Inverter performance detection device

By designing a height-adjustable inverter performance testing device, the problems of inconvenient movement and poor adaptability of existing equipment are solved, enabling flexible use and stable testing in different environments.

CN221926503UActive Publication Date: 2024-10-29JIANGSU XINNENG TESTING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323641406.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-10-29
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

Existing inverter performance testing equipment is large in size, inconvenient to move, and difficult to adapt to the ground and supporting surfaces in different environments, making the testing process inconvenient.

Method used

An inverter performance testing device including a base, a box, a sleeve, studs and a universal wheel is designed. It is connected to the inverter and communication monitoring terminal through connecting lines, and the base is adjusted using studs and threaded sleeves. height, and achieves movement and stability through universal wheels and shock-absorbing components to adapt to different floors and supporting surfaces.

Benefits of technology

It realizes the convenient movement and height adjustment of the inverter performance testing device, ensuring the normal use of the testing equipment in different environments, and avoids vibration damage through shock-absorbing components, improving the flexibility and stability of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221926503U_ABST
    Figure CN221926503U_ABST
Patent Text Reader

Abstract

The utility model discloses an inverter performance detection device, which relates to the technical field of inverter detection and comprises a base and a box body arranged at the upper end of the base. The back surface of the box body is provided with a first storage groove used for installing a voltage data collector, a second storage groove used for placing a connecting line, and a third storage groove used for placing a communication monitoring terminal. By adopting the above structure, the main control computer is respectively connected with the inverter and the terminal monitoring terminal through the connecting line, and the external connecting line of the inverter and the communication monitoring terminal are connected with the voltage data collector, so that the use performance of the inverter can be detected; the stud drives the threaded sleeve to longitudinally move in the sleeve, the height of the base can be adjusted, the base can be kept at the horizontal position by rotating the studs at different positions, the inverter performance detection device can adapt to the ground and the supporting face under different conditions, and normal use of the inverter performance detection device is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of inverter detection, and particularly relates to an inverter performance detection device. Background Art

[0002] A new energy station refers to a collection of all equipment below the grid connection point of a wind farm or solar power station that is centrally connected to the power system, including transformers, busbars, lines, converters, energy storage, wind turbines, photovoltaic power generation equipment, reactive power regulation equipment and auxiliary equipment. The emergence of new energy stations will help optimize the energy structure, promote energy conservation and emission reduction, and achieve sustainable development.

[0003] Inverter is a power conversion device that can convert direct current into alternating current. It is an indispensable device in new energy stations. During the on-site rapid frequency grid-connected detection of new energy stations, it was found that the inverter performance of some stations did not meet the test requirements, and the response lag time did not meet 1 second. In order to provide inverter manufacturers with inverter response capability reports and provide transformation plans, it is necessary to test the inverter performance through experiments.

[0004] However, in the prior art, the inverter performance testing equipment is usually large in size and difficult to move, so it is very inconvenient to move it to a new energy station for use. It is also difficult to make the inverter performance testing equipment adapt to the ground and other supporting surfaces in different environments. Therefore, there are certain inconveniences in the use of the inverter performance testing equipment. Utility Model Content

[0005] In view of the problems mentioned in the background technology, the purpose of the utility model is to provide an inverter performance detection device to solve the problem that the inverter detection equipment in the prior art is difficult to move to the new energy station for use, which causes certain inconveniences in the inverter of the new energy station in the detection room.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions:

[0007] An inverter performance detection device comprises a base and a box body installed on the upper end of the base, wherein the back of the box body is respectively provided with a first storage slot for installing a voltage data collector, a second storage slot for placing a connection line, and a third storage slot for placing a communication monitoring terminal, a main control machine is fixedly installed on the upper end of the box body, a sleeve penetrating the base is fixedly installed on the outer side of the upper end of the base, a threaded sleeve penetrating the sleeve is slidably connected inside the sleeve, a stud extending into the sleeve is rotatably connected at the upper end of the sleeve, the lower end of the stud is threadedly connected to the inside of the threaded sleeve, and the lower end of the threaded sleeve is damped by a damper The component is movably connected with a universal wheel; by using connecting lines to connect the main control machine with the inverter and the terminal monitoring terminal respectively, and connecting the external connecting lines of the inverter, the communication monitoring terminal and the voltage data collector, the performance of the inverter can be tested, and by rotating the stud, the stud drives the threaded sleeve to move longitudinally inside the sleeve, so as to achieve the effect of adjusting the height of the base, and by rotating the studs in different positions, the base can be kept in a horizontal position to adapt to the ground and supporting surfaces in different situations, thereby ensuring the normal use of the inverter performance detection device.

[0008] Furthermore, as a preferred technical solution, hooks are fixedly installed on both sides of the inner wall of the second storage groove, and the connecting lines are respectively hung inside the hooks; the hooks can facilitate the neat placement of the connecting lines.

[0009] Furthermore, as an optimal technical solution, a baffle is fixedly installed on the front side of the third storage slot, and the front side of the communication monitoring terminal is in contact with the back side of the baffle; the baffle can limit the position of the communication monitoring terminal inside the third storage slot to prevent the communication monitoring terminal from slipping.

[0010] Furthermore, as an optimal technical solution, a first limit block is fixedly installed at the lower end of the inner wall of the sleeve, and a first limit groove is provided on the outer wall of the threaded sleeve for sliding connection to the outer wall of the first limit block; a positioning block is fixedly installed on the upper end of the outer wall of the stud, and a positioning groove is provided on the upper end of the inner wall of the sleeve for rotation of the positioning block; the position of the stud can be effectively stabilized by the positioning block and the positioning groove to prevent the stud from moving longitudinally, and the first limit block and the first limit groove can prevent the threaded sleeve from rotating with the stud, so that the stud can drive the threaded sleeve to move longitudinally.

[0011] Furthermore, as an optimal technical solution, the shock absorbing assembly includes a support sleeve, which is fixedly installed on the upper end of the universal wheel, the upper end of the support sleeve is sleeved on the lower end of the outer wall of the threaded sleeve, a damper fixedly installed inside the support sleeve and connected to the lower end of the threaded sleeve, a spring is sleeved on the outside of the damper, the upper end of the spring fits with the lower end of the threaded sleeve, and the lower end of the spring fits with the lower end of the support sleeve; a second limit block is fixedly installed on the lower end of the outer wall of the threaded sleeve, and a second limit groove slidably connected to the outer wall of the second limit block is opened on the inner wall of the support sleeve; the shock absorbing assembly can play a shock absorbing role on the base during the movement to avoid damage to the main control machine, voltage data collector, and communication monitoring terminal due to vibration.

[0012] In summary, the utility model mainly has the following beneficial effects:

[0013] First, by using connecting lines to connect the main control machine with the inverter and the terminal monitoring terminal respectively, and connecting the external connecting lines of the inverter, the communication monitoring terminal and the voltage data collector, the performance of the inverter can be tested, and by rotating the stud, the stud drives the threaded sleeve to move longitudinally inside the sleeve, so as to adjust the height of the base, and by rotating the studs at different positions, the base can be kept in a horizontal position to adapt to the ground and the supporting surface under different conditions, thereby ensuring the normal use of the inverter performance detection device;

[0014] Second, by using a shock-absorbing component to install the universal wheel at the lower end of the threaded sleeve, the base can be moved to the desired position through the universal wheel, and during the movement, the shock-absorbing component can provide shock-absorbing service for the base to avoid damage to the main control machine, voltage data collector, and communication monitoring terminal caused by vibrations generated by the complex ground environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a rear view structural schematic diagram of the utility model;

[0017] Figure 3 It is a schematic diagram of the sleeve structure of the utility model;

[0018] Figure 4 This utility model Figure 3 Schematic diagram of the enlarged structure of part A.

[0019] Figure numerals: 1, base, 2, box, 21, first storage slot, 22, second storage slot, 221, hook, 23, third storage slot, 231, baffle, 201, main control machine, 202, voltage data collector, 203, communication monitoring terminal, 3, sleeve, 31, first limit block, 32, first limit slot, 4, threaded sleeve, 5, stud, 51, positioning block, 52, positioning slot, 6, shock absorbing assembly, 61, support sleeve, 62, damper, 63, spring, 64, second limit block, 65, second limit slot, 7, universal wheel. DETAILED DESCRIPTION

[0020] Example

[0021] See also Figure 1-Figure 4 In an embodiment of the present invention, an inverter performance detection device includes a base 1 and a box 2 installed on the upper end of the base 1, the back of the box 2 is respectively provided with a first storage slot 21 for installing a voltage data collector 202, a second storage slot 22 for placing a connection line and a third storage slot 23 for placing a communication monitoring terminal 203, a main control machine 201 is fixedly installed on the upper end of the box 2, a sleeve 3 penetrating the base 1 is fixedly installed on the outer side of the upper end of the base 1, a threaded sleeve 4 penetrating the sleeve 3 is slidably connected inside the sleeve 3, a stud 5 extending into the sleeve 3 is rotatably connected at the upper end of the sleeve 3, the lower end of the stud 5 is threadedly connected to the inside of the threaded sleeve 4, and the lower end of the threaded sleeve 4 is movably connected to a universal wheel 7 through a shock absorbing component 6;

[0022] The universal wheel 7 and the shock absorbing assembly 6 can be used to conveniently move the base 1 to the desired position. During the movement, the shock absorbing assembly 6 can provide a shock absorbing effect on the base 1, thereby preventing the main control machine 201, the voltage data collector 202, and the communication monitoring terminal 203 from being damaged due to vibration. After the base 1 is moved to the desired position, the height of the base 1 can be adjusted by rotating the stud 5 so that the stud 5 drives the threaded sleeve 4 to move longitudinally inside the sleeve 3. By rotating the stud 5 at different positions, the base 1 can be kept in a horizontal position to adapt to the ground and the supporting surface under different conditions, thereby ensuring the normal use of the inverter performance detection device. Then, the main control machine 201 is connected to the inverter and the terminal monitoring terminal respectively by using connecting lines, and the external connecting lines of the inverter and the communication monitoring terminal 203 are connected to the voltage data collector 202, so as to detect the inverter performance.

[0023] The main criterion for judging the performance of the inverter is that after the inverter receives the target power instruction from the master control machine 201, it controls the output power of the inverter until the actual grid-connected power change reaches the target power. This is the performance time that needs to be measured. The shorter the time, the better the performance.

[0024] The main control machine 201 sends instructions to the inverter and the communication monitoring terminal 203 at the same time. The communication monitoring terminal 203 and the inverter receive the instructions sent by the main control machine 201 at the same time. After reading the instructions, the inverter changes the real-time grid-connected power. The communication monitoring terminal 203 parses the instructions and outputs an analog voltage value. The voltage data collector 202 records the voltage value output by the communication monitoring terminal 203 and the real-time power output by the inverter in real time, and records the timestamp.

[0025] refer to Figure 2 Hooks 221 are fixedly installed on both sides of the inner wall of the second storage groove 22, and the connecting lines are respectively hung inside the hooks 221; by installing the hooks 221 on the inner wall of the second storage groove 22 and hanging the connecting lines inside the hooks 221, the position of the connecting lines can be stabilized by the hooks 221, so that the connecting lines can be stably and neatly placed in the second storage groove 22.

[0026] refer to Figure 2 A baffle 231 is fixedly installed on the front side of the third storage slot 23, and the front of the communication monitoring terminal 203 is in contact with the back of the baffle 231; by installing the baffle 231 on the front side of the third storage slot 23, and making the back of the baffle 231 in contact with the front of the communication monitoring terminal 203, the communication monitoring terminal 203 can be effectively stabilized in the third storage slot 23.

[0027] refer to Figure 3 A first limiting block 31 is fixedly mounted at the lower end of the inner wall of the sleeve 3, and a first limiting groove 32 slidably connected to the outer wall of the first limiting block 31 is provided on the outer wall of the threaded sleeve 4; Figure 4 A positioning block 51 is fixedly installed on the upper end of the outer wall of the stud 5, and a positioning groove 52 for rotating the positioning block 51 is opened at the upper end of the inner wall of the sleeve 3; the first limiting groove 32 is slidably connected to the outer wall of the first limiting groove 31, so that the sleeve 3 stabilizes the position of the threaded sleeve 4 through the first limiting block 31 and the first limiting groove 32, and prevents the threaded sleeve 4 from rotating with the stud 5, and the positioning block 51 is rotatably connected to the inside of the positioning groove 52 to prevent the stud 5 from moving longitudinally, so that when the stud 5 is rotated, the stud 5 drives the threaded sleeve 4 to move longitudinally inside the sleeve 3.

[0028] refer to Figure 3 The shock absorbing assembly 6 includes a support sleeve 61, which is fixedly mounted on the upper end of the universal wheel 7, and the upper end of the support sleeve 61 is sleeved on the lower end of the outer wall of the threaded sleeve 4. A damper 62 fixedly connected to the lower end of the threaded sleeve 4 is fixedly mounted inside the support sleeve 61, and a spring 63 is sleeved outside the damper 62. The upper end of the spring 63 is in contact with the lower end of the threaded sleeve 4, and the lower end of the spring 63 is in contact with the lower end of the support sleeve 61; refer to Figure 3A second limiting block 64 is fixedly installed at the lower end of the outer wall of the threaded sleeve 4, and a second limiting groove 65 is opened on the inner wall of the support sleeve 61, which is slidably connected to the outer wall of the second limiting block 64; it is slidably connected to the outer wall of the second limiting block 64 through the second limiting groove 65, and the upper end of the support sleeve 61 is sleeved on the lower end of the outer wall of the threaded sleeve 4 to effectively stabilize the position of the universal wheel 7, and the damper 62 and the spring 63 play a supporting and shock-absorbing role between the support sleeve 61 and the threaded sleeve 4, so that the shock-absorbing component 6 can play a shock-absorbing role on the base 1.

[0029] Principle and advantages of use: When it is necessary to detect the inverter in the new energy battlefield, the universal wheel 7 and the shock absorbing assembly 6 can be used to easily move the base 1 to the desired position, and during the movement, the second limit groove 65 is slidably connected to the outer wall of the second limit block 64, and the upper end of the support sleeve 61 is sleeved on the lower end of the outer wall of the threaded sleeve 4 to effectively stabilize the position of the universal wheel 7, and the damper 62 and the spring 63 play a supporting and shock absorbing role between the support sleeve 61 and the threaded sleeve 4, so that the shock absorbing assembly 6 can play a shock absorbing role on the base 1 to avoid vibration causing damage to the main control machine 201, the voltage data collector 202, and the communication monitoring terminal 203. At the same time, the baffle 231 can prevent the communication monitoring terminal 203 from slipping. After the base 1 is moved to the desired position, the stud 5 is rotated and connected to the inside of the positioning groove 52 through the positioning block 51. The stud 5 is prevented from moving longitudinally, and the first limiting groove 32 is slidably connected to the outer wall of the first limiting block 31 to prevent the threaded sleeve 4 from rotating with the stud 5, so that the stud 5 can drive the threaded sleeve 4 to move longitudinally inside the sleeve 3 to adjust the height of the base 1, and by rotating the studs 5 in different positions, the base 1 can be kept in a horizontal position to adapt to the ground and the supporting surface under different conditions, thereby ensuring the normal use of the inverter performance detection device, and then the connecting line is removed from the hook 221 to take the connecting line out of the second storage slot 22, and the terminal monitoring terminal is taken out of the third storage slot 23, and the main control machine 201 is connected to the inverter and the terminal monitoring terminal respectively by using the connecting line, and the external connecting line of the inverter and the communication monitoring terminal 203 are connected to the voltage data collector 202 in the first storage slot 21, so as to detect the inverter performance;

[0030] The main control machine 201 on the box 2 simultaneously sends instructions to the inverter communication port COM2 and the communication port COM3 of the communication monitoring terminal 203 through the serial port CMO1. The communication monitoring terminal 203 and the inverter simultaneously receive the instructions issued by the main control machine 201. After reading the instructions, the inverter changes the real-time grid-connected power. The communication monitoring terminal 203 parses the instructions within the <1ms level and outputs an analog voltage or current value. The voltage value is input to the voltage data collector 202. The timestamp is recorded at this time as the time point when the inverter receives the target instruction; the inverter starts to adjust the power at this time and change the grid-connected power. When the actual grid-connected power reaches the target power, the timestamp is the end time point. The difference between the two times is the performance time that needs to be calculated, thereby detecting the performance of the inverter.

Claims

1. An inverter performance detection device, comprising a base (1) and a box (2) mounted on the upper end of the base (1), characterized in that: The back of the box (2) is respectively provided with a first storage slot (21) for installing a voltage data collector (202), a second storage slot (22) for placing a connection line, and a third storage slot (23) for placing a communication monitoring terminal (203); a main control machine (201) is fixedly installed on the upper end of the box (2); a sleeve (3) penetrating the base (1) is fixedly installed on the outer side of the upper end of the base (1); a threaded sleeve (4) penetrating the sleeve (3) is slidably connected inside the sleeve (3); a stud (5) extending into the interior of the sleeve (3) is rotatably connected at the upper end of the sleeve (3); the lower end of the stud (5) is threadedly connected to the interior of the threaded sleeve (4); and the lower end of the threaded sleeve (4) is movably connected to a universal wheel (7) via a shock absorbing component (6).

2. The inverter performance detection device according to claim 1, characterized in that: Hooks (221) are fixedly mounted on both sides of the inner wall of the second storage slot (22), and the connection lines are respectively hung inside the hooks (221).

3. The inverter performance detection device according to claim 1, characterized in that: A baffle (231) is fixedly installed on the front side of the interior of the third storage slot (23), and the front side of the communication monitoring terminal (203) is in contact with the back side of the baffle (231).

4. The inverter performance detection device according to claim 1, characterized in that: A first limiting block (31) is fixedly mounted on the lower end of the inner wall of the sleeve (3), and a first limiting groove (32) slidably connected to the outer wall of the first limiting block (31) is formed on the outer wall of the threaded sleeve (4).

5. The inverter performance detection device according to claim 1, characterized in that: A positioning block (51) is fixedly mounted on the upper end of the outer wall of the stud (5), and a positioning groove (52) for the positioning block (51) to rotate is provided on the upper end of the inner wall of the sleeve (3).

6. The inverter performance detection device according to claim 1, characterized in that: The shock absorbing assembly (6) comprises a support sleeve (61), the support sleeve (61) being fixedly mounted on the upper end of the universal wheel (7), the upper end of the support sleeve (61) being sleeved on the lower end of the outer wall of the threaded sleeve (4), a damper (62) being fixedly mounted inside the support sleeve (61) and being fixedly connected to the lower end of the threaded sleeve (4), a spring (63) being sleeved outside the damper (62), the upper end of the spring (63) being in contact with the lower end of the threaded sleeve (4), and the lower end of the spring (63) being in contact with the lower end inside the support sleeve (61).

7. The inverter performance detection device according to claim 6, characterized in that: A second limiting block (64) is fixedly mounted on the lower end of the outer wall of the threaded sleeve (4), and a second limiting groove (65) slidably connected to the outer wall of the second limiting block (64) is formed on the inner wall of the support sleeve (61).