Hydraulic engineering construction protection slope

By using spliced ​​slope protection blocks and fixtures in water conservancy projects, the problems of long construction period and poor slope protection effect in the existing technology are solved, and rapid and effective river bank protection is achieved.

CN221941240UActive Publication Date: 2024-11-01GUANGXI YUANTAI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420215297.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-01
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

The structure of the existing water conservancy project construction slope protection is fixed, the construction period is long, and the slope protection effect is poor, making it difficult to meet the needs of rapid construction and efficient protection.

Method used

Multiple spliced ​​slope protection blocks are used, each slope protection block is equipped with through holes and fixing devices, including limit blocks, drill rods, spiral pieces, bayonets and fixing rods. The slope protection is achieved through the cooperation of the rope body and drill rod. Flexible installation and fixation of blocks.

Benefits of technology

The construction cycle is shortened, the fixing effect of slope protection blocks is improved, effective protection of the river bank is ensured, and the construction efficiency and effect of slope protection is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941240U_ABST
    Figure CN221941240U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydraulic engineering construction slope protection, which comprises a plurality of sequentially spliced slope protection blocks, each slope protection block comprises a slope protection block body, a plurality of through holes are uniformly arranged on the slope protection block body, fixing devices are arranged in the through holes, first bayonets are arranged at the left end and the bottom end of the top of the slope protection block body, and the first bayonets are arranged on the slope protection block body. The right end and the top end of the bottom of the slope protection block body are provided with second bayonets matched with the first bayonets, a plurality of fixing rods are evenly arranged at the bottom of the slope protection block body, the fixing device comprises a limiting block arranged in the through hole, a limiting rod body is fixedly arranged on the limiting block, and a drill rod is connected to the limiting block through a rope body; the drill rod is provided with a spiral piece surrounding the drill rod. The slope protection structure has the advantages of being short in construction period, good in slope protection effect and convenient to construct.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy slope protection, in particular to a water conservancy project construction slope protection. Background Art

[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Water is a precious resource indispensable to human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flows, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc. to achieve their goals.

[0003] Slope protection refers to the general term for various paving and planting on the slope surface to prevent the slope from being eroded. After the completion of water conservancy project construction, the direction of river water will often change due to the construction of water conservancy project, which will erode the river bank and endanger the buildings on the river bank. It is necessary to build protective buildings on the river bank. The existing water conservancy project slope protection has a fixed structure, a long construction period, and poor slope protection effect, which needs to be improved. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the above difficulties and provide a water conservancy project construction slope protection with short construction period, good slope protection effect and convenient construction.

[0005] In order to solve the above technical problems, the technical solution provided by the utility model is as follows: a slope protection for water conservancy project construction, comprising a plurality of slope protection blocks spliced ​​in sequence, the slope protection block comprising a slope protection block body, the slope protection block body being evenly provided with a plurality of through holes, and a fixing device being provided in the through holes;

[0006] The fixing device comprises a limit block arranged in the through hole, a limit rod body is fixedly arranged on the limit block, a drill rod is connected to the limit block via a rope body, and a spiral sheet arranged around the drill rod is arranged on the drill rod.

[0007] As an improvement, the top left end and the bottom end of the slope protection block body are provided with a first bayonet, and the bottom right end and the top end are provided with a second bayonet that cooperates with the first bayonet.

[0008] As an improvement, a plurality of fixing rods are evenly arranged at the bottom of the slope protection block body.

[0009] As an improvement, the end of the drill rod away from the rope body is in a spike shape.

[0010] As an improvement, a ring is provided on the limit block, and the rope body is connected to the ring.

[0011] As an improvement, a ring is provided on the drill rod, and the rope body is connected to the ring.

[0012] Compared with the prior art, the utility model has the following advantages: 1. The slope protection blocks spliced ​​in sequence are easy to construct and have a short construction period; 2. The fixing rod can improve the fixing effect of the slope protection block body; 3. The fixing device can fix the slope protection block body on the river bank, and the position of the fixing device can be installed in the through hole at any position according to people's needs, with good fixing effect and good slope protection effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the utility model.

[0014] Figure 2 It is a structural schematic diagram of the slope protection block body of the utility model.

[0015] Figure 3 It is a structural schematic diagram of the slope protection block body of the utility model.

[0016] Figure 4 This utility model Figure 3 Schematic diagram of the structure in the enlarged state at A in the middle.

[0017] As shown in the figure: slope protection block 1, slope protection block body 2, through hole 3, fixing device 4, bayonet one 5, bayonet two 6, fixing rod 7, limit block 8, limit rod body 9, rope body 10, drill rod 11, spiral sheet 12, collar 13, and circular ring 14. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] Embodiment 1:

[0020] Combined with Figure 1-4 A slope protection for water conservancy project construction includes a slope protection block 1, a slope protection block body 2, a through hole 3, a fixing device 4, a bayonet 1 5, a bayonet 2 6, a fixing rod 7, a limit block 8, a limit rod body 9, a rope body 10, a drill rod 11, a spiral sheet 12, a collar 13, and a ring 14. The slope protection block body 2 spliced ​​in sequence is convenient for people to construct. The fixing device 4 can fix the slope protection block body 2 on the river bank. The position of the fixing device 4 can be installed in the through hole 3 at any position according to people's needs, with good fixing effect and good slope protection effect.

[0021] The invention comprises a plurality of slope protection blocks 1 which are sequentially spliced. The slope protection block 1 comprises a slope protection block body 2. The slope protection block body 2 is evenly provided with a plurality of through holes 3. Fixing devices 4 are arranged in the through holes 3.

[0022] The top left end and the bottom end of the slope protection block body 2 are provided with a bayonet 1 5, and the bottom right end and the top end are provided with a bayonet 2 6 that cooperates with the bayonet 1 5. The bayonet 1 5 and the bayonet 2 6 cooperate to fix the slope protection block body 2 to each other.

[0023] A plurality of fixing rods 7 are evenly arranged at the bottom of the slope protection block body 2, and the fixing rods 7 can improve the fixing effect of the slope protection block body 2 and the river bank.

[0024] The fixing device 4 includes a limit block 8 arranged in the through hole 3, a limit rod body 9 is fixed on the limit block 8, a drill rod 11 is connected to the limit block 8 through a rope body 10, a spiral piece 12 is arranged around the drill rod 11 on the drill rod 11, and the end of the drill rod 11 away from the rope body 10 is in a spike shape, a ring 13 is provided on the limit block 8, the rope body 10 is connected to the ring 13, a circular ring 14 is provided on the drill rod 11, and the rope body 10 is connected to the circular ring 14. People pass the drill rod 11 through the through hole 3, and then use a tool to sleeve on the circular ring 14 to rotate the circular ring 14, thereby rotating the drill rod 11 and the spiral piece 12, so that the drill rod goes deep into the ground to fix the device.

[0025] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A slope protection for water conservancy project construction, comprising a plurality of slope protection blocks spliced ​​in sequence, characterized in that: The slope protection block comprises a slope protection block body, a plurality of through holes are evenly arranged on the slope protection block body, and a fixing device is arranged in each of the through holes; The fixing device comprises a limit block arranged in the through hole, a limit rod body is fixedly arranged on the limit block, a drill rod is connected to the limit block via a rope body, and a spiral sheet arranged around the drill rod is arranged on the drill rod.

2. A water conservancy project construction slope protection according to claim 1, characterized in that: The top left end and the bottom end of the slope protection block body are provided with a first bayonet, and the bottom right end and the top end are provided with a second bayonet matched with the first bayonet.

3. A water conservancy project construction slope protection according to claim 1, characterized in that: A plurality of fixing rods are evenly arranged at the bottom of the slope protection block body.

4. A water conservancy project construction slope protection according to claim 1, characterized in that: One end of the drill rod away from the rope body is in a spike shape.

5. A water conservancy project construction slope protection according to claim 1, characterized in that: The limiting block is provided with a ring, and the rope body is connected to the ring.

6. A water conservancy project construction slope protection according to claim 1, characterized in that: The drill rod is provided with a circular ring, and the rope body is connected with the circular ring.