Anti-blocking concrete pouring hopper for railway construction
By setting a longitudinal air outlet pipe and a rotatable diversion channel in the concrete pouring funnel, the problem of easy blockage and wear of the funnel in the prior art is solved, and efficient flow and flexible emission of concrete are achieved.
Patent Information
- Application Number
- CN202323640365.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During use, existing concrete pouring funnels are easily worn due to friction between the feed screw and the inner wall of the funnel, and are easily blocked and difficult to clean.
An anti-blocking concrete pouring funnel was designed, and a longitudinally distributed air outlet pipe was used to transport high-pressure airflow on the inner wall of the funnel to increase concrete fluidity, and a rotatable diversion channel was set at the lower end of the discharge pipe to facilitate concrete output.
It effectively avoids concrete clogging, reduces wear of the funnel inner wall, simplifies the cleaning process, and improves the flowability and emission flexibility of concrete.
Smart Images

Figure CN221940980U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of railway construction equipment, in particular to an anti-blocking concrete pouring funnel for railway construction. Background Art
[0002] The use of concrete pouring funnels in railway construction can conveniently and efficiently pour and transport concrete. The funnel is wide at the top and narrow at the bottom, and it is easy to get stuck in the narrow discharge pipe during use.
[0003] A Chinese patent discloses a concrete pouring hopper for railway construction (authorization announcement number CN211227899U). The patented technology includes a base, a vertical rod, and a funnel with an opening at the top. The front and rear sides of the funnel are rotatably connected to a lifting frame through a rotating shaft. The bottom end of the lifting frame is fixedly connected to a stud. The outer sleeve of the stud is provided with a vertical rod. The top of the vertical rod is located on the outer side of the stud and is rotatably connected to a screw sleeve. The bottom of the vertical rod is fixedly connected to the base. In the utility model, firstly, a combined adjustable structure is adopted, and the height and angle of the pouring funnel can be adjusted according to the actual pouring needs of railway construction, which is convenient for adjusting the pouring of concrete and also improves the applicability of the pouring funnel. Secondly, a spiral feeding structure is arranged inside, which can accelerate the discharge of concrete through the funnel, improve the rate of concrete circulation, and thus improve the efficiency of concrete pouring.
[0004] This patented technology has the advantage of increasing the flow rate of concrete during use, but it still has some shortcomings during use. The spiral twisted blades on the outer wall of the feeding screw rub against the inner wall of the funnel. Although the concrete is pushed by the spiral to help discharge, the concrete squeezes the inner wall of the funnel during the pushing process, and the twisted blades also wear the inner wall, resulting in serious wear inside the funnel. The potholes are more likely to stick to the material, and the twisted blades on the curved surface are difficult to clean and easy to accumulate. Therefore, those skilled in the art provide a concrete pouring funnel for anti-clogging railway construction to solve the problems raised in the above background technology. Utility Model Content
[0005] 1. Technical solution
[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:
[0007] The utility model is a concrete pouring funnel for anti-blocking railway construction, comprising a material barrel,
[0008] The anti-blocking structure includes a bracket, a booster pump located at the upper end of the bracket, a sliding sleeve located at one end of the bracket, a mounting pipe slidably plugged into the inner part of the sliding sleeve, a hose located at the output end of the booster pump, and an air outlet pipe located at the outer wall of the lower end of the mounting pipe;
[0009] The barrel includes a discharge pipe located at the lower end of the barrel;
[0010] as well as;
[0011] The flow guide structure is located at the lower end of the barrel;
[0012] The flow guiding structure comprises a flow guiding groove, a ring seat sleeved on the outer wall of the discharge pipe, and a sleeve ring sleeved on the outer side of the ring seat.
[0013] Furthermore, a spirally distributed lining steel wire is embedded and installed inside the hose, one end of the hose passes through the installation pipe, and the upper and lower ends of the installation pipe are closed and hollow inside;
[0014] Specifically, the steel wire lining increases the strength of the hose and ensures the flexible and movable characteristics of the hose. When the installation pipe moves longitudinally, the booster pump is connected to the installation pipe.
[0015] Furthermore, the air outlet pipes are distributed in a longitudinal annular array, and the openings face downwards and are inclined outwards;
[0016] Specifically, the airflow outputted from the installation pipe is split through the exhaust pipe, and the airflow acts on the outer space in an inclined state.
[0017] Furthermore, both ends of the guide groove are provided with limit plates, and one end of the guide groove is provided with a discharge port;
[0018] Specifically, the limiting plates limit the two sides of the guide groove, and the concrete carried by the guide groove is limited by the limiting plates and then guided to the discharge port for output.
[0019] Furthermore, the inner wall of the collar is provided with an annular sliding block, the inner side of the ring seat is provided with an annular sliding groove, and the sliding block is slidably installed in the sliding groove;
[0020] Specifically, the sleeve ring is slidably installed inside the slide groove through a slider, and is rotationally supported on the outer wall of the ring seat, so as to rotationally support the guide groove, and the position of the guide groove can be adjusted.
[0021] Furthermore, the air outlet pipe is located inside the discharge pipe, and a valve is provided inside the lower end of the discharge pipe;
[0022] Specifically, the high-pressure airflow output by the air outlet pipe enters the interior of the discharge pipe, and the airflow is downward, which helps the fluidity of the concrete inside the discharge pipe.
[0023] Furthermore, a limiting ring is sleeved on the outer wall of the upper end of the installation tube, the limiting ring is located at the upper end of the sliding sleeve, and the sliding sleeve corresponds to the center position of the discharge pipe, and the outer diameter of the limiting ring is larger than the inner diameter of the sliding sleeve;
[0024] Specifically, the limiting ring limits the installation pipe and is fixed on the sliding sleeve through interception by the sliding sleeve, thereby ensuring that the air outlet pipe is firmly located at the center of the discharge pipe.
[0025] 2. Beneficial effects
[0026] Compared with the prior art, the advantages of the present invention are:
[0027] The utility model provides a longitudinally distributed air outlet pipe inside the guide funnel, and delivers high-pressure airflow at a narrow position of the guide funnel. When discharging concrete, a downward-flowing airflow is applied to the concrete to increase the fluidity of the concrete. During transportation, the high-pressure airflow is delivered, and the airflow flows upward, thereby increasing the fluidity of the concrete inside the barrel, alleviating the solidification problem, avoiding the blockage of concrete, and avoiding the wear of the inner wall of the guide funnel. The anti-blocking structure inside the guide funnel is simple and easy to clean.
[0028] At the same time, a rotatable guide groove is arranged at the lower end of the discharge pipe to guide the vertically discharged concrete, so that the concrete can be output in different directions, and the flexibility during discharge is increased.
[0029] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0031] Figure 1 This is a schematic diagram of the main three-dimensional structure of the utility model;
[0032] Figure 2 This is a bottom-up three-dimensional structural schematic diagram of the utility model;
[0033] Figure 3 This is a three-dimensional structural schematic diagram of the anti-blocking structure of the utility model;
[0034] Figure 4 It is a schematic diagram of the three-dimensional structure of the diversion structure of the utility model.
[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0036] 100, anti-blocking structure; 101, mounting pipe; 102, sliding sleeve; 103, limiting ring; 104, hose; 105, booster pump; 106, bracket; 107, air outlet pipe;
[0037] 200, flow guide structure; 201, sleeve ring; 202, slider; 203, flow guide groove; 204, limit plate; 205, discharge port; 206, ring seat; 207, valve; 208, slide groove;
[0038] 300, barrel; 301, discharge pipe. DETAILED DESCRIPTION
[0039] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.
[0040] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific implementation methods disclosed below.
[0041] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the implementation of the present invention, for the sake of convenience, the cross-sectional diagram showing the device structure will not be partially enlarged according to the general scale, and the schematic diagram is only an example, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0042] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.
[0043] Example 1
[0044] See also Figure 1-Figure 4 As shown, this embodiment is a concrete pouring funnel for anti-clogging railway construction.
[0045] comprising a barrel 300,
[0046] The anti-blocking structure 100 includes a bracket 106, a booster pump 105 located at the upper end of the bracket 106, a sleeve 102 located at one end of the bracket 106, a mounting tube 101 slidably plugged into the inner part of the sleeve 102, a hose 104 located at the output end of the booster pump 105, and an air outlet pipe 107 located at the outer wall of the lower end of the mounting tube 101;
[0047] The barrel 300 includes a discharge pipe 301 located at the lower end of the barrel 300;
[0048] A spirally distributed lining steel wire is embedded in the hose 104. One end of the hose 104 passes through the installation pipe 101. The upper and lower ends of the installation pipe 101 are closed and hollow inside.
[0049] The air outlet pipes 107 are distributed in a longitudinal annular array, and the openings face downwards and are inclined outwards;
[0050] The air outlet pipe 107 is located inside the discharge pipe 301, and a valve 207 is provided inside the lower end of the discharge pipe 301;
[0051] The outer wall of the upper end of the installation tube 101 is sleeved with a limit ring 103, which is located at the upper end of the sliding sleeve 102, and the sliding sleeve 102 corresponds to the center position of the discharge pipe 301, and the outer diameter of the limit ring 103 is larger than the inner diameter of the sliding sleeve 102;
[0052] The anti-blocking structure 100 is used in the railway construction process. Concrete is transported to the barrel 300. The valve 207 of the barrel 300 is closed during the concrete bearing process. The booster pump 105 operates during the transportation process to transport high-pressure airflow into the hose 104. The steel wire lining increases the strength of the hose 104 and ensures the flexible and movable characteristics of the hose 104. When the installation pipe 101 moves longitudinally, the booster pump 105 is connected to the installation pipe 101, and the airflow enters the installation pipe 101. The airflow output by the installation pipe 101 is diverted through the exhaust pipe, and the airflow acts on the outside in an inclined state. The airflow in the side space is downward, intercepted by valve 207, and flows upward. The concrete inside the barrel 300 is pushed by the airflow, the fluidity is increased, and the solidification is slowed down. After being transported to the specified position, valve 207 is opened, and the airflow passes through valve 207, which increases the fluidity of the concrete inside the discharge pipe 301, drives the concrete to flow out, and the concrete is discharged normally. The wear of the anti-blocking structure 100 on the inside of the discharge pipe 301 is avoided, thereby improving the problem of increased material agglomeration caused by the wear of the inner wall of the discharge pipe 301. The installation pipe 101 passes too deep through the sliding sleeve 102, which is convenient for removal and cleaning after use.
[0053] Example 2
[0054] See also Figure 1-Figure 4 As shown, this embodiment is based on the embodiment 1 and also includes:
[0055] as well as;
[0056] The flow guiding structure 200 is located at the lower end of the barrel 300;
[0057] The flow guiding structure 200 includes a flow guiding groove 203, a ring seat 206 sleeved on the outer wall of the discharge pipe 301, and a collar 201 sleeved on the outer side of the ring seat 206;
[0058] Limiting plates 204 are provided at both ends of the guide groove 203, and a discharge port 205 is provided at one end of the guide groove 203;
[0059] The inner wall of the ring 201 is provided with an annular slider 202, and the inner side of the ring seat 206 is provided with an annular slide groove 208, and the slider 202 is slidably installed in the slide groove 208;
[0060] Using the flow guiding structure 200;
[0061] The discharge pipe 301 outputs concrete, and the limiting plate 204 limits the two sides of the guide groove 203. The concrete received by the guide groove 203 is limited by the limiting plate 204 and then directed to the discharge port 205 for output. The sleeve 201 is slidably installed in the slide groove 208 through the slider 202, and is rotatably supported on the outer wall of the ring seat 206 to rotatably support the guide groove 203. The guide groove 203 drives the discharge port 205 to adjust the position, and the azimuth is adjusted during the concrete output process, avoiding the need to move the equipment horizontally, and the use is flexible.
[0062] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0063] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A concrete pouring hopper for anti-clogging railway construction, characterized in that: comprising a barrel (300), The anti-blocking structure (100) comprises a bracket (106), a booster pump (105) located at the upper end of the bracket (106), a sliding sleeve (102) located at one end of the bracket (106), a mounting tube (101) slidably plugged into the interior of the sliding sleeve (102), a hose (104) located at the output end of the booster pump (105), and an air outlet pipe (107) located at the outer wall of the lower end of the mounting tube (101); The barrel (300) comprises a discharge pipe (301) located at the lower end of the barrel (300); as well as; A flow guiding structure (200) is located at the lower end of the barrel (300); The flow guide structure (200) comprises a flow guide groove (203), a ring seat (206) sleeved on the outer wall of a discharge pipe (301), and a sleeve ring (201) sleeved on the outside of the ring seat (206).
2. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: The hose (104) is embedded with spirally distributed lining steel wires, one end of the hose (104) passes through the installation tube (101), and the upper and lower ends of the installation tube (101) are both closed and hollow inside.
3. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: The air outlet pipes (107) are distributed in a longitudinal annular array, with their openings facing downwards and inclined outwards.
4. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: Limiting plates (204) are provided at both ends of the guide groove (203), and a discharge port (205) is provided at one end of the guide groove (203).
5. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: An annular sliding block (202) is provided on the inner wall of the sleeve ring (201), an annular sliding groove (208) is provided inside the side of the ring seat (206), and the sliding block (202) is slidably installed inside the sliding groove (208).
6. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: The air outlet pipe (107) is located inside the discharge pipe (301), and a valve (207) is provided inside the lower end of the discharge pipe (301).
7. The anti-clogging concrete pouring funnel for railway construction according to claim 1, characterized in that: The outer wall of the upper end of the installation tube (101) is sleeved with a limit ring (103), the limit ring (103) is located at the upper end of the sliding sleeve (102), and the sliding sleeve (102) corresponds to the center position of the discharge tube (301), and the outer diameter of the limit ring (103) is greater than the inner diameter of the sliding sleeve (102).
