two running brick upper seams are separated by the running brick center brick seam cutting disk 58 to form a uniform brick seam for mortar to penetrate;
[0085] After the short rod 282 of the partition brick is free from resistance, the short rod return spring arranged between its outer end and the tail stopper 284 can restore it to its initial position;
[0086] When laying the rolling brick layer, the bricklaying chain 28 moves downward to the left. Fig.13 As shown, when the short rod 282 of the partition brick reaches the bottom stop 283, it collides with the beveled surface at the upper end thereof. The outer end of the short rod 282 of the partition brick cannot be turned over because of the blockage of the tail stop 284. Therefore, the short rod 282 of the partition brick can slide through the beveled surface. The short rod 282 of the partition brick keeps the original state to separate and push the rolling bricks. There is no need to set a brick seam in the middle of the rolling bricks. Therefore, there is no center brick seam cone angle 57 and running brick center brick seam cutting disk 58 on the left bottom plate.
[0087] The partition plate 61 in the present invention is installed on the wall side rod 23 through a detachable structure.
[0088] In the utility model, bricks are stacked in sequence on the roller group 13, which can be stacked manually or by an automatic conveyor belt. The relevant automatic conveyor belt is a prior art and is not specifically described in the utility model.
[0089] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. A large number of terms "front end" used in the present utility model are used to locate the front and back in an orientation in which the wall to be built is in the front and the present utility model is in the back.
[0090] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0091] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0092] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it; although the utility model is described in detail with reference to the above embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above embodiments, or replace part or all of the technical features therein with equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model. For example, the lifting rope 50 and the lifting motor in the utility model can directly adopt a winch.
Claims
1. A multifunctional automatic wall-building machine, characterized in that: It includes traveling mechanism, lifting mechanism, feeding mechanism, bricklaying mechanism and power mechanism; The travel mechanism comprises a track (1), a box-shaped frame (2), a wheel pair (3) and a standard rod (4), wherein the two track rails (1) are arranged in parallel and fixedly mounted on the ground via a detachable structure, the two wheel pairs (3) are rotatably mounted on the lower left and lower right parts of the box-shaped frame (2), and the two wheel pairs (3) are both rollingly supported on the two track rails (1), a travel transmission wheel (31) is mounted on the connecting shaft of one of the wheel pairs (3), and four standard rods (4) are mounted on the box-shaped frame (2), and the top and bottom ends of the four standard rods (4) are interconnected via a plurality of cross beams (5) to form a stable frame; A workbench (6) is installed between the four standard rods (4), and the workbench (6) is connected to the standard rods (4) via a lifting mechanism to achieve step-by-step lifting at a fixed height; The feeding mechanism comprises a bottom plate (12), a roller group (13), a guard bar (14) and a pushing mechanism, wherein the bottom plate (12) is fixed on the workbench (6), the roller group (13) is mounted on the bottom plate (12), the upper plane of the roller group (13) forms a slant with the front portion facing downward, a guard bar (14) is provided above both sides of the roller group (13) to prevent bricks from falling off, the pushing mechanism is mounted on the workbench (6), and a pushing stroke of the pushing mechanism is the length of one brick; The bricklaying mechanism comprises a wall side rod (23), a partition (61), an upper support rod (24), a vertical support rod (25), a sprocket group (26), a bricklaying chain (27), a brick partition rod (28), a bricklaying sprocket (29) and a one-way flip plastering bucket (30), wherein two wall side rods (23) are arranged in parallel at the front and lower part of a workbench (6), a partition (61) is installed between the two wall side rods (23), and a wall side rod (23) close to the workbench (6) is fixedly connected to the workbench (6), an upper support rod (24) is arranged in parallel above the two wall side rods (23), and the two upper support rods (24) are connected to the corresponding wall side rods (23) below through a plurality of vertical support rods (25), and both ends of the two upper support rods (24) are fixedly connected through a cross bar, so that the wall side rods (23) and the upper support rods (24) parallel to each other are connected to each other. The rod (24) is a group of support rod groups, each group of support rod groups is equipped with a sprocket group (26), each sprocket group (26) includes four sprockets respectively installed at the four corners of the support rod group, the shafts of the two sprockets at the corresponding corners of the two groups of support rod groups are fixedly connected by round rods, and one of the round rods is fixedly connected to a bricklaying sprocket (29), and the round rods located at the two corners of the lower part of the support rod group are movably equipped with roller sleeves, and the plane distance between the bottom edge of the roller sleeve and the partition (61) is the thickness of a brick, each sprocket group (26) is equipped with a bricklaying chain (27), and the two bricklaying chains (27) are connected by a plurality of brick partition rods (28), and the distance between every two adjacent brick partition rods (28) is the width of a brick, and a one-way flip plastering bucket (30) is installed at both ends of the wall side rod (23); The power mechanism comprises at least one motor, and the power mechanism drives the travel transmission wheel (31) and the bricklaying sprocket wheel (29) to rotate; Proximity switches are installed at both ends of the track (1) via a detachable mechanism, and the proximity switches control the forward and reverse rotation of the motor of the power mechanism.
2. A multifunctional automatic wall-building machine according to claim 1, characterized in that: The power mechanism comprises a main motor, a reduction gearbox (32), a main chain (33), a main sprocket (34), a top sprocket (35) and a pressure sprocket (36); the main motor is fixedly mounted in the box-shaped frame (2); the output shaft of the main motor is connected to the input shaft of the reduction gearbox (32); the main sprocket (34) is mounted on the output shaft of the reduction gearbox (32); the top sprocket (35) is mounted on the crossbeam (5); the main chain (33) is sleeved between the main sprocket (34) and the top sprocket (35); the travel transmission wheel (31) and the bricklaying sprocket (29) are sleeved on the inner side of the main chain (33); and at least one pressure sprocket (36) is sleeved on the outer side of the main chain (33).
3. The multifunctional automatic wall-building machine according to claim 1, characterized in that: The box-shaped frame (2) is provided with a height-increasing assembly, the height-increasing assembly comprising a guide column (46), a lifting rod (47), a cross bar (48), a lifting rope (50) and a lifting motor, at least one guide column (46) is fixed on the box-shaped frame (2), a lifting rod (47) is slidably installed in the guide column (46), a fixing locking device is installed between the lifting rod (47) and the guide column (46), a cross bar (48) is fixedly installed on the upper end of the lifting rod (47), and at least one second cross bar (48) is installed on the cross bar (48). A fixed pulley (49), a lifting motor fixedly mounted on the box-shaped frame (2) and having a winding wheel mounted on its output shaft, one end of a lifting rope (50) fixedly connected to a top crossbeam (5) of a standard rod (4), the other end of the lifting rope (50) passing around a second fixed pulley (49) and being wound around and connected to the winding wheel, the standard rod (4) being a hollow rod body and having a guide inner rod slidably sleeved therein, the bottom end of the guide inner rod being fixed on the box-shaped frame (2), and a fixing locking device being arranged between the standard rod (4) and the guide inner rod; The power mechanism comprises a travel motor for controlling the rotation of a travel transmission wheel (31) and a bricklaying motor for controlling the rotation of a bricklaying sprocket wheel (29); The output shaft of the travel motor is connected to the travel transmission wheel (31) through a transmission mechanism to achieve power connection and control its uniform rotation; The output shaft of the bricklaying motor is connected to the bricklaying sprocket (29) through a transmission mechanism to achieve power connection and control its uniform rotation.
4. A multifunctional automatic wall-building machine according to claim 2 or 3, characterized in that: The pushing mechanism comprises a pushing frame (15), a pushing travel rail (16), a support rod (17), a crankshaft rotating rod (18), a connecting rod (20), a pushing sprocket (21) and a one-way pushing plate (22); Two push travel rails (16) are fixedly installed on the workbench (6), the two push travel rails (16) are arranged in parallel and are respectively located on both sides of the bottom plate (12), the push frame (15) is a rectangular parallelepiped frame and is located directly above the roller group (13), the four corners of the push frame (15) are provided with support rods and the bottom of the support rods is movably installed on the push travel rails (16) and does not separate from it, two support rods (17) are fixedly installed on the workbench (6), the two support rods (17) are respectively located on both sides of the bottom plate (12), the two ends of the crankshaft rotating rod (18) are respectively rotatably installed on the top of the two support rods (17), the middle part of the crankshaft rotating rod (18) is a crankshaft U rod (19), and the crankshaft rotating rod (18) is provided with a crankshaft U rod (19). A sleeve is movably mounted on the cross bar of the protruding portion of the shaft U rod (19), one end of a connecting rod (20) is connected to the sleeve, and the other end of the connecting rod (20) is hinged to the top of the front end of the pushing frame (15), a one-way pushing plate (22) is hinged to the rear of the pushing frame (15), a cross bar is arranged behind the one-way pushing plate (22) to prevent it from tipping over, the cross bar is fixedly arranged on the pushing frame (15), a pushing sprocket (21) is fixedly mounted on one end of the crankshaft rotating rod (18), the shaft body of the pushing sprocket (21) is connected to the shaft body of the intermediate wheel through a reversing gear set, and the bricklaying sprocket (29) is connected to the intermediate wheel through a transmission mechanism and drives it to rotate at a constant speed.
5. The multifunctional automatic wall-building machine according to claim 4, characterized in that: A brick-laying staggered mechanism is installed above the descending chain of the bricklaying chain (27); The brick parallel moving staggered mechanism comprises a staggered frame (38), a staggered rod (39), a tilting rod (40), a first top block (41), a pull rope (42), an elastic reset rope (51), a supporting rotating rod (52), a rotating rod (53), a brick supporting plate (54) and a second top block (55); Two rectangular offset frames (38) are placed above the two lower chains of the bricklaying chains (27) and are located at the left and right parts respectively. A plurality of offset rods (39) are arranged in the offset frames (38). The spacing between two adjacent offset rods (39) is greater than the length of a brick. The four corners of the offset frames (38) are hinged to the corresponding outer wall side rods (23) through short rods (45). An extension rod (43) is fixed to the front end of the workbench (6), a thin rod (44) is vertically arranged on the extension rod (43), the middle part of the tilting rod (40) is hinged to the top end of the thin rod (44), one end of the tilting rod (40) close to the pushing frame (15) is fixedly connected to one end of the pull rope (42), the other end of the pull rope (42) is fixedly connected to the misalignment frame (38) after passing through the extension rod (43), the two misalignment frames (38) are connected by an elastic reset rope, and a first top block (41) is fixed to the front end of the pushing frame (15); When the elastic reset rope is in a relaxed state, the two offset frames (38) are partially stacked up and down so that the spacing between adjacent offset rods (39) is less than the length of a brick, and the end of the tilting rod (40) away from the pushing frame (15) is located on the travel path of the first top block (41); The supporting rotating rod (52) is fixed on the pushing frame (15) and is located at the front end thereof. The middle part of the rotating rod (53) is rotatably mounted on the supporting rotating rod (52). The brick supporting plate (54) is fixed on the lower end of the rotating rod (53) and faces the pushing frame (15). After the brick is pushed out by the self-feeding mechanism, the front end of the brick is stuck on the brick supporting plate (54). The second top block (55) is fixed on the upper support rod (24) at the front end and corresponds to the upper end of the rotating rod (53). Top brick plates (60) for limiting the forward movement of bricks are arranged on both sides below the second top block (55). The top brick plates (60) are fixed on the wall side rods (23) at the front end.
6. The multifunctional automatic wall-building machine according to claim 1, characterized in that: The lifting mechanism comprises a lifting cable (7), a winding rod, a reduction stepping motor, an inverted right-angled triangular prism-shaped boss (10) and a buckle (11). The reduction stepping motor is fixedly mounted on the crossbeam (5) at the bottom end of the standard rod. The winding rod is rotatably mounted on the crossbeam at the bottom end of the standard rod (4) through a bearing. The four corners of the workbench (6) are respectively fixedly connected to one end of a lifting cable (7). Four first fixed pulleys (8) are respectively provided on the crossbeam (5) at the top end of the standard rod (4) corresponding to the four lifting cables (7). The other ends of the lifting cables (7) are all fixedly connected to the winding rod after passing through the corresponding first fixed pulleys (8). The output shaft of the reduction stepping motor is fixedly connected to the end of the winding rod and drives it to rotate. Each standard rod (4) is provided with a plurality of inverted right-angled triangular prism-shaped bosses. The table (10) has a right-angled surface of the inverted right-angled triangular prism-shaped boss (10) fixed on the side of the standard rod (4) with its inclined surface facing downwards; a vertical rod (9) is arranged on the side of the standard rod (4) facing away from the inverted right-angled triangular prism-shaped boss (10), and the vertical rod (9) is fixed on the workbench (6); the buckle (11) is a U-shaped buckle, the opening of the U-shaped buckle is hinged on the bottom end of the vertical rod (9), the U-shaped buckle is sleeved on the standard rod (4), the buckle (11) is clamped in the groove formed by two adjacent inverted right-angled triangular prism-shaped bosses (10) to achieve the positioning of the workbench (6), the closed end of the buckle (11) is connected to the top of the vertical rod (9) through an elastic rope, and the height difference between the upper and lower two adjacent inverted right-angled triangular prism-shaped bosses (10) is the sum of the thickness of a brick plus the mortar joint.
7. The multifunctional automatic wall-building machine according to claim 1, characterized in that: An infrared laser vertical detection device for detecting the verticality of the wall surface is installed above the box-shaped frame (2).
8. The multifunctional automatic wall-building machine according to claim 1, characterized in that: A slurry bucket (56) is fixedly mounted above the box-shaped frame (2), an anti-condensation stirring device is installed in the slurry bucket (56), a slurry outlet is provided on the slurry bucket (56) and a solenoid valve switch is provided at the slurry outlet, a telescopic hose is connected to the slurry outlet, and an outlet end of the telescopic hose is correspondingly arranged directly above the one-way flip plastering bucket (30).
9. The multifunctional automatic wall-building machine according to claim 1, characterized in that: A wall side plasterer (37) and a brick rolling shaft (59) are fixedly mounted on both sides of the bottom ends of the two wall side rods (23); The wall side plasterer (37) comprises a V-plate (371), a connecting rib plate (372), a fixing plate (373) and a mortar receiving plate (374); the V-plate (371) is a vertically placed V-shaped plate, and the outer side of the pointed end of the V-plate (371) corresponds to the masonry wall surface below the partition plate (61); the vertical height of the V-plate (371) is greater than the thickness of two bricks; the inner side surface of the open end of the V-plate (371) is fixedly connected to the fixing plate (373) via a plurality of connecting rib plates (372); the fixing plate (373) is located at the upper end of the V-plate (371) and is fixedly connected to the wall side rod (23); a mortar receiving plate (374) is fixedly connected to the middle of the two outer side surfaces of the V-plate (371); the outer end angle of the mortar receiving plate (374) is an arc angle; The brick-rolling shaft (59) comprises an inner rod and an outer shaft cylinder, the upper end of the inner rod is fixed to the lower end of the wall side rod (23), and the outer shaft cylinder is rotatably mounted on the inner rod, the outer shaft cylinder surface is in contact with the wall surface to be built, and the length of the outer shaft cylinder does not exceed the thickness of one brick, and the axial distance between the brick-rolling shafts (59) located at the same end of the two wall side rods (23) is the length of one brick.
10. The multifunctional automatic wall-building machine according to claim 1, characterized in that: A brick rolling and running switching mechanism and a brick seam adjustment mechanism are provided between the bricklaying chains (27); The brick rolling and running switching mechanism comprises a long brick partition rod (281), a short brick partition rod (282), a bottom stopper (283), a tail stopper (284) and a short rod return spring. The middle parts of the inner sides of the two bricklaying chains (27) are connected by a plurality of long brick partition rods (281). The spacing between two adjacent long brick partition rods (281) is the length of a brick. The middle part of the short brick partition rod (282) is hinged to the outer ring surface of the bricklaying chain (27) between the two adjacent long brick partition rods (281). The tail stopper (284) is fixedly installed on the outer sides of the two bricklaying chains (27). The tail stopper (284) is located at the outer end of the corresponding short brick partition rod (282) and rotates. On the track, a short rod return spring is arranged between the tail stopper (284) and the outer end of the corresponding partition brick short rod (282), a bottom stopper (283) is fixedly arranged on the partition plate (61) located on the inner side of the bricklaying chain (27), the lower end of the bottom stopper (283) is fixed on the partition plate (61) and the top end thereof is a beveled surface, when the partition brick short rod (282) is in the initial state and is located between the bottom stopper (283) and the tail stopper (284), the bevel of the bottom stopper (283) faces away from the partition brick short rod (282), the upper end of the bottom stopper (283) is located on the walking route of the partition brick short rod (282) and the top end of the bottom stopper (283) does not exceed the lowest end of the partition brick long rod (281); The brick joint adjustment mechanism comprises a running brick center brick joint cone angle (57) and a running brick center brick joint cutting disk (58). The running brick center brick joint cone angle (57) is provided on the partition (61). The running brick center brick joint cone angle (57) is located at the center of one end of the partition (61) facing the chamfered surface of the bottom stop head (283). The running brick center brick joint cutting disk (58) is provided at the center above the running brick center brick joint cone angle (57). The running brick center brick joint cutting disk (58) is rotatably mounted on a round rod, and both ends of the round rod are fixed on the partition (61).