Temporary plugging equipment for waterproofing of construction embedded pipeline
By using a combined structure of inflatable air bags and positioning clamps in the construction of embedded pipelines, the problem of water inflow caused by unblocked pipeline openings is solved, and efficient and stable waterproofing is achieved.
Patent Information
- Application Number
- CN202323449534.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-18
AI Technical Summary
During construction, when the buried openings of pipelines are not blocked, rainwater and construction water can easily flow into the basement or the floors below, causing pollution. The existing sealing plugs have low sealing durability and poor adaptability, making it difficult to effectively waterproof.
A temporary blocking device including an expansion air bag and a positioning clamp is designed. The expansion air bag is used to achieve sealing in the pipeline, and the matching structure of the positioning clamp and the rod body is used to ensure the stable positioning and sealing of the air bag.
It achieves efficient temporary blocking of pipelines, the inflatable air bag has strong adaptability, long-lasting and stable sealing, avoids air bag deflection caused by external force, is simple to operate and has good sealing effect.
Smart Images

Figure CN221922506U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pre-buried pipe plugging, and in particular relates to a temporary plugging device used for waterproofing of pre-buried pipelines. Background Art
[0002] In building water supply and drainage projects, most of the water supply and drainage, fire protection pipes, etc. need to be installed through walls or floor slabs, and their openings need to be pre-buried during the main construction period, especially the pipes penetrating the outer wall of the basement, kitchen and bathroom, balcony, roof penetrating floor slabs, etc. Before the pre-buried pipe openings are sealed, rainwater and construction water will flow into the basement or the floors below, which will pollute the walls and floor slabs and are difficult to clean. The pre-buried pipes need to be sealed with temporary plugging before the decoration is completed.
[0003] At present, pipelines are mostly sealed with sealing plugs, which have low sealing durability, are difficult to adjust, and have poor adaptability.
[0004] Therefore, in view of the shortcomings of the above-mentioned scheme in actual production and implementation, it has been revised and improved. At the same time, in the spirit and concept of seeking excellence, with the assistance of professional knowledge and experience, and after many ingenuity and experiments, the present utility model was created. A temporary plugging device for waterproofing pre-buried pipes is provided to solve the above-mentioned problems. Utility Model Content
[0005] The utility model provides a temporary plugging device for waterproofing a pre-buried pipeline, which solves the problems in the prior art.
[0006] The technical solution of the utility model is achieved as follows: a temporary plugging device for waterproofing pre-buried pipelines, comprising: an inflatable airbag that blocks the pipeline and a positioning clamp fixed to the pipeline, an air nozzle is provided at one end of the inflatable airbag, a rod sleeve is provided outside the air nozzle, a rod body is provided inside the rod sleeve to achieve the plugging of the air nozzle, an adapter is provided at the end of the rod body, and an air conveying device for supplying air to the inflatable airbag is connected to the input end of the adapter.
[0007] As a preferred embodiment of a temporary sealing device for waterproofing pre-buried pipelines, the positioning clamp includes a first half hoop component, a second half hoop component is arranged relatively below the first half hoop component, positioning holes are provided at both ends of the first half hoop component and the second half hoop component, fasteners are provided in the positioning holes, and the first half hoop component cooperates with the second half hoop component to fix the pipeline.
[0008] As a preferred embodiment of a temporary sealing device for waterproofing pre-buried pipelines, the first half hoop member and the second half hoop member include an arc-shaped arm on one side, and clamping plates are arranged opposite to each other on the two arc-shaped arms. The two clamping plates are provided with clamping grooves corresponding to the rod sleeves, and the rod sleeves are arranged between the two clamping grooves. The two clamping plates are used to realize the positioning of the rod sleeves to avoid lateral and longitudinal displacement of the inflated airbag due to external force factors, which affects the sealing effect.
[0009] As a preferred embodiment of a temporary sealing device for waterproofing pre-buried pipelines, an end cap is provided at one end of the rod sleeve away from the expansion airbag, a circular hole is provided in the middle of the rod sleeve, a threaded hole is provided in the middle of the end cap, threads are provided on the rod body and the rod wall, the rod body and the end cap are threadedly matched, and the rod body is retractable under the threaded matching.
[0010] As a preferred embodiment of a temporary plugging device for waterproofing pre-buried pipelines, the threaded hole has a smaller diameter than the circular hole, and there is a gap between the rod body and the rod sleeve.
[0011] As a preferred embodiment of a temporary sealing device for waterproofing pre-buried pipelines, a conical end is provided at one end of the rod body close to the expansion airbag, a conical channel is provided in the middle of the air nozzle, the conical end cooperates with the conical channel, an annular port is provided at one end of the rod body away from the expansion airbag, a thread is provided on the inner wall of the annular port, the adapter cooperates with the thread of the annular port, and sealing is achieved when the conical end cooperates with the conical channel, thereby ensuring the expandability of the expansion airbag, and deflation is achieved when the conical end is away from the conical channel.
[0012] As a preferred embodiment of a temporary plugging device for waterproofing pre-buried pipelines, a notch is provided on the outer wall of the annular port, and the notch is conducive to applying force to achieve better rotation of the rod body.
[0013] As a preferred embodiment of a temporary plugging device for waterproofing a pre-buried pipeline, a nut is provided on the rod body, which is conducive to locking the rod body.
[0014] As a preferred embodiment of a temporary plugging device for waterproofing pre-buried pipelines, the middle part of the rod body is semi-hollow to form a conveying cavity, and an exhaust hole is provided on the rod wall of the rod body corresponding to the conveying cavity, and the exhaust hole and the conveying cavity are interconnected.
[0015] After adopting the above technical solution, the beneficial effects of the utility model are: 1. The device realizes temporary blocking of the pipeline through the expansion airbag, the expansion airbag has strong adaptability, and the sealing is durable and stable.
[0016] 2. The conical end of the rod body will seal the pores when it cooperates with the conical hole, thereby ensuring the expansion effect of the inflatable airbag. When the conical end is away from the conical hole, inflation and deflation can be achieved, and the operation is relatively simple.
[0017] 3. The positioning clamp can achieve synchronous fixation of the pipe and the rod sleeve, thereby avoiding the lateral and longitudinal deviation of the expansion airbag caused by external forces, which affects the sealing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 It is a structural schematic diagram of a temporary plugging device for waterproofing a pre-buried pipeline according to the utility model;
[0020] Figure 2 This is a schematic diagram of the plugging structure of the utility model;
[0021] Figure 3 This is a cross-sectional view of the structure of the expansion airbag of the utility model in the blocked state;
[0022] Figure 4 This is a cross-sectional view of the structure of the inflatable airbag of the utility model in the inflated and deflated state;
[0023] Figure 5 This is a schematic diagram of the structure A of the utility model;
[0024] Figure 6 This is a cross-sectional view of the expansion airbag structure of the utility model;
[0025] Figure 7 This is a disassembled diagram of the positioning clamp structure of the utility model;
[0026] Figure 8 This is a schematic diagram of the rod structure of the utility model;
[0027] In the figure, 1-inflatable airbag; 2-positioning clamp; 21-first half of the hoop; 22-second half of the hoop; 23-arc arm; 24-clamp plate; 25-positioning hole; 3-air nozzle, 4-conical channel; 5-rod sleeve; 6-circular channel; 7-end cap; 8-threaded hole; 9-rod body; 10-conical end; 11-annular port; 12-nut; 13-notch; 14-exhaust hole; 15-adapter. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] like Figure 1-4 As shown, a temporary plugging device for waterproofing a pre-buried pipeline comprises: an inflatable airbag 1 for plugging in the pipeline and a positioning clamp 2 fixed on the pipeline, an air nozzle 3 is arranged at one end of the inflatable airbag 1, a rod sleeve 5 is arranged outside the air nozzle 3, a rod body 9 is arranged inside the rod sleeve 5 to achieve the plugging of the air nozzle 3, an adapter 15 is arranged at the end of the rod body 9, and an input end of the adapter 15 is connected to an air conveying device for conveying air to the inflatable airbag 1.
[0030] Specifically, the air delivery device may be an electric air pump or a manual air pump.
[0031] like Figure 5-6 As shown, an end cap 7 is provided at one end of the rod sleeve 5 away from the expansion airbag 1, a circular hole 6 is provided in the middle of the rod sleeve 5, a threaded hole 8 is provided in the middle of the end cap 7, a thread is provided on the rod wall of the rod body 9, and the rod body 9 is threadedly matched with the end cap 7. Under the threaded match, the rod body 9 is retractable.
[0032] The diameter of the threaded hole 8 is smaller than the circular hole 6, and there is a gap between the rod body and the rod sleeve.
[0033] like Figure 7 As shown, the positioning clamp 2 includes a first half hoop member 21, a second half hoop member 22 is arranged relatively below the first half hoop member 21, positioning holes 25 are arranged at both ends of the first half hoop member 21 and the second half hoop member 22, and fasteners are arranged in the positioning holes 25. The first half hoop member 21 and the second half hoop member 22 cooperate to fix the pipeline.
[0034] One side of the first half hoop member 21 and the second half hoop member 22 includes an arc-shaped arm 23, and clamping plates 24 are arranged opposite to each other on the two arc-shaped arms 23. The two clamping plates 24 are provided with clamping grooves corresponding to the rod sleeve 5. The rod sleeve 5 is arranged between the two clamping grooves. The two clamping plates are used to realize the positioning of the rod sleeve 5 to avoid the lateral and longitudinal displacement of the inflatable airbag 1 caused by external force factors, which affects the blocking effect.
[0035] like Figure 6 , Figure 8As shown, a conical end 10 is provided at one end of the rod body 9 close to the inflatable airbag 1, a conical channel 4 is provided in the middle of the air nozzle 3, the conical end 10 cooperates with the conical channel 4, and an annular port 11 is provided at one end of the rod body 9 away from the inflatable airbag 1, a thread is provided on the inner wall of the annular port 11, and the adapter 15 cooperates with the thread of the annular port 11.
[0036] A notch 13 is provided on the outer wall of the annular port 11 , and the notch 13 is conducive to applying force to achieve better rotation of the rod body 9 .
[0037] The rod body 9 is provided with a nut 12 , which is helpful for locking and fixing the rod body 9 .
[0038] The middle part of the rod body 9 is half hollow to form a delivery cavity, and an exhaust hole 14 is arranged on the rod wall of the rod body 9 corresponding to the delivery cavity, and the exhaust hole 14 is interconnected with the electric air pump.
[0039] When in use, firstly pressurize the inflatable airbag 1 through the electric air pump to make the inflatable airbag 1 expand to a certain extent, then place it in the pipeline for better positioning and blocking, and then continue to inflate it through the electric air pump again until the pipeline is completely blocked, and twist the rod body 9 so that its conical end 10 seals the conical channel 4, and then cooperate with the nut 12 and the end cap 7 to lock the rod body 9 to prevent the inflatable airbag 1 from leaking, and finally remove the electric air pump.
[0040] In the description of the present utility model, it should be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In the description of the present utility model, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a mechanical connection or an electrical connection, or it can be the internal communication of two elements, it can be a direct connection, or it can be an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A temporary plugging device for waterproofing pre-buried pipelines, characterized in that: include: An expansion airbag (1) sealed in a pipeline and a positioning clamp (2) fixed on the pipeline, wherein one end of the expansion airbag (1) is provided with an air nozzle (3), a rod sleeve (5) is provided outside the air nozzle (3), a rod body (9) is provided in the rod sleeve (5) to achieve the sealing of the air nozzle (3), an adapter (15) is provided at the end of the rod body (9), and an input end of the adapter (15) is connected to an air delivery device for delivering air to the expansion airbag (1).
2. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 1, characterized in that: The positioning clamp (2) comprises a first half clamp member (21), a second half clamp member (22) is arranged below the first half clamp member (21), and positioning holes (25) are arranged at both ends of the first half clamp member (21) and the second half clamp member (22), and a fastener is arranged in the positioning hole (25).
3. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 2, characterized in that: The first half hoop member (21) and the second half hoop member (22) comprise arc-shaped arms (23) on one side, and clamping plates (24) are arranged opposite to each other on the two arc-shaped arms (23). The two clamping plates (24) are provided with clamping grooves corresponding to the rod sleeve (5), and the rod sleeve (5) is arranged between the two clamping grooves.
4. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 1, characterized in that: An end cap (7) is provided at one end of the rod sleeve (5) away from the expansion airbag (1), a circular hole (6) is provided in the middle of the rod sleeve (5), a threaded hole (8) is provided in the middle of the end cap (7), a thread is provided on the wall of the rod body (9), and the rod body (9) is threadedly matched with the end cap (7).
5. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 4, characterized in that: The threaded hole (8) has a diameter smaller than the circular hole (6).
6. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 1, characterized in that: The rod body (9) is provided with a conical end (10) at one end close to the inflation airbag (1), and a conical hole (4) is provided in the middle of the air nozzle (3). The conical end (10) cooperates with the conical hole (4). The rod body (9) is provided with an annular port (11) at one end away from the inflation airbag (1), and the inner wall of the annular port (11) is provided with a thread, and the inner thread of the adapter (15) cooperates with the annular port (11).
7. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 6, characterized in that: A notch (13) is provided on the outer wall of the annular port (11).
8. The temporary plugging device for waterproofing a pre-buried pipeline according to claim 1, characterized in that: The rod body (9) is matched with a nut (12).
9. A temporary plugging device for waterproofing a pre-buried pipeline according to claim 1, characterized in that: The middle part of the rod body (9) is semi-hollow to form a conveying cavity, and an exhaust hole (14) is provided on the rod wall of the rod body (9) corresponding to the conveying cavity, and the exhaust hole (14) and the conveying cavity are interconnected.
