Lifting point anchoring structure for integrally lifting steel box girder
By designing an integral lifting lifting point anchor structure of steel box girder including anchoring main beam, the problems of large hanging lug specifications and low equipment efficiency are solved, convenient processing, installation and smooth improvement of steel box girders are achieved, and equipment rental costs are reduced and site requirements have improved construction efficiency.
Patent Information
- Application Number
- CN202420589808.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-26
AI Technical Summary
In the existing steel box girder overall lifting technology, the size of the hanging lug is large, which is not conducive to on-site processing and installation. The lifting equipment rental cost is high, the site requirements are high, and the working efficiency is low. The installation and disassembly of the diamond hanging basket is complicated and inconvenient to operate. .
Design a hanging point anchor structure for the overall lifting of steel box girders. The anchor main beam is reinforced by two parallel intervals of I-shaped steels arranged in a parallel manner through the upper reinforcement decorative plate and the lower reinforcement decorative plate. The anchor main beam is arranged horizontally and bridgely, and is welded. On the middle web of the steel box girder, an anchor plate is placed at the bottom of the reinforced ornament plate, and the sling is fixed through the anchor clamp to achieve a smooth lift of the steel box girder.
The lifting point anchor structure with the overall lifting of steel box girders is easy to process and install, and is firmly connected, which is suitable for the smooth lifting of steel box girders, reducing equipment rental costs and site requirements, and improving construction efficiency.
Smart Images

Figure CN221939872U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel box girder construction, in particular to a lifting point anchoring structure for overall lifting of a steel box girder. Background Art
[0002] With the continuous development of highway construction, prefabricated beams are widely used in the construction of bridge superstructures, and steel box beams are also widely used in interchange hub projects. In recent years, the overall lifting technology of steel box beams has gradually been applied to more and more bridge projects because of its advantages such as fast construction speed, low cost and convenient operation. In the past, the overall lifting technology mostly adopted floating crane lifting, large-tonnage crane lifting, diamond hanging basket frame lifting and other methods. The special equipment lifting method of floating crane lifting and large-tonnage crane lifting has the disadvantages of high rental costs, high requirements for site conditions at the construction site, and low work efficiency; and the use of diamond hanging baskets also has the problems of complex installation and disassembly and inconvenient operation. Therefore, it is necessary to design a new technology suitable for the overall lifting of steel box beams. Public literature also reports some technologies for the overall lifting of steel box beams, such as:
[0003] 1. Chinese Patent: A steel box girder bridge deck integral lifting structure and installation method, application number: 202311221262.6, application date: 2023.09.20, abstract: This application relates to a steel box girder bridge deck integral lifting structure and installation method, which includes at least two lifting modules, the lifting module includes a bridge pier, a bridge deck unit section and a lifting mechanism, the bridge deck unit section is fixed to the top of the bridge pier, the lifting mechanism includes a steel strand and a lifting cylinder for pulling the steel strand up, and the lifting cylinder is installed on the bridge deck unit section. This application can improve the convenience of building a steel box girder bridge deck in a shallow water navigation area and reduce the impact on the navigation conditions in the water area.
[0004] 2. Chinese Patent: A self-anchoring structure and method for overall lifting of a steel box girder, application number: 202311734307.X, application date: 2023.12.15, abstract: The invention discloses a self-anchoring structure for overall lifting of a steel box girder, comprising a bridge tower and a constructed steel box girder, the bridge tower is provided with an annular self-anchoring bracket body, the bottom of the bridge tower is provided with a bracket bottom embedded steel plate, the annular self-anchoring bracket body is connected with the bracket bottom embedded steel plate and the constructed steel box girder, the top of the constructed steel box girder is provided with a self-anchoring truss, and a lifting device is provided at one end of the self-anchoring truss facing the installation surface. The present invention also discloses a self-anchoring method for lifting a steel box girder as a whole, and the steps are as follows: 1. Pre-embed a steel plate at the bottom of a fixed bracket at the bottom of a bridge tower; 2. Install an annular self-anchoring bracket body; 3. In-situ hoist the prefabricated steel box girder, and weld adjacent prefabricated steel box girders to make them into constructed steel box girders; 4. Install the steel box girder inner support circular tube and self-anchoring truss on the constructed steel box girder; 5. Install the steel box girder to be hoisted. The present invention can economically and reasonably lift the steel box girder to a specified position, and can be widely used in the field of steel structure installation in building construction.
[0005] Through applied research, it was found that the above-mentioned disclosed overall lifting technology of steel box girders and the common lifting method of steel box girders are to set lifting ears for lifting. However, in the overall lifting construction of steel box girders, due to the heavy weight of the lifted steel box girder sections, the requirements for the lifting ears are high, and the specifications and dimensions of the lifting ears are large, which is not conducive to on-site processing and installation. Summary of the invention
[0006] The utility model aims to provide a lifting point anchoring structure for the overall lifting of a steel box girder. The lifting point anchoring structure for the overall lifting of the steel box girder is easy to process and install, is firmly connected to the steel box girder, and is conducive to the smooth lifting of the steel box girder.
[0007] The utility model is realized by the following technical solutions:
[0008] A lifting point anchoring structure for the overall lifting of a steel box girder comprises an anchoring main beam, which is the main load-bearing member of the lifting point anchoring structure. The anchoring main beam is arranged transversely to the bridge, and both ends of the anchoring main beam are welded to the web in the middle of the steel box girder. The anchoring main beam is composed of two parallel and spaced I-beams connected and reinforced by an upper reinforcement gusset plate and a lower reinforcement gusset plate. A space for the sling to pass through is reserved between the two I-beam wing plates. The upper reinforcement gusset plate and the lower reinforcement gusset plate are respectively welded to the two I-beams. The top and bottom surfaces of the steel are connected and reinforced with two I-beams. The upper and lower reinforcement plates are set throughout the length of the I-beams. The centers of the upper and lower reinforcement plates correspond to the sling positions and are provided with round holes for the slings to pass through. An anchor plate is placed at the bottom of the lower reinforcement plate. The anchor plate is a thick steel plate placed at the bottom of the lower reinforcement plate to bear the load during lifting. The anchor plate is made of Q345 steel and has a round hole for the slings to pass through at the corresponding sling positions. According to the lifting needs, two anchoring main beams are symmetrically set at both ends of the steel box beam. Two bundles of slings are symmetrically passed through each anchoring main beam, and each bundle of slings is composed of multiple steel strands.
[0009] Further preferably, the bottom of the lower reinforcement plate is connected with a triangular stiffening plate for stiffening the steel box beam web. The triangular stiffening plate is arranged at the intersection angle between the lower reinforcement plate and the steel box beam web, and the material of the triangular stiffening plate is Q235 steel.
[0010] The lifting point anchoring structure of the steel box girder for overall lifting is easy to process and install. Two parallel and spaced I-beams are used to connect and reinforce the anchoring main beam through the upper reinforcement plate and the lower reinforcement plate as the main load-bearing member. The anchoring main beam is arranged transversely to the bridge. Both ends of the anchoring main beam are welded to the middle web of the steel box girder and firmly connected to the steel box girder. A thick steel plate is placed at the bottom of the lower reinforcement plate to bear the load during lifting. The sling is passed through the upper reinforcement plate, the double-jointed I-beam, the lower reinforcement plate and the anchor plate in sequence from top to bottom, and finally it is tightened and fixed with an anchor clamp to achieve smooth lifting of the steel box girder. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 This is a schematic diagram of the connection structure of the lifting point anchor structure of the steel box girder as a whole;
[0012] Figure 2 yes Figure 1 A left-side or right-side schematic diagram;
[0013] Figure 3 This is a schematic diagram of the connection relationship between the lifting point anchor structure and the steel box girder for overall lifting of the steel box girder;
[0014] The names corresponding to the numbers in the figure are:
[0015] 1. Anchor clamp, 2. Anchor plate, 3. Triangular stiffening plate, 4. Lower reinforcement plate, 5. I-beam, 6. Upper reinforcement plate, 7. Lifting cable. DETAILED DESCRIPTION
[0016] In order to describe the present technology more clearly, the present technology is further described in detail below with reference to the accompanying drawings and embodiments. Example
[0017] A lifting point anchoring structure for the overall lifting of a steel box girder comprises an anchoring main beam, which is the main load-bearing member of the lifting point anchoring structure. The anchoring main beam is arranged transversely to the bridge, and the two ends of the anchoring main beam are welded to the web in the middle of the steel box girder. The anchoring main beam is composed of two parallel and spaced I-beams 5 connected and reinforced by an upper reinforcement plate 6 and a lower reinforcement plate 4. A space for the sling 7 to pass through is reserved between the wing plates of the two I-beams 5. The upper reinforcement plate 6 and the lower reinforcement plate 4 are respectively welded to the top of the two I-beams 5. The upper and lower reinforcement plates 6 and 4 are arranged throughout the length of the I-beam 5. Circular holes for the passage of the slings 7 are opened in the centers of the upper and lower reinforcement plates 6 and 4 corresponding to the positions of the slings 7. An anchor plate 2 is placed at the bottom of the lower reinforcement plate 4. The anchor plate 2 is a thick steel plate placed at the bottom of the lower reinforcement plate 4 for bearing the load during lifting. The anchor plate 2 is made of Q345 steel and has a circular hole for the passage of the slings 7 mechanically opened at the positions of the slings 7.
[0018] The bottom of the lower reinforcement gusset plate 4 is connected with a triangular stiffening plate 3 for stiffening connection with the web of the steel box beam. The triangular stiffening plate 3 is arranged at the intersection angle between the lower reinforcement gusset plate 4 and the web of the steel box beam.
[0019] The design and construction process of the lifting point anchor structure of the steel box girder as a whole is as follows:
[0020] 1. According to the design dimensions, complete the processing of all structural components and transport them to the construction site for installation.
[0021] 2. First, after the overall assembly of the steel box girder is completed on site, accurately measure and mark the position of the top lifting point, mark the position of the anchoring main beam on the steel box girder, and mark the outline.
[0022] 3. Position and drill holes in the upper reinforcement plate 6 and the lower reinforcement plate 4. Place the upper reinforcement plate 6 and the lower reinforcement plate 4 within the positioned contour line, center them, and then drill holes mechanically at the corresponding hanging point positions.
[0023] 4. After the holes of the upper reinforcement plate 6 and the lower reinforcement plate 4 are opened, the upper reinforcement plate 6 and the lower reinforcement plate 4 are welded to the anchor main beam. First, the I-beam 5 is placed strictly symmetrically on the lower reinforcement plate 4 to ensure that the distance between the two I-beams 5 is slightly larger than the circular hole opened on the plate. After positioning and placing, the I-beam and the plate are welded into a whole.
[0024] 5. After the gusset plate and the anchoring main beam are welded into a whole, the anchor plate 2 is placed at the bottom of the lower reinforcement gusset plate 4, and holes are drilled in the anchor plate 2 corresponding to the opening positions of the gusset plate.
[0025] 6. Accurately locate the contour positions of the two ends of the anchored main beam at the web of the steel box beam to ensure that the anchored main beam is in a horizontal state after welding and fixing. Ceramic liners are first used for the anchored main beam and the anchor plate, and then carbon dioxide gas shielded welding is used for primer, and submerged arc automatic welding is used for layered filling and covering. A triangular stiffening plate 3 is welded at the intersection angle between the lower reinforcement plate 4 and the web of the steel box beam.
[0026] 7. After completing the welding of the anchor main beam, the entire anchor lifting beam can be threaded and fixed. The sling 7 is passed through the upper reinforcement plate 6, the double I-beam, the lower reinforcement plate 4 and the anchor plate 2 in sequence from top to bottom, and finally tightened and fixed with the anchor clamp 1.
[0027] 8. Check the verticality of the sling 7 and ensure that the force is reasonable before starting the lifting test.
[0028] The above description is not a limitation of the present application, and the present application is not limited to the above examples. Any changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present application should fall within the scope of protection of the present application.
Claims
1. A lifting point anchoring structure for the overall lifting of a steel box girder. Features: The invention comprises an anchoring main beam, the two ends of which are welded to the web of the middle part of the steel box beam. The anchoring main beam is composed of two parallel and spaced I-beams (5) connected and reinforced by an upper reinforcing plate (6) and a lower reinforcing plate (4). A space for a sling (7) to pass through is reserved between the wing plates of the two I-beams (5). The upper reinforcing plate (6) and the lower reinforcing plate (4) are respectively welded to the top and bottom surfaces of the two I-beams (5) to connect and reinforce the two I-beams. A circular hole for the sling (7) to pass through is opened in the center of the upper reinforcing plate (6) and the lower reinforcing plate (4) corresponding to the position of the sling (7). An anchor plate (2) is placed at the bottom of the lower reinforcing plate (4). A circular hole for the sling (7) to pass through is mechanically opened corresponding to the position of the sling (7).
2. The lifting point anchoring structure for the overall lifting of the steel box girder according to claim 1, Features: The bottom connection of the lower reinforcement gusset plate (4) is provided with a triangular stiffening plate (3) for stiffening connection with the web of the steel box girder.
Citation Information
Cited By
Lifting point anchoring structure for integrally lifting steel box girder
CN120841351A
